Reflections on disruption and cultural shift Tim Wark Digital Director, AECOM The new normal: The mobile knowledge worker Data: The new oil S&P 500 Top 10 Stocks 1980 2005 2022 1 IBM General Electric Apple 2 AT&T Exxon Mobil Microsoft 3 Exxon Mobil Microsoft Amazon 4 Standard Oil of Indiana Citigroup Tesla 5 Schlumberger Proctor & Gamble Alphabet (Google) 6 Shell Wal Mart Berkshire Hathaway 7 Mobil Oil Bank of America UnitedHealth Group 8 Standard Oil of California Johnson & Johnson Johnson & Johnson 9 Atlantic Richfield AIG Exxon Mobil 10 General Electric Pfizer JPMorgan Chase Current global challenges driving innovation Population growth and urbanization Safe, secure and resilient infrastructure Funding & investment decisions Sustainability and environmental impact Speed of major projects How to increase opportunity, improve services and enhance the quality of people's lives. How to strengthen cybersecurity and protect against natural and human disasters. How to optimise infrastructure decisions by managing public/private sector collaboration and effective community engagement. How to ensure sustainably, tackling climate change by mitigating impacts. How to drive productivity and efficiency across the major project lifecycle. Business as usual… 1980 1000s of Pencil Strokes 2000 1000s of Mouse Clicks 2020 1000s of Mouse Clicks 2022 100s of Parameters Automated Design Automated design (computational, parametric or generative design) provides our teams with a smart way to generate and analyse multiple design options in a fast, effective and iterative way. Melbourne Park Melbourne, Victoria Client: Projects Victoria Melbourne Park is a multi-purpose sports and entertainment precinct, hosting globally significant events such as the Australian Open. Automated design Perth Children’s Hospital Footbridge Perth, Western Australia Client: Perth Children’s Hospital Funded by the hospital foundation, the Perth Children’s Hospital commissioned the construction of the “Kids Bridge”, to provide safe access from the hospital to Kings Park. At a cost of $6.3M, the pedestrian bridge provides patients and their families an opportunity to escape the rigours of the hospital environment through the colourful and fantastical passageway all while avoiding the busy street crossing below. Solution: With only 60 hours to deliver the first model to the client, the team created the initial ‘3d mesh’ for the bridge which included almost 2,000 vertical slats in several digital design tools. The final project model was then fed through a visualisation software to enable quick renderings to be produced. Sustainable Legacies Infrastructure is a major source of carbon emissions, both embodied and operational. For the lower emissions future we need, our industry needs to radically rethink how infrastructure is planned, delivered and managed.