Georgia Copper o o Southwire - Continuous Rod Plant 1128 South Park Street, Carrollton Ga 30116 Southwire - Copper Rod Mill 372 Central High Road, Carrollton Ga 30116 Operational Projects o Live Oak Landfill Creates high BTU RNG injected into the pipeline infrastructure. Also fuels 14 CNG sanitation trucks. Air Liquide process for upgrade to 2,300 scfm of high Btu gas; uses combination of pressure swing adsorption and membrane technology. "generating up to 1,500 MWh of renewable natural gas daily to be transported via pipeline 430,007 MMBTU/ yr 3,832,704.96 Gasoline gallon equivalent o No livestock/agriculture o No Wrrf Kentucky Aluminum o Aluminum Rod Mill 1987 State Rte 3543, Hawesville, KY 42348 Operational Projects o Big Run Project at Boyd County Sanitary Landfill All gas going into pipeline to earn enviro attributes 1,705,000 standard cubic feet per day Upgraded gas 560,092.50 upgraded MMBTU/ year 4,992,179 Gasoline Gas Equivalent / year o Outer Loop Landfill Creates high BTU RNG injected into the pipeline infrastructure. 822,480 upgraded MMBTU per year 7,330,873 Gasoline Gas Equivalent / year o No livestock/ agriculture o No wrrf Texas Copper o Southwire - Denton Plant o Southwire - Houston Facility Operational Projects o Landfills Atascocita/Humble (WM, Montauk) Coastal Plains RNG Edinburg Landfill (Morrow) Fort Bend Regional Landfill (DTE Biomass Energy) Galveston County Landfill Garland/Charles M. Hinton Jr. Regional Landfill Greenwood Farms Landfill/Tyler (Morrow "East Texas") McCarty Road Landfill (Republic, Montauk) McCarty Road 2 (Ameresco) McCommas Bluff Landfill (Energy Power Partners) North Texas Municipal Water District, Melissa ("NTMWD") (Morrow) Pine Hill/Longview (Kilgore) (Morrow) Renovar Arlington (Coalition database) Republic Services Blue Ridge Landfill ("Houston") (Morrow) Seabreeze Environmental Landfill (Seabreeze, DTE Biomass) Skyline Landfill Tessman Road (Coalition database) Turkey Creek Landfill/Alvarado (Morrow) o Livestock and agriculture o Cactus Digester Gas Utilization Plant (Coalition database) The product gas capacity is 1,173 MMBtu/day 428,145 MMBtu/ year Dalhart RNG, LLC (JBS USA) 50,000 MMBtu/ year 445, 657 gasoline gas equivalent/ year Wwrf Dos Rios Water Recycling Center