RMTL-KSS-QA&C-DS01 R0
RATNAMANI METALS & TUBES LIMITED
ITP No.
SS PLANT - KUTCHH WORKS
ITP/4223000145/REV.1
INSPECTION & TEST PLAN
Page 1 of 2
Survey No.474, Anjar - Bhachau Road, Village
Bhimasar, Tal. Anjar Dist.: Kutchh, Pin: 370
240. Gujarat, India
ITEM: AUSTENITIC STAINLESS STEEL, SEAMLESS, HOT/COLD FINISHED, SOLUTION ANNEALED PICKLED AND PASSIVATED PIPES CONFORMING TO A312. DIMENSION AS PER ASME B36.19.
S.O. No.
: 4223000145
CUSTOMER
: AL ABDULKARIM HOLDING CO., DAMMAM, S.A.
AL Abdulkarim
Holding Co. P.O. No.
ARAMCO PO NO.
9COM
PLANT ID
: 6000000055
: 30004897
: 22 Aug 2023
INSPECTION BY
: AAI
: 4507242965
4.
5.
6.
SPECIFICATION
NPS (OD)
THK
RANDOM LENGTH
FEET
END
CONDITION
ORDER QTY.
Saudi Aramco Spec. SAES-A-206 Dated 05.05.2019.
Saudi Aramco Packing specification: 8314-02.
Saudi Aramco Packing specification: 8314-04
WELDED /
SEAMLESS
PIPE SIZE
00001
: ITP/4223000145/REV.1
DATE
: 4507242965 DATED 03 AUG 2023.
REFERENCE DOCUMENTS:
1.
ASTM A312-22a.
2.
Saudi Aramco Spec. 01-SAMSS-046 Dated 07.07.2022.
3.
Saudi Aramco IR010800 FORM 175 Dated 16.12.2009.
PO SR.
NO.
ITP NO.
2 NPS
(2.375” OD,
60.30mmOD)
SCH 80S
(5.54mm,
0.2180")
18.0-22.0 FEET
26000.00
S
BE
A312
GRADE
HYDRO TEST
PRESSURE
[PSIg]
TP316L
2,300.00
S = SEAMLESS, PE = PLAIN ENDS, BE = BEVELED ENDS AS PER FIG.4 OF B16.25
Sr.
No.
INSPECTION ACTIVITIES
ACTIVITY DETAILS /
REFERENCE DOCUMENTS
ACCEPTANCE NORMS
FREQUENCY
OF CHECK
RMTL
INSPECTION BY
AAI
P.O., Specn.
PIM Report
-
-
-
P.O., Specn.
Per ASTM A999
P.O., Specn.
-
H
R
P.O., Specn., A312, 01-SAMSS-046
P.O., Specn., A312, 01SAMSS-046
-
H
R
-
-
-
0010 Pre-Fabrication / Production Requirement
--
Pre Inspection meeting
0010
Material Test report
0020
Inspection and Test Plan (ITP)
0030
Welding procedure specification (WPS),
Procedure Qualification Records (PQR)
IR010800 FORM 175
IR010800 FORM 175
N/A
N/A
A312, 01-SAMSS-046
As Per paragraph 8.4 & 8.5 of 01SAMSS-046 and applicable ASTM std
(TP316/316L: PREN 24 Min, Mo ≥
2.5%)
100%
H
R
N/A
N/A
-
-
-
E426/A999, 01-SAMSS-046
-
H
R
A312, A999, P.O.
A312, A999, P.O.
100%
H
WNOTE-9
P.O., Specifications
P.O., Specifications
-
H
W
--
--
-
-
-
H
W
H
W
H
W
H
W
-
-
0040
Raw material verification
( Mother hollow)
0050
Welder qualification records
0060
IR010800 FORM 175, 01-SAMSS-046
NDT Procedures & personnel (Eddy current testing) Verify valid personnel certification
and procedures.
A312,
0020 In Process inspection & test requirement
0010
Workmanship, components and Dimensions
0020
Compliance with PO description, specifications,
supplier’s catalog description, certified drawings
and paint specification (as applicable)
0030
Chemical and Mechanical tests:
0040
Chemical Composition-Product analysis
0050
Tensile test
0060
Hardness Test [On cross section near the inside &
outside surface]
0070
Flattening test
0080
Guided bend test
Prepared by:
K A Paun
(Sr.Engr-QA&C)
Checked by:
D I Joshi
(Sr.Mgr-QA&C)
Reviewed by:
S S Patel
(AGM-QA&C)
For, Ratnamani Metals & Tubes Ltd.
A312,
A312, 01-SAMSS-046,
As per
01-SAMSS-046 and applicable ASTM (TP316/316L: PREN 24 Min, Mo ≥
A312
2.5%)
std.
A312, A370, A999,
A312, A370, A999,
As per
01-SAMSS-046
A312
01-SAMSS-046
Per applicable ASTM std.,
A312, A370, A999,
2 samples
A312, A370, A999,
01-SAMSS-046,
per Heat per HT
01-SAMSS-046
(248 HV10 max)
lot
A312, A370, A999,
A312, A370, A999,
As per
01-SAMSS-046 and as
A312
01-SAMSS-046
per applicable ASTM std.
N/A
N/A
-
APPROVED BY
RMTL-KSS-QA&C-DS01 R0
RATNAMANI METALS & TUBES LIMITED
ITP No.
SS PLANT - KUTCHH WORKS
ITP/4223000145/REV.1
INSPECTION & TEST PLAN
Page 2 of 2
Survey No.474, Anjar - Bhachau Road, Village
Bhimasar, Tal. Anjar Dist.: Kutchh, Pin: 370
240. Gujarat, India
Sr.
No.
INSPECTION ACTIVITIES
REFERENCE DOCUMENTS
ACCEPTANCE NORMS
FREQUENCY
OF CHECK
A262, 01-SAMSS-046
A262
N/A
INSPECTION BY
RMTL
AAI
1 sample per
heat per HT lot
H
W
N/A
-
H
W
0090
Corrosion test IGC Practice ‘E’
0100
Metallographic examination
0110
Heat treatment
A312, 01-SAMSS-046
A312, 01-SAMSS-046
100%
H
NOTE-10
0120
Repair welding
N/A
N/A
-
-
-
A312, A999
Per 01-SAMSS-046
A312, A999
100%
H
H
10%
E426, A999, 01-SAMSS-046
E426, A999, 01-SAMSS-046
100%
H
10%W
A312, 01-SAMSS-046, A380
A312, 01-SAMSS-046, A380
100%
H
NOTE-10
A312, 01-SAMSS-046,
FORM 175-320300, SAES-A-206
Per 01-SAMSS-046
A312, 01-SAMSS-046,
FORM 175, SAES-A-206
100%
H
5%W
0130
Pressure testing-Hydro test
(Chloride content of water shall not exceed 50 ppm)
0140
Non destructive testing - Eddy current test
0150
Pickling & Passivation
0160
Positive material identification NOTE-4,5 & 6
(Already covered in clause no. 0030/0050)
W
W
0030 Final inspection & test requirements
0010
Visual inspection
A312, A999, B36.19M
As per 01-SAMSS-046
A312, A999, B36.19M
100%
H
H
10%
0020
Dimensions
A312, A999, B36.19M
As per 01-SAMSS-046
A312, A999, B36.19M
100%
H
H
10%
0030
Weld seam
N/A
N/A
-
-
-
100%
H
10%W
Marking on Pipes:
0040
Inkjet Marking
0050
Positive material identificationNOTE-4,5 & 6
--
A312, A999, 01-SAMSS-046
Per 01-SAMSS-046
Ferroxyl Test
0060
Handling, Packing
0070
Mill test certificate
--
Certificate of compliance
--
Product test certificate
(Same as covered in 0070 above)
--
Issue Release notes
RATNAMANI | NPS | THK | RL
|SPECIFICATION |
SEAMLESS | GRADE | HEAT NO.
| ET OK|PMI OK | MADE IN
INDIA
A312, 01-SAMSS-046,
FORM 175-320300, SAES-A-206
A312, 01-SAMSS-046,
FORM 175, SAES-A-206
100%
H
5%W
01-SAMSS-046, A380
01-SAMSS-046, A380
One sample /size/
release
H
W
100%
H
10%W
-
R
R
-
R
R
-
R
R
-
H
H
Per 01-SAMSS-046, 8314-02, 8314-04, 01-SAMSS-046, 8314-02,
RMTL Procedure
8314-04, RMTL Procedure
A312, A999, 01-SAMSS-046
A312, A999, 01-SAMSS-046
EN 10204:2004 TYPE 3.1
EN 10204:2004 TYPE 3.1
P.O.
P.O.
A312, A999,
A312, A999,
01-SAMSS-046 Clause 19
01-SAMSS-046 Clause 19
BS EN 10204:2004 TYPE 3.1
BS EN 10204:2004 TYPE 3.1
P.O.
P.O.
ABBREVIATIONS: W = WITNESS H = HOLD R=REVIEW OF RECORDS P =PERFORM
NOTES:
1. PIPE WALL THICKNESS TO BE MEASURED ON BOTH ENDS WITH MICROMETER.
2. PIPE MANUFACTURING SHALL BE HOT FINISHED OR COLD FINISHED, AT MANUFACTURER’S OPTION & MOTHER HOLLOW USED WILL BE RMTL MANUFACTURED OR ANY OTHER REPUTED
MANUFACTURER.
3. LABORATORY TESTING WILL BE CARRIED OUT AT ISO/IEC 17025 ACCREDITED IN-HOUSE LAB OF RMTL.
4. COLOR CODING AFTER PMI, AS PER SAES-A-206 TO BE DONE WITH ‘BLACK’ COLOR ON 5% PIPES WITNESSED BY INSPECTION AGENCIES. LONGITUDINAL STRIPE, WIDTH 5mm OR LARGER.
5. MARKING ON PIPES SHALL ADDITIONALLY INCLUDE PMI CONFORMANCE ON ONE END OF PIPE, AS ‘PMI’ AT 75MM DISTANCE FROM END, BY ELECTRO ETCHING METHOD, ON 5% PIPES
WITNESSED BY INSPECTION AGENCIES.
6. 100% PIPES INTERNALLY CHECKED BY XRF METHOD. QUALITATIVE REPORT (PASS/FAIL) TO BE FURNISHED FOR 100% PIPES.
5% PIPES PER HEAT/SIZE WITNESSED IN PRESENCE OF TPI. ELEMENT CONCENTRATION TO BE REPORTED FOR THESE 5% PIPES. ELEMENTS TO REPORT FOR TP316L: C%, Cr%, Ni%, & Mo%.
C% TO BE CHECKED BY SPECTRO METHOD, BALANCE ELEMENTS TO BE CHECKED BY XRF METHOD.
7. INSPECTION NOTIFICATION SHALL BE 7 DAYS IN ADVANCE FOR W & H POINTS.
8. IT SHALL BE CERTIFIED IN THE TEST CERTIFICATE THAT THE RADIATION LEVELS FROM THE PIPES ARE LESS THAN 0.5µSV/hr.
9. WORKMANSHIP, COMPONENTS AND DIMENSIONS: TO BE WITNESSED AT THE TIME OF FINAL INSPECTION.
10. HEAT TREATMENT & PICKLING & PASSIVATION SHALL BE WITNESSED FOR INITIAL LOT. FOR FORTHCOMING LOTS, HT CHART AND REPORTS SHALL BE REVIEWED.
Prepared by:
K A Paun
(Sr.Engr-QA&C)
Checked by:
D I Joshi
(Sr.Mgr-QA&C)
Reviewed by:
S S Patel
(AGM-QA&C)
For, Ratnamani Metals & Tubes Ltd.