tambahkan kolom target joint inspeksi add table untuk target action CAR & NCR Sukanda Monitoring No 1 ISSUE DESCRIPTION Joint Inspection Schedule AREA CAR/NCR No. Closing Schedule All Areas CAR-04 04/ISACAR/SKDCBT/XI//2022 ASAP remaining cleaning 10 Point for finishing injection surface CAR-08 2 Mezzanine Slab Crack Processing Area 1. Cutting nipple - 2 days 2. Patching Stage - 2 days 08/ISACAR/SKDCBT/II//2022 Stagging and Utility Area CAR-11 11/ISACAR/SKDCBT/II//2022 04-Sep-23 Remarks Need Discuss to CM 1. asking engineering recommend for using welding rectification (DODI / 06-09) 2. Obtain approval method from CM 3. Action window time 2 weeks 1. Top Mezzanine Elv. 8.000 Rectification Closed (signature obtained) 2. Continue Repair Crack on Bottom Mezzanine Elv. 8.000 1. Confirm Closing Progress on warehouse 11 septwill be confirm on monday 3 Evaluation of flashing, roof gutter, and roof drain work 4 Joint Sealant Warehouse Area CAR-12 12/ISACAR/SKDCBT/III//2023 5 Inspection Punchlist Warehouse Area CAR-14 14/ISACAR/SKDCBT/V//2023 N/A Repair Complete, Waiting Rain for Final Check 6 The Defect on The Gutter, Roof, and Flashing Warehouse Area CAR-15 15/ISACAR/SKDCBT/V//2023 N/A Repair Complete, Waiting Rain for Final Check Condensor Area (Top Area) CAR-17 17/ISACAR/SKDCBT/V//2023 13-Sep-23 Continue Close Comment one by one. itemClosed: Staging Area CAR-22 22/ISACAR/SKDCBT/VII//2023 05-Sep-23 1. Permit to Work Obtained 2. Rectification will be conducted on night time due after complete next morning shall be ready to access by owner 3. Has been inspected for closing but have remaining and additional comment Utility Area CAR-23 23/ISACAR/SKDCBT/VII//2023 15-Sep-23 Access scafollding installed, wating rain torepair know leakage point ILosed : item Utility Area CAR-24 24/ISACAR/SKDCBT/VII//2023 7 8 Finishing Defect on Top Area Slab Crack target close 5 sept 23 9 10 The defects of waterproofing work & some points of leakages. The defects of in the warehouse N/A Repair Complete, Waiting Rain for Final Check preparation permit 6 sept 23 Permit (Area on Energized/Cold Area used by owner activity) will beN/A confirm Waiting kamisOwner (7 sept window time - 5 days Closing schedule october 23 (rainy Season) Closing schedule october 23 (rainy Season) revisi 11-Sep-23 revisi total comment : tiemTarget closing each day waiting rain : item (october) rectifiaction time : 1 weeks 1. Some comment on going repaired (wall repair and slab) 2. Continue closing comment on by one total comment : itemClosed: tiemTarget closing each day CAR & NCR Sukanda Monitoring No ISSUE DESCRIPTION 11 Incomplete infrastructure work (paving blocks and cansteen work) 12 Painting works for steel (especially bolts) AREA CAR/NCR No. Closing Schedule Warehouse Area CAR-25 25/ISACAR/SKDCBT/VIII/2023 N/A Axis 23 stair, support ceiling, and other steel works. 16/ISANCR/SKDCBT/VIII/2023 11-Sep-23 Remarks Waiting final inspection total item: closing item : target closing: Continue Close Comment one by one. target discussion to owner