Georgia

Copper
o
o

Southwire - Continuous Rod Plant
 1128 South Park Street, Carrollton Ga 30116
Southwire - Copper Rod Mill
 372 Central High Road, Carrollton Ga 30116

Operational Projects
o Live Oak Landfill
 Creates high BTU RNG injected into the pipeline infrastructure.
Also fuels 14 CNG sanitation trucks. Air Liquide process for
upgrade to 2,300 scfm of high Btu gas; uses combination of
pressure swing adsorption and membrane technology. "generating
up to 1,500 MWh of renewable natural gas daily to be transported
via pipeline
 430,007 MMBTU/ yr
 3,832,704.96 Gasoline gallon equivalent
o No livestock/agriculture
o No Wrrf
Kentucky

Aluminum
o Aluminum Rod Mill


1987 State Rte 3543, Hawesville, KY 42348

Operational Projects
o Big Run Project at Boyd County Sanitary Landfill
 All gas going into pipeline to earn enviro attributes
 1,705,000 standard cubic feet per day Upgraded gas
 560,092.50 upgraded MMBTU/ year
 4,992,179 Gasoline Gas Equivalent / year
o Outer Loop Landfill
 Creates high BTU RNG injected into the pipeline infrastructure.
 822,480 upgraded MMBTU per year
 7,330,873 Gasoline Gas Equivalent / year
o No livestock/ agriculture
o No wrrf
Texas

Copper
o Southwire - Denton Plant
o

Southwire - Houston Facility


Operational Projects
o Landfills
 Atascocita/Humble (WM, Montauk)
 Coastal Plains RNG
 Edinburg Landfill (Morrow)
 Fort Bend Regional Landfill (DTE Biomass Energy)
 Galveston County Landfill
 Garland/Charles M. Hinton Jr. Regional Landfill
 Greenwood Farms Landfill/Tyler (Morrow "East Texas")
 McCarty Road Landfill (Republic, Montauk)
 McCarty Road 2 (Ameresco)
 McCommas Bluff Landfill (Energy Power Partners)
 North Texas Municipal Water District, Melissa ("NTMWD") (Morrow)
 Pine Hill/Longview (Kilgore) (Morrow)
 Renovar Arlington (Coalition database)
 Republic Services Blue Ridge Landfill ("Houston") (Morrow)
 Seabreeze Environmental Landfill (Seabreeze, DTE Biomass)
 Skyline Landfill
 Tessman Road (Coalition database)
 Turkey Creek Landfill/Alvarado (Morrow)
o Livestock and agriculture


o
Cactus Digester Gas Utilization Plant (Coalition database)
 The product gas capacity is 1,173 MMBtu/day
 428,145 MMBtu/ year
Dalhart RNG, LLC (JBS USA)
 50,000 MMBtu/ year
 445, 657 gasoline gas equivalent/ year
Wwrf

Dos Rios Water Recycling Center