Uploaded by mezher18

2018-Road-Maintenance-Services-Bid-Results-Pavement-Markings

advertisement
Unit of
Measure
Estimated
Quantity
Water Based
Hi-Way Safety
Systems
Unit Price
$
0.041
$
0.041
$
0.420
$
0.600
$
45.000
Hi-Way Safety
Systems
Total Cost
$
410.00
$
10,250.00
$
1,680.00
$
600.00
$
900.00
Markings, Inc
Unit Price
$
0.045
$
0.045
$
0.445
$
0.750
$
25.000
0.045
5,535.00 $
Markings, Inc
Total Cost
$
450.00
$
11,250.00
$
1,780.00
$
750.00
$
500.00
4" White Line
4" Yellow Line
12' Painted White Line (Cross Walks)
13 - 18' Painted White Lines (Cross Walks)
Painting Bike Route Symbol Marking
Linear Feet
Linear Feet
Linear Feet
Linear Feet
Each
4” White Fog Line
Linear Feet
10,000
250,000
4,000
1,000
20
135,000
$
0.041 $
$
6,075.00
4” Double Yellow
Linear Feet
351,000
$
0.082 $
28,782.00
$
0.089
$
31,239.00
$
0.041 $
6,047.50
$
0.045
$
6,637.50
0.445
4” Single Line
Linear Feet
147,500
12” Cross Walk & Stop Line
Linear Feet
27,000
$
0.420 $
11,340.00
$
$
12,015.00
4” Yellow Center Line
Linear Feet
15,000
$
0.041 $
$
615.00
66,159.50
$
0.045
$
$
675.00
71,371.50
Chlorinated Rubber
4” Double Yellow Line
Linear Feet
750,000
$
0.084 $
63,000.00
$
0.089
$
66,750.00
4” Single White
Linear Feet
330,000
$
0.042 $
13,860.00
$
0.045
$
14,850.00
4” Single Yellow
Linear Feet
12,000
$
0.042 $
504.00
$
0.045
$
540.00
Straight Arrows
Each
10
$
20.000 $
200.00
$
18.750
$
187.50
$
38.000 $
228.00
$
33.900
$
203.40
19.500
$
292.50
Double Arrows
Each
6
Curved Arrows
Each
15
$
20.000 $
300.00
$
“Only” Signs
Each
15
$
20.000 $
$
300.00
78,392.00
$
38.950
$
$
584.25
83,407.65
25,000
57,000
32,000
10,000
45
35
65
65
75
75
75
30
30
30
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
20,000.00
88,350.00
12,800.00
15,500.00
3,375.00
5,250.00
4,875.00
10,400.00
5,625.00
5,625.00
5,625.00
2,250.00
2,250.00
2,250.00
184,175.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.780
2.150
0.395
2.150
65.000
135.000
75.000
175.000
200.000
225.000
225.000
75.000
75.000
65.000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
19,500.00
122,550.00
12,640.00
21,500.00
2,925.00
4,725.00
4,875.00
11,375.00
15,000.00
16,875.00
16,875.00
2,250.00
2,250.00
1,950.00
255,290.00
$
328,726.50
$
410,069.15
$
$
$
750.00
125.00
5,000.00
$
$
$
2,250.00
177.50
65,250.00
$
5,875.00
$
67,677.50
Thermoplastic
4" Double Yellow Line
12" White Line
4" Single White Line
12” Cross Walk & Stop Line
Straight Arrows
Double Arrows
Curved Arrows
“Only” Signs
Left & Right Arrow - Straight Arrow
Left & Right Arrow - Combined Arrow
Left & Right Arrow - Legend
Left Arrow
Right Arrow
Center Arrow
Linear Feet
Linear Feet
Linear Feet
Linear Feet
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
0.800
1.550
0.400
1.550
75.000
150.000
75.000
160.000
75.000
75.000
75.000
75.000
75.000
75.000
Total Pavement Marking Cost
Thermoplastic Marking Removal
4” Single Lines
Legends
Remove Pavement Markings
Linear Feet
Each
Sq Yards
3,000
5
5,000
$
$
$
0.250
25.000
1.000
Total Thermoplastic Removal Cost
Copy of 2018 Road Maintenance Services Bid Results.xlsx
1
$
$
$
0.750
35.500
13.050
5/29/2018
Download