PRESENTACIÓN GEOLOGÍA ABRIL 2023 (003)

advertisement
GEOLOGÍA y EXPLORACIONES
UNIDAD MINERA
UNTUCA
UNTUCA, ABRIL 2023
INVENTARIO DE RECURSOS – MARZO 2023
Cut Off
MEDIDO
Tmh
MEDIDO + INDICADO
INDICADO
Au g/t Onz. Au
Tmh
Au g/t Onz. Au
Tmh
Au g/t
TOTAL
INFERIDO
Onz. Au
Tmh
Au g/t Onz. Au
Tmh
Au g/t
Onz. Au
9,174,409 1.06 313,053 23,104,367 1.12 829,717 12,289,944 1.07 422,715 35,394,312 1.10 1,252,433
>= 0.0
13,929,958 1.15 516,664
>= 0.8
9,040,245 1.51 440,265
5,388,261 1.48 256,660 14,428,506 1.50 696,924
6,852,487 1.58 348,830 21,280,993 1.53 1,045,755
>= 1.0
6,869,225 1.72 379,042
4,165,572 1.66 221,757 11,034,796 1.69 600,798
5,460,666 1.76 308,824 16,495,462 1.72
>= 1.3
4,633,584 2.00 298,517
2,695,098 1.94 168,326 7,328,683 1.98 466,843
3,744,064 2.04 245,951 11,072,747 2.00
>= 1.5
2,981,748 2.33 223,294
1,998,584 2.14 137,405 4,980,332 2.25 360,699
2,881,551 2.24 207,413
>= 1.8
1,977,111 2.69 170,851
1,261,037 2.44
98,870 3,238,148 2.59 269,720
1,924,485 2.54 157,049
>= 2.0
1,540,688 2.92 144,498
922,340 2.64
78,416 2,463,028 2.81 222,914
1,468,264 2.74 129,343
Medido
ETAPA
TIPO_MINADO
OPEN PIT
MINA_ORIGEN
AREA_ORIGEN
ESPERANZA
ESPERANZA NORTE
Total ESPERANZA
CRUZ DE ORO
OPCION 3_ETAPA 1 y 2
Total CRUZ DE ORO
Total OPEN PIT
OPERATIVO
SUBTERRANEO
Subsidencia (1,156,779 Tn @ 2.85 g Au/Tn)
LOMADA
LOMADA
Total LOMADA
POMARANI ALTO
POMARANI
POMARANI BAJO
Total POMARANI
SANTA ROSA
SANTA ROSA
Total SANTA ROSA
ESPERANZA
ESPERANZA SUR
Total ESPERANZA
OPCION 3_ETAPA 3
CRUZ DE ORO
OPCION 3_ETAPA 4
OPCION 3_ETAPA 5
Total CRUZ DE ORO
ISABEL
ISABEL NORTE
Total ISABEL
Total SUBTERRANEO
Total OPERATIVO
Total general
tmh.
Au g/t
7,861,883 2.25
5,162,633 2.57
3,931,292 2.79
Indicado
Oz Au.
tmh.
Au g/t
Oz Au.
909,622
712,794
568,112
426,769
352,257
Total tmh. Total Au g/t Total Oz Au.
1,610
1,610
38,335
38,335
2.20
2.20
2.40
2.40
114
114
2,960
2,960
4,095
4,095
30,529
30,529
2.22
2.22
2.43
2.43
293
293
2,383
2,383
5,705
5,705
68,864
68,864
2.22
2.22
2.41
2.41
406
406
5,343
5,343
39,945
2.39
3,073
34,624
2.40
2,676
74,569
2.40
5,749
59,240
59,240
110,648
55,193
165,841
62,605
62,605
51,258
51,258
814,211
120,445
215,861
1,150,517
11,281
11,281
3.25
3.25
3.30
2.72
3.11
3.93
3.93
2.61
2.61
2.81
2.86
3.02
2.85
2.71
2.71
6,184
6,184
11,743
4,829
16,573
7,908
7,908
4,305
4,305
73,456
11,080
20,937
105,473
983
983
3,077
3,077
96,111
34,765
130,876
39,503
39,503
67,872
67,872
503,190
39,746
82,220
625,156
21,232
21,232
2.23
2.23
2.66
2.64
2.66
2.87
2.87
2.53
2.53
2.64
2.70
2.85
2.67
2.26
2.26
221
221
8,229
2,950
11,180
3,643
3,643
5,517
5,517
42,650
3,452
7,536
53,638
1,541
1,541
62,317
62,317
206,759
89,958
296,717
102,108
102,108
119,130
119,130
1,317,401
160,191
298,081
1,775,673
32,513
32,513
3.20
3.20
3.00
2.69
2.91
3.52
3.52
2.56
2.56
2.74
2.82
2.97
2.79
2.41
2.41
6,405
6,405
19,972
7,780
27,752
11,552
11,552
9,822
9,822
116,106
14,532
28,474
159,111
2,523
2,523
1,500,743
2.93
141,425
887,716
2.65
75,740
2,388,459
2.83
217,164
1,540,688
2.92
144,498
922,340
2.64
78,416 2,463,028
2.81
222,914
1,540,688
2.92
144,498
922,340
2.64
2.81
222,914
78,416
2,463,028
66 %
PERFORACIÓN DIAMANTINA – POMARANI
DIAMEC-U6
GAL 7339 N, NV-4960
Programa: 303m.
Potencial:
30,125TM@2.30gr.Au
MANTO 1
Recursos de
Mineral (M+I):
133,000 tn @ 2.68
RECURSOS MINERAL CDO - ESPERANZA
Esperanza
Norte
Etapa
5
Taller
CDO
CDO – E3
Cx 370
Túnel
Esperanza
Gal 3
Recursos de
Mineral (M+I):
76,136 tn @ 2.53
Potencial de Mineral:
210,000 tn @ 2.41
RECURSOS MINERAL CDO - ESPERANZA
Esperanza
Norte
Etapa
5
Taller
CDO
CDO – E3
Cx 370
Túnel
Esperanza
Gal 3
Recursos de
Mineral (M+I):
76,136 tn @ 2.53
Potencial de Mineral:
210,000 tn @ 2.41
RECURSOS MINERAL CDO - ESPERANZA
PERFORACIÓN DIAMANTINA – 2023
PERFORACION DIAMANTINA CORIPUNO 2023
MÁQUINA
MINA
ZONA
LABOR
CONTRATA
METROS FECHA INICIO FECHA FIN
CRUZ DE ORO
ESPERANZA
SUPERFICIE (Taller Mantto)
CRUZ DE ORO
ESPERANZA
TÚNEL ESPERANZA
TORREMANI
TORREMANI
SUBTERRANEO
B 100 (120max)
CRUZ DE ORO ESPERANZA NORTE
SUPERFICIE
POMARANI
BAJO
GAL 7424 - NV 4892
DIAMEC-U6 (400max)
POMARANI
BAJO
GAL 925 - NV 4892
CERRO LA TORRE CLT- SAN MIGUEL
SUPERFICIE
CS14 (900max)
ISABEL
ISABEL SUR
SUPERFICIE
SFP DRILLING
SFP DRILLING
SFP DRILLING
SFP DRILLING
CORI PUNO
CORI PUNO
SFP DRILLING
SFP DRILLING
1200
1100
2000
1500
750
750
1500
2000
ACTUAL
16/05/2023
ACTUAL
1/08/2023
ACTUAL
1/05/2023
ACTUAL
1/06/2023
DIAMEC 232 (60max)
ACTUAL
DRILL-CAT (300max)
LM 75 (600max)
H 400 (600max)
15/05/2023
30/06/2023
31/07/2023
30/09/2023
30/04/2023
30/06/2023
31/05/2023
31/07/2023
COMENTARIOS
Perforación de la zona intermedia de Esperanza y CDO Etapa 3.
Perforación al SE del Cx. 480 (Nv. 4460)
Perforación Manto Principal
Perforación al norte del Open Pit
Pomarani Bajo , recategorización de recursos Manto 1-2
Profundización (Nivel Esquistos Porfidoblásticos) (Concesión San Miguel Untuca)
Profundización (Nivel Esquistos Porfidoblásticos Y Lodolíticos) Recomendación de Warren Pratt.
VETASPATA
PUKAMANI
SUPERFICIE
CORI PUNO
1200
CENTRAL
CRUZ DE ORO
VILACOTA
NEVADOS
ESPERANZA
VILACOTA ESTE
POLVORÍN CENTRAL
TÚNEL ESPERANZA
SUPERFICIE
SFP DRILLING
SFP DRILLING
SFP DRILLING
700
800
1500
20/04/2023 31/05/2023 Perforación a la Formación Sandia (Niveles Superiores) (Pizarras)
1/06/2023 30/06/2023 Perforación al E de la Gal. 27 (Nv. 4460)
1/05/2023 30/06/2023 Continuidad de Mantos de La Rinconada
MYLAGROS
MYLAGROS
SUPERFICIE
SFP DRILLING
1500
1/07/2023
31/05/2023 Perforación en el Proyecto Vetaspata
30/09/2023 Perforación niveles de Esquistos Porfidoblasticos