Non­Conformance Report 05 Epoxy floor levelling not in tolerance Form Reference F1.383916 Owned By Bob Huang (Intract) Date 12/09/2023 13:49:35 Status Open Project Name K49 ­ LDPR Project Reference K49 Location J017A ­ Ancillary Building (ISS2)>Stage 2 ­ Electrical Infrastucture (WE2)>HSE Form Location J017A ­ Ancillary Building (ISS2) 1. PROJECT DETAILS Raised By Bob Huang Issued to Laing O'Rourke Person Issued to Michael Hill Discipline / Activity E0 ­ Finishes & FFE Specification J0109­00­000­AR­BVN­SPC­0657 External Reference Document / Drawing Reference J0109­02­020­AR­BVN­DWG­1102 Document Name Type Created By Date J0109­02­020­AR­BVN­DWG­1102_04.pdf Pdf Bob Huang (Intract) 14/09/2023 09:31:08 2. DETAILS OF NON­CONFORMANCE NCR Subject 05 Epoxy floor levelling not in tolerance Non­conforming details The epoxy flooring topped up as part of K49A/V0661/J017A – “Variation Order” – Removable Floor Panels ISS2 works are not in tolerance specified in J0109­00­000­AR­BVN­SPC­0657. Document Name Type Created By Date RE_ Floor levelling in ISS2 CB removal.msg Unknown Pat Chaonafai ­ Intract (Intract) 15/09/2023 12:53:25 Please distribute this non­conformance report to the non­conforming party noted above 3. REMEDIAL ACTION PROPOSED Rectification / Disposition Accept without repair by concession Immediate Rectification Details DCR / TQ / RFI Number N/A Root Cause Category People ­ Competency, Language/Literacy, Vandalism and Careless Action Root cause details Corrective Action Details Ensure that the construction is in accordance with the specifications. Actions Proposed by 4. REMEDIAL ACTION REVIEWED AND ACCEPTED Laing O'Rourke Representative Remedial Works Target Completion Date Design Consultant Client Representative 5. REMEDIAL WORKS COMPLETE Description of Remedial Works Completed 6. VERIFICATION OF REMEDIAL WORKS Rectification completed, inspected and accepted? Corrective action effective? Laing O'Rourke Representative Client Representative. COST Raise NCR Cost Form NO F1.383916: Non­Conformance Report (version 8.1) Page 1 of 2 Distribution: Project Director, Project Technical Lead, Commercial Manager and Project Quality Manager. Copy: To client and Design if applicable F1.383916: Non­Conformance Report (version 8.1) Page 2 of 2