SNSF-M-LI-001 Rev.01 Mechanical Equipment List (AP)

advertisement
DOCUMENT NO
SNSF-M-LI-001
PROJECT TITLE
SOUTH SENORO FACILITIES
DISCIPLINE
MECHANICAL
REV : 01
AREA
N/A
PAGE : 1 / 4
ISSUED DATE
22/08/2023
LIST
MECHANICAL EQUIPMENT LIST
REVISION SHEET
01
22/08/23
Re-Approved for Bid
BAR
SYW
AHB
0
18/01/2022
Approve For Bid
IG / AF
AND
WHY / SD
B
21/12/2021
Issued for Approval
IG / AF
AND
WHY / SD
A
25/11/2021
Issued for Review
AF / DH
AND
WHY / SD
REV
DATE
PURPOSE
PREPARED
BY
CHECKED
BY
APPROVED
BY
DOCUMENT NO
SNSF-M-LI-001
MECHANICAL EQUIPMENT LIST
REV :
01
PAGE : 2 / 4
ISSUED DATE
22/08/2023
LIST
TABULATION OF REVISED PAGES
SHEET
REVISION
SHEET
REVISION
DOCUMENT NO
SNSF-M-LI-001
MECHANICAL EQUIPMENT LIST
REV :
01
PAGE : 3 / 4
ISSUED DATE
22/08/2023
LIST
REVISION SHEET
No.
PAGE
DESCRIPTION
1
4
Remove ‘Temporary’ description from Pig Launcher (Cluster#3) and Pig Receiver (CPP).
MECHANICAL EQUIPMENT LIST
SOUTH SENORO FACILITIES
Rev.
PID/PFD
Number
Tag No.
Q'ty
Part of
Package
Description
MIGAS
Certificate
(Yes/No)
Capacity Each
Horizontal
Yes
-
Status
New/ Existing
Equipment Type
Rental
% of
Plant
Duty
Operating
Design
Dimension
Material
(Note 1)
Driver Power
(kW)
-
Carbon Steel + 1mm
CA
Pressure
(psig)
Temp.
(°F)
Pressure
(psig)
Temp.
(°F)
Width /
Dia
LL /
Length
TT /
Height
100%
497 - 1,005
146 - 169
2,885
-20 / 225
Min. Barrel : 18"
Maj. Barrel : 22"
(Note 1)
Project No
:
Doc. No.
:
SNSF-M-LI-001
Revision
:
01
Date
:
22/08/2023
Page
:
4/4
Weight
Remarks
Dry
Oper
N/A
8693* Kg
(Note 4)
(Note 1)
Facility Location : Senoro Wellheads
Process System : Wellhead and Flowline
0
SNSF-R-PI-904
SNO-L-0001
1 (One)
-
Pig Launcher
0
SNSF-R-PI-901
SNO-PK-0030
1 (One) Rack 8 (Eight) Cylinder
-
N2 Cylinder Bottle Package Cluster #B
New
Vertical
(Cylinder Bottle)
Yes
6* Nm3 / Cylinder Bottle
N/A
100 - 110
68 - 100
150*
-20 - 100 °F
2200* mm
(Note 6)
675* mm
(Note 6)
2530* mm
(Note 6)
(Note 1)
N/A
±800* Kg
(Note 4)
±1200* Kg
(Note 4)
0
SNSF-R-PI-902
SNO-PK-0040 A/B
2 (Two) Rack 16 (Sixteen)
Cylinder
-
N2 Cylinder Bottle Package Cluster #6
New
Vertical
(Cylinder Bottle)
Yes
6* Nm3 / Cylinder Bottle
N/A
100 - 110
68 - 100
150*
-20 - 100 °F
2200* mm
(Note 6)
675* mm
(Note 6)
2530* mm
(Note 6)
(Note 1)
N/A
±1600* Kg
(Note 4)
±2400* Kg
(Note 4)
0
SNSF-R-PI-903
SNO-PK-0050
1 (One) Rack 8 (Eight) Cylinder
-
N2 Cylinder Bottle Package Cluster #3
New
Vertical
(Cylinder Bottle)
Yes
6* Nm3 / Cylinder Bottle
N/A
100 - 110
68 - 100
150*
-20 - 100 °F
2200* mm
(Note 6)
675* mm
(Note 6)
2530* mm
(Note 6)
(Note 1)
N/A
±800* Kg
(Note 4)
±1200* Kg
(Note 4)
Located at Cluster #3
Each well consist of 4 N2
bottles
(2 operation, 2 standby)
Each well consist of 4 N2
bottles
(2 operation, 2 standby)
Each well consist of 4 N2
bottles
(2 operation, 2 standby)
Facility Location : Senoro CPP
Process System : Process Area Separation
0
SNSF-R-PI-904
SNO-R-0001
1 (One)
-
Pig Receiver
Rental
Horizontal
Yes
-
100%
497 - 1,005
146 - 169
2,885
-20 / 225
Min. Barrel : 18"
Maj. Barrel : 22"
(Note 1)
-
Carbon Steel + 1mm
CA
N/A
10571* Kg
(Note 4)
(Note 1)
0
SNSF-R-PI-905
SNO-V-1001
1 (One)
-
Slug Catcher
New
Horizontal
Yes
4155.83 ft³
100%
920
106.5 - 116.1
1.300
-20 / 140
ID : 3040 mm
T/T : 15200 mm
-
Carbon Steel + 3mm
Clad Alloy 825
N/A
327,311 lbs
(Note 4)
517,544 lbs
(Note 4)
NOTE:
1. * / VTA: VENDOR to advise; VTC: VENDOR to confirm; Provide by VENDOR
2. Material: NACE requirement is only applicable for where contact directly with sour fluid.
3. Design condition, additional equipment and sizing basis to be confirmed by VENDOR.
4. Preliminary information only, will provide by VENDOR during detail design.
5. N/A : Not Applicable
6. Preliminary dimensions for one rack.
Located at CPP