DOCUMENT NO SNSF-M-LI-001 PROJECT TITLE SOUTH SENORO FACILITIES DISCIPLINE MECHANICAL REV : 01 AREA N/A PAGE : 1 / 4 ISSUED DATE 22/08/2023 LIST MECHANICAL EQUIPMENT LIST REVISION SHEET 01 22/08/23 Re-Approved for Bid BAR SYW AHB 0 18/01/2022 Approve For Bid IG / AF AND WHY / SD B 21/12/2021 Issued for Approval IG / AF AND WHY / SD A 25/11/2021 Issued for Review AF / DH AND WHY / SD REV DATE PURPOSE PREPARED BY CHECKED BY APPROVED BY DOCUMENT NO SNSF-M-LI-001 MECHANICAL EQUIPMENT LIST REV : 01 PAGE : 2 / 4 ISSUED DATE 22/08/2023 LIST TABULATION OF REVISED PAGES SHEET REVISION SHEET REVISION DOCUMENT NO SNSF-M-LI-001 MECHANICAL EQUIPMENT LIST REV : 01 PAGE : 3 / 4 ISSUED DATE 22/08/2023 LIST REVISION SHEET No. PAGE DESCRIPTION 1 4 Remove ‘Temporary’ description from Pig Launcher (Cluster#3) and Pig Receiver (CPP). MECHANICAL EQUIPMENT LIST SOUTH SENORO FACILITIES Rev. PID/PFD Number Tag No. Q'ty Part of Package Description MIGAS Certificate (Yes/No) Capacity Each Horizontal Yes - Status New/ Existing Equipment Type Rental % of Plant Duty Operating Design Dimension Material (Note 1) Driver Power (kW) - Carbon Steel + 1mm CA Pressure (psig) Temp. (°F) Pressure (psig) Temp. (°F) Width / Dia LL / Length TT / Height 100% 497 - 1,005 146 - 169 2,885 -20 / 225 Min. Barrel : 18" Maj. Barrel : 22" (Note 1) Project No : Doc. No. : SNSF-M-LI-001 Revision : 01 Date : 22/08/2023 Page : 4/4 Weight Remarks Dry Oper N/A 8693* Kg (Note 4) (Note 1) Facility Location : Senoro Wellheads Process System : Wellhead and Flowline 0 SNSF-R-PI-904 SNO-L-0001 1 (One) - Pig Launcher 0 SNSF-R-PI-901 SNO-PK-0030 1 (One) Rack 8 (Eight) Cylinder - N2 Cylinder Bottle Package Cluster #B New Vertical (Cylinder Bottle) Yes 6* Nm3 / Cylinder Bottle N/A 100 - 110 68 - 100 150* -20 - 100 °F 2200* mm (Note 6) 675* mm (Note 6) 2530* mm (Note 6) (Note 1) N/A ±800* Kg (Note 4) ±1200* Kg (Note 4) 0 SNSF-R-PI-902 SNO-PK-0040 A/B 2 (Two) Rack 16 (Sixteen) Cylinder - N2 Cylinder Bottle Package Cluster #6 New Vertical (Cylinder Bottle) Yes 6* Nm3 / Cylinder Bottle N/A 100 - 110 68 - 100 150* -20 - 100 °F 2200* mm (Note 6) 675* mm (Note 6) 2530* mm (Note 6) (Note 1) N/A ±1600* Kg (Note 4) ±2400* Kg (Note 4) 0 SNSF-R-PI-903 SNO-PK-0050 1 (One) Rack 8 (Eight) Cylinder - N2 Cylinder Bottle Package Cluster #3 New Vertical (Cylinder Bottle) Yes 6* Nm3 / Cylinder Bottle N/A 100 - 110 68 - 100 150* -20 - 100 °F 2200* mm (Note 6) 675* mm (Note 6) 2530* mm (Note 6) (Note 1) N/A ±800* Kg (Note 4) ±1200* Kg (Note 4) Located at Cluster #3 Each well consist of 4 N2 bottles (2 operation, 2 standby) Each well consist of 4 N2 bottles (2 operation, 2 standby) Each well consist of 4 N2 bottles (2 operation, 2 standby) Facility Location : Senoro CPP Process System : Process Area Separation 0 SNSF-R-PI-904 SNO-R-0001 1 (One) - Pig Receiver Rental Horizontal Yes - 100% 497 - 1,005 146 - 169 2,885 -20 / 225 Min. Barrel : 18" Maj. Barrel : 22" (Note 1) - Carbon Steel + 1mm CA N/A 10571* Kg (Note 4) (Note 1) 0 SNSF-R-PI-905 SNO-V-1001 1 (One) - Slug Catcher New Horizontal Yes 4155.83 ft³ 100% 920 106.5 - 116.1 1.300 -20 / 140 ID : 3040 mm T/T : 15200 mm - Carbon Steel + 3mm Clad Alloy 825 N/A 327,311 lbs (Note 4) 517,544 lbs (Note 4) NOTE: 1. * / VTA: VENDOR to advise; VTC: VENDOR to confirm; Provide by VENDOR 2. Material: NACE requirement is only applicable for where contact directly with sour fluid. 3. Design condition, additional equipment and sizing basis to be confirmed by VENDOR. 4. Preliminary information only, will provide by VENDOR during detail design. 5. N/A : Not Applicable 6. Preliminary dimensions for one rack. Located at CPP