Replace Street Lantern
Building 3 Carpark
Ng KW
Acro Avenue Sdn Bhd
1 day
TBA
Likelihood
1
2
5
5
10
4
4
8
3
3
6
2
2
4
1
1
2
RISK ASSESSMENT
Example
The most likely result of the hazard/event being realized
Has a good chance of occurring and is not unusual
Might be occur at sometime in future
Has not been known to occur after many years
Is practically impossible and has never occurred
Step No.
Sequence of Basic
Job
Step/Observation
1
Rating
5
4
3
2
1
Severity
Catastrophic
Fatal
Serious
Minor
Negligible
Severity
3
15
12
9
6
3
4
20
16
12
8
4
5
25
20
15
10
5
High
Medium
Low
Critical
Example
Numerous fatalities, irrecoverable property damage and productivity
Approximately one single fatality major property damage if hazard is realized
Non-fatal injury, permanent disability
Disabling but not permanent injury
Minor abrassions, bruises, cuts, first aid type injury
Rating
5
4
3
2
1
Likelihood X Severity = Risk Ranking
Hazard Identification
Hazard
Effect
Work place and site
inspection.
Slip,trip & Fall
Body injury
2
Loading and
unloading materials
ergonomic hazard (manual
handling)
3
Mobilize skylift to
work area
4
Operating the
Skylift
5
To replace the
Street Lantern
Falling object/electricity
Serious Body
Injury/Fatality
6
Housekeeping
Tripping hazard from leftover
materials.
Bodily injury
Collision with other equpments
Fall from height/falling object
Issues by : Toh CW
Designation : Project Engineer
Issuance Date : 24/07/2023
Reviewed and verified by : …..............................................
Designation : …............................
Date : ….....................
Approved by : …...........................................................
Designation : …............................................................
Date : ….......................................
Current Risk Control
Review the site emergency evacuation plan and advise site management of
work activity on the day. Become familiar with the site safety signage and
follow all instructions.Be aware on the work route and obtruction. Must
undergo sine safety induction program
Risk Assessment
Risk Ranking
Score
Level
Likelihood Severity
Additoinal Risk Control (if
needed)
1
1
1
Low
Na
1
2
2
Low
Na
All worker must carefully and to check all hazard, and access during mobilize
the skylift
3
1
3
Mi
Na
Serious Body
Ensure work force using basic PPE,safety shoes, helmet, body harness (100%
Injury/Fatality/Property tie off).
damage
4
3
12
Mo
1.Toolbox briefing.
2.Supervision.
1.To secure the work
material safely
2.To ensure no power
supply with test pen
Muscle and join sprain To emphasize buddy system and to have working schedule
Body injury/Property
damage
1.To use body harness and proper PPE
2.To Switch Off the power supply before any wiring connection works
4
3
12
Mo
Always be careful and alert hazard around