All Seasons Park Project All Pending items for all project Item # System Description Working done Pending items RMC Comments Remarks Deduction to be provided RFI (248) 50,000 CIR's(293/294/295/296/297/29 8 )to be finalized all comments. contractor responsibility. 25,000 to be provided RFI (519) 419,467 CIR (157) to be finalized all comments. contractor responsibility. 25,000 NCR (76, 77, 78, 80, 94, 95) to be finalized. Refer to snag list يجب تغير اماكن الرشاشات المثبتة اعلي الباسباروخاصة . اعلي الوصﻼت ويجب غلق بوتات الزرع أعلي . المسارات الباسبار ويجب غلق بعض نقاط الصرف أعلي . المسارات الباسبار ويجب معالجة جميع الفواصل اﻹنشائية contractor. .responsibility 900,000 to be provided RFI (522) 120,000 Electrical 1 2 RMU change LBS SWITCH from manual type to motorized type Testing and Commissioning for MDB'S & ATS system All MDB'S & ATS Main low Voltage switchgear (MCCB type modification) 3 Generators Testing and Commissioning for Generator system Testing and Commissioning for FEEDER BUSBAR system 4 All All Bus Way Aluminum busway short circuit rating (Feeder bus al with copper contact busway ) 5 MATV Testing and Commissioning for MATV system Cir (123)to be finalized all comments. All Page 1/4 25,000 All Seasons Park Project All Pending items for all project Item # 6 System Lighting Description Working done Pending items RMC Comments Remarks Deduction Testing and Commissioning for Lighting System. 85% Testing and Commissioning 15% Testing and Commissioning 15% to be provided refer to all CIR's related to lighting system 100,000 RFI (591) contractor responsibility. 206,836 CIR ( 176 ) contractor responsibility. 50,500 RFI (215) contractor responsibility. 130,000 missing to be provided in B.O.Q (11) ﺑند 5,000 95% Testing and Commissioning 5% Testing and Commissioning 5% to be provided contractor responsibility. 40,000 Testing and 95% Commissioning Testing and for Panels System. Commissioning 5% Testing and Commissioning 5% to be provided contractor responsibility. 350,000 Lighting Fixture Type EX2 -Lighting Fixture Type EX1 2 لم يتم تنف ذ عدد type 1 كشاف C12 الموجود نافورة cancelled تغي ال شافات من اSPOT LIGHTING C1 8 لم يتم تنف ذ عدد type wm2 كشاف الموجود ك ري C08 الدور الثا 7 8 Testing and Commissioning Power Sockets for Power Sockets (Wiring devices) System. Panels Testing and Commissioning for Fire Alarm system. 9 Fire Alarm system Fire alarm bell 90 db (عدم توص ل اﻻجراس ع الدائرة loop ) monitor module unit Stand alone testing for 3 panels Stand alone testing for 4 All interface between fire panels, testing alarm system with MEP Interface between and systems (Fire fighting , Access fire alarm system commissioning for Control, Car Barking system with MEP systems all panels as one ,Sound system, Elevators, are test and Escalators, CO system, contractor/operator integration Generators, FM200, CO2 responsibility. between fire system, ……… ) to be provided. alarm with all MEP systems. missing to be provided. Omittion of heat detectors zone p17 basement Cost reduction for the disability of ( Walk test ) missing Page 2/4 to be provided. 1,000,000 RFI (322) 78,750 RFI (628) 425,250 RFI (485) 6,000 material submital (01757) 100,000 All Seasons Park Project All Pending items for all project Item # 10 11 12 System 14 CO system 15 TELEPHONE system 18 19 20 21 22 Pending items RMC Comments Remarks Termination , Termination Testing and Testing and ,Testing and contractor 2 racks to be provided Commissioning Commissioning Commissioning responsibility. for 2 racks for public address for 2 racks system. Insulation ,Testing Insulation ,Testing and LV & MV Testing Earthing and LC. Earthing to be provided / contractor/operateand Commissioning system Commissioning 15 test link missing or responsibility. Commissioning for Earthing for L.C. system system Insulation installation of 1 ,Testing and LIGHTINING installation of 2 lightning 2 Down Copper tap missing in contractor Commissioning PROTECTION lightning protection, Mosque (not install) , Testing responsibility. for LIGHTINING system protection Testing and and Commissioning PROTECTION Commissioning system 13 17 Working done public address system Access Control system 16 Description Testing and Commissioning 2nd fix 80% + 3rd 2nd fix 20% + 3rd fix fix 50% 50% for Access Control system Testing and Commissioning for CO system Testing and Commissioning for Telephone system Redundancy for power supply Testing and Commissioning for CAR BARKING CAR BARKING system system Change the Origin from Europe to Egypt Testing and Data Network Commissioning system for Data Network system card readers , magnetic door lock , door resale button , control room , main servers (not installed) 10,000 80,000 50,000 contractor responsibility. 40,000 3RD FIX 70% 3RD FIX 30% all co sensors (not installed) contractor responsibility. 450,000 3RD FIX 85 % 3RD FIX 15 % all frames and main rack for system to be provided contractor responsibility. 25,000 missing to be provided. material submital (2273 rev 1) 130,000 3RD FIX 25% all servers and main rack to be provided contractor responsibility. 800,000 3RD FIX 75% 6,400,000 100% 0% Civil Defense Report Shall be Provided M.O.S & ITP for Foam System Operation Manual Catalogues Operation Performance Certificate Spare Parts or Extra Material Deduction 100% Page 3/4 Shall be Provided 25,000 Shall be Provided 5% from each items Shall be Provided 5% from each items Shall be Provided 5% from each items All Seasons Park Project All Pending items for all project Item # 23 24 System warranty for all systems Training Employees Schedule Description Working done Pending items RMC Comments Remarks Deduction Shall be Provided 3,000,000 Training Schedule with time frame for each system Shall be Provided 250,000 Page 4/4