Quantitative Aptitude by JITENDRA TYAGI SIR TIME & WORK SESSION Q.2 One third of a wall can be constructed in 4 days. In how many days 6 such walls can be constructed? (A) 144 (B) 72 (C) 64 (D) 24 Q.4 A is thrice as efficient as B. A can complete a work in 5 days. In how many days B can complete the same work? (A) 15 (B) 3 (C) 5 (D) 30 P and Q can complete a project in 15 days and 10 days respectively. They started doing the work together, but after 2 days Q had to leave and P alone completed the remaining work. In how many days was the whole work completed? (A) 11 (B) 12 (C) 13 (D) 10 SSC CGL Q.10 If A can finish a work in 12 days and B is 3 times efficient than A, then the time taken by both A and B working together to complete the work is (A) 2 days (B) 3 days (C) 6 days (D) 4 days Q.11 If A and B working together can finish a work in 8 days and B is 4 times efficient than A, then the time taken by A, working alone to complete the work is (A) 24 days (B) 20 days (C) 40 days (D) 32 days A is as efficient as B and C together. Working together A and B can complete a work in 36 days and C alone can complete it in 60 days. A and C work together for 10 days. B alone will complete the remaining work in (A) 110 days (B) 88 days (C) 84 days (D) 90 days SSCCGL Q.12 If A working alone takes 4 days more than A and B together. B working alone takes 9 days more than A and B together, then the number of days taken by A and B , working together to finish a job is given by (A) 3 days (B) 8 days (C) 6 days (D) 4 days Q.13 If 10 persons can complete two-fifths of a work in 8 days, then find the number of persons required to complete the remaining work in 12 days (A) 10 (B) 8 (C) 6 (D) 9 Q.14 If 5 men and 3 women can finish a work in 8 days then in how many days 6 men and 2 women can do the same work? (A) 8 (B) 9 (C) 10 (D) 12 Q.17 A,B and C can do a piece of work in 20 days, 30 days and 60 days, respectively. In how many days can A do work, if he is assisted by B and C on every third day? (A)12 (B) 15 (C) 16 (D)18 (E) 14 A,B and C can complete a piece of work separately in 10, 20 and 40 days, respectively. In how many days will the work be completed if A is assisted by both B and C every third day? (A) 58/7 (B) 9 (C) 32/3 (D) 6 SSC CGL Q.18 3 men, 4 women and 6 children working together can finish a piece of work in 7 days. If each woman works twice as much as a man does, and each child does half as much as a man does, how many women, working together, can finish the work in 7 days? ATC JULY SHIFT-2 2022 (A) 9 (B) 10 (C) 8 (D) 7 Q.19 A and B can do a piece of work in 45 and 40 days, respectively. They began the work together but A left after some days and B finished the remaining work in 23 days. After how many days did A leave? (A) 12 days (B) 11 days (C) 9 days (D) 10 days ATC JE 2022 JULY SHIFT-3 Q.20 ATC 2021 Shift-1 A and B can do a piece of work in 80 days; B and C can do it in 120 days; A and C can do it in 112 days. In how many days can B alone do it? (A) 168 (B) 182 (C) 158 (D) 172 Q A can do one-third of a work in 15 days. B can do 75% of the same work in 18 days and C can do the same work in 36 days. B and C work together for 8 days. In how many days will A alone complete the remaining work? (A) 24 days (B) 18 days (C) 20 days (D) 16 days