METHOD OF STATEMENT FOR SITE INSTALLATION AND TESTING OF SWITCH BOARD Content: 1. Method for installation of DB panel. 2. Method for installation of SB panel. 3. Method for installation of outdoor panel. 4. Method for installation of MSB panel. The condition of space at front and both side of MSB panel with front access type. The condition of space at front, rear and both side of MSB panel with front and rear access type. 5. Tightening torque for reference and follow. 6. Safety rule for loading and unloading 7. Site acceptance testing for MSB panel. 1. METHOD FOR INSTALLATION OF DB PANEL . 1. 2. 3. 4. 5. Steps of installation: To define position install the panel and make sure that the front area enough space when open the door do not touch to other. We need to refer to drawing for detail dimension of panel. To mark position of 4 holes on the wall. To drill 4 holes have just marking on the wall. To use bolt anchor M6 or M8 to hold the panel for this case. To fixed the panel on the wall after alignment by tightening 4 anchors. Step 4 Step 1 Step 2 Drilling hole To marking 4 holes on the wall Step 3 Insert bolt anchor The DB panel after install on the wall 2. METHOD FOR INSTALLATION OF SB, MDB PANEL (FREE STANDING MOUNTED FLOOR TYPE). 1. 2. 3. 4. 5. Steps of installation: To define position install the panel and make sure that the front area enough space when open the door do not touch to other. We need to refer to drawing for detail dimension of panel. To mark position of 4 holes on the floor. To drill 4 holes have just marking on the floor. To use bolt anchor M8 or M10 to hold the panel for this case. To fixed the panel on the floor after alignment by tightening 4 anchors. Step 3 Step 1 Step 2 Drilling hole Insert bolt anchor FLOOR FLOOR Step 3 2. METHOD FOR INSTALLATION OF SB, MDB PANEL (STANDING MOUNTED BESIDE THE WALL). 2. 3. 4. 5. Step 3 Bolt anchor Step 1 Step 2 Drilling hole Insert bolt anchor THE WALL 1. Steps of nstallation: To define position install the panel and make sure that the front area enough space when open the door do not touch to other. We need to refer to drawing for detail dimension of panel. To mark position of 4 holes on the floor. To drill 4 holes have just marking on the floor. To use bolt anchor M8 or M10 to hold the panel for this case. To fixed the panel on the floor after alignment by tightening 4 anchors. THE FLOOR THE FLOOR 3. METHOD FOR INSTALLATION OF OURDOOR PANEL. 1. 2. 3. 4. 5. Steps of installation: To define position install the panel and make sure that the front area enough space when open the door do not touch to other. We need to refer to drawing for detail dimension of panel. To mark position of 4 holes on the floor. To drill 4 holes have just marking on the floor. To use bolt anchor M8 or M10 to hold the panel for this case. To fixed the panel on the floor after alignment by tightening 4 anchors. Step 3 Step 1 Step 2 Drilling hole Insert bolt anchor 4. METHOD FOR INSTALLATION OF MSB PANEL. FRONT MODULE 9 MODULE 8 MODULE 7 MODULE 6 MODULE 5 MODULE 4 MODULE 3 MODULE 2 B ≥ 400 (mm) MODULE 1 The condition of space at front and both side of MSB panel. C ≥ 400 (mm) MSB PANEL FRONT ACCESS TYPE A ≥ 1200 (mm) MAIN SWITCHBOARD ROOM 4. METHOD FOR INSTALLATION OF MSB PANEL. The condition of space at front and both side of MSB panel. D ≥ 600(mm) FRONT MODULE 9 MODULE 8 MODULE 7 MODULE 6 MODULE 5 MODULE 4 MODULE 3 MODULE 2 B ≥ 600 (mm) MODULE 1 REAR C ≥ 600 (mm) MSB PANEL FRONT & REAR ACCESS TYPE A ≥ 1200(mm) MAIN SWITCHBOARD ROOM 4. METHOD FOR INSTALLATION OF MSB PANEL. 1. 2. To move the modules of to position its and connect them together: To define position install the panel in the room and make sure that the space at front, rear and both side of panel are meet requirement or higher as mentioned above. To move each module into the position its which was defined before. 4. METHOD FOR INSTALLATION OF MSB PANEL. 3. The modules of panel be connected by the bolts and nuts M12. Below is number of points connection and detail of bolt. A “A” Bolt M12 30mm DETAIL “A” SECTION A-A A TWO MODULES AFTER CONNECTED 4. METHOD FOR INSTALLATION OF MSB PANEL. 4. Main BUSBAR be connected between two modules by link busbar and bolts + nuts M10. MAIN BUSBAR “A” LINK BUSBAR DETAIL “A” REAR VIEW 4. METHOD FOR INSTALLATION OF MSB PANEL. 5. To fixed the MSB panel to the floor after completed installation at least six points by anchor bolt M14 or M16. Meaning, we need have at least three points at front side and three points at rear side fixed to the floor. The number of points fixed the panel to the floor depend on the length of panel. FRONT REAR MSB COMPLETED INSTALLATION “B” “B” Fixed the Panel to the Floor Detail “B” 5. TIGHTENING TORQUE FOR REFERENCE AND FOLLOW. 5. TIGHTENING TORQUE FOR REFERENCE AND FOLLOW. 6. SAFETY RULE FOR LOADING AND UNLOADING. YES YES YES NO NO NO X X X X 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL Purpose of site acceptance test procedure: The aim of this document is to outline the site acceptance test (S.A.T) procedure of Main Switch Board. 1. Location of S.A.T. The S.A.T will be conducted in switch board room at site with panel is clean and ready. 2. Safety & risk control. To control the risks during the S.A.T, the flowing arrangement will be done: - Safety barriers will be installed surrounding the area where the S.A.T is going to be carried out. - Danger signs will be handed to warn the people who approach the S.A.T area. 3. Visual inspection of Main Switch Board. Visual inspection with customer will be carried out on the Main Switch Board: - To check outlook of panel to make sure do not any unwonted after install at site. - To check outlook of all components to make sure do not any unwonted after go to site. - To check power cable arrangement inside panel come from loads connect to the terminal at outgoing side of feeders and incoming side of incomer breaker. (done by Sunlight’s customer) - To check all connect point which be done at site as control cable connect point between modules with modules, connect points of busbar connectors at main busbar of panel after link at site by random force tighten by specialized tool. 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL 4. Insulation resistance test- Mega test for MSB and EMSB panel. The insulation resistance test on the Main Switch Board at site will be carried out as follows: All the main incoming, coupler, outgoing breakers will be kept close position (OFF), exclude RCCB, ELCB, RCBO. All the auxiliary circuits which supply to electronic devices, indication lamps, capacitor banks, surge arresters from main supply will be isolated. Insulation resistance measurement will be taken: Phase to earth, phase to neutral, phase to phase and neutral to earth. Using the insulation resistance tester with selection of 1kVDC. Remark: All the insulation resistance measuring will be record in the form: Insulation test- QC-INS. Test circuit of insulation resistance test: sample 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL 5. Over current and earth fault test. (Secondary injection current method) The over current and earth test on the Main Switch Board at site will be carried out by using current injection equipment injected current to E/F & O/C relay (Secondary current), then over current – earth fault relay will send signal to control the circuit breaker, these process is followed out: Carry out setting for over current and earth relay (IDMTL) as: Sunlight suggestion for incoming breaker: • Tripping time is 0.3S. • Characteristic is 1.3/10. (Normal invert) • High set for over current: 10 times. • Pick up over current phases is 100% In. • Pick up current earth fault is 10% In for incoming breaker with rating below 1200A and lower than 10% In for incoming breaker with rating above 1200A. Sunlight will follow data from design consultant for setting if have requirement. Inject the current through the machine test to ‘’L1 ‘’ phase of protection relay and neutral (10, 15 and 25A) and then record the tripping time respectively. Repeat the test for L2 phase and L3 phase. Inject the current through the machine test to ‘’N’’ neutral of protection relay at 2, 3, 5 times setting earth fault current then record the tripping time respectively. 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL Carry out setting for earth fault protection relay “DTL” as: Sunlight suggestion: Current earth fault setting 10%In for breaker up to 1200A and 120A for breaker with rating above 1200A (Range setting of relay from 0.1 to 2.0A). Time tripping setting is 0.1S (range setting of relay from 0.0 to 1.0s) Sunlight will follow data from design consultant for setting if have requirement. Inject the current through the machine test to ‘’2 & 7’’ terminal of protection relay at same current setting for earth fault protection relay then record the time tripping respective. 6. The function test on the Main Switch Board at site will be carried out: • To check mechanical interlock without supply power.(do not supply power to Main circuit and control circuit). We carry out to check it base on sequence have designed. • To check electrical interlocking with supplier power for control circuit 220VAC. We carry out to check it base on sequence have designed. • To supply power to control circuit and do not supply power to main circuit to test the function of ATS. We carry out the testing base on sequence have designed. • We will carry out all the function test for another control circuit have design in this panel. • All the testing will be recording the result at that time. 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL TOOLING AND EQUIPMENT SUPPORTING FOR TESTING. 1. TORQUE SCREW DRIVER: - Measuring range: (210)Nm - Function: Check tightening torque of screw 2. TORQUE WRENCH: - Torque range: (2 20)Nm; (20 100)Nm - Function: Check tightening torque of bolt 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL TOOLING AND EQUIPMENT SUPPORTING FOR TESTING. 3. DIGITAL MEGA OHM METER: 4. ANOLOG MEGA OHM METER: - Measuring range: 2000 M at 250 ÷ 500 ÷ 1000VDC - Function: Test insulation - Measuring range: 2000 M at 250 ÷ 500 ÷ 1000VDC - Function: Test insulation 7. SITE ACCEPTANCE TEST PROCEDURE FOR MSB PANEL TOOLING AND EQUIPMENT SUPPORTING FOR TESTING. 5. ANOLOG SECONDARY CURRENT INJECTION: - Current range: (0.1 200) A - Voltage range: (0 300)VAC or (0 300)VDC - Timer: (0 999999) Seconds Function: + Test Over Current (O/C) Relay + Test Earth Fault (E/F) Relay EQUIREMENT SUPPORT AT SITE AFTER SALE. 6. THERMAL IMAGER WITH STANDARD INFRARED LENS(Fluke Ti450): - Temperature measurement range: -20 °C to +1200 °C (not calibrated below -10 °C) Function: Scan hot spot for electrical panels and other systems. EQUIREMENT SUPPORT AT SITE AFTER SALE. 7. POWER QUALITY INSPECTION ANALYSE METER: - Measurement: THD Voltage (1÷40); THD Current (1÷40) - Measurement: P-Q-S-A-V-F - Measurement: Events, transients, interruption, unbalance Function: Measurement analysis power quality. FACTROY ACCEPTANCE TEST PROCEDURE FOR MSB PANEL TOOLING AND EQUIPMENT SUPPORTING FOR TESTING. 8. HIGH VOLT TESTER: - Current range: (1100)mA - High volt range: (05) kV - Function: Test electric discharge of all main buss bar FACTORY ACCEPTANCE TEST PROCEDURE FOR MSB PANEL TOOLING AND EQUIPMENT SUPPORTING FOR TESTING. 9. DIGITAL PRIMARY CURRENT INJECTION: - Current range: (15000) A - Voltage range: (0300)VAC or (0300)VDC - Timer: (0 9999) Seconds Function: + Test current transformer’s polarities and ratio + Test over current (O/C) relay + Test earth fault (E/F) relay CERTIFICATE OF CALIBRATION BY ‘’ QUATEST 3 ‘’ Noted: Depend on equipment, period of six moths or one year. We need send the equipment to calibration center for checking.