School Hot Work Permit EP The Alice Smith Schools Association (1923-A) JB PO NUMBER: www.alice-smith.edu.my This permit is to be issued to cover all work involving flame cutting apparatus, oxyacetylene welding apparatus, electric welding apparatus, blow torches, grinding equipment, bitumen boilers or any other equipment producing flame, intense heat or sparks. [A] Proposed work - this section to be completed by the school: Permit No: ASSA/HW/EP Permit Holder: Permit Duration Hot Work Description: Location: Hot Work Area: Date from : To : Time from : To : [B] The permit holder is responsible for implementing the following fire prevention measures: 1. Ensuring proper ventilation in the hot work area. 2. Removing combustible materials from the vicinity. 3. Properly positioning fire extinguishers, fire blankets, and other fire-fighting equipment. 4. Assigning a qualified fire watch personnel during and after the hot work. 5. The permit holder has verified that all fire safety equipment within the hot work area, such as fire alarms, smoke detectors, and fire suppression systems, are tested and in proper working order. 6. The permit holder shall notify the Facilities Manager and Security Team of the start and completion of hot work activities. 7. All personnel involved in the hot work activities have received proper training in fire safety procedures, emergency response protocols, and the use of personal protective equipment. 8. The work will be supervised by a competent individual who can address safety concerns promptly. 9. After completing the hot work, a post-work inspection must be conducted to ensure no smoldering materials or potential fire hazards remain in the hot work area. Any abnormalities or concerns should be reported immediately. 10. The permit holder agrees to comply with all relevant laws, regulations, and guidelines regarding hot work activities and fire safety. 11. The school administration reserves the right to terminate the hot work activities if safety protocols are breached or if any unsafe conditions arise during the work. [C] The following precautions are required and are a condition to the permit being issued. Tick where appropriate. Area cleared of all loose combustible material Tar boilers to be supervised by experiences persons and never left unattended unless switched off Flammable liquids/gases removed or protected Tar boilers, or similar equipment, only to be used on roofs if a noncombustible heat insulating base is used to prevent the heat igniting the roof Other sides of walls or partitions checked to ensure combustible materials will not be ignited by conducted heat Gas cylinders to be stored a minimum of three metres from the burners Exposed wooden floors or other immovable combustible materials covered with non-combustible materials Appropriate extinguishers to be located in the working area Welding, cutting or grinding work screened using non- combustible material Competent person to be standing by with fire extinguisher while work is in progress Smoke/heat detectors rendered inoperable by disconnection or enclosing with plastic bag and to be made operable immediately after work completed If working close to a gas supply, gas to be turned off and piping protected When hot working on a roof, provision must be made for an alternative way off, in case of fire Gas cylinders to be stored in vertical position In case of fire, please dial this number 999 / 03-8941 6281 Flashback arrestors to be fitted to gas cylinders Smoking not allowed Risk assessment attached Safe System of Work/Method Statement attached Working area to be checked for heat or fire one hour after the completion of hot works [D] Authorisation before work starts – this section to be completed by school and contractor: I have read and understood the conditions of this permit and will ensure that the I have seen, and am satisfied (within the limits of my knowledge and expertise,) with work is carried out in accordance with the risk assessment, the safe system of the risk assessment and safe system of work/method statement for this above works and have agreed the above conditions with the contractor. I thereby authorise the work work/method statement and the agreed conditions outlined in this permit. to start in line with the agreed conditions of this permit. Name of permit issuer (Facility Management & Security): Name of Permit Acceptor : ____________________________ NRIC/PASSPORT NO: _________________________________ Signature: Date: Acceptance signature : _________________________________ Date: [E] Permit cancellation after work is completed – this section to be completed by school and contractor: I have checked and am satisfied that The above work has/has not ( delete as appropriate ) been completed. The work area and all disabled heat/smoke detectors all adjacent areas to which sparks and heat might have been made operable. have spread (including floors above and below and on the other side of walls), have been periodically inspected for a minimum of one hour immediately after the work was completed and there were no signs of heat or fire. The site has been left in a safe condition. I am satisfied that the above work has/has not (delete as appropriate) been completed, that all disabled heat/smoke detectors have been made operable and the site has been left in a safe condition Signature:________________________ Signature:_____________________________________ Signature: Faciities Management & Security Facilities Manager Time work completed: Name: Name: MUHAMMAD SURIA Time of last inspection: Date: Name: Date: 7/2023 Date: 7/2023