TRƯỜNG ĐẠI HỌC NGOẠI THƯƠNG CƠ SỞ II TẠI THÀNH PHỐ HỒ CHÍ MINH MID-TERM REPORT Subject: Project Management – TMAE315 “DEVELOP A WEBSITE FOR STUDENTS’ MENTAL HEALTH SUPPORT” Họ tên và MSSV: 1. Lê Khuê Minh Bản – 1915535308 2. Lê Phạm Vân Anh – 1915535305 3. Nguyễn Ngọc Hân – 1915535313 4. Lại Thị Thu Ngân – 1915535330 5. Dương Ngọc Mai Thảo – 1915536159 Lớp: K59CLC1 Giảng viên giảng dạy: Lê Tuấn Bách Ngày nộp bài: 22/06/2023 Điểm bằng số Điểm bằng chữ Table of Contents 1 Overview...............................................................................................................3 1.1 Background information ...................................................................................3 1.2 Problem Statement ............................................................................................3 1.3 Description of major elements (deliverables) of the completed project ..........4 1.4 Expected benefits ..............................................................................................4 2 The Process of Project selection ...........................................................................5 3 The Statement of Work (SOW) ............................................................................7 3.1 Description and Scope ......................................................................................8 3.2 Approach ..........................................................................................................9 3.3 Resource Requirements ..................................................................................10 3.4 Risk Management ...........................................................................................11 3.5 Accpeptance Criteria ......................................................................................14 3.6 Estimated time and cost ..................................................................................15 4 Work Breakdown Structure (WBS) ....................................................................15 4.1 Project Work Breakdown Structure................................................................15 4.2 Explanations for the logical framework of project activities .........................17 4.2.1 Deliverable 1 - Project Planning ................................................................17 4.2.2 Deliverable 2 - Analysis to define requirements and specifications for the Website ...............................................................................................................17 4.2.3 Deliverable 3 – Sponsorship ......................................................................18 4.2.4 Deliverable 4 - Connecting with Specialists and Building the former students network .................................................................................................18 1 4.2.5 Deliverable 5 – Design the website ...........................................................19 4.2.6 Deliverable 6 - Developing the IT Infrastructure ......................................19 4.2.7 Deliverable 7 - QC testing .........................................................................19 4.2.8 Deliverable 8 - Accumulative Project Report ...........................................20 5 Project Scheduling ..............................................................................................20 6 Cost estimation and budgeting ...........................................................................22 7 Organizational Breakdown Structure .................................................................24 7.1 OBS ................................................................................................................24 7.2 Responsibilty Assignment Matrix (RAM) .....................................................25 8 Time-phased Budget ...........................................................................................27 9 Implementation Strategy.....................................................................................28 9.1 Introduction ....................................................................................................28 9.2 Management Overview ..................................................................................28 9.3 Major tasks .....................................................................................................30 9.4 Security and Privacy .......................................................................................30 9.5 Documentation................................................................................................32 9.6 Performance monitoring .................................................................................32 10 Earned Value Management ................................................................................33 2 1 Overview 1.1 Background information Project name: Develop a website for students’s mental health support The project of developing a website for students' mental health support with a diverse network of specialists stems from the growing recognition of the importance of mental wellbeing in educational settings. The project aims to develop a comprehensive website dedicated to providing mental health support for students. The website will serve as a valuable resource by offering a diverse network of specialists who are equipped to address a wide range of mental health concerns commonly experienced by students. Through this platform, students will have access to a multitude of professionals, including psychologists, counselors, therapists, and psychiatrists, who possess expertise in various areas such as anxiety, depression, stress management, and relationship issues. By fostering this diverse network of specialists, the website endeavors to ensure that students can find the appropriate support and guidance they need to navigate their mental health challenges effectively. 1.2 Problem Statement In recent years, there has been a significant increase in the number of students experiencing mental health issues, including anxiety, depression, stress, and other related challenges. These issues can have a profound impact on students' academic performance, overall well-being, and future prospects. The current lack of accessible and comprehensive mental health support for students poses a significant challenge in educational settings. Many students are experiencing mental health issues such as anxiety, depression, and stress, which adversely affect their academic performance and overall well-being. The absence of a centralized platform that offers a diverse network of specialists compounds this problem, as students struggle to find the appropriate support for their specific needs. 3 Therefore, there is an urgent need to develop a website for students' mental health support that provides a diverse network of specialists who can address a wide range of mental health concerns. This website will aim to bridge the gap by offering easily accessible resources, connection with professionals, and culturally sensitive care to empower students to seek help, overcome challenges, and thrive academically and personally. 1.3 Description of major elements (deliverables) of the completed project Firstly, the network of professional specialists 1.4 Expected benefits Firstly, the website will provide students with easily accessible and round-the-clock support. Students can access the platform at their convenience, breaking down the barriers of time and location. This accessibility ensures that students can seek help and guidance whenever they need it, fostering a proactive approach to mental health management. Secondly, the diverse network of specialists available on the website will cater to the specific needs of students. Mental health challenges vary greatly, and by offering a range of professionals such as psychologists, counselors, therapists, and psychiatrists, the website ensures that students can connect with specialists who possess expertise in their particular areas of concern. This tailored support increases the likelihood of students receiving effective interventions and the appropriate guidance for their individual mental health needs. Moreover, the website's emphasis on cultural sensitivity and inclusivity will create a safe and supportive environment for students from diverse backgrounds. By incorporating specialists who understand different cultural contexts and can provide culturally competent care, students will feel understood, respected, and more inclined to seek help. This inclusivity will contribute to reducing the stigma surrounding mental health issues and foster a sense of belonging among students. 4 Another benefit of the project is the availability of a wide range of resources and selfhelp materials on the website. Students will have access to educational content, articles, videos, and tools that promote mental well-being and empower them to take an active role in managing their mental health. These resources will enhance students' knowledge and equip them with practical strategies for coping with stress, improving resilience, and maintaining a healthy work-life balance. Last but not least, the website will facilitate seamless communication and collaboration between students and specialists. Features such as secure messaging or virtual appointments will enable students to engage in confidential conversations with professionals, ensuring their privacy and encouraging open dialogue. This direct interaction with specialists will strengthen the student-professional relationship and increase the likelihood of positive treatment outcomes. 2 The Process of Project selection Because of budget restrictions, there was no way that both projects could be funded. The first evaluation team used a scoring model, based on the key strategic categories, to evaluate the two projects. The categories they employed were: (1) strategic fit, (2) profitability of technical success, (3) financial risk, (4) potential profit, (5) strategic leverage (ability of the project to employ and enhance company resources and technical capabilities), (6) safety, (7) competitive advantage. using these categories, the team evaluated the two projects as shown here. Scores were based on: 1=low, 2=medium, and 3=high for the Importance scale; The scale for the point is from 1 - 10. 5 The short overview of the three potential projects: Mental Health Support Platform: Create an online platform that connects students with trained peer listeners, resources, and tools to help manage stress, anxiety, and mental health concerns. By addressing the unique mental health needs of university students, a Mental Health Support Platform can contribute to a healthier and more supportive campus environment. Free Eatery: A restaurant that combines business and charity. Based on the reality of fast food, canned and processed foods are increasingly popular and account for the majority of daily meals. While healthy meals are not favored due to the high cost. The shop was built for a main purpose to address the need to eat healthier, enjoy more and connect more people to people. Moreover, supporting people in difficult circumstances, improving the quality of human life is another main goal of this project. FTU2 Mentor - Mentee Program: A long-term and yearly program helping to connect the elder students to the newcomers at FTU2, especially students who study the same expertise field. Project: Mental Health Support Platform Category Importance Strategic fit 3 Probability of technical success 2 Financial risk 2 Potential risk 3 Strategic leverage 1 Safety 3 Competitive advantage 2 Project: Free Eatery Category Strategic fit Probability of technical success Financial risk Potential risk Strategic leverage Importance 3 2 2 3 1 6 Score 7 5 5 4 5 7 7 Score Weighted Score 21 10 10 12 5 21 14 93 Score 6 3 9 8 1 Weighted Score 18 6 18 24 1 Safety Competitive advantage 3 1 Project: FTU2 Mentor - Mentee Program Category Importance Strategic fit 3 Probability of technical success 2 Financial risk 2 Potential risk 3 Strategic leverage 1 Safety 3 Competitive advantage 1 6 1 Score 18 1 86 Score 8 6 5 6 2 3 2 Score Weighted Score 24 12 10 18 2 9 2 77 The result obtained by scoring model suggested that Project “Mental Health Support Platform” would be the best choice for the next new project. NPV analysis of "Mental Health Support Platform". The findings of the viability of “Mental Health Support Platform” with the assumed required rate of return of 12% is as follow. Besides, the IRR of this project is higher than the assumed rate of return (0.34 > 0.12). Therefore, the project “Mental Health Support Platform" would be the choice. Project "Mental Health Support Platform" (Unit in US$) Anticipated stream of future Inflow Outflow Net flow cash flows (yr) 0 1000 -1000 3 NPV -1.000,00 1 2000 2000 1.785,71 2 3000 3000 2.391,58 3 5000 5000 3.558,90 4 4000 4000 2.542,07 5 12000 12000 6.809,12 Calculated NPV 16.087,39 The Statement of Work (SOW) 7 3.1 Description and Scope 1. Summary of work Develop and launch a website that supports student mental health. The website will serve as a comprehensive platform requested to provide information, resources, and support for students who are dealing with stress, peer pressure, etc. The key deliverables include a user-friendly website with a well-organized structure, relevant content, interactive features, and connection to mental health resources. 2. Background Mental health issues among students have been on the rise, and there is a growing need for accessible support and resources. By creating a centralized platform where students can find information, learn coping strategies, access mental health services, and connect with supporting networks, the website will contribute to improving the overall mental well-being and academic success of students. 3. Description of terms of mental health. major elements (deliverables) of the Detailed analysis and understanding of student’s needs in Build a network/community of predecessors/experts specialized in psychology to support and take care of completed project students with mental health problems. Create a well-structured and easy-to-navigate website architecture that allows users to find information quickly and efficiently. Develop informative and engaging content that addresses various aspects of student mental health, including common challenges, coping strategies, and available support resources 4. Expected Benefit Increased awareness and understanding of student mental health issues. 8 Enhanced access to mental health resources, support, and services. Empowerment of students to take proactive steps towards their mental well-being. Reduction of stigma surrounding mental health by promoting open conversations and support networks. 5. Priorities assigned Website design and content management: High priority to each element in the Community/network building: Medium priority project 3.2 Approach Milestone 1. Major milestone/ key events anticipated 1. Project planning 16/05/2023 2. Analysis student’s need 30/05/2023 3. Sponsorship acquisition 30/06/2023 4. Connect with predecessors/ specialists to build network. 30/06/2023 5. Design the website 14/06/2023 6. Developing website 27/06/2023 7. Testing and Release 20/07/2023 8. Accumulative Project Report 30/08/2023 2. Special standards or methodologies to be observed Expected date Critical path method Agile Project Management Change Management & Risk Management Documentation and Version Control Communication and Reporting: Quality Assurance 9 Weekly meetings with the project stakeholders to discuss progress, address concerns, and provide updates on the project status. 3. Plans for status report updates 3.3 Resource Requirements a. Detail plan for resource need assignment Person Project Manager Role and Rationale Responsible for overall project coordination, communication, and management. Research & - Conduct extensive research to identify the need and requirement Planning Team for website - Develop a content strategy that aligns with the project goals and addresses the mental health needs of students. Software - Design and develop the website's front-end and back-end Developer Team functionality. - Test and identify any issues or bugs in the website's functionality and user experience Designer Team Design user experience and interface to create an intuitive and visually appealing website. Sales Team - Identify, approach and negotiate with potential sponsors to get sponsorship - Connect with predecessors/specialists to build the network/community - Manage relationships with these stakeholders Review and Ensuring the website's quality, performance, compliance, and Report Team progress monitoring 10 b. Other material resource needs: - Hardware: Computers or laptops with appropriate specifications for web development and testing. - Software: Development tools and software, such as code editors, graphic design software, project management tools, and version control systems. - Web Hosting and Domain: Secure and reliable web hosting services and a registered domain name for the website. 3.4 Risk Management a. Risk management objective The purpose of the Risk Management Plan is to identify the risks for the “Develop a website for students’s mental health support” project, and develop mitigation strategies to avoid the issues that are outlined. b. Qualitative Risk Analysis 11 Figure 3-1 - Qualitative Risk Analysis c. Identified Risks Type of risk Risk The works are not complete within the stated Project timeline which Internal development lead the project progress to slower than planned Level of risk Solution Responsible staff 2 - Take some time to reflect and evaluate every step of the project process to make sure the progression is still under control. - Remind the team members about the deadlines of every task and also the importance of finishing the task on time. - Have a supporter for every task All 12 Technical The website runs improperly as it can lag and crash due to technical reasons like too much traffic, malware or bugs The sudden shortage of personnel 6 - Test before release to minimize problems as much as we can - Have a list of specialists who can give team advice or support when there comes to a problem we can not handle Nam Phương Minh Thi 3 - The team members need to be clarified about the commitment to the project from the beginning. - For designing, developing or testing, have a backup list of people who can handle these work for the project at any time. Kỳ Duyên Quỳnh Vi 2 - Have a list of specialists who can support team when Kỳ Duyên there comes to a problem we can not handle 4 - Put ourselves on customers' shoes before designing and developing to give them the best experience - It should have clear and detailed instructions for customers to read before use. The website can also have a box chat to text with staff if customers need support. Thương Thương Minh Thi 6 Encourage customers to leave their feedback through forms or box chat to find out the issues and fix them promptly Nam Phương Thương Thương Personnel Team members' skills can not fulfill tasks at the level expected Customers find it difficult to use the website External Customer Customers are not satisfied or even have a bad experience with the website 13 More competitors Competitive appear with similar topic and flatforms Every risks that can possibly Security and happen when the privacy website is attacked The actual budget is higher than expected 4 Focus on developing competitive ability in customer service and customer satisfaction which make the website different from others. Besides, boost promotion to attract more customers visit the website and use it. Quỳnh Vi 6 - For Security misconfiguration: Change the passwords and keeping them updated. - For complicated risks: Have a list of specialists who can give team advice or support when there comes to a problem we can not handle Thương Thương Minh Thi 4 - Check the costs incurred to control timely - Have a backup fund of 10% of the budget planned Quỳnh Vi 6 - Comply with terms and conditions in the contract, not violating any agreement that can breach the contract or lead to termination. - In case the sponsors just simply don't want to work with the project: Have a backup list of potential sponsors, expand the search for more sponsors and negotiate more promised benefits for them. Kỳ Duyên Financial Sponsors terminate the contract and withhold the funding 3.5 Accpeptance Criteria 14 a. Detailed acceptance - Each stage of project deliverable development will be signed process and criteria off by author, project manager, functional leader appropriate before implemented. b. Termination of - The Activities described in this SOW is completed, including project provision of the Deliverables Materials - The Process is terminated in accordance with the provisions of the Agreement identified in the Schedule 3.6 Estimated time and cost a. Estimated time to complete project work 4 months b. Estimated costs to complete project work 14.926.000 VND 4 Work Breakdown Structure (WBS) 4.1 Project Work Breakdown Structure Breakdown Description WBS Code Develop a website for students’ mental health support 1.0 Deliverable 1 Project planning 1.1 WP1 Build a Project Management Plan 1.1.1 WP2 Define Project’s Scope Statement 1.1.2 WP3 Estimate project duration (Scheduling) 1.1.3 WP4 Estimate project budget (Budgeting) 1.1.4 WP5 Define assumptions, constraints, risks and build a contingency plan 1.1.5 15 Deliverable 2 Analysis to define requirements and specifications for the Website 1.2 WP1 Conducting Interviews with targeted stakeholders via online 1.2.1 survey or 1-1 interview WP2 Reporting needs collected from the Interviewees 1.2.2 WP3 Define Requirements and Specifications for the Website 1.2.3 Deliverable 3 Sponsorship WP1 Complete sponsorship proposal 1.3.1 WP2 Acquire sponsors 1.3.2 WP3 Fulfill sponsorship contract 1.3.3 Deliverable 4 Connecting with specialists and Building the former students network WP1 Expanding the former students community WP2 Connecting with psychologists and specialists in the field of 1.4.2 study experience and orientation Deliverable 5 Design the website WP1 Defining and creating the content appearing on the website 1.5.1 WP2 Prototype design - User Interface (UI) 1.5.2 WP3 Architecture design - User Experience (UX) 1.5.3 WP4 Define the database structure and data models 1.5.4 Deliverable 6 Developing the IT Infrastructure WP1 Frontend development 1.6.1 WP2 Backend development 1.6.2 WP3 Integrate front-end, back-end and CMS components 1.6.3 Deliverable 7 QC testing and Release WP1 Test Configuration 1.3 1.4 1.4.1 1.5 1.6 1.7 1.7.1 16 WP2 Reviewing the website’s performance and collecting feedback 1.7.2 WP3 Fixing bugs, adjusting and finalizing the website 1.7.3 WP4 Releasing the website 1.7.4 Deliverable 8 Accumulative Project Report WP1 Analyze actual budget usage 1.8.1 WP2 Analyze the website usage statistics 1.8.2 WP3 Submit and declare the project’s report to the stakeholders (sponsors, project members,...) 1.8.3 1.8 4.2 Explanations for the logical framework of project activities 4.2.1 Deliverable 1 - Project Planning The first and foremost step of any project is to determine the agreed vision and mission, the related stakeholders and how the project will be managed. These will be presented in the Project Management plan of the team and the leader needs to complete and declare this plan to make sure it is followed by all the members (1.1.1). The scope of work statement, scheduling planning, budget planning and risk planing (1.1.2, 1.1.3, 1.1.4, 1.1.5) are the next important steps to help the team have a general and sole view of the project and these compose the base for execution of other tasks. 4.2.2 Deliverable 2 - Analysis to define requirements and specifications for the Website To define specific requirements and specifications needed for the website, the core team has to conduct a survey to better understand their target customers, their expectations and insight. This market research ensures that the project will be more attractive and welcomed by the public when it is launched and our website meets the needs and unspoken desires of the customers. 17 The survey will be conducted in two ways which are 1-1 interview and an online survey via Google Forms (1.2.1). The target interviewee is students from universities within Ho Chi Minh City. Before publishing the survey, the core team has to be gathered to brainstorm questions to gain more knowledge about the market as well as the users’ needs within that market. After publishing the survey, several answers will be collected and the core team has to analyze and report certain outstanding requirements from those answers (1.2.2) The final step is to determine which requirements specifications needed to be incorporated into the website to ensure the website UX and UI meet the users’ satisfaction (1.2.3). 4.2.3 Deliverable 3 – Sponsorship Finance is of importance in almost project and in order to finance and realize the project, the project team needs to acquire funds through sponsorship. A sponsorship proposal is a well-designed document including sponsorship packages of rights and obligations and information about the project. Normally, a complete, professional and concise proposal will make the project valuable in the evaluation of the potential sponsors. Therefore, the external relations team needs to complete the sponsorship proposal in a competent range of time to ensure that the project is financed in time (1.3.1). Once the proposal has been finalized, the external relations (ER) team begins to send the invitation for sponsorship and sponsorship proposal to the sponsors in the list of potential sponsors via emails and phone calls. The ER team then tries to negotiate and come to the contract terms agreement (1.3.2 and 1.3.3) 4.2.4 Deliverable 4 - Connecting with Specialists and Building the former students network Before the website is launched and used by the very first users, our website needs to have a network of former students as well as psychologists available for the inquiry of the users. 18 As these two stakeholders are of two different categories and the approaches taken are far different, so our team takes them as two work packages. Our team has to connect with former students, fresh graduates and graduates from universities within Ho Chi Minh City and invite them to join the community to help the insecure student solve their problems (1.4.1) Another approach is to connect and invite the psychologists and specialists in the field of study experience and orientation to join our community to help the students with more severe mental problem (1.4.2) 4.2.5 Deliverable 5 – Design the website When the information on the users’ requirements, the agreed specifications and data of former students network and specialists are gathered, our team will start to create the content that appeared on the website (1.5.1), build the prototype design or user interface (UI)(1.5.2), design the architecture or user experience (UX) (1.5.3). Furthermore, we need to define the data structure and data model to enhance the incorporation of gathered data into our website (1.5.4) After the fulfillment of this deliverable, the prototype of the website is available and ready for further IT infrastructure development. 4.2.6 Deliverable 6 - Developing the IT Infrastructure Front-end development is now conducted, we ensure that the website has full attributes, features and functionalities in the interface that can enhance the users’ usage (1.6.1) Next step, our IT team will develop the backend by coding (1.6.2) and concurrently integrate the backend with the constructed front-end, find and adjust the incompatible features (1.6.3). 4.2.7 Deliverable 7 - QC testing The website will go through steps of Quality Control testing to ensure that the website’s specifications and functionality are of the best condition to be launched. Our IT team will take responsibility to test the configuration (1.7.1) and then review the website’s performance in all aspects to collect feedback (1.7.2). The bugs will be found in this step and the IT team needs to fix them, make necessary adjustments and finalize the website (1.7.3). The final step is to launch the website to the target market and wait to collect the actual user statistics (1.7.4). 19 4.2.8 Deliverable 8 - Accumulative Project Report In the 1-month duration after the launching of the website, several information and data need to be collected to fulfill the cummulative Project report. Firstly, the actual budget usage need to be calculated, analyzed and compared with the original budgeting to evaluate the cost efficiency of the project (1.8.1). Furthermore, the website usage statistics will be collected on a hourly basis for the analysis purpose (1.8.2). Then the report will be declared, submitted or sent to the project’s stakeholders including project leader and members, sponsors and associates. 5 Project Scheduling ID Job Title Start Date Duration End Date 1,0 Project planning 27/04/2023 14 days 16/05/2023 1,1 Build a Project Management Plan 27/04/2023 11 days 11/05/2023 1,2 Define Project’s Scope Statement 12/05/2023 2 days 15/05/2023 1,3 Estimate project duration (Scheduling) 11/05/2023 4 days 16/05/2023 1,4 Estimate project budget (Budgeting) 12/05/2023 3 days 16/05/2023 Define assumptions, constraints, risks and build a contingency plan Analysis to define requirements and 2,0 specifications for the Website Conducting Interviews with targeted stakeholders 2,1 via online survey or 1-1 interview 1,5 2,2 Reporting needs collected from the Interviewees 2,3 Define Requirements and Specifications for the Website 12/05/2023 3 days 16/05/2023 16/05/2023 11 days 30/05/2023 16/05/2023 6 days 23/05/2023 23/05/2023 1 day 23/05/2023 23/05/2023 6 days 30/05/2023 3,0 Sponsorship 30/05/2023 24 days 30/06/2023 3,1 Complete sponsorship proposal 30/05/2023 13 days 15/06/2023 3,2 Acquire sponsors 16/06/2023 11 days 30/06/2023 3,3 Fulfill sponsorship contract 16/06/2023 11 days 30/06/2023 4,0 Connecting with specialists and Building the former students network 20 16/05/2023 34 days 30/06/2023 4,1 Expanding the former students community 4,2 16/05/2023 24 days 16/06/2023 Connecting with psychologists and specialists in the 16/05/2023 34 days 30/06/2023 field of study experience and orientation 5,0 Design the website 5,1 01/06/2023 10 days 14/06/2023 Defining and creating the content appearing on the website 01/06/2023 8 days 12/06/2023 5,2 Prototype design - User Interface (UI) 01/06/2023 7 days 09/06/2023 5,3 Architecture design - User Experience (UX) 01/06/2023 7 days 09/06/2023 5,4 Define the database structure and data models 09/06/2023 4 days 14/06/2023 6,0 Developing the IT Infrastructure 15/06/2023 9 days 27/06/2023 6,1 Frontend development 15/06/2023 6 days 22/06/2023 6,2 Backend development 23/06/2023 3 days 27/06/2023 6,3 Integrate front-end, back-end and CMS components 23/06/2023 3 days 27/06/2023 7,0 QC testing and Release 27/06/2023 18 days 20/07/2023 7,1 Test Configuration 27/06/2023 7 days 05/07/2023 7,2 Reviewing the website’s performance and collecting 06/07/2023 3 days 10/07/2023 feedback 7,3 Fixing bugs, adjusting and finalizing the website 11/07/2023 4 days 14/07/2023 7,4 Releasing the website 15/07/2023 4 days 20/07/2023 8,0 Accumulative Project Report 20/07/2023 30 days 30/08/2023 8,1 Analyze actual budget usage 20/07/2023 4 days 25/07/2023 8,2 Analyze the website usage statistics 20/07/2023 28 days 28/08/2023 8,3 Submit and declare the project’s report to the 28/08/2023 3 days 30/08/2023 stakeholders (sponsors, project members,...) Table 5-1 – Project Scheduling 21 Figure 5-1 – Project Gantt Chart 6 Cost estimation and budgeting ID Labor hour Title Labor rate 1,0 Project planning Budget 1.149.000 1,1 PM plan 33 15.000 495.000 1,2 Scope statement 12 14.000 168.000 1,3 Scheduling 8 12.000 96.000 1,4 Budget planning 9 15.000 135.000 1,5 Risk planning Analysis to define requirements and specifications 2,0 for the Website 15 17.000 255.000 2,1 Interviews 36 16.000 576.000 2,2 Reporting needs 4 20.000 80.000 2,3 Requirements specifications 48 18.000 864.000 1.520.000 3,0 Sponsorship 1.097.000 3,1 Complete sponsorship proposal 26 13.000 338.000 3,2 Acquire sponsors 33 18.000 594.000 3,3 Sign sponsorship contract 11 15.000 165.000 22 ID Labor hour Title Labor rate Connecting with specialists and Building the former 4,0 students network Budget 1.824.000 4,1 Expand the predecessor community 72 22.000 1.584.000 4,2 Connect with the specialist or spychologist 12 20.000 5,0 Design the website 240.000 2.992.000 5,1 Content creation 40 15.000 600.000 5,2 User interface design 56 16.000 896.000 5,3 User experience design 56 17.000 952.000 5,4 Improve site performance 32 17.000 544.000 6,0 Developing the IT Infrastructure 2.610.000 6,1 Frontend development 42 25.000 1.050.000 6,2 Backend development 18 40.000 720.000 6,3 Integrate front-end, back-end 24 35.000 840.000 7,0 QC testing and Release 1.467.000 7,1 Test configuration 21 25.000 525.000 7,2 Review 12 28.000 336.000 7,3 Finalize 24 24.000 576.000 7,4 Release and Double Check 2 15.000 30.000 8,0 Accumulative Project Report 2.267.000 8,1 Analyze actual budget usage 8 8,2 Analyze the website usage statistics 84 Submit and declare the project’s report to the 8,3 stakeholders (sponsors, project members,...) 15 Table 6-1 – Project’s Cost Budget Summary of cost Budget (in VND) 23 10.000 80.000 23.000 1.932.000 17.000 255.000 ID Title Budget 1,0 Project planning 1.149.000 2,0 Analysis to define requirements and specifications for the Website 1.520.000 3,0 Sponsorship 1.097.000 4,0 Connecting with specialists and Building the former students network 1.824.000 5,0 Design the website 2.992.000 6,0 Developing the IT Infrastructure 2.610.000 7,0 QC testing and Release 1.467.000 8,0 Accumulative Project Report 2.267.000 Total 14.926.000 Table 6-2 – Summary of Cost Budget in VND 7 Organizational Breakdown Structure 7.1 OBS The Project includes the participation of 5 functional teams: Research and Planning team, Sales team, Design team, Software developer team and Review and report team. We will assign the specialized task to each manager and executive as in the image below: 24 Figure 7-1 - Organizational Breakdown Structure 7.2 Responsibilty Assignment Matrix (RAM) The Responsibility Assignment Matrix (RAM) for our project outlines the involvement of six distinct departments, individuals, and roles in the completion of tasks and deliverables. It provides a clear indication of the three roles individuals can have in the project activities: - Primary responsibility (P): Individuals who are responsible for ensuring the accomplishment of desired outcomes. - Secondary responsibility (S): Individuals who contribute to achieve a portion of the desired outcomes. - Approval (A): Individuals who do not directly work on the deliverables but have the authority to approve the results produced by others who are involved. 25 Software Dev Design Sales Research & Planning Review & Report Thương Thương Kỳ Duyên Nam Phương Quỳnh Vy Minh Thi 1.1 P S 1.2 P S 1.3 A P 1.4 S P WBS code 1 1.5 P 2 2.1 P A 2.2 P 2.3 A P 3 3.1 P S 3.2 P A 3.3 P A 4.1 S P 4.2 S P 4 26 5 5.1 A 5.2 P 5.3 P 5.4 S P A P 6 6.1 P 6.2 6.3 S P A A P S P 7 7.1 7.2 A P 7.3 S P 7.4 P A 8.1 A S P 8.2 A P S 8.3 A A P S 8 S A Table 7-1 - Responsibilty Assignment Matrix (RAM) 8 Time-phased Budget Deliverable Project planning Analysis to define requirements and specifications for the Website Sponsorship Apr May Jun 164.143 984.857 27 Aug Total 1.149.000 1.520.000 91.417 July 1.520.000 1.005.583 1.097.000 Connecting with specialists and 643.765 Building the former students network Design the website Developing the IT Infrastructure QC testing and Release Accumulative Project Report 164.143 3.240.039 Monthly Plan 164.143 3.404.181 Monthly Cumulative 1.180.235 1.824.000 2.992.000 2.992.000 2.610.000 2.610.000 326.000 1.141.000 604.533 1.467.000 1.662.467 2.267.000 8.113.819 1.745.533 1.662.467 11.518.000 13.263.533 14.926.000 14.926.000 Table 8-1 – Time-phased Budget 9 Implementation Strategy 9.1 Introduction - Vision: Create an online platform to help manage stress, anxiety, and mental health concerns. - Mission: By addressing the unique mental health needs of university students, a Mental Health Support Platform can contribute to a healthier and more supportive campus environment by connecting students with trained peer listeners, resources, and tools - Target: Focused on students at University in Ho Chi Minh City, where many have to deal with the stress as a result of the over-dynamic environment - Objective: Helping students manage stress, anxiety, and other mental health concerns. - Assumptions and Constraints Here are some items to consider when identifying the assumptions and constraints: -Aug -employ and outsource present traffic 9.2 Management Overview 28 In this section, provide a description of how the implementation will be managed and identify the major tasks involved. Description of Implementation On the platform, there will be 4 main sections: the introduction, the seek for help option and the storyline section, and the common Q&A questions for students looking to solve their mental health hindrances: The introduction section: About us, and our contact, email, and name of the sponsor for this website The seek-for-help option: this part has the share story feasibility and looks for some videos about the common issues that the students frequently have to deal with The storyline section: the story of an exemplary predecessor and how they manage to cope with stress and their point of view as well as some pieces of advice The common Q&A sections: this allows the target users to liberally post their current issues and seeking for others’ advice, it can be answered by anyone, including but not limited to our team of psychiatrists, alumni, and those who experienced the same situations… This website is just for reference only and does not supersede any medical help. All personal information/data should be kept confidential and the user's data will not be exploited for any commercial uses. The user could use any anonymous name to share their story and their current problems. We understand that in practice, not many people have enough confidence to share their issues explicitly. That is the reason why we create our forum to have a space to share our storyline. Main activities that our platform carries out: Receive questions and problems from users 29 Answer these questions, provide advice Post a story about two exemplary figures a week for reference Marketing our platform on other social media bases (Youtube, Facebook, Tiktok, Telegrams… by sharing stories) 9.3 Major tasks Major task Planning & Analysis Sponsor and contact specialists Design and developing the platform QC testing and report Time line Advantages Disadvantages Risks 27/04 to 30/05 collecting the opinions of targets online and offline, time flexibility, not required many monetary resources Energy and technical constraints to analyze the data, not much capital in this stage The data do not reflect the authentic situations of the target's desire Human, analytical tools 16/05 to 30/06 Contact the sponsors via some traditional channels and social media, and it is easy to find their portfolios online Do not have enough resources to suffice partner's requirement (users' data, advertising,...) The negligence of the sponsors and the specialist's team; the high cost to invite them to our project Human resource 01/06 to 27/06 Perform online, do not require much-fixed cost, exploit the learning curve from others Require the technical skills to build and decor the platform high cost of domain low technical skills the technical problem arising during performance Human resource; PCs; utilities the time constraint not much traffic during the very first stage of launching the platform do not gather enough data and user experience to conclude about the effectiveness of the platform; the results do not satisfy the sponsors and the partners Human resource; PCs; all stakeholders 20/07 to 30/08 testing online, quick and effective Resources required 9.4 Security and Privacy Provide a summary and analysis of the security measures that need to be considered during the implementation of the project. 30 Data Encryption Implement encryption protocols, such as Transport Layer Security (TLS) or Secure Sockets Layer (SSL), to encrypt sensitive data transmitted between the website and users. This should includes encryption of login credentials, personal information, and any data collected through forms or interactions. User Authentication and Access Control Employ secure user authentication mechanisms, such as strong password policies and multi-factor authentication, to ensure that only authorized users can access sensitive information or perform certain actions on your website. Implement role-based access control to manage different levels of access based on user roles and privileges. Secure Data Storage Store user data and sensitive information securely, utilizing appropriate security measures such as encryption at rest. Implement access controls and regular backups to protect against data loss or unauthorized access. Privacy Policy and Consent Create a comprehensive privacy policy that clearly outlines how your website user data will be collected, used, and protected. Obtain user consent for data collection and ensure transparency in data handling practices. Compliance with Data Protection Regulations: Ensure compliance with relevant data protection regulations, such as the General Data Protection Regulation (GDPR) or the California Consumer Privacy Act (CCPA). Familiarize yourself with the requirements and obligations imposed by these regulations and incorporate them into your website's privacy practices. Regular Security Audits and Testing 31 Conduct regular security audits and penetration testing to identify vulnerabilities and weaknesses in the website's security infrastructure. Address any identified issues promptly and proactively. 9.5 Documentation Project charter & Proposal: Outlines the project's objectives, scope, stakeholders, and high-level timeline Project plan: A roadmap for project execution that outlines the activities and tasks required to complete the project. Requirements specification: Describes the features, functionalities, and user interactions that the website should have to support student mental health. Design document: Wireframes, mockup, design guidelines. Development Documentation: Technical specifications, code documentation. Testing Plan: Outlines the testing approach, methodologies, and test scenarios to ensure the quality and functionality of the website. Deployment and Maintenance Documentation: Deployment plan, user guide, maintenance plan. Project report and evaluation: Assesses the project's success in meeting its objectives, analyzing project performance, stakeholder satisfaction and lesson learned. 9.6 Performance monitoring Objective - Track the project's progress, identify any deviations from the plan, and take corrective actions as necessary. It helps ensure that the project is on track to meet its objectives, deliverables, and expected outcomes 32 - Assess resource allocation and utilization. We can identify any resource constraints or bottlenecks and make adjustments to optimize resource usage, ensuring that the right resources are available at the right time. - It helps enable effective cost control by tracking actual project costs against the allocated budget and take corrective actions if there are any budget overruns => Optimizing expenses and ensuring financial accountability. - Performance monitoring techniques enable our team to assess the quality of deliverables and the satisfaction of project stakeholders. By monitoring performance metrics and gathering feedback, we can identify areas for improvement and take necessary actions to enhance the quality of the website and meet stakeholder expectations. To measure performance and thoroughly evaluate project advancement, we will take into account various factors such as: - Website traffic, page view - The number of web users, user engagement level - Retention rate, bounce rate of website - User Satisfaction - Progress of completing the project against the plan 10 Earned Value Management 33 Figure 10-1 – Earn Value Table (EVN) Schedule Variances Planned Value (PV) Earned Value (EV) 3.574.640 3.519.920 Schedule Performance Index (SPI) Estimated Time to Completion 1,05 3,81 The project completion is projected to be 1 week prior schedule Cost Variances Actual Cost of Work Performed (AC) Earned Value (EV) Cost Performance Index (CPI) Estimated Cost to Completion 3.650.000 3.519.920 0,96 15.477.596 The project completion is projected to end up costing more than 15 million dong According to the result of EVM at the end of May, we can clearly see that after around 1 month of the project, SPI and CPI are still under our control. Estimated Time and Cost to complete the project are close to what we have scheduled before. Although the estimated cost is slightly over the expected number, we can still afford it. However, since the backup fund accounts for just 10% of the budget, we expect the CPI in the rest 3 months will increase to more than 1. About SPI, it should maintain around 0.98 - 1.02 for the best performance. In fact, the works have progressed well from the beginning of June until now and we expect it will maintain at this level in the next months. 34