All Seasons Park Project
All Pending items for all project
Item #
System
Description
Working done
Pending items
RMC Comments
Remarks
Deduction
to be provided
RFI (248)
50,000
CIR's(293/294/295/296/297/29
8 )to be finalized all comments.
contractor
responsibility.
25,000
to be provided
RFI (519)
419,467
CIR (157) to be finalized all
comments.
contractor
responsibility.
25,000
NCR (76, 77, 78, 80, 94, 95) to
be finalized.
Refer to snag list
‫يجب تغير اماكن‬
‫الرشاشات المثبتة‬
‫اعلي‬
‫الباسباروخاصة‬
. ‫اعلي الوصﻼت‬
‫ويجب غلق بوتات‬
‫الزرع أعلي‬
. ‫المسارات الباسبار‬
‫ويجب غلق بعض‬
‫نقاط الصرف أعلي‬
. ‫المسارات الباسبار‬
‫ويجب معالجة‬
‫جميع الفواصل‬
‫اﻹنشائية‬
contractor.
.responsibility
900,000
to be provided
RFI (522)
120,000
Electrical
1
2
RMU
change LBS
SWITCH from
manual type to
motorized type
Testing and
Commissioning
for MDB'S & ATS
system
All
MDB'S & ATS
Main low Voltage
switchgear (MCCB
type modification)
3
Generators
Testing and
Commissioning
for Generator
system
Testing and
Commissioning
for FEEDER
BUSBAR system
4
All
All
Bus Way
Aluminum busway
short circuit rating
(Feeder bus al
with copper
contact busway )
5
MATV
Testing and
Commissioning
for MATV system
Cir (123)to be finalized all
comments.
All
Page 1/4
25,000
All Seasons Park Project
All Pending items for all project
Item #
6
System
Lighting
Description
Working done
Pending items
RMC Comments
Remarks
Deduction
Testing and
Commissioning
for Lighting
System.
85%
Testing and
Commissioning
15%
Testing and
Commissioning
15% to be provided
refer to all CIR's
related to lighting
system
100,000
RFI (591)
contractor
responsibility.
206,836
CIR ( 176 )
contractor
responsibility.
50,500
RFI (215)
contractor
responsibility.
130,000
missing
to be provided
in B.O.Q (11) ‫ﺑند‬
5,000
95%
Testing and
Commissioning
5%
Testing and
Commissioning
5% to be provided
contractor
responsibility.
40,000
Testing and
95%
Commissioning
Testing and
for Panels System. Commissioning
5%
Testing and
Commissioning
5% to be provided
contractor
responsibility.
350,000
Lighting Fixture
Type EX2 -Lighting
Fixture Type EX1
2 ‫لم يتم تنف ذ عدد‬
type 1 ‫كشاف‬
C12 ‫الموجود نافورة‬
cancelled
‫تغي ال شافات من‬
‫ ا‬SPOT LIGHTING
C1
8 ‫لم يتم تنف ذ عدد‬
type wm2 ‫كشاف‬
‫الموجود ك ري‬
C08 ‫الدور الثا‬
7
8
Testing and
Commissioning
Power Sockets for Power Sockets
(Wiring devices)
System.
Panels
Testing and
Commissioning
for Fire Alarm
system.
9
Fire Alarm
system
Fire alarm bell 90
db (‫عدم توص ل‬
‫اﻻجراس ع الدائرة‬
loop )
monitor module
unit
Stand alone
testing for 3
panels
Stand alone
testing for 4
All interface between fire
panels, testing
alarm system with MEP
Interface between
and
systems (Fire fighting , Access fire alarm system
commissioning for
Control, Car Barking system
with MEP systems
all panels as one
,Sound system, Elevators,
are
test and
Escalators, CO system,
contractor/operator
integration
Generators, FM200, CO2
responsibility.
between fire
system, ……… ) to be provided.
alarm with all
MEP systems.
missing
to be provided.
Omittion of heat
detectors zone
p17 basement
Cost reduction for
the disability of (
Walk test )
missing
Page 2/4
to be provided.
1,000,000
RFI (322)
78,750
RFI (628)
425,250
RFI (485)
6,000
material submital
(01757)
100,000
All Seasons Park Project
All Pending items for all project
Item #
10
11
12
System
14
CO system
15
TELEPHONE
system
18
19
20
21
22
Pending items
RMC Comments
Remarks
Termination ,
Termination
Testing and
Testing and
,Testing and
contractor
2 racks to be provided
Commissioning Commissioning
Commissioning
responsibility.
for 2 racks
for public address
for 2 racks
system.
Insulation ,Testing
Insulation ,Testing
and
LV & MV Testing
Earthing
and
LC. Earthing to be provided / contractor/operateand
Commissioning
system
Commissioning
15 test link missing
or responsibility.
Commissioning
for Earthing
for L.C. system
system
Insulation
installation of 1
,Testing and
LIGHTINING
installation of 2
lightning
2 Down Copper tap missing in
contractor
Commissioning
PROTECTION
lightning
protection,
Mosque (not install) , Testing
responsibility.
for LIGHTINING
system
protection
Testing and
and Commissioning
PROTECTION
Commissioning
system
13
17
Working done
public
address
system
Access
Control
system
16
Description
Testing and
Commissioning 2nd fix 80% + 3rd 2nd fix 20% + 3rd fix
fix 50%
50%
for Access Control
system
Testing and
Commissioning
for CO system
Testing and
Commissioning
for Telephone
system
Redundancy for
power supply
Testing and
Commissioning
for CAR BARKING
CAR BARKING
system
system
Change the Origin
from Europe to
Egypt
Testing and
Data Network Commissioning
system
for Data Network
system
card readers , magnetic door
lock , door resale button ,
control room , main servers
(not installed)
10,000
80,000
50,000
contractor
responsibility.
40,000
3RD FIX 70%
3RD FIX 30%
all co sensors
(not installed)
contractor
responsibility.
450,000
3RD FIX 85 %
3RD FIX 15 %
all frames and main rack for
system to be provided
contractor
responsibility.
25,000
missing
to be provided.
material submital
(2273 rev 1)
130,000
3RD FIX 25%
all servers and main rack to be
provided
contractor
responsibility.
800,000
3RD FIX 75%
6,400,000
100%
0%
Civil Defense
Report
Shall be Provided
M.O.S & ITP
for Foam
System
Operation
Manual
Catalogues
Operation
Performance
Certificate
Spare Parts or
Extra Material
Deduction
100%
Page 3/4
Shall be Provided
25,000
Shall be Provided
5% from each
items
Shall be Provided
5% from each
items
Shall be Provided
5% from each
items
All Seasons Park Project
All Pending items for all project
Item #
23
24
System
warranty for
all systems
Training
Employees
Schedule
Description
Working done
Pending items
RMC Comments
Remarks
Deduction
Shall be Provided
3,000,000
Training Schedule with time
frame for each system Shall be
Provided
250,000
Page 4/4