4.2.4 IV & PV CALCULATION SHEET FOR STEEL PIPEWORK SYSTEMS Nom. bore mm in 150 Individual lengths m Nom. bore Total length m × CSA m2 mm in 6” 150 6” ∙ 02 125 5” 125 5” ∙ 014 100 4” 100 4” ∙ 009 80 3” 80 3” ∙ 0054 65 2½” 65 2½” ∙ 0038 50 2” 50 2” ∙ 0024 40 1½” 40 1½” ∙ 0015 32 1¼” 32 1¼” ∙ 0011 25 1” 25 1” ∙ 00064 20 ¾” 20 ¾” ∙ 00046 15 ½” 15 ½” ∙ 00024 = Pipe IV m3 Meter type IVmeter PVmeter IVpipes m3 E6 ∙ 0024 m3 ∙ 01 m3 IVfittings = IVpipes × 0.1 m3 IVmeter m3 G4 U6 ∙ 008 m3 ∙ 01 m3 G10 U16 ∙ 025 m3 ∙ 03 m3 G16 U25 ∙ 037 m3 ∙ 05 m3 PVpipes = IVpipes × 1.5 m3 G25 U40 ∙ 067 m3 ∙ 10 m3 PVfittings = PVpipes × 0.1 m3 G40 U65 ∙ 100 m3 ∙ 125 m3 PVmeter m3 G65 U100 ∙ 182 m3 ∙ 285 m3 PVhose = Length × CSA × 1.5 m3 G100 U160 ∙ 304 m3 ∙ 355 m3 IVtotal PVtotal © 2023 RAD TRAINING (MIDLAND) LTD. m3 m3 4.2.4 IV & PV CALCULATION SHEET FOR STEEL PIPEWORK SYSTEMS Nom. bore mm in 150 Individual lengths m Nom. bore Total length m × CSA m2 mm in 6” 150 6” ∙ 02 125 5” 125 5” ∙ 014 100 4” 100 4” ∙ 009 80 3” 80 3” ∙ 0054 65 2½” 65 2½” ∙ 0038 50 2” 50 2” ∙ 0024 40 1½” 40 1½” ∙ 0015 32 1¼” 32 1¼” ∙ 0011 25 1” 25 1” ∙ 00064 20 ¾” 20 ¾” ∙ 00046 15 ½” 15 ½” ∙ 00024 = Pipe IV m3 Meter type IVmeter PVmeter IVpipes m3 E6 ∙ 0024 m3 ∙ 01 m3 IVfittings = IVpipes × 0.1 m3 IVmeter m3 G4 U6 ∙ 008 m3 ∙ 01 m3 G10 U16 ∙ 025 m3 ∙ 03 m3 G16 U25 ∙ 037 m3 ∙ 05 m3 PVpipes = IVpipes × 1.5 m3 G25 U40 ∙ 067 m3 ∙ 10 m3 PVfittings = PVpipes × 0.1 m3 G40 U65 ∙ 100 m3 ∙ 125 m3 PVmeter m3 G65 U100 ∙ 182 m3 ∙ 285 m3 PVhose = Length × CSA × 1.5 m3 G100 U160 ∙ 304 m3 ∙ 355 m3 IVtotal PVtotal © 2023 RAD TRAINING (MIDLAND) LTD. m3 m3