[ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 1. INTRODUCTION The Environmental Audit which was undertaken as per Section 19 of the Environmental Assessment Act No. 10 of 2011. The audit was also undertaken to fulfil the obligations of the contractual loan agreement between the Botswana Government, represented by the Ministry of Agriculture and African Development Bank (AfDB) on the implementation of the above mentioned project. The audit was conducted jointly by the following institutions: Department of Environmental Affairs; Department of Waste management and Pollution Control; Department of Water Affairs; Chobe District Council (Roads and Environmental Health); and Chobe Land Board. The Departments of Mines and Department of Meterological Services did not participate although they were invited. 2. AUDIT OBJECTIVES The objectives of the environmental audit were to: a) b) c) d) Establish whether the project is complying with the conditions of authorisation of the EIA report, especially with regard to the mitigation measures and impact management/monitoring recommendations outlined in the approved Environmental Management Plan; Establish the effectiveness of the mitigation measures and impact management/monitoring recommendations outlined in the approved Environmental and Social Monitoring Plan; Establish whether there are any other impacts that were not predicted; and Make appropriate recommendations to address issues that require corrective actions where applicable. 3. SCOPE OF AUDIT The scope of audit covered issues related to management of effluent from the farms; pollution of water, soil and air; resource use; security, health and safety; and general considerations at the following areas: o Contractors Camp o Electric Perimeter Fence o Road networks 1|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] o Borrow Pits o Drainage Facilities o Underground Water Quality Monitoring Furthermore the audit covered aspects related to health, community relations, crime and other social issues that the project, nay impact upon. This is particularly important in that the environmental assessment of the project had a strong social comoponent. 4. METHODOLOGY The methodology used for undertaking the audit involved the following: a) Literature review An extensive review of the ESIA report/ESMP that was approved in 2007 was undertaken prior to the actual audit in order to confirm the impacts that were predicted together with the recommended mitigation measures. The minutes of the ESMP Monitoring Unit meeting were also reviewed to assess effectiveness of the aspects such as project implementation structures and the level of implementation by the various role players in the ESMP. b) Pre-audit site visit DEA Team undertook a pre-audit site visit on the 24th September, 2012. This was a reconnaissance visit for the Team to familiarise themselves with the project set–up and activities in order to inform the scope of the audit, audit plan and logistics. The observations and information obtained during the pre – audit visit was also used to determine the audit scope and guide the actual audit. c) Physical site audit During the actual audit the Audit Team undertook site inspections, interviews, reviewed and analysed documents to verify information. 5. AUDIT TEAM The audit team comprised the following officers from the participating institutions: 2|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Department of Environmental Affairs; Department of Waste management and Pollution Control; Department of Water Affairs; Chobe District Council (Roads and Environmental Health); and Chobe Land Board. The Departments of Mines and Department of Meterological Services did not participate although they were invited 6. SUMMARY STATEMENT OF THE AUDIT FINDINGS The audit team wishes to thank the auditee which is the Department of Crop Production in the Ministry of Agriculture and its associated project implementing partners, EREIS (Pty) Ltd, (The Environmental Consultants), DIWI Engineering Consultants and China Jiangxi Corporation for their cooperation and assistance during the audit exercise. The audit team was generally satisfied with the measures that have been put in place to mitigate against the environment and social impacts of the project. For example the plan for disposing the excess overburden material from the drainage canals and road network, the creation of retention ponds which reduces borrow material while on the other hand creates an opportunity for storage of drainage water for possible re-use. There is evidence of responsiveness by the Supervising Consultants on emerging issues.A case in point is the on-going consultations regarding the impact of construction of road culvert on the BAMB road on the neighboring farms and dust impacts on the poultry farm. However the audit team has identified a number of serious evidence of non-compliance with the approved ESMP and general disregard to environment and social considerations. This is particularly evident on the component of construction works in the borrow pits and the operations within the contractor’s camp. Major non-compliance issues are storage and handling of fuels and hazardous waste especially used oil and used oil filters; liquid waste management and occupational health and safety especially lack of personal protective equipment for workers at the workshop, evidence of lack of commitment to workers welfare. It would seem that there is limited or no commitment on overall environment and social impacts of the project by senior management of the construction company – China Jiangxi. 3|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Furthermore the audit has also generally revealed that there is still alot that needs to be done to mitigate the social impacts of the project especially to the village of Pandamatenga. The audit has revealed that the village leadership does not have a sense of ownership to the project. Some of the concerns that are obtained within the community are limited employment opportunities for the people of Pandamatenga, lack of investments in corporate social responsibility by the contractors of the project and lack of involvement of village leadership in the project especially regular briefing about the project. Based on the foregoing it can be concluded that there is lack of clear established communication channels among interested and affected parties. There is evidence of increased pressure on existing services such as health and law enforcement. The client which is DCP, Contractor and supervising consultant should engage with the village leadership and other local structures to develop strategies of making sure that the project is environmentally, socially and economically beneficial to the host community. 7.0 AUDIT FINDINGS The following sections present the detailed findings of the audit. 7.1 CONTRACTORS CAMPS 7.1.1 Fuel Storage Area There are five tanks for storage of diesel with each tank of twenty two thousand litres (22 000 l). Two tanks are kept in an open bunded containment facility of 44.33 cubic metres which is less than the stipulated 110% with no drain plug and oil separators. There was one tank which was found empty. Fuelling point is not bunded. There are signs of oil spillages in the bounded area and over spillage probably during refilling. Fuel is leaking from one of the pipes in one of the storage tanks as a five (5) litre paint container was observed full of diesel collecting from the leaking pipe. Litter was also observed at the fuel storage site. Fuel spills observed on the fuel bay. Interviews with fuel handling employee indicated that he has background in the fuel industry but has not been trained. Interviews with the SHE Officer revealed that there is no spillage management plan. Only two small serviced fire extinguishers (4.5kg and 5kg) were found at the fuel point. There are no adequate warning signs. Electrical 4|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] cables were observed uncovered with the bound wall. Signs of fuel seepage on the bound wall were observed. Fig 1: Oil spillages at fuel storage point 7.1.1.1 Recommendations A drain plug should be installed on the bund walls fitted with an oil separator Fuelling bay should be properly drained, connected to the oil separator and extended to service all the Tanks Oil spillage observed at the fuel bay should be cleaned. All leakages in the fuel storage system should be identified and fixed accordingly More fire extinguishers should be placed at the site Adequate warning signs should be provided. Electrical cables should be properly covered All litter should be collected and disposed off accordingly Bound wall should be properly sealed with impermeable material 5|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.1.2 Workshop Area It was observed that generally most of the staff were not provided with appropriate Personal Protective Equipment (PPE). Staff were found wearing torn overalls and without protective hand gloves. The workshop was not properly demarcated and poor housekeeping observed. No safety signs, first aid kit and fire extinguishers were observed. Evidence of oil spillage around the parking bay was found which may be attributed to repair of vehicles anywhere in the workshop area. A heap of oil contaminated soil was stored in a plastic membrane but not contained in proper bund walls. The area for holding containers (drums) with used oil had bund walls on the side however, oil contaminated litter was observed around the area. Fig 2: Scrap materials at Workshop Area 6|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.1.2.1 Recommendations All Staff should be provided with appropriate Personal Protective Equipment (minimum of two per employee) Provide the workshop area with safety signs, first aid kit and fire extinguishers Repair/ maintenance of vehicles should be confined to the garage area which should also be properly drained and connected to an oil separator The facilities for holding used oil should be cleaned off litter A proper salvage yard area should be constructed at the site Oil contaminated soils should be contained in a bunded area and progressively treated. All oil contaminated soil spots should be excavated, contained and properly treated The workshop area should be properly demarcated and housekeeping improved 7.1.3 Solid and liquid waste Management Facility There was solid waste storage facility at the contractor’s camp entrance, on the road reserve. The refuse cage is full of mixed waste materials. The gate for the refuse cage was broken. There are no solid waste receptacles within the camp. Liquid waste from the residential area is directed into the septic tanks. It was observed that the septic tank is covered with boards on top with no proper coverage with strong impermeable material such as concrete with proper inspection chambers. There was an indication of liquid waste leaking from the septic/conservancy tank. Interviews with the SHE officer revealed that the inhabitants irrigate their vegetables with raw sewage from the kitchen and laundry which has the possibility of contaminating the underground water and causing waterborne diseases. It was reported that the tanks are emptied by Chobe District Council on regular basis and that payment has been done for regular emptying. 7|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Fig 3 : Solid waste storage facility at the contractor’s camp entrance 7.1.3.1 Recommendations The waste collection facility should be relocated into the camp plot (leased area) and properly constructed Waste receptacles should be provided within the camp and emptied regularly Pandamatenga village is supplied with borehole water and therefore irrigation with raw sewage is not permitted. The constructed conservancy tank should be properly constructed and covered with concrete slab. Regular emptying of conservancy tanks should be done and the Contractor should ensure that there is no pollution of the environment and the underground water The contractor should make sure it does not overspill and there are no leakages 8|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.2.0 ELECTRIC PERIMETER FENCE During the audit, a 2.4 m electric fence was already erected at the periphery of the new commercial farms on the south eastern part of the existing farms as a measure to prevent wildlife from invading the new farms. The electric fence covers a distance of about 50 km and was constructed by a 100 % citizen owned company, Fourie Investments (Pty) Ltd. Solar power is the source of electric current of about 6.0 - 8.8 kV that powers the electric fence. The team audit observed 4 solar power sub stations at strategic locations along the fence, each servicing 8 km on either side. Fig 4 : Electric Fence and one of the solar power sub stations 7.2.1 Condition of the fence The audit team noted that the fencing material particularly the poles were of low quality as observed by easy breakage thereof when hit by animals. This was exacerbated by the fact the poles used were the perforated type different from the ones used in the existing fence erected in 2000 (Fig 4). The team observed that poles mainly broke at perforations resulting in the fence falling off in certain areas, i.e the holes in the poles create weak points within the pole. The Department of Wildlife and National Parks (DWNP) informed the audit 9|Page [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] team that they were not consulted at the design stage of the fence to advice and have input on the final selection of the fencing material as per the recommendations of the design documents. Fig 5 : Perforated Electric Fence Poles Fig 6 : Pole broken at the perforation 10 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] The electrician from Fourie Investments (Pty) Ltd informed the team that the fence has been repaired by the contractor on several occasions due to the above. Records on the maintenance of the fence were said to be unavailable. 7.2.2 Human - Wildlife conflict The audit team noted several cases of human – wildlife conflict as reported by the DWNP through the Chobe Wildlife Regional Office mainly due to existence of wildlife within the new fence area. The DWNP informed the audit team that they were tasked by the Ministry of Agriculture to mitigate human wildlife conflict in the Pandamatenga Agricultural Development. Part of the objective of this exercise was for a total depopulation of wildlife from the new farms being fenced to reduce the levels of human wildlife conflict. In cooperation with the Ministry of Agriculture and Fourie Investments (fencing contractors) the DWNP managed to remove about 450 animals from the new fenced area. Some wildlife was however left within the fence area after the first removal exercise. Table 1.0 and 1.1 show the animals removed from the new fenced area and those left within the fence. Species Number Eland 380 Tshessebe 40 Roan 24 Giraffe. 6 Table 1.0 Number of wildlife removed from the new fenced area. (Source, DWNP) 11 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Species Number Roan 8 Impala 5 Ostrich 20 Tshessebe 10 Zebra 10 Eland 2 Giraffe 2 Black-backed Jackals 2 Table 1.1 Number of animals left within the new fenced area (Source, DWNP) The team also found out that the Chobe Regional Wildlife Office developed and submitted to the director of DWNP for approval a work plan and request for support and equipment to ensure the successful completion of total depopulation exercise. According to the Regional Office, the plan and request referred to above were never approved and they have since been compelled to continue providing water at various points. The team observed 3 watering points at farm 108QO, 105QO and 100QO where the regional wildlife office supplies animals with water through a water bowser at regular intervals. This has resulted in more animals being attracted back into the new fenced area. An estimated 155 animals were seen inside the fence, during the DWNP patrols (DWNP). The audit team observed some of these animals within the fenced area during the audit. According to DWNP, this situation was exacerbated by the fact that fence gates are always left open. The team further found out that some farmers were also supplying wildlife with water from their private boreholes. 12 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Fig 7 : A furrow used as watering points for wildlife Fig 8 : A watering trough used as a watering point fro wildlife 13 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Fig 9: Water pumped from a Private borehole supply wild animals The audit team established that the presence of wildlife within the fenced area resulted in a number of human wildlife conflict scenarios. The DWNP through the Regional Wildlife office reported cases of injuries to wildlife by farmers, crop damage and livestock predation by wildlife. It was reported to the audit team that a total of 110 livestock were lost by farmers due to lion predation since January 2012. These were 58 cattle, 40 goats, 8 sheep, 3 donkeys, and 1 horse (DWNP). A total of P73 517-25 was paid to farmers as monetary compensation (DWNP). In addition, 1 lion, 1 python and 1 leopard were reported to be injured by farmers in protection of their property (DWNP). Elands, kudus and tshessebes were also reported to be problematic with regards to crop damage to farmers who have already started ploughing. The team established that continued existence of wildlife within the new fenced area will cause more human – wildlife conflicts as at the time of audit, more farmers had already started preparing their farms for ploughing. 14 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.2.3 Wildlife Mortality In addition to the above, the audit team further established that there have since been cases of wildlife mortality due to the erection of the fence. Wildlife mortality within the new fenced area was mainly attributed to animals hitting the fence, poaching as well as natural death possibly due to harsh conditions within the fenced area. The Chobe Regional Wildlife office reported that about eleven (11) animals were killed by the fence being 4 giraffes, 4 Elands and 3 Zebras. Fig 10 shows the carcass of one the animals killed by the fence as observed by the audit team during the audit. These cases have also led to more breakages of the fence. Fig 10 : Dead zebra within the fence 15 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.2.4 Loss of wildlife habitat During the audit, some farmers had acquired burning permits from DFRR and were already debushing and clearing their farms to prepare for ploughing (Fig 11). This resulted in less/ reduced forage left for game. Animals are now left with little space for habitat and were exposed to the scotching sun with little vegetation to hide in. According to the Chobe Regional Wildlife office these animals were getting emaciated and were bound to perish. Fig 11: Cleared New farms 7.2.5 Occupational Health and safety The audit team observed a few employees of the contractor putting on protective clothing. A majority of workers were not putting on any protective clothing. In addition, the team observed adequate signage around the perimeter electric fence to warn people of the impending danger (Fig12). The Regional 16 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Wildlife office reported to the audit team that in order to ensure safety they provided escort/ protection for consultants as well as Plant Protection personnel during their surveys/ study. Fig 12: Signage on the fence 7.2.6 Illegal installation of fence within the perimeter electric fence Some of the issues that the audit team noted related to illegal construction of a fence within the electric fence by the owner of farm 94QO (Fig 13). The team had an opportunity to interview the farmer who indicated that he installed the fence to limit access and avoid poaching by farm workers from other farms. DWNP indicated that they were not aware of poaching issues mentioned by the farmer in that area as they did not record any. The Land Board also said that they did not grant the farmer permission to erect the fence. In addition, the Project Coordinator also said the farmer erected the fence without consulting them. In an interview with the farmer, he indicated that he put forward a suggestion to the Land Board and DWNP to put gates at the 17 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] entrance of his farm along his fence and lock them. He informed the team that was once the gates are put up, he was willing to avail keys to all relevant departments to access his farm. The team observed that the existence of this fence could affect the functions of the electric fence, encourage retention of game within the electric and consequently exacerbate the problem of humanwildlife conflicts. Fig 13 : Illegal fence constructed by owner of farm 94QO within the electric within the electric fence 7.2.7 Recommendations In view of the above findings, the following recommendations are made by the audit team: That DWNP embarks on and undertakes a total depopulation exercise to remove all wildlife trapped within the fence with immediate effect with a view to: Avoiding cases of human – wildlife conflicts 18 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Reducing incidents of wildlife mortality due to poaching, hitting the fence and harsh conditions within the fenced area Reducing fence breakage No wildlife should be kept within the fenced area to avoid wildlifehuman conflicts. In view of this, game farms should not be entertained within the area. DWNP and farmers cease to provide water to wildlife forthwith after the depopulation exercise. The contractor progressively maintains the fence to replace broken poles at his expense in view of the low quality material used. The DWNP should be engaged in this regard particularly with regards to procurement of appropriate fencing material. Records of fence maintenance should be kept. Gates of the new fence should be secured always to avoid animals gaining entry into the farm area Farmers affected by wildlife through crop damage and wildlife predation should be compensated whilst the depopulation exercise is ongoing. The illegal fence constructed by owner of farm 94 QO should be removed with immediate effect. No wildlife should be entertained within the fence. 7.3.0 BURROW PIT OPERATIONS 7.3.1 Access Routes The Pandamatenga Agricultural Infrastructural Development project consists of the construction of 190 km road network all weather roads within the farms. The implementation of the project necessitated the need for earth material to be sourced from identified burrow pits for the extraction of weathered basalt and decomposed granite material. The audit team visited Burrow Pit 1(BRP1) and Burrow Pit 2(BRP2) and observed that bush clearing and stockpiling of stripped topsoil had encroached outside of the leased area. The burrow pit areas at both sites are not yet fenced 19 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] or demarcated. The audit team noted that burrowing of granite material was ongoing on site and areas were very dusty. Personnel at burrow pits were not provided with appropriate protective equipment. Heavy machinery and trucks on site are not fitted with safety flash lights or beacon lights. The audit team noticed that there is no road signage along haul routes and general disregard for road signs and road safety measures. There are no road signages, speed limit signs and other traffic control measures to warn other road users of risks particularly at main road access approaches. Material haulage trucks were observed transporting material uncovered. It was very evident that dust suppression measures as approved in the Environmental and Social Management Plan for the project were not being implemented. Records on any dust suppression measures and their frequency of application were not availed during the audit. There is no first aid kit available at the quarry site for emergency injuries. There are no portable toilet facilities for workers on site thus people indiscriminately use the bush. In addition to the above, there are no solid waste receptacles on site. The access routes to burrow pits trespasses’ through other people’s properties. Fig 14: Haulage truck loaded with gravel material from one of the burrow pits 20 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.3.1.1 Recommendations As much as possible clearing should be limited to the area required for excavation activities Where possible skirting should be done within the leased area and clear demarcation of the leased area is required Vegetation clearing should be done using dozer blade raised above the soil in order to preserve vegetation rootstock. The vegetation cleared should be stockpiled appropriately and tree branches separated from dull dozed soil The topsoil should be carefully striped from the burrow pit site and stored in a separate pile from the subsoil and overburden All disturbed slopes should be maintained to quitter running or operations. Excavation should be limited to the leased area and activities should not encroach outside leased area All equipment should be maintained to ensure low noise levels Silencers should be fitted to mobile plant( exhaust and air intake fans) to reduce noise generation Operation activities should be planned to avoid prolonged noise generating activities. All machinery that will be used intermittently should be shut down during periods of inactivity. Use of insulators enclosing noise generating equipment (around processing plants) is a must Noise monitors should be used to ensure controls are effective Mining works should not be undertaken on weekends when the majority of people will be resting Workers safety must include health screening and should make use of hearing protectors Workers should be properly trained on safety measures on quarry site. Well equipped first aid kit should be on site at all times Receptacles for solid waste should be provided on site and waste should be collected and disposed off at designated refuse disposal Hauling trucks should be covered to prevent dust pollution and gravel material from falling during transportation. 21 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Speed limits of 40 km/ hr should be adhered to by construction vehicles especially along access roads to pit site and the project site Signs indicating construction and operational activities should be placed about 100m from the entrance and exit approaches to the site informing other road users of the risks and presence of turning vehicles. Contents of portable toilets for the workers should be disposed off at least twice a week 7.4 ROAD NETWORKS The project consist of the peripheral road north , west, South , East , East West Road, Access Roads 1, 2, 3, 4, 4A, 5, ARS, BAMB road as well as access roads within the new small holders farms. Currently the roads under construction are the BAMB road, Access road 2 and 5, peripheral road East and portions of the access road 1 and peripheral road West. 7.4.1 Air pollution/ decline in air quality The audit team travelled along the BAMB road, Access road 2 and 5, peripheral road east and portions of the access road 1 and peripheral road west where construction was ongoing and observed that the areas being worked on as well as the access roads being used to access these areas were very dusty. It was very evident that dust suppression measures as approved in the Environmental and Social Management Plan for the project were not being implemented Adequately. Records on any dust suppression measures and their frequency of application were not availed during the audit. Dust is a major concern as it can hamper visibility of drivers and may lead to accidents. Workers may also contact diseases due to constant exposure to dust. The dust from the road is also a nuisance to the chicken farm near the BAMB road. The poultry owner indicated that the dust has affected the chickens as they have started coughing and that this has implications on her production. 22 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] The poultry houses were observed to be around 1- 2 meters from the road. Interviews with the Environmental Control officer revealed that the Project Management and the Contractor are aware of the issue and have been in consultation with the poultry owner. It was highlighted by the Project Manager that the BAMB road will be the busiest road even during operation especially during the harvesting season hence the dust will continue even after construction. Chobe Land Board further revealed that more commercial farms have been and some will be allocated in the area. Residential dwellings particularly BAMB staff houses are also affected by the dust from the road construction works and will continue to be affected during the road operation phase. It is also worth noting that dust if not suppressed will create a problem for the subsistence farmers along the road as their crops may be covered by dust. Fig 15 : Dust observed in one of the farm roads 7.4.1.1 Recommendations Implement dust suppression measures as per the approved ESMP. Consultations with the poultry owner should continue. An assessment on the health status of the chicken should be undertaken and a 23 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] mitigation measure to prevent dust from affecting the chicken should be implemented. Special mitigation measures to suppress dust along the BAMB road should be considered for the operation phase Additional conditions for allocation of the new commercial farms along the BAMB road should be considered by the Chobe Land Board so that the prospective applicants plan ahead to mitigate against dust. Adequate dust suppression measures including regular sprinkling of water especially on loose dirt and stripped surfaces Stringent material handling/ overhauling procedures should be put in place and enforced All construction vehicles plying the access road should be tuned and maintained regularly to ensure that emission levels are kept within permissible limits Employ safe traffic control measures including road signs and flag persons to warm motorists and pedestrian of construction work signage should be complemented by traffic control officer who manages the traffic during hauling of the materials All machinery should be fitted with flashing / warning light Trucks hauling material from the quarry site should be covered at all times Trucks loaded with stone and other materials should at all times be covered from the quarry pit to point of destination To reduce dust in loading / unloading areas, consideration should be given to lowering drop height and use of water mist spray 7.4.2 Occupational Health and Safety 7.4.2.1 Provision and use of Personal Protective Clothing The ESMP for the project recommended that all employees be provided with protective clothing. It was observed during the audit that most employees on site were provided with inadequate Personal Protective Equipment (PPE). The workers were observed working in dusty areas with no masks and some with their own T- shirts instead of the relevant PPE. 24 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.2.1.1 Recommendation Workers should be provided with full Personal Protective Clothing and the SHE officer should ensure and enforce compliance. 7.4.3. Traffic Management and Signage The audit team also established that there was no traffic signage along the access roads even where construction was ongoing. This poses danger to oncoming traffic for the construction crew and the farmers/ public. Most vehicles on site were driven at high speed despite the conditions of the road. Vehicles were also observed to have no beacon lights and the head lights were not kept on though the works were done in a dusty environment. 7.4.3.1 Recommendations Signage should be provided immediately Vehicles should be installed with beacon lights which should be kept on at all times when on site A proposer speed limit should be observed. 7.4.4 Occupational Risks and Hazards Haphazard placement of materials on site posed a safety hazards to employees. Boards with needle points facing upwards were observed on site especially in area where work was concentrated. It was reported by the Station Commander that some employees have been caught driving without the requisite licenses. This poses a danger to the employees and the communities in the project site as the operator may not be competent in dealing with the machinery they are using. The audit was also made aware that one of the employees was injured (when operating) by a grader and the case was never reported .The competency of the operator was however not established. It was further established that there was no first Aid station on site even though the works were carried out very far from the village with a significant number of employees. 25 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] A section of the game fence on the BAMB road has been opened for construction and it has been indicated that a cattle grill shall be provided to prevent animal access into the farms. The team observed that a trench with safety barricade has been made for the grill. It was however reported and noted in the Environmental Supervision report of August 2012 that the gap is not being consistently manned to reduce chances of wildlife gaining access into the farms during construction. The Department of Wildlife reported that already there are some wild animals within the farms areas which should not be there and are a problem to the farmers. Though animals are not expected in this area, the construction works pose a hazard to them as they may fall into the pits or be hit by vehicles. The animals on the other hand pose a danger to the construction workers on site. 7.4.4.1 Recommendations All materials on site should be appropriately placed Employees without the requisite licenses should not be allowed to drive /operate any equipment that requires such. A mobile clinic should be considered. The game fence opening on BAMB road should be manned accordingly. Department of Wildlife should consider removing the animals in the farms areas as they will continue to be a nuisance to the farmers and resulting in high mortality rates since (as reported by DWNP) the farmers are allowed to kill them. 7.4.5 Awareness of the Environment, Health and Safety Policy including HIV/AIDS Programme. Most of the employees indicated that they have never been trained on issues of Health, Safety and Environment. It was also very clear from the records availed to the audit team that very little is done to train the workers. Only six meetings with the different sections were recorded since the project started and there was no evidence that workers were inducted to ensure that they are aware of what is expected of them in terms of implementing the ESMP requirements and the Health and Safety Policy. The said policy was also not 26 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] provided to the audit team on request. The workers were not aware of the aforementioned documents. The ESMP also recommended for an HIV/AIDS awareness programme for employees to be implemented. The safety health and environmental officer indicated that he collects condoms from the clinic and places them in toilets for the employees to collect in private. It was further established that there were no health and safety committees. 7.4.5.1 Recommendations All new employees must be inducted prior to starting any tasks Health and Safety committees must be formed immediately and Safety ,Health and Environment awareness meetings should be held occasionally with minutes of such documented 7.4.6 Waste Management Portable toilets were noted along the roads being constructed but were however not moved to active working points as the construction progresses. The auditee representatives reported that the sanitary facilities were regularly serviced and that records were available to that effect. The records were however not availed to the audit team on request. The audit team also observed that there were no dustbins provided on site. Fig 16 : Portable toilets along the roads 27 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.6.1 Recommendations Portable toilets should be moved to active working points as work progresses. The sanitary facilities should be regularly emptied and proper records should be kept. Dustbins should also be provided 7.4.7 Loss of Farm Land and Crops The construction of the access roads has impacted on the farms especially the subsistence farm land. It was noted that a culvert being installed along the BAMB road would direct all the runoff into a field which was reported to belong to Mr Moyo. The water that would be drained in to the field would harm affect the owners livelihoods, either affect the way he used to operate his farm or his harvest. The auditee representatives indicated that they have noted the impact that would be caused by the culvert and have been in consultation with the owner. They further reported that the field owner indicated that he would prefer an alternative farm land instead of cash. Some portions of commercial farm lands also had to be taken up to give way for the project especially along farm boundaries where junctions were being formed and where the road networks were running parallel to the main drainage systems. On a positive note, construction of the roads is being undertaken during the fallow season hence no crops have been lost or affected by the project. 7.4.7.1 Recommendations Assessments of the impact of flooding of the field due to the culverts (and other fields upstream the culvert) by Ministry of Agriculture, Supervising Consultants, Contractor, in consultation with Chobe Land Board. 28 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.8 Noise Pollution As it would be expected construction machinery increases the ambient noise levels within the site. It is however worth noting that the noise levels observed on site were normal construction levels. 7.4.9 Hindrance of Movement Construction of access roads as would be expected impedes movements of farm workers and farm owners within the existing commercial farms. Efforts were however noted where the constructor provided openings for the farmers to be able to cross over the access roads being created. 7.4.10 Impact on Archaeological Sites Two burial sites were observed along the peripheral road west. The audit team observed fresh tyre tracks/marks very close to the graves as well as trees which were just felled around the sites. This was evidence that the construction works encroached into the sensitive areas despite the barricade tape that was provided to prevent access. It was reported that an Archaeologist was not engaged after this incidents. 7.4.10.1 Recommendation An archaeologist registered with the Department of Museum and Monuments should be engaged to assess the site and establish the way forward. 7.4.11Soil Erosion The land scaring activities on site lead to localized disturbance of topsoil which may lead to soil erosion. There were however no evidence of soil erosion on site due to project activities. The construction works were also done at the right time with no runoff to cause and exacerbate soil erosion. It 29 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] is however important the contractor restores or seals erosion features if observed on site to ensure stability. 7.4.12 Social Issues The Pandamatenga Agricultural Infrastructure Project is a mega project with significant potential social issues. During the environmental audit the following social issues of concern cropped up; 7.4.12.1 Communication with Village Leadership Consultations with the village leadership indicated that there is no communication between the Project Management office and the village leadership. The village Chief indicated that he is not aware of the progress status of the project except that he has noticed that construction has already started. 7.4.12.1.1 Recommendation It is important that the Chief is consulted and briefed on the progress of the project. This will create a sense of ownership which will trickle down to the community members. 7.4.12.2 Health services Interviews with the Pandamantenga Clinic representative’s revealed that the services available at the clinic could not cope with the project considering the distances and the resources available. It was highlighted that the clinic has only one ambulance and very few personnel. The mobile clinic car that the clinic has is not copining with the increased farming areas. 30 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.12.3Disease Prevalence (HIV/AIDS and Malaria) Statistics provided by the Pandamatenga clinic have shown that there has been an increase n the number of HIV/AIDS cases in the area. It was however highlighted that there are many projects in the area hence the population has grown which could be attributed to the increased prevalence. Interviews with the clinic further revealed that there has been an increase in pregnancy cases with an unusual 94 recorded cases by September 2012. The nurse also said that it was worrisome that women are not given support by men under these circumstances. The pregnancy cases indicate that a significant number of the population is at risk of contacting Sexually Transmitted Diseases. The SHE officer for the contractor Mr. Mugungu told the team that there is no health and wellness committee at the contractor. He further said that he normally collect boxes of condoms from the clinic and put them at strategic locations. The audit team found out that there has not been any recorded increase in Malaria cases but were further informed that a possible increase may happen during the Malaria season with the disease affecting most of the workers who do not originate from the area hence were likely to be affected by Malaria. 7.4.12.3.1 Recommendations The contractor should have a fully functional health and wellness committee in place. The SHE officer should constantly liaise with the clinic and invite them to give educational sessions to the staff. 31 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.12.4Increase in Crime Rate The audit team was informed by the Station Commander, Pandamatenga Police that there has been an increase of crime incidents in the area. He however did not attribute the increase to the project but to an increase in the population due to a number of projects that are ongoing. It was reported during the audit that some of the employees of the Companies contracted in the project were involved in some of the incidences recorded by the police. Some of the cases attributed to the project include employment of non citizens without working permit and driving without licenses. The clinic also revealed that there is an increase in cases of assault mainly involving males possibly due to an uneven male dominated population structure. It was also established that one employee of the contractor was injured by a grater on the 18th September 2012. The Station Commander told the team that they were unaware of such a case as it was never reported to his office. The Environmental Supervision report of August 2012 for the project also recorded incidences where one worker stabbed another with a screw driver and in another incident a Chinese foreman hit a heavy duty driver with a metal pipe. 7.4.12.4.1 Recommendations All incidences should be reported to the police The SHE officer should approach the Police for them to address the staff on issues of conduct and the law. 7.4.12.5 Pressure on Limited Resources (Police and Clinic) It became apparent during the interviews with the Clinic and the Police representatives that the increase in population in the area is putting a strain in the limited resources they have. The officer in charge for Pandamatenga clinic Ms. Sithole indicated that drug supply is overstretched due to additional work force and that drugs often run out resulting in disgruntlement of patients. The team also learnt from the nurse that the clinic is not fully staffed as there is no pharmacy technician and the doctor is not based in Pandamatenga. She said 32 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] that the clinic qualifies for a doctor to be based there but there is no accommodation for the doctor in Pandamatenga and the government cites lack of funds as well. It was also noted that there is lack of transport as one ambulance has a breakdown and the clinic is relying on one ambulance that is also not equipped with life saving kit. This has resulted in some patients losing their lives on their way to Kasane for referral. The clinic also has inadequate diagnostic equipment such as oxygen equipment. The Botswana Defence Force camp often assists with admitting some patients. There is also lack of provision of mosquito nets since the service remained with the local Council when the Central Government acquired clinics. It was also cited that most homes are not open to the spraying personnel and this aggravates the problem of Malaria. The audit team noted that the Police Office in the area is also facing similar challenges as the clinic due to increase in population. The station Commander revealed that the limited resources they have particularly vehicles are overstretched and this has implications on other departments such as the Department of wildlife and National Parks (DWNP) which are normally required to assist with vehicles. 7.4.12.5.1 Recommendations The Pandamatenga Police should seek assistance from other policing areas to augment capacity The project should consider procuring another mobile clinic vehicle to assist the clinic so that they can cover the additional farms. Considerastion into provision for accommodation for the doctor and the pharmacy technician because the farms are going to be a long term establishment 33 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.4.12.6 Labour Issues The audit team learnt that employees are employed on monthly contract basis. This arrangement does not favour the employees as they may be easily expelled from work if the employer feels so. The SHE officer said that these issues were discussed with the Regional Labour Office and it was agreed that this arrangement should be ceased but that recommendation has not been implemented as yet. The team observed that this also had implications on provision of Personal Protective Equipment (PPE) as companies do not usually provide temporary staff with PPE. During the interview, the nurse indicated that they have workforce coming to the clinic at odd hours because they are not released by their seniors at work. Ms Sithole indicated that a nurse sometimes makes up to ten trips after normal working hours to attend to emergency patients who could have been assisted during the day. The nurse further indicated that some patients default on their medication particularly Anti Retroviral drugs and have often cited refusal of permission for them to go to the clinic by the senior management of the construction company. This was said to be dangerous as the patients may develop drug resistance. 7.4.12.6.1 Recommendations Labour and social relation issues should be raised with relevant authorities and should be treated with the seriousness they deserve by the contractor. Patients should be given exit permits by the employer to go to the clinic. 7.4.12.7 Impact of Project on Livelihoods The audit team observed that the construction of the farm roads particularly the BAMB road has direct impacts on two farms, namely Mr Moyo’s farm and the Poultry farm near the road. Thr culvert being installed along the BAMB road would direct all the runoff into Mr Moyo’s field. The water that would be drained in to the field would affect the owners’ livelihoods, either affect the way 34 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] he used to operate his farm or destroy his harvest. The auditee representatives indicated that they have noted the impact that would be caused by the culvert and have been in consultation with the owner. They further reported that the field owner indicated that he would prefer an alternative farm land instead of cash. The dust from the road is a problem to the chicken farm near the BAMB road. The poultry owner indicated that the dust has affected the chickens as they have started coughing and that this has implications on her production. The poultry houses were observed to be around 1- 2 meters from the road. Interviews with the Environmental Control officer revealed that the Project Management and the Contractor are also aware of the issue and have been in consultation with the poultry owner as well. Fig 17 : BAMB road passing near a poultry house 7.4.19.1 Recommendations Assessments of the impact of flooding of the field due to the culverts (and other fields upstream the culvert) by Ministry of Agriculture, Supervising Consultants, Contractor, in consultation with Chobe Land Board. 35 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Consultations with the poultry owner should continue. An assessment on the health status of the chicken should be undertaken and a mitigation measure to prevent dust from affecting the chicken should be implemented. Maintenance of roads after completion need to be considered through involvement of Chobe District Council to take over the responsibility of road maintenance. 7.5 DRAINAGE NETWORKS Drainage system is still under construction and no signs of erosion were observed. The drainage channels cover a length of thirty (30) km, a width ranging from 60-100 m with a gradient of 1: 2000. The servitude between the farm drainage channels is 15 meters but 30 m is required which will result in loss of farm land. The retention pond which was not in the initial design, will be constructed to a maximum depth of 2.5 m. The initial target was to excavate a maximum of 2 million m3 of soils from the drains. However a total of five million cubic meters (5 000 000 m3) of gravel / soil will be excavated from the drains. 3.3 million Cubic meters of the excavated material will be salvaged at areas identified in the site area. Only 1.2 million cubic of the excavated material will be used in roads construction. Black cotton soils excavated will be stockpiled together with the calcrete material. The stockpile will be to a maximum height of 1 m. Black cotton soils will be placed on top of the calcrete then vegetated to stimulate growth. Initial design of the drainage networks indicated use of bunds at the end of each farm to monitor quality of discharge at each farm to serve as monitoring points for surface. It also showed that monitoring ponds / wetland will be constructed to contain effluent before being discharged into the environment but has since been left open discharging effluent directly into the environment. This modification has not been revised in the original ESMP. There is likelihood of transboundary issues related to agrochemical contaminated water. However timing of operation done during fallow period and drainage channels done in sections hence minimize disturbance of farm 36 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] operations. Evidence of dusts observed no warning signs for impending dust and other safety measures. No first aid equipment on site. Fig 18 : Drainage channel under construction 7.5.1 Recommendations All modifications to the initial design should be formally communicated to DEA Signage on impending dusts and other safety issues should be put in place. Baseline information of ground and surface water monitoring should be collected to monitor the quality of effluent being discharged into the environment It is strongly recommended that the issue of transboundary impacts associated with the project should assess and addressed. Consultation with Chobe Land Board on the issue of replacing of servitude with drainage canals should be done 37 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 7.6 GROUND BOREHOLE WATER & QUALITY MONITORING Privately owned monitoring boreholes are used in the farms. There is no water quality monitoring baseline data on existing boreholes including privately owned boreholes. DWA has not been provided with documents regarding the boreholes in the farm areas i.e. borehole location map and certificates. Fig 19 : A private monitoring borehole in the farms 7.6.1 Recommendations Relevant authorities to conduct baseline survey and map borehole locations. Ministry of Agriculture, DWA, DGS and CLB to consult farmers on issues of water quality monitoring in the active boreholes. Develop and implement water quality and hydrological monitoring infrastructure and program. Explore potential for establishing participatory water quality and hydrological monitoring. 38 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] All the boreholes in the project area should be registered with the Department of Water Affairs. 7.7 INSTITUTIONAL CAPACITY During the audit it was noted that the institutional arrangements is not very effective in implementation sectoral functions of the project as outlined in the approved ESMP of the Pandamatenga Infrastructural Development Project. One of the shortcomings in implementing institutional functions of the project was lack of participation during project coordination and steering committee meetings by concerned departments. Some departments indicated shortage of funds for performing their roles. Some of the key stakeholders such as the village leaders, Police Officers and Nurses were not fully engaged in the project coordination. 7.7.1 Recommendations Funds should be provided in each participating department financial vote allocation for each department to satisfactorily perform their responsibilities Directors for participating departments should formally appoint officers who will be responsible for attending project coordination meetings Schedule for all project meetings should incorporated into the Chobe Dictrict Council annual schedule of activities 8.0 CONCLUSION The audit revealed that Pandamatenga Infrastructural Development project is generally complying with most of the in terms of environmental standards outlined in the Environmental and Social Monitoring Plan. However, most of the project activities are still under construction phases. Issues of noncompliance were identified mainly at the Contractor’s Camp. In addition there are certain areas within the project components which need to be improved to enhance the environmental performance of the project. The recommendations 39 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] made on this report as captured under each project component need to be implemented in totality by the Ministry of Agriculture – Department of Crop Production. 40 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] 9.0 APPENDICES Appendix 1 Minutes of Opening Meeting of Pandamatenga Agricultural Infrastructure Project Environmental Audit Venue: Pandamatenga Agricultural Infrastructure Site Office Date: 25 September 2012 Time: 0900 hours Rapporteur: Judith Maifala Attendance register NAME 1. Khandu K. INSTITUTION Chobe Land Board Wellfield CONTACTS 72420205/ kantlyn.01@yahoo.com 75765352 Wellfield 75530182 DEA 6801237 Department of Water Affairs – Maun Department of Environmental Affairs – Gaborone Department of Environmental Affairs – Francistown CJIC 74062695 CJIC 74063641 DIWI Consulting 76066449 2. J. Kamona 3. F. J. Regedzai 4. S. Motsumi 5. A. Chika 6. L. Seakanyeng 7. C. Masheto 3902050 2417330 75428042 8. Shuang Xia 9. Eddy de Graaff 10. B. Jennings 11. S. Semetsa 41 | P a g e Department of Crop 71392987 [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Production 12. L. Gavor 13. J. Maifala 14. Phillip Sandawana 15. Dolly Mbizo 16. Mpaphi Mugungu 17. Khotso Sebeke 18. Rebaone Tshiamo 19. Percy S. Kanokang 20. Mosiami Bagopi EREIS (Pty) Ltd Department of Environmental Affairs – Gaborone Department of Environmental AffairsMaun Department of Wildlife and National Parks 71351849 3644642 CJIC Department of Waste Management and Pollution Control Chobe District CouncilRoads Chobe District Council – Public Health Trainee – DIWI Consulting 6232113 6801244 6801237 6232066 6250275 6250275 72687503 Introductions An opening prayer was rendered. The Environmental Control Officer, Mr Lizo Gavor welcomed everyone to the meeting and introduced the auditee representatives who comprised of the Project manager, Project coordinator. This was then followed by introductions by all present at the meeting. Mr Gavor handed over to the Project Coordinator to say a few words prior to receipt of remarks by the Department of Environmental Affairs. The Project coordinator indicated that the project was funded by the African Development Bank and that prior to acquiring the funds A Environmental Assessment clearance had to be acquired from the DEA. He further highlighted that the Environmental audit is also a requirement by the financier and that 42 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] they would like to know where they may be legging in implementing the project so that they could put in place some corrective measures to move forward. He encouraged all to cooperate as the project is the responsibility of all. Objectives of Audit and Expectations Mr. Motsumi thanked the client and the project management team for their presence. He extended the welcome to the technical Departments who were present to join the Department of Environmental affairs in undertaking the audit. Mr Motsumi indicated that DEA is responsible for providing guidance in implementing the Environmental and Social Management Plan for the project which was approved in 2007. He highlighted that the Environmental Assessment report for the project was approved under the Environmental Impact Assessment of 2005 which has since been replaced by the Environmental Assessment Act of 2011. Furthermore, he highlighted that section 19 of the EA Act makes a provision for the DEA to undertake Environmental audit to monitor compliance to the approved Environmental Assessment report. The audit team leader, Mr Motsumi informed the meeting that the purpose of the exercise was to ascertain if the construction of the Pandamatenga Agricultural Infrastructure Project was being done in accordance with the approved ESMP. He further indicated that the process also provides opportunity for other stakeholders to take ownership of the project. Mr Motsumi highlighted that DEA does not have all the expertise hence the need to involve other technical departments other technical to do a proper audit. He further indicated his hope that all the stakeholders will interface with the project from here forward. He called for cooperation among all the members and the client urging all to work in a transparent manner to identify the elements that need to be corrected or enhanced. Mr Motsumi emphasized that the audit was not meant to be a punitive exercise but to identify challenges in mitigating the impacts. He highlighted that the project is of national interest and encouraged all to ensure that there are no gaps that may end up damaging the positive intent of the project. He indicated to the auditee that at the end of the exercise the team will submit a preliminary report of findings and that the main audit report shall be submitted later. 43 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] In laying down the scope of the audit, he explained that the joint audit team would visit the entire construction site comprising of the Contractor’s camp, road networks, drainage system, Electric Fence and burrow pits. Project Overview The Project Manager Mr. Brian Jennings gave a project overview and indicated that the project comprises of the following contracts; - - - - Supervisory engineering contract which was awarded to DIWI consulting mainly to oversee the contractor. He highlighted that the consultancy has sixteen engineers and twenty support staff, four survey team, two quantity surveyors, a resident engineer and an assistant resident engineer. Civil contract which has been awarded to China Jianxu International Cooperation and comprises of 180km of roads and drains and minor ancillary works. Electric game fence contract which was awarded to Fourie Investments. He indicated that the six months contract was for the 50km fence and that the company is currently in their six months maintenance period and have also requested for an extension. The project manager further highlighted that the fence is for the new commercial farms and that 2500ha have been reserved for the small holder’s farms ranging from 20ha to 100ha and about 17000ha for the new commercial farms at approximately 100ha to 500ha per farm. Bush clearing contract at the small holder farms. Mr Jennings indicated that the tender has been floated and contractor is expected by the end of October 2012. Continuing with the overview, the project manager indicated that they are one year in to the project and efforts are being concentrated in constructing the farm roads. He highlighted that the intention is to try to get the roads usable before the rainy seasons. The roads under construction were indicated to be access road 1, 2 and 5, peripheral road east, peripheral road west, the BAMB road including the cattle grid. He mentioned that the roads being constructed are all weather roads and that traffic is low at the moment but expected to be high during the harvest season especially along the BAMB road. 44 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] The project manager further informed the meeting that the drainage component for the project was necessary as the area has good soils and high rainfall. He said the problem with the rainfall is that it is very intense and localized and often lead to flooding. He highlighted that the drainage for the project was designed by DIWI Consulting Engineers and the basis is to control the water. The drains consist of primary drains to collect the water draining it into the western collector to minimize effects on farm one to ten. In the Southern plains all drains lead the water to the south and south west. He further indicated that some of the material being used for the construction is obtained from the northern and western collectors which are outside the farming area with suitable material for road construction. Additional material, he indicated is obtained from four borrow pits identified by the contractor and licensed by the relevant authorities. It was highlighted that excavations have been started at pit 1 and that pit 2 has been cleared while clearing of pit 3 was expected to start on the same day. Mr Jennings also explained that a shortfall for the earth materials has been derived and require about ten pits which have already been identified by the contractor. He highlighted that they are to approach the land board and apply for the relevant permits for such. In laying down the challenges they are experiencing, the manager indicated that they have large quantities of unsuitable material that require disposal. He also highlighted that there are wild animals trapped within the new area which was recently fenced and also indicated the need to put up monitoring boreholes and automatic weather stations. Furthermore, he indicated that an estimated five hundred trees shall be cleared in the small holder’s farms with some trees reserved on the farm boundaries. Discussions There was a concern that the drainage systems presented are different from the ones approved in the ESMP and that the project has trasnboundary implication as the water which may have pollutants will drain into Zimbabwe. In his response the manager reported that the initial design where bunds were to be developed at each farm have since been changed as there are no bunds 45 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] that will be created. With regards to the transboundry issue, he indicated that the water will be following the natural lines as has always been the case. Closing Remarks In his remarks, the audit team leader advised that more questions shall be asked during the audit tour. He emphasized the need for cooperation among all and requested that all the relevant documentation to be availed for scrutiny by the audit team. 46 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Appendix 2 Proceedings of the Audit Team Meeting with the Bee-Keeping Officer Present: Mr. S. Motsumi (Audit Team Leader, DEA) – Chairing Ms. Phale (Bee-keeping Officer) Mr. P. Sandawana (Audit Team Member, DEA) Mr L. Gavor (Project Environmental Control Officer) Ms. C. Masheto (Audit team member, DEA) Ms. J. Maifala (Audit Team Member, DEA) Mr. K. Sebeke (Audit Team Member, DWMPC) Mr. A. Chika (Audit Team Member, DWA) Mr. M. Mugungu (SHE officer, CJIC) Mr D. Otsile (Audit Team Member, DEA) Mr. K. Kanda (Audit Team Member, Chobe Land Board) Mr. P. Kanokang (Audit Team Member, Chobe District Council) Mr J. Kamona (Wellfield Consulting Engineer) Ms. D. Mbizo (Audit Team Member, DWNP) Mr. L. Seakanyeng (Audit Team Member, DEA) – Recording The objective of the meeting was to obtain information from the bee keeping officer regarding the Apiculture component of the Project which is financed by the African Development Bank (ADB) on a 100 % grant scheme. Proceedings Mr. Motsumi welcomed Ms Phale to the meeting and introduced the audit team to her. He indicated that the purpose of the meeting was to appreciate the Apiculture component of the larger project proposal. 47 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Ms Phale said that some farmers who benefited from the scheme and were provide with 10 hives. She said that 10 colonies inhabited these hives. In addition, she informed the audit team that men were leading in the number of colonies and she attributed this to the passion required in apiculture as women are less passionate about bee-keeping particularly because issues of safety are involved. Ms Phale specifically informed the team that her office was not privy to the selection criterion for beneficiaries of hives. She also indicated that there was a plan to provide more hives. Explaining the operational aspect of the project, Ms Phale said that the plan was to practice migratory bee keeping by taking colonised hives from the farm to the sunflower fields during the ploughing season. She however conceded that this presented challenges as hives trap the bees and bees end up absconding from the hives during harvesting. She cited an incident where one farmer is even reluctant to harvest from the hives due to the risks associated with the above. Asked about the success rate Ms Phale said that harvesting is not done often and that one farmer harvested about13.2 kg of honey from 2 colonies. Ms Phale also highlighted some of the challenges that the apiculture project was facing and these she indicated as: Safety and health issues- Naughty kids were reported to be playing with the hives Potential of pollution due to use of oil to control bee pests Potential Air pollution due to use of bee smoke to collect bees Disturbance of hives by wild animals Extension services challenged by transport problems as the officer have to travel from Kasane to Pandamatenga. The ECO mentioned that the Agriculture project is also constrained in providing the transport but they often assist Most beneficiaries are working in government so they do not have time to look after the bees. In view of the above, the following recommendations were made: 48 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] There should be guidelines for allocation of hives to beneficiaries that clearly spell out the selection criterion for beneficiaries Redistribution of hives should take into account issues of equity Monitoring and evaluation of the Apiculture component should be undertaken and reports to that effect kept In the absence of further discussion, the meeting was adjourned. 49 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Appendix 3 Proceedings of the Audit Team Meeting with the Pandamatenga Police Station Commander Present: Mr. S. Motsumi (Audit Team Leader, DEA) - Chairing Mr. J.K. Mokoti (Station Commander, Pandamatenga Police) Ms. Mosinga (Police Officer, Pandamatenga Police) Mr. P. Sandawana (Audit Team Member, DEA) Mr L. Gavor (Project Environmental Control Officer) Ms. C. Masheto (Audit team member, DEA) Ms. J. Maifala (Audit Team Member, DEA) Mr. K. Sebeke (Audit Team Member, DWMPC) Mr. A. Chika (Audit Team Member, DWA) Mr. M. Mugungu (SHE officer, CJIC) Mr D. Otsile (Audit Team Member, DEA) Mr. K. Kanda (Audit Team Member, Chobe Land Board) Mr. P. Kanokang (Audit Team Member, Chobe District Council) Mr J. Kamona (Wellfield Consulting Engineer) Ms. D. Mbizo (Audit Team Member, DWNP) Mr. L. Seakanyeng (Audit Team Member, DEA) – Recording The objective of the meeting was to obtain information from the Pandamatenga Police regarding social issues encountered in the village due to the implementation of Pandamatenga Agricultural Project. Proceedings The audit team and all present introduced themselves to the Officials from Pandamatenga Police. Mr Motsumi then thanked the officials for agreeing to meet the audit team despite having been invited at short notice. 50 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] He further explained that the audit team was in Pandamatenga to undertake an environmental audit for Pandamatenga Agricultural Infrastructure Project. Mr Motsumi further explained that the environment encompasses the physical, economic and social aspects. He explained that the reason for having a session with the police is to address the social component of the environment with the understanding that the project of this nature would normally bring about both negative and positive social issues. Mr Motsumi highlighted that the project is funded by African Development Bank (ADB) and the institution was said to be particular about conducting audits to report on social issues as well. He also said that the expectation in this meeting was for the Station Commander to share their experiences with the project in their policing area so that relevant institutions could assist in resolving social issues. The Station Commander Mr. Mokoti told the team that his office is aware of the project referred to above. He informed the team that they are aware of more than six companies undertaking construction in their policing area. He then highlighted common issues that they usually encounter some of which are directly related to the project and these are: Employment of non citizens without working permit Use of vulgar language- 1 Common nuisance Theft Driving without licences Proper loading-4 Safety awareness-1 Accidents- 6 serious accidents (fatalities?) 3 fatalities Working without permits- 17 The above incidents are for the period January –December 2011 and January – September 2012. The station commander indicated that whereas they cannot say that there was an increase in incidences of crime specifically due to the project, they could attribute this to increase in population due to additional workforce because normally when the population increase, crime also soars. When asked about what they do with non citizens without passports, he indicated these individuals are normally deported to their countries. 51 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Asked whether there are issues of substance abuse in his area, the Station Commander conceded that such cases exist particularly during month end when people have money. He further stated that they are aware of the provisions of environmental legislation with particularly reference to the Waste Management Act and they were implementing them. On illegal mining issues the Commander said his office has not encountered such issues. However, the Environmental Control Officer for the project Mr. Gavor cited two cases of illegal mining by the contractor at Panda Quarry. The team also raised the incident where one employee of the contractor was injured by a grater on the 18th September 2012 and wanted to know if the case was reported or not. The Station Commander told the team that they were unaware of such a case as it was never reported to his office. The Station Commander then highlighted some of the challenges they are faced with such as pressure on limited resources due to population increase in the area. He indicated that the limited resources particularly vehicles are overstretched and this has implications on other departments such as the Department of wildlife and National Parks (DWNP) which are normally required to assist with vehicles. In addition to the above, the audit team also raised labour related issues and brought them to the attention of the Station Commander. The SHE officer informed the team that employees are employed on monthly contract basis. This arrangement did not favour the employees as it was a ploy to get them expelled at the end of each contract should the employer feel so. The SHE officer said that these issues were discussed with the Regional Labour Office and it was agreed that this arrangement should be ceased but that recommendation has not been implemented as yet. The team observed that this also had implications on provision of Personal Protective Equipment (PPE) as companies do not usually provide temporary staff with PPE. The team generally noted that there were serious issues of labour and social relations within the contractor. In light of the foregoing issues, the following recommendations were made during the meeting: 52 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] The Pandamatenga Police should seek assistance from other policing areas to augment capacity The SHE officer should approach the Police for them address the staff on issues of conduct and the law. Labour and social relation issues should be raised with relevant authorities and should be treated with the seriousness they deserve by the contractor 53 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Appendix 4 Proceedings of the Audit Team Meeting with the Health Officials from Pandamantenga Clinic Present: Mr. S. Motsumi (Audit Team Leader, DEA) - Chairing Ms. F. Sithole (Nurse, Pandamatenga Clinic) Mr. K. Nick (Nurse, Pandamatenga Clinic) Mr. P. Sandawana (Audit Team Member, DEA) Mr L. Gavor (Project Environmental Control Officer) Ms. C. Masheto (Audit team member, DEA) Ms. J. Maifala (Audit Team Member, DEA) Mr. K. Sebeke (Audit Team Member, DWMPC) Mr. A. Chika (Audit Team Member, DWA) Mr. M. Mugungu (SHE officer, CJIC) Mr D. Otsile (Audit Team Member, DEA) Mr. K. Kanda (Audit Team Member, Chobe Land Board) Mr. P. Kanokang (Audit Team Member, Chobe District Council) Mr J. Kamona (Wellfield Consulting Engineer) Ms. D. Mbizo (Audit Team Member, DWNP) Mr. L. Seakanyeng (Audit Team Member, DEA) – Recording The objective of the meeting was to obtain information from the health officials regarding social and health issues encountered due to the implementation of Pandamatenga Agricultural Project. Proceedings The audit team and all present introduced themselves to the nurses from Pandamatenga clinic. 54 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Mr. Motsumi then thanked the nurses for agreeing to meet the audit team despite having been invited at short notice. He introduced the project to them and gave a brief background, indicating that the project is a strategic project by the Government of Botswana and financed by the African Development Bank (ADB) to develop Agricultural Infrastructure within the Pandamatenga Commercial Farms. He said that the Department of Environmental Affairs (DEA) was interfacing with the project through implementation of the Environmental Assessment Act to provide coordination, implementation and oversight. He further said that the DEA however does not have all the expertise, thus the department assembles a team of officers from other departments to undertake an environmental audit. Mr Motsumi emphasised that the ADB is particular about provision of audit reports including reports on social issues as well. In view of the above, Mr Motsumi indicated that the purpose of invitation of the health authorities was to allow them to indicate issues that they have realised due to the implementation of the project. The officer in charge for Pandamatenga clinic Ms. Sithole indicated that Pandamatenga clinic services a population of about 2625 people constituted by 1625 females and 1000 males. She said that the clinic has two ambulances and one has a breakdown. She cited the operational hours as from 0730 to 1630 and highlighted that they however also assist emergency patients on call. Ms Sithole said that the clinic provides the following services to the people of Pandamatenga: Mobile clinic for outreach to all commercial farms Maternal and child health ARV clinic Counselling Ms Sithole further highlighted some of the issues that they realised due to the implementation of the project. The audit team noted the following issues from the nurse: Population increase in the area due to male workers who have come for employment from other areas. This was said to have implications on available resources. In addition, the population structure has also changed with the population having more males than females. 55 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Overstretched drug supply due to additional work force. Drugs often run out resulting in disgruntlement of patients. The team learnt from the nurse that drugs are obtained from Kasane Increase in pregnancy cases with an unusual 94 recorded cases by September 2012. The nurse also said that it was worrisome that women are not given support by men under these circumstances. Increase in HIV/AIDS prevalence. Possible increase in Malaria cases as the area is generally faced with high incidences of Malaria particularly with the Malaria season being just around the corner. Most of the workers who do not originate from the area were likely to be affected by Malaria. The nurse indicated that the clinic emphasises education on Malaria. Increase in cases of assault mainly involving males possibly due to the uneven male dominated population structure. Patients defaulting on their medication citing refusal of permission to go to the clinic by the senior management of the construction company. This was said to be dangerous as the patients may develop drug resistance. Increased workload for the clinic staff due to increase in the workforce as well as patients coming to the clinic at odd hours because they are not released by their seniors at work. Ms Sithole indicated that a nurse sometimes makes up to ten trips to attend to emergency patients. Establishment of new settlements in some farms. This also has implications on the already limited resources. The audit team learnt of the challenges faced by the clinic from Ms Sithole. These challenges were cited as: Lack of manpower. Ms Sithole indicated that the clinic is not fully staffed as there is no pharmacy technician and the doctor is not based in Pandamatenga. She said that the clinic qualifies for a doctor to be based there but there is no accommodation for the doctor in Pandamatenga and the government cites lack of funds as well. Lack of transport as one ambulance has a breakdown and the clinic is relying on one ambulance that is also not equipped with life saving kit. This has resulted in some patients losing their lives on their way to Kasane for referral. 56 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Inadequate diagnostic equipment such as oxygen equipment. The Botswana Defence Force camp often assists with admitting some patients. Inadequate drugs since drugs are obtained from Kasane and issues of lack of transport and population increase exacerbate the problem. Lack of provision of mosquito nets since the service remained with the local council when the central government acquired clinics. It was also cited that most homes are not open to the spraying personnel and this aggravates the problem of Malaria. The SHE officer for the contractor Mr Mugungu told the team that there is no health and wellness committee at the contractor. He further said that he normally collect boxes of condoms from the clinic and put them at strategic locations. In view of the above issues arising as a result of the project and the inherent challenges faced by the health service providers, the following recommendations were made during the meeting: ADB should consider financing the mobile clinic and looking into provision for accommodation for the doctor and the pharmacy technician because the farms are going to be a long term establishment The contractor should have a fully functional health and wellness committee in place. The SHE officer should also constantly liaise with the clinic and invite them to give educational sessions to the staff. Patients should be given exit permits by the employer to go to the clinic. Social issues mentioned above should be taken with seriousness they deserve and should be raised with the relevant authorities for action. In the absence of further discussions, the meeting was adjourned. 57 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Appendix 5 Pandamatenga Commercial Farms Infrastructural Development Audit Kgotla Meeting Minutes MEETING ATTENDANNCE REGISTER Name Lizo Gavor S. Motsumi Dolly Mbizo Abraham Chika Dikgang Otsile Kandu K Percy Kanokang John Kamona Mphapi Mugunya Khotso Sebeke Chenge Mashetu D. Mafikizolo Organization Environmental Control Officer DEA - Maun DWNP DWA DEA- Maun Chobe Land Board CHDC Environmental Health Wellfield China Jingsu DWMPC DEA – F/Town Tribal Administration phone 71351849 e- mail The Audit team leader Mr. Motsumi Sekgowa started the closed up session with the chief of Pandamatenga Village by introducing all audit team members. He stated that the audit team is in Pandamatenga to conduct an audit of the ongoing Pandamatenga Infrastructural Development Project to determine how the project has negatively or positively impacted on the environment and the village of Pandamatenga. Mr. Motsumi Sekgowa indicated that it is widely accepted that projects of this nature and magnitude will have both the positive and the negative impacts on the environment and the social way of life of host communities by increase in crime rates, substance and drug abuse, HIV/AIDS risks and employment creation. The team leader further indicated that to militate against these the Government of Botswana, through the Department of Crop Production was 58 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] required by the law and as finance condition from by African Development Bank to undertake and develop a social and environmental management plan. In his response, the Kgosi of Pandamatenga; D. Mafikizolo thanked the team leader and the audit team for having seen it fit to come to address the village leadership. The chief stated that when the project started the Ministry of Agriculture came to the Village Kgotla and created an expectation that the project will create employment for the villagers’ particularly the youths. He further stated that this has still not been fulfilled. The chief further decried the lack of clear communication channels and consultation processes between the Ministry of Agriculture; the Contractors Company and the Village Leadership Other critical issues that were mentioned include increase in crimes – public nuisance; increase in waste production due to an increase in population; lack of corporate social responsibility by the Contractors Company and Social cohesion disruption in the village. The project Environmental Control Offocer, Mr. Lizo Gavor indicated that indeed there has been a breakdown in communication and committed himself to ensuring that all relevant stakeholders including the village leadership are kept informed of the project. In conclusion, the audit team emphasized that there is need to establish proper communication channels between the village leadership, the contractor and the Supervising consultants to address emerging issues. On the issue of employment, the audit team advised that where possible there is need for the contractors to always come to Kgotla to profile skills that they would want and where possible priority should be given to local host community people particularly for semi skilled jobs 59 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Appendix 6 Pandamatenga Commercial Farms Infrastructural Development Project Audit Closing Minutes MEETING ATTENDANCE REGISTER Name Lizo Gavor S. Motsumi Dolly Mbizo Abraham Chika Dikgang Otsile Kandu K Judith Maifala Lesego Seakanyeng Mmoloki Khukhutha Phillip Sandawana V.K Kabulusa Caiphas B. Motshewa Stanley Sametsa John Kamona Mphapi Mugunya Khotso Sebeke Chenge Mashetu E.P de Graaff Organization Environmental Control Officer DEA - Maun DWNP DWA DEA- Maun Chobe Land Board DEA- Gaborone DEA phone 71351849 e- mail DCP -MOA DEA DIWI - Wellfield DAC DCP Wellfield China Jingsu DWMPC DEA – F/Town CJIC Mr. Lizo Gavor, who was the meeting facilitator opened the meeting and emphasized that what has been undertaken by the Department of Environmental Affairs together with other government regulatory bodies through the audit process is just the beginning of the process. In his audit summary opening remarks, the Audit team Leader Mr. S. Motsumi stated that the mandate of the Department of Environmental Affairs is to see the overall coordination and mainstreaming of environmental management 60 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] issues into Developmental process. Mr. Sekgowa Motsumi further stated that as the competent authority in the enforcement of the EA Act, the DEA is expected to undertake environmental and social audit of the project to check for compliance. He informed the participants that the Auditing process is vital to ensure compliance; to ensure that the mitigation measures as identified in the ESMP are implemented. Mr. Motsumi indicated that the project is of National interest and that non compliance to the developed ESMP may have detrimental effects on the disbursement of funds by the financiers (ADB) He went on to thank the client, the contractor for the hospitality and cooperation accorded to the audit team during the audit. He then indicated that the audit team was generally satisfied with some of the measures that have been put in place to mitigate against the environment and social impacts of the project. He further indicated that the team has however identified a number of serious evidence of non compliance, lack of commitment and negligence by senior management of China Jiangxi with the approved ESMP and general disregard to the environment and social consideration by the contractors particularly on components of construction works in the burrow pits; access routes; drainage canals and the contractor camp. Mr. Motsumi Sekgowa indicated that based on the audit findings; there is generally a lot that needs to be done to mitigate the social impacts of the project especially on the village of Pandamatenga and to instill the sense of ownership of the project particularly by the village leadership. Some of the critical social issues that he highlighted that were obtained from village concerns included limited employment opportunities; lack of investment in corporate social responsibility by the contractors and lack of involvement of the village leadership in the project particularly through regular briefings. Following opening summary remarks, the Department of Environmental Affairs (Mr Phillip Sandawana) together with the Department of Waste Management & Pollution Control (Mr K. Sebeke) presented a detailed presentation of all the major audit findings with detailed mitigation measures/ actions that could be considered for implementation. In his reaction to the presentation, Mr. E.P de Graaff of DIWI Consulting Company as the supervising consultants stated that he appreciates the genuine concerns raised and that as the supervising consultant they will work on the identified concerns and address them accordingly. 61 | P a g e [ENVIRONMENTAL AUDIT REPORT FOR THE PANDAMATENGA [24-28 September 2012] AGRICULTURAL INFRASTRUCTURE DEVELOPMENT PROJECT] Mr Stanley Semetsa (Department of Crop Production) stated that they are happy that the audit has been undertaken and has revealed areas that should be addressed to ensure that the project is economically, environmental and socially sustainable and is in compliance with all legislations and funding conditions. He further stated that as the MOA – DCP they are committed to ensuring that the recommendations of the ESMP are implemented and that where slight design changes have been made efforts will be made to ensure that appropriate mitigation measures are put in place. In conclusion, the audit team concluded that there is need for the client, the contractors and the environmental control office to ensure that appropriate action is undertaken with immediate effect and clear coordinated communication channels among interested parties should be established and where appropriate the contractor, DCP and the supervising consultant should engage with local structures to develop strategies of making sure that the project is economically, socially and environmentally beneficial to the host community. 62 | P a g e