ManufacturingFlowchartMITI

advertisement
Input Compenents
&
Raw Materials
Activity 1
Component
Activity 2
Activity 3
Cutting
Steel Channel & Steel Bar
Baseframe
Grid Blasting
Painting
Drilling
Welding
Unit Assembly On Baseframe
Aluminium Plate
Cutting
Coupling Guard
Welding
Pump Components
Laser Alignment
Bearings
Pump
Gaskets
Hydrostatic
Testing
Unit Performance Test
Acc. ISO9906
Machining
Assembly
Mechanical Seals
Shaft Material
Painting
Coupling
Driling Keyway
Coupling
Painting
Packing
Steel Pipes
Flanges
Cutting
Piping
Welding
Bolts & Nuts
Hydrostatic
testing
Shipment
Manufacturing Flow Chart
Gaskets
Electric Motor
Key Process are laser alignment and especially unit performance
testing according international standards, on top of product and
application know how and good workmanship
Johnson Pump (Malaysia) Sdn. Bhd. April 2021