SG4

advertisement
2 layers 12.5mm plasterboard
vapour control layer
facing brickwork
breather membrane
5mm min. resilient flanking strip installed at
perimeter and turned under skirting board
22mm min. t&g flooring board on
top of 19mm plasterboard
70mm min. FFT1 resilient
composite deep battens
wall ties securing external
cladding to steel frame
25mm min. mineral wool quilt
22mm min.
wood based
board
air tightness barrier around joists,
lapped with vapour control layer
insulated cavity barrier
90mm rigid insulation fixed to
outer face of steel studs
100mm min. mineral wool quilt
insulation
25mm min. proprietary metal
resilient ceiling bars at right
angles to beams
225mm min. deep UltraBEAM
metal joists
2 layers 12.5mm plasterboard
S-G4
STEEL FRAME WALL
STEEL COMPARTMENT FLOOR
External wall to meet min. U-Value 0.18 W/m²K. Insulation
thickness and specification based on project requirements.
All steel frame construction and connections should be designed
by an engineer - all details subject to specific design.
Separating floor drawn in accordance with Part E Robust Details
E-FS-2. Consult Building Regulation Part E or Robust Details for
further alternative.
Cavity barrier reduces flanking sound and air circulation within
the cavity. They are also required to withhold the passage of
smoke and fire. Cavity barriers need to be fitted tightly, with no
gaps however they can sometimes be omit if using fire class A1
full fill mineral wool insulation.