PRESENT GAS FLOW CONDITIONS
Meghnaghat TBS
Gozaria TBS
A-B 1
B-S (30” OD, 60.4 Km) Pipeline (GTCL)
Siddhirganj
Flow: 200-230 mmcfd
Haripur
Meghnaghat
MPL
450 MWPP
From
Narsingdi
Location
Demra
Bkb-D (20” OD, 68.72 Km) Pipeline (GTCL)
GOADNAIL
C-F-B
Haripur TBS
Flow : 100-120 mmcfd
Bakhrabad Hub
A-B 2
Sonargaon TBS
Summit
335 MWPP
Flow: 110-130 mmcfd
Meghnaghat
EGCB
335 MWPP
HPL
360 MWPP
EGCB
412 MWPP
EGCB
2x120 MWPP
Siddhirganj
Nh-S (20” OD) Pipeline (TGTDCL)
Haripur
Siddhirganj
Power Plant
MPL
450 MW
Summit
335 MW
HPL
360 MW
EGCB
412 MW
EGCB
335 MW
EGCB
2x120 MW
Present Flow
25
‐
50
60
50
‐
Source PL
B‐S
B‐S
B‐S
B‐S
B‐S
B‐S
Total
(MMSCF)
185
Remarks
Present Situation
(as on 11‐10‐22)
GAS FLOW CONDITIONS DURING ILI
Gozaria TBS
Sonargaon TBS
Meghnaghat TBS
Haripur TBS
A-B 1
Bakhrabad Hub
Flow : 180-200 mmcfd
C-F-B
B-S (30” OD, 60.4 Km) Pipeline (GTCL)
Haripur
Meghnaghat
MPL
450 MWPP
From
Narsingdi
Location
Siddhirganj
Flow: 50 mmcfd
GOADNAIL
A-B 2
Demra
Bkb-D (20” OD, 68.72 Km) Pipeline (GTCL)
Summit
335 MWPP
Flow: 160-180 mmcfd
Meghnaghat
EGCB
335 MWPP
HPL
360 MWPP
EGCB
412 MWPP
EGCB
2x120 MWPP
Siddhirganj
Nh-S (20” OD) Pipeline (TGTDCL)
Haripur
Siddhirganj
Power Plant
MPL
450 MW
Summit
335 MW
HPL
360 MW
EGCB
412 MW
EGCB
335 MW
EGCB
2x120 MW
Present Flow
25
‐
50
60
50
‐
Source PL
B‐S
B‐S
B‐S
B‐S
B‐S
B‐S
Flow
50
‐
50
‐
‐
‐
Source PL
Bkb‐D
‐
Nh‐S
‐
‐
‐
Total
(MMSCF)
185
Remarks
Present Situation
(as on 11‐10‐22)
100
During Pigging