DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation ISSUED FOR APPROVAL Contract No.: SPHR00130A Izzatur Rahman Digitally signed by Izzatur Rahman Date: 2023.06.07 15:20:32 +07'00' 7-Jun-23 A2 Issued for Approval (WO-2023-007821) IR US 27-May-23 A1 Issued for Review (WO-2023-007821) IR US ZUL DATE REV DESCRIPTION ORIG CHK APP'D Approved by: Company Approval: Date: Date: DOCUMENT CONTROL NO. ZUL PHR Field Area Discipline Type Originator Sequence Sheet Revision SLON GATH MGNO000 CIV CAL PHR 2013 00 A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Revision History: REV DATE DESCRIPTION ORIG CHK APP'D A1 27-May-23 Issued for Review (WO-2023-007821) IR US ZUL A2 7-Jun-23 Issued for Approval (WO-2023-007821) IR US ZUL Change Log: REV Page COMMENT Change Description / Response Document Hold 2 of 47 Swicth Rack Shelter Structure & Foundation Calculation DED INSTALASI COOLING TOWER MANGGALA NORTH GS SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: Rev. A2 7-Jun-23 Table of Contents 1 GENERAL .................................................................................................................................................................................................. 5 1.1 2 Objectives ................................................................................................................................................................................... 5 1.3 Purpose ....................................................................................................................................................................................... 5 REFERENCES .......................................................................................................................................................................................... 5 2.1 3 4 5 Code and Standard ................................................................................................................................................................. 5 2.2 Project Specification .............................................................................................................................................................. 5 2.3 Project Refference ................................................................................................................................................................. 6 MATERIAL PROPERTIES 6 3.1 Unit...............................................................................................................................................................................................................6 3.2 Quality of Material ................................................................................................................................................................... 6 3.3 Unit Weight of Material ......................................................................................................................................................... 7 3.4 Language .................................................................................................................................................................................... 7 3.5 Measurent Unit ......................................................................................................................................................................... 7 DESIGN CONDITIONS ..................................................................................................................................................................................... 7 4.1 General Descriptions ............................................................................................................................................................. 7 4.2 Stability Parameter ................................................................................................................................................................ 7 LOADING ANALYSIS & COMBINATION 5.1 9 Loading Analysis Design ...................................................................................................................................................... 9 5.1.1 Dead Load of Structure (Ds). ................................................................................................................................... 9 5.1.2 Live Load (L). ................................................................................................................................................................... 9 5.1.3 Wind Load (WL). .......................................................................................................................................................... 10 5.1.4 5.2 6 Introduction .............................................................................................................................................................................................5 1.2 Seismic Load (S). ........................................................................................................................................................ 15 Loading Combination........................................................................................................................................................... 16 5.2.1 Unfactored Load Combination. .............................................................................................................................. 16 5.2.2 Factored Load Combination. .................................................................................................................................. 16 COMPUTER MODELLING ............................................................................................................................................................. 19 6.1 Computer Program ............................................................................................................................................................... 19 6.2 Unit System ............................................................................................................................................................................. 19 6.3 Structure Modelling .............................................................................................................................................................. 20 6.4 AXis System ............................................................................................................................................................................. 20 6.4.1 6.4.2 Global AXis System .................................................................................................................................................... 20 Local AXis System ....................................................................................................................................................... 20 6.5 Method of Analysis ................................................................................................................................................................ 20 6.6 Building Structure Modelling ............................................................................................................................................ 21 6.4.1 Isometric Framing. ..................................................................................................................................................... 21 6.4.2 Member Properties ...................................................................................................................................................... 21 6.4.3 6.7 Joint and Member Numbering. .............................................................................................................................. 24 Loading Design ....................................................................................................................................................................... 25 3 of 47 Swicth Rack Shelter Structure & Foundation Calculation DED INSTALASI COOLING TOWER MANGGALA NORTH GS SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7 STEEL StruCture Design ............................................................................................................................................................. 28 7.1 8 Rev. A2 7-Jun-23 Steel Member and Unity Check....................................................................................................................................... 28 7.2 Displacement and Drift ....................................................................................................................................................... 28 7.3 Slenderness Check .............................................................................................................................................................29 CONCRETE STRUCTURE DESIGN 30 8.1 Foundation Lay Out .............................................................................................................................................................. 30 8.2 Structure Dead Load ............................................................................................................................................................ 31 8.3 Joint Result Load Combination........................................................................................................................................ 32 8.4 Design Of Pedestal Reinforcement .............................................................................................................................35 8.5 Base Plate and Anchor Bolts Analysis .......................................................................................................................40 8.6 Foundation Stability Analysis .......................................................................................................................................... 43 8.6.1 Foundation Analysis for Shallow Foundation. ................................................................................................. 43 8.6.2 Intensity of Soil Pressure (q). ................................................................................................................................ 44 8.6.3 Stability Against Sliding ............................................................................................................................................ 45 8.6.4 Stability Against Overturning ................................................................................................................................. 45 8.6.5 Slab Reinforcement .................................................................................................................................................... 45 8.6.6 Rebar Requirement on X & Y-Direction ............................................................................................................. 46 8.6.7 Crack Control ................................................................................................................................................................. 46 APPENDIX APPENDIX A - PLOT PLAN APPENDIX B - SOIL INVESTIGATION DATA APPENDIX C - INPUT & OUTPUT STAAD PRO 4 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 1 1.1 Rev. A2 GENERAL INTRODUCTION The COMPANY (Pertamina Hulu Rokan/PHR) requests that the CONTRACTOR (PT. Berca Engineering International) to perform the adequacy check of existing cooling pits regarding the work of additional cooling tower installation in Menggala North Gathering Station to accommodate the need to increase the capacity of existing produced water system and to comply with environmental regulations. 1.2 OBJECTIVES The purpose of this document is to provide a calculation of the switchrack shelter structure that will be used in th DED Instalasi Cooling Tower Menggala North Gathering Station. 1.3 PURPOSE The purpose of this document is to describe requirement conditions relating to switchrack shelter investigation w of DED Instalasi Cooling Tower Menggala North GS. 2 REFERENCES 2.1 Code and Standard SNI 1726 - 2019 : Indonesian Seismic Code for Building and Non-Building Structures Non Gedung SNI 2049 - 2015 Semen Portland SNI 2052 - 2017 Baja Tulangan Beton SNI 8460 - 2017 SNI 03 - 1727 - 2020 SNI 03 - 1729 - 2020 Persyaratan Perancangan Geoteknik Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur lain Pedoman Perencanaan Bangunan Baja untuk Gedung SNI 03 - 1734 - 2002 Petunjuk Perencanaan Beton Bertulang dan Struktur Dinding Bertulang SNI 03 - 2847 - 2019 Persyaratan Beton Struktural untuk Bangunan Gedung dan Penjelasannya ACI 318M - 14 Building Code Requirements for Structural Concrete ACI 351 AISC 360 - 10 Standard Practice for Details and Detailing of Concrete Reinforcement Steel Construction Manual, American Institute of Steel Construction ASCE 7 -16 Minimum Design Loads for Buildings and Other Structures ASCE 37 - 02 IBC 2018 Design Load on Structures During Construction. International Building Code, 2015 NFPA – 101 Safety to Life from Fire in Buildings & Structures untuk Rumah dan Gedung, 2002 2.2 Project Specifications PHR-SP-CI-GG-002 General Specification for Civil and Structure PHR-SP-CI-CC-001 Concrete Work Specification PHR-SP-CI-CC-004 Concrete Mix Design 5 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 2.3 Rev. A2 Project References SLON-GATHBKSP000-PIP-PLT-PHR-2023-00 : SLON-GATHMGNO000-CIV-DTL-PHR-2035-00 : 3 MATERIAL PROPERTIES 3.1 Unit Plot Plan DED Instalation Cooling Water Menggala Menggala North GS Shelter Plan Section & Detailing Drawing Menggala North GS All units are in Metric System. 3.2 Quality of Material Quality material refer to Design Specification No. PHR-SP-CI-GG-002. For steel pile pipe refer to available material in the market that shall be confirmed by COMPANY. Cement = I f'c = 28 Mpa (ASTM C150) f'c = 15 Mpa (ASTM C150) Type Concrete Foundation Lean Concrete Reinforcement Bar Deformed bar Plain bar fyrd = fyrp = 420 Mpa 280 Mpa (BjTS420B) (BjTP280) Steel Structure ASTM A36 or JIS G 3101 grade SS 400 or eq. for Wide Flange, Angle, Channel, Plate and Tee ASTM A53 Gr. B or JIS G3444 STK 400 or equivalent for structural steel pipe ASTM A501 or equivalent for square or rectangular steel tubing Bolt Mild steel bolt is conform to ASTM A307 or ASTM F568 class 4.6 or equivalent, galvanized High strength bolt is conform to ASTM A325 & A490 or ASTM F568 class 8. 8 & 10.9 or equivalent, galvanized 6 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 3.3 Rev. A2 Unit Weight of Material Steel = Reinforcement Concrete = Plain Concrete = Soil = Water = = 3 2000.00 kg/m 1000.00 kg/m3 = = Cement Mortar = 2100 Sand (dry) = 1800 Sand Gravel (wet) Crushed Stone 3.4 7850.00 kg/m3 2400.00 kg/m3 2250.00 kg/m3 = = 1860 1550 = = = kg/m 3 kg/m 3 = 3 = = kg/m 3 kg/m 76.97 kN/m3 23.56 kN/m3 22.00 kN/m3 17.00 kN/m3 9.80 kN/m3 20.58 kN/m3 17.64 kN/m3 18.23 kN/m3 15.19 kN/m3 Language This report calculation is described in English. 3.5 Measurent Unit Unit of measurement Uses SI system, kN for weight unit, meter for distance, and Mpa for pressure. 4 DESIGN CONDITIONS 4.1 General Descriptions This reports cover analysis for Sump Pit& Sump Box Foundation in Menggala North GS. 1. Switchrack shelter will be built as a steel structure with reinforce concrete as its foundation. 2. Design loads that are considered on this analysis consist of self-gravity loads, equipment loads, live loads, wind loads, lateral earth loads and seismic loads. 3. 4. Wind load will perform using ASCE 7-16. Lateral earth loads will perform using Mononobe-Okabe method which cover seismic pressure, with load factor 0.6 for ASD and 0.9 for LRFD. 5. Seismic loads will be run using seismic parameter taken from SNI 1729 - 2019, in particular from https://rsa.ciptakarya.pu.go.id/2021/ 6. 7. The structure will be analyzed using microsoft excel. Concrete reinforcement will be designed using factored load combination, whereas unfactored load combination is used for foundation design and structure stability check. 8. Crack checking will control refer to ACI 318R-14 sub 24.3.2 7 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 4.2 Rev. A2 Stability Parameter Parameter for Steel Structure Stability Permanent All. Bending Ratio for Steel Member All. Lateral Displacement (Δ/L) 1.00 1/300 Temporary 1.00 1/200 All. Vertical Displacement (Δ/L) - Girders & Beams 1/90 1/90 - Girts & Purlins 1/200 1/200 * Δ : Maximum displacement of one node * L : Span of member/beam Parameter for Soil Bearing Capacity Location : Manggala North GS BH-02 Soil Stability Parameter Permanent Temporary All. Soil Bearing Capacity (ton/m ) 14.56 18.92 All. Safety factor for overturning 2.00 1.50 All. Safety factor for sliding 2.00 1.50 2 *increased permanent allowable bearing capacity by 30% Friction coefficient between soil and concrete Maximum settlement : : 8 of 47 0.4 25 mm DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 5 Rev. A2 LOADING ANALYSIS DESIGN & COMBINATION 5.1 Loading Analysis Design 5.1.1 Dead Load of Structure (Ds) Dead load means the weight of structure it self, and all material permanently attached there to or supported there by. 1). Selfweight of structure is add by 10% (steel connectiion) and analyze by using STAAD.Pro 2). Roof Weight 3) - Roofing sheet = - Miscellaneous item - Mech. Electrical, instrument = = 10.0 kg/m2 7.5 kg/m2 7.5 kg/m2 = 25.0 kg/m2 Panel Weight Tributary Length (m) Uniform Load (kg/m) Uniform Load (kN/m) 1.2 30.0 0.294 1.0 25.0 0.245 0.8 18.8 0.184 = 0.25 kN 5.1.2 Live Load (L) Live Loads shall means the moving or movable external loads on structure, floor, foundation and building produced by people, tools, furnishings of building etc. which are not permanently fixed thereon. Minimum Live load shall be shown as below: 150 kg/m2 18.00 m2 (Section 4.8 ASCE 7-16) 1.00 Roof basic load, Lo = Roof total area, At = Factor Reduction, R1 = Roof slope, Number of inches of rise per foot, F Factor Reduction, R2 = = 17.00 = = 1.00 Roof Live Load, Lr = R1 R2 Lo o 3.67 (Section 4.8 ASCE 7-16) 150 kg/m2 Tributary Length (m) Uniform Load (kg/m) Uniform Load (kN/m) 1.2 180.0 1.766 1.0 150.0 1.472 0.75 112.5 1.104 9 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 5.1.3 Wind load (WL) Wind load calculated Procedure Wind Load are as below : System Building : Type Building : automatically by StaadPro based on ASCE 7-16 and in accordance with Calculation Design Basis . The system of structure for analysis in Staad Pro Building Frame System Open Building Directional Procedure (Section 27 ASCE 7-16) for Buildings of Any Height Analysis Method : Parameter for input in staad Pro will be listed as the following 1. Common Data h (mean height) 1.95 = m B (Horizontal dimension measured normal to wind direction = 9 m B (Horizontal dimension measured normal to wind direction = 2 m θ angle of plane roof = 17 Building Classification Category = II Basic Wind Speed, V = Exposure Category, = C Consider Wind Speed-up over Hills = No Enslosure Classification = Open Building Important Factor, I Wind Directional Factor, Kd = = 1.15 Gust Effect Factor, G = 0.85 Velocity Pres. Exposure Coef Kz Kzt = = 0.85 1 degree 32.10 m/sec 0.85 (ASCE 7-16 Table 1.5-2) (ASCE 7-16 Table 26.6) (ASCE 7-16 Table 26-10) (ASCE 7-16 Table 26-8) 1 Ke (ASCE 7-16 Table 26-9) = The equation for calculationg wind load which is used by Staad Pro based on ASCE 7-16 qz = Velocity Pressure (N/mm2) = 0.613 x Kz x Kd x Ke x Kzt x V2 (Sect. 26.10.2, Eq. 26.10-1) = 456.36 N/m2 46.53 kg/m2 = Wind Load (N/mm2) = qz x G x Cp - qi x (+/-GCpi) = P for windward wall, where: qi =qh (Eq. 27.3-1, Sect. 27.3-1) = qh x G x Cp - qi x (+/-GCpi) for leeward wall, sidewalls, and roof, where: qi = (Sect. 27.3-1) Then, Wind load (P) is assigned in longitudinal and transversal direction of structure based on its height. The following figure is ilustration about the assignation forces 10 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 A B : Leeward Wall Load : Windward Wall Load C D : Windward Roof Load : Leeward Roof Load E : Side Wall Load F : Side Wall Load D F A C E B Wind Direction 11 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 = Wind X dir & Z-dir = Wind X dir = Wind Z-dir 12 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Case 1, Wind X Direction [(GCpf) - (GCpi)] 2 Windward 0.68 W (kg/m ) 31.64 Leeward -0.43 -19.78 Sidewall Windward Leeward -0.60 -0.85 -0.51 -27.69 -39.55 -23.73 Tributary Length Windward Leeward Sidewall Wall Roof Loading Applied X (+) Dir Grid No. Wall (m) (kN/m) (kN/m) (kN/m) A 0.10 0.031 - - B C 0.10 0.10 Tributary Length (m) 0.031 0.031 Windward (kN/m) Leeward (kN/m) Sidewall (kN/m) 1 2 1.20 1.00 -0.465 -0.388 -0.279 -0.233 - 3 0.75 -0.291 -0.174 - [(GCpf) - (GCpi)] W (kg/m ) Windward Leeward Sidewall 0 to h/2 0.68 -0.17 -0.60 -0.77 31.64 -7.91 -27.69 -35.60 h/2 to h h to 2h -0.77 -0.43 -35.60 -19.78 >2h -0.26 -11.87 Tributary Length Windward Leeward Sidewall (m) (kg/m) (kg/m) (kg/m) 0.10 0.10 0.10 0.031 - -0.02 - Distance Roof Case 2, Wind Z Direction Wall Roof 2 Loading Applied Z (+) Dir Grid No. Wall A B C 13 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 27-May-23 Rev. A1 Distance Roof 0 1 2.0 to to to > 1.0 2.0 4 4 Tributary Length (m) 2.00 (kg/m) Leeward (kg/m) Sidewall (kg/m) 0.75 1.00 1.00 1.00 -0.262 -0.349 -0.194 -0.116 -0.262 -0.349 -0.194 -0.116 - 14 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 5.1.4 Seismic Load (S) Earthquake Load is calculated based on SNI-1762-2019 using application by PUSKIM PU. For Duri, parameter for design Parameter Occupancy Important fact (Ie) Soil Site Class SS (g) S1 (g) Fa Fv SMS (g) SM1 (g) SDS (g) SD1 (g) T0 Ts Category Design Response Mode ( R ) Value II 1 SD 0.41 0.28 1.5 2.1 0.615 0.588 0.410 0.392 0.191 0.956 C 3.5 Refference Table 3, SNI 03-1726-2019 Table 4, SNI 03-1726-2020 Appendix D Peta Zona Gempa Indonesia (Kemen PU) Peta Zona Gempa Indonesia (Kemen PU) SNI 03-1726-2019 SNI 03-1726-2019 Sms = Fa*Ss, Eqn 5, SNI 03-1726-2019 Sm1 = Fv*S1, Eqn 6, SNI 03-1726-2019 SDS = 2/3*SMS, Eqn 7, SNI 03-1726-2019 SD1 = 2/3*SM1, Eqn 8, SNI 03-1726-2019 T0 = 0.2* SD1/SDS Ts = SD1/SDS Table 12, SNI 03-1726-2019 The earthquake load will be generated automatically by Staad Pro with input parameter above. 15 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 5.2 Rev. A2 Loading Combination There are two type for loading combination, Factored and Unfactored load combination. Factored load combination shall be used for foundation reinforcement design while unfactored load combination shall be used for foundation stability check and steel structure design. 5.2.1 Unfactored Load : LC 101 : LC 102 : LC 103 : LC 104 : LC 105 LC 106 LC 107 LC 108 LC 109 LC 110 LC 111 LC 112 LC 113 LC 114 LC 115 LC 116 LC 117 LC 118 LC 119 LC 120 LC 121 LC 122 LC 123 LC 124 LC 125 LC 126 LC 127 LC 128 LC 129 LC 130 LC 131 LC 132 LC 133 LC 134 LC 135 LC 136 LC 137 LC 138 LC 139 LC 140 LC 141 LC 142 : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Combination Ds + Do + L + Tf + Af + Ff + H + Vh 0,6 (Ds + De + Wx) 0,6 (Ds + De + Wz) 0,6 (Ds + De + (-Wx)) 0,6 (Ds + De + (-Wz)) Ds + Do + 0.75L + 0.45Wx + Af Ds + Do + 0.75L + 0.45Wz + Af Ds + Do + 0.75L + 0.45(-Wx) + Af Ds + Do + 0.75L + 0.45(-Wz) + Af Ds + Do + 0.6Wx + Af Ds + Do + 0.6Wz + Af Ds + Do - 0.6Wx + Af Ds + Do - 0.6Wz + Af 0.6 (Ds + De) + 0.7Eex + 0.21Eez + 0.2*SDS*D + Af 0.6 (Ds + De) + 0.7Eex - 0.21Eez + 0.2*SDS*D + Af 0.6 (Ds + De) - 0.7Eex + 0.21Eez + 0.2*SDS*D + Af 0.6 (Ds + De) - 0.7Eex - 0.21Eez + 0.2*SDS*D + Af 0.6 (Ds + De) + 0.21Eex - 0.7Eez + 0.2*SDS*D + Af 0.6 (Ds + De) + 0.21Eex - 0.7Eez + 0.2*SDS*D + Af 0.6 (Ds + De) - 0.21Eex + 0.7Eez + 0.2*SDS*D + Af 0.6 (Ds + De) - 0.21Eex - 0.7Eez + 0.2*SDS*D + Af Ds + Do + 0.75L + 0.525Eox + 0.1575Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L + 0.525Eox - 0.1575Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L - 0.525Eox + 0.1575Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L - 0.525Eox - 0.1575Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L + 0.1575Eox + 0.525Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L + 0.1575Eox - 0.525Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L - 0.1575Eox + 0.525Eoz + 0.2*SDS*D + Af Ds + Do + 0.75L - 0.1575Eox - 0.525Eoz + 0.2*SDS*D + Af Ds + Do + 0.7Eox + 0.21Eoz + 0.2*SDS*D + Af Ds + Do + 0.7Eox - 0.21Eoz + 0.2*SDS*D + Af Ds + Do - 0.7Eox + 0.21Eoz + 0.2*SDS*D + Af Ds + Do - 0.7Eox - 0.21Eoz + 0.2*SDS*D + Af Ds + Do + 0.21Eox + 0.7Eoz + 0.2*SDS*D + Af Ds + Do + 0.21Eox - 0.7Eoz + 0.2*SDS*D + Af Ds + Do - 0.21Eox + 0.7Eoz + 0.2*SDS*D + Af Ds + Do - 0.21Eox - 0.7Eoz + 0.2*SDS*D + Af Ds + De + 0.6Wpx Ds + De + 0.6Wpz Ds + De - 0.6Wpx Ds + De - 0.6Wpz Ds + Dt + 0.6Wpx + 0.75L 16 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 LC 143 LC 144 LC 145 LC 146 Rev. A2 : : : : Ds + Dt + 0.6Wpz + 0.75L Ds + Dt - 0.6Wpx + 0.75L Ds + Dt - 0.6Wpz + 0.75L Ds + H 17 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 5.2.2 Factored Load Combination for Foundation Steel Structure : 1.4 (Ds + Do + L + Tf + Af + Ff + H + Vh) LC 201 : 1.2 (Ds + Do + Tf + Af + Ff) + 1.6L LC 202 : 0.9 (Ds + De) + 1.0Wx LC 203 : 0.9 (Ds + De) + 1.0Wz LC 204 : 0.9 (Ds + De) - 1.0Wx LC 205 : 0.9 (Ds + De) - 1.0Wz LC 206 : 1,2 (Ds + De) +0.5L + 1.0Wx LC 207 : 1,2 (Ds + De) +0.5L + 1.0Wz LC 208 : 1,2 (Ds + De) +0.5L - 1.0Wx LC 209 : 1,2 (Ds + De) +0.5L - 1.0Wz LC 210 : 0.9 (Ds + De) + 1.0Eex + 0.3Eez + 0.2*SDS*D LC 211 : LC 212 0.9 (Ds + De) + 1.0Eex - 0.3Eez + 0.2*SDS*D : LC 213 0.9 (Ds + De) - 1.0Eex + 0.3Eez + 0.2*SDS*D : LC 214 0.9 (Ds + De) - 1.0Eex - 0.3Eez + 0.2*SDS*D : 0.9 (Ds + De) + 0.3Eex + 1.0Eez + 0.2*SDS*D LC 215 : LC 216 0.9 (Ds + De) + 0.3Eex - 1.0Eez + 0.2*SDS*D : LC 217 0.9 (Ds + De) - 0.3Eex + 1.0Eez + 0.2*SDS*D : LC 218 0.9 (Ds + De) - 0.3Eex - 1.0Eez + 0.2*SDS*D : 0.9 (Ds + Do) + 1.0Eex + 0.3Eez + 0.2*SDS*D LC 219 : LC 220 0.9 (Ds + Do) + 1.0Eex - 0.3Eez + 0.2*SDS*D : LC 221 0.9 (Ds + Do) - 1.0Eex + 0.3Eez + 0.2*SDS*D : LC 222 0.9 (Ds + Do) - 1.0Eex - 0.3Eez + 0.2*SDS*D : 0.9 (Ds + Do) + 0.3Eex + 1.0Eez + 0.2*SDS*D LC 223 : LC 224 0.9 (Ds + Do) + 0.3Eex - 1.0Eez + 0.2*SDS*D : LC 225 0.9 (Ds + Do) - 0.3Eex + 1.0Eez + 0.2*SDS*D : LC 226 0.9 (Ds + Do) - 0.3Eex - 1.0Eez + 0.2*SDS*D : LC 227 1.2 (Ds + Do) + 0.5L + 1.0Eox + 0.3Eoz + 0.2*SDS*D : LC 228 1.2 (Ds + Do) + 0.5L + 1.0Eox - 0.3Eoz + 0.2*SDS*D : LC 229 1.2 (Ds + Do) + 0.5L - 1.0Eox + 0.3Eoz + 0.2*SDS*D : LC 230 1.2 (Ds + Do) + 0.5L - 1.0Eox - 0.3Eoz + 0.2*SDS*D : LC 231 1.2 (Ds + Do) + 0.5L + 0.3Eox + 1.0Eoz + 0.2*SDS*D : LC 232 1.2 (Ds + Do) + 0.5L + 0.3Eox - 1.0Eoz + 0.2*SDS*D : LC 233 1.2 (Ds + Do) + 0.5L - 0.3Eox + 1.0Eoz + 0.2*SDS*D : LC 234 1.2 (Ds + Do) + 0.5L - 0.3Eox - 1.0Eoz + 0.2*SDS*D : LC 235 0.9 (Ds + De) + 1.0Wpx : LC 236 0.9 (Ds + De) + 1.0Wpz : LC 237 0.9 (Ds + De) - 1.0Wpx : LC 238 0.9 (Ds + De) - 1.0Wpz : LC 239 1.2 (Ds + Dt) + 1.0Wpx : LC 240 1.2 (Ds + Dt) + 1.0Wpz : LC 241 1.2 (Ds + Dt) - 1.0Wpx : LC 242 1.2 (Ds + Dt) - 1.0Wpz : LC 243 1.2 Ds + 1.6 H 18 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Where as : : Ds : De D0 : : Dt : W : E : L : Vh : Th : Tf : Af : Ff : I J H M Bp Wp Ee : : : : : : Dead Load of Structure Proper Empty Load of Equipment Operating Load of Equipment Test Load of Equipment Wind Load Earthquake Load Live Load Vehicle Load Thermal Load Thermal Forces Pipe Anchor and Guide Forces Pipe Friction Forces Impact Load Dynamic Load Earth / Water Pressure Maintenance Load Bundle-Pull Load Wind Load during Maintenance Earthquake Load (Empty) 6. Computer Modelling 6.1 Computer Program The following software will be used for modelling and designing of structures : Staad Pro V8i SS6 Edition Shelter Structure is analyzed by using Staad Pro V8i. This analysis consists of structure and design load modeling, internal steel member code checking deflection/displacement node check. Support reaction, member forces and moment will also be obtained from this structure analysis. 6.2 Unit System The following unit system shall be adopted in the Staad Pro analysis files and design documents: Great length : in meter (member length, joint co-ordinates) Small length : in mm (dimension of beam/column, deflection, etc) Forces : kN Moments : kN m Masses : in kg 2 Stresses : in N/mm Angles : in degree ` 19 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000 GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 6.3 Rev. A2 Structure Modeling Figure 1. Structure Modeling by StaadPro 6.4 Axis System 6.4.1 Global Axis System Nodes of the structural model are described in a global axis system defined as follows: - Y is vertical from the Chart Datum - Z is horizontal parallel to the structure south - X is horizontal parallel to the structure east 6.4.2 Local Axis System Each member of the structural model has its own local axis system in which calculated internal forces and moments are expressed. It can also be used to introduce loads on the members. 6.5 Method of Analysis The structure analysis to be carried out are framing structure analysis of a three dimensional space frame computer model. 20 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000 GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 6.6 Building Structure Modeling 6.6.1 Isometric Framing 6.6.2 Member Properties Column : H100X100X6X8 21 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000 GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Rafter : H150x75x5x7 22 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Beam : H150x75x5x7 Beam : C150X75X6.5 23 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 6.6.3 Joint and Member Numbering Joint Numbering Member Numbering 24 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 6.7 Rev. A2 Loading Design Seismic Load X Direction Seismic Load Z Direction 25 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Dead Load (Selfweight) Live Load Roof 26 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Wind Load X Direction Wind Load Z Direction 27 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 7 7.1 Rev. A2 Steel Structure Design Steel Member Size and Unity Check From STAADPro output, strength ratio of steel member as following : No Beam Marking Property IR 55 C1 H100X100X6X8 0.12 58 C1 H100X100X6X9 0.12 H100X100X6X10 43 C1 0.16 H100X100X6X11 98 C1 0.14 H100X100X6X12 24 C1 0.12 H100X100X6X13 27 C1 0.12 37 RF1 H150X75X5X7 0.25 88 RF1 H150X75X5X7 0.24 83 RF1 H150X75X5X7 0.19 97 RF1 H150X75X5X7 0.18 86 B1 H150X75X5X7 0.14 38 B1 H150X75X5X7 0.14 39 B1 H150X75X5X7 0.13 85 B1 H150X75X5X7 0.13 36 B2 C150X75X6.5 0.02 49 B2 C150X75X6.6 0.02 LC 227 227 227 227 228 228 202 202 202 202 202 202 202 202 201 201 Note: For all member size and unity check, please see Appendix C 7.2 Displacement & Drift Δy Δx Δy Δx Direction Node Lateral Vertical 28 28 Max. Dis. (Δ) Max. Span (L) mm mm 3.204 0.095 2000 1040 28 of 47 : : Vertical Displacement Lateral Displacement Δ/L All. Δ/L 0.0016 0.0001 0.0033 0.011 Check OK! OK! DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 7.3 Rev. A2 Slenderness Check No Beam Marking Property KR/L 55 C1 H100X100X6X8 80.27 58 C1 H100X100X6X9 80.27 57 C1 H100X100X6X10 80.27 59 C1 H100X100X6X11 80.27 56 C1 H100X100X6X12 80.27 37 RF1 H150X75X5X7 18.01 12 RF1 H150X75X5X7 62.90 68 RF1 H150X75X5X7 62.90 9 B1 H150X75X5X7 60.05 93 B1 H150X75X5X7 84.00 2 B1 H150X75X5X7 60.05 36 B2 C150X75X6.5 180.60 49 B2 C150X75X6.6 180.60 Allow 200 200 200 200 200 200 200 200 200 200 200 200 200 Check OK! OK! OK! OK! OK! OK! OK! OK! OK! OK! OK! OK! OK! * "KL/R max" means the highest value between KL/R in y-axis and z-axis, obtained from output StadPro. * "Allow." means allowable slenderness, for column or compression member does not exceed 200 and for tension main beam doesn't exceed 300 except for bracing tensiononly member, maximum slenderness limit need not apply. 29 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8. 8.1 Concrete Structure Design Foundation Layout Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 500 A 4000 9000 X 4000 Z 500 2000 100.0 Hs Slab 100.0 Section A Foundation Dimension Width of Foundation, BF = = 2 m 9 m 0.200 m Concrete Cover = = 18 m2 0.040 m Pedestal Dimension Width of Pedestal, Bp = 0.350 m Length of Pedestal, Lp = Height of pedestal above ground, Gp = 0.350 m 0.300 m Length of Foundation, LF Total thick. of Foundation, HF Area of Foundation, AF = Total height of pedestal, Hp = 0.300 m Area of pedestal AP = 0.123 m2 30 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.2 Structure Dead Load Pedestal Slab Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 = n * B P * L P * HP * c = 3* 0.35 * 0.35 * 0.3 * 2400 = BF * LF * HF * c = 264.60 kg = 2 * 9 * 0.2 * 2400 = 8640 kg 8904.6 kg Total Dead Load, WDL 31 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.3 Joint Result Load Combination Combination load for checking of axial bearing capacity Summary Unfactored Load No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Load Combination 101 = DS+DO+L+TF+AF+FF+H+VH 102 = 0.6(DS+DE+WX) 103 = 0.6(DS+DE+WZ) 104 = 0.6(DS+DE+(-WX)) 105 = 0.6(DS+DE+(-WZ)) 106 = DS+DO+0.75L+0.45WX+AF 107 = DS+DO+0.75L+0.45WZ+AF 108 = DS+DO+0.75L+0.45(-WX)+AF 109 = DS+DO+0.75L+0.45(-WZ)+AF 110 = DS+DO+0.6WX+AF 111 = DS+DO+0.6WZ+AF 112 = DS+DO+0.6(-WX)+AF 113 = DS+DO+0.6(-WZ)+AF 114 = 0.6 (Ds + De) + 0.7Eex + 0.21Eez + 0.2*SDS*D + Af 115 =0.6 (Ds + De) + 0.7Eex 0.21Eez + 0.2*SDS*D + Af 116 = 0.6 (Ds + De) - 0.7Eex + 0.21Eez + 0.2*SDS*D + Af 117 = 0.6 (Ds + De) - 0.7Eex 0.21Eez + 0.2*SDS*D + Af 118 = 0.6 (Ds + De) + 0.21Eex + 0.7Eez + 0.2*SDS*D + Af 119 = 0.6 (Ds + De) - 0.21Eex + 0.7Eez + 0.2*SDS*D + Af 120 = 0.6 (Ds + De) - 0.21Eex 0.7Eez + 0.2*SDS*D + Af 21 121 = DS+DO+0.75L-0.525EOZ+AF 22 23 24 25 26 27 28 29 30 122 = Ds + Do + 0.75L + 0.525Eox + 0.1575Eoz + 0.2*SDS*D + Af 123 = Ds + Do + 0.75L + 0.525Eox 0.1575Eoz + 0.2*SDS*D + Af 124 = Ds + Do + 0.75L - 0.525Eox + 0.1575Eoz + 0.2*SDS*D + Af 125 = Ds + Do + 0.75L - 0.525Eox 0.1575Eoz + 0.2*SDS*D + Af 126 = Ds + Do + 0.75L + 0.1575Eox + 0.525Eoz + 0.2*SDS*D + Af 127 = Ds + Do + 0.75L + 0.1575Eox 0.525Eoz + 0.2*SDS*D + Af 128 = Ds + Do + 0.75L - 0.1575Eox + 0.525Eoz + 0.2*SDS*D + Af 129 = Ds + Do + 0.75L - 0.1575Eox 0.525Eoz + 0.2*SDS*D + Af 130 = Ds + Do + 0.7Eox + 0.21Eoz + 0.2*SDS*D + Af Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Horizontal Fx Fz Vertical Fy Mx Moment Mz My kN 0.01 0.13 0.01 -0.01 0.01 0.11 0.01 -0.01 0.01 0.14 0.01 -0.01 0.01 kN 0.53 0.33 0.31 0.33 0.35 0.53 0.52 0.53 0.55 0.55 0.53 0.55 0.57 kN 111.71 91.86 92.73 91.86 92.73 106.95 107.60 106.95 107.60 96.05 96.92 96.05 96.92 kN.m 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 kN.m 0.04 0.05 0.02 0.02 0.02 0.06 0.04 0.04 0.04 0.07 0.04 0.04 0.04 kN.m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.20 0.33 94.61 -0.02 0.43 0.00 0.01 0.25 94.61 -0.05 0.03 0.00 0.25 0.33 94.60 -0.02 -0.30 0.00 0.25 0.44 94.60 0.02 -0.30 0.00 -0.06 0.19 94.60 -0.07 0.15 0.00 -0.06 0.57 94.60 0.07 0.15 0.00 0.08 0.19 94.60 -0.07 -0.07 0.00 0.08 0.57 94.60 0.07 -0.07 0.00 -0.30 0.52 98.79 -0.03 0.64 0.00 -0.30 0.69 98.79 0.04 0.64 0.00 0.38 0.52 98.79 -0.03 -0.44 0.00 0.38 0.69 98.79 0.04 -0.44 0.00 -0.09 0.32 98.79 -0.10 0.22 0.00 0.12 0.32 98.79 -0.10 -0.10 0.00 -0.09 0.89 98.79 0.11 0.22 0.00 0.12 0.89 98.79 0.11 -0.10 0.00 -0.39 0.49 98.79 -0.04 0.84 0.00 32 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 131 = Ds + Do + 0.7Eox - 0.21Eoz + 31 0.2*SDS*D + Af 132 = Ds + Do - 0.7Eox + 0.21Eoz + 32 0.2*SDS*D + Af 133 = Ds + Do - 0.7Eox - 0.21Eoz + 33 0.2*SDS*D + Af 134 = Ds + Do + 0.21Eox + 0.7Eoz + 34 0.2*SDS*D + Af 135 = Ds + Do + 0.21Eox - 0.7Eoz + 35 0.2*SDS*D + Af 136 = Ds + Do - 0.21Eox + 0.7Eoz + 36 0.2*SDS*D + Af 137 = Ds + Do - 0.21Eox - 0.7Eoz + 37 0.2*SDS*D + Af 38 138 = Ds + De + 0.6Wpx 39 139 = Ds + De + 0.6Wpz 40 140 = Ds + De - 0.6Wpx 41 141 = Ds + De - 0.6Wpz 42 142 = Ds + Dt + 0.6Wpx + 0.75L 43 143 = Ds + Dt + 0.6Wpz + 0.75L 44 144 = Ds + Dt - 0.6Wpx + 0.75L 45 145 = Ds + Dt - 0.6Wpz + 0.75L 46 146 = Ds + H Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 -0.39 0.72 98.79 0.05 0.84 0.00 0.50 0.49 98.79 -0.04 -0.60 0.00 0.50 0.72 98.79 0.05 -0.60 0.00 -0.12 0.22 98.79 -0.14 0.28 0.00 -0.12 0.98 98.79 0.15 0.28 0.00 0.16 0.22 98.79 -0.14 -0.15 0.00 0.16 0.98 98.79 0.15 -0.15 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.55 0.55 0.55 0.55 0.53 0.53 0.53 0.53 0.55 97.74 97.74 97.74 97.74 108.21 108.21 108.21 108.21 97.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Vertical Fy kN Mx kN.m Summary Factored Load Load Combination No. Horizontal Fx Fz kN kN Moment Mz kN.m My kN.m 1 201 = 1.4(DS+DO+L+TF+AF+FF+H+VH) 0.01 0.74 34.22 0.00 0.06 0.00 2 202 = 1.2(DS+DO+TF+AF+FF)+1.6L 0.01 0.63 122.18 0.00 0.05 0.00 3 4 5 6 203 204 205 206 0.9(DS+DE)+1.0WX 0.9(DS+DE)+1.0WZ 0.9(DS+DE)+1.0(-WX) 0.9(DS+DE)+1.0(-WZ) 0.22 0.01 -0.01 0.01 0.50 0.46 0.50 0.53 93.88 95.33 93.88 95.33 0.00 -0.01 0.00 0.01 0.09 0.04 0.03 0.04 0.00 0.00 0.00 0.00 7 207 = 1.2(DS+DE+AF)+0.5L+1.0WX 0.22 0.65 104.00 0.00 0.10 0.00 8 208 = 1.2(DS+DE+AF)+0.5L+1.0WZ 0.01 0.62 105.45 -0.01 0.05 0.00 9 209 = 1.2(DS+DE+AF)+0.5L+1.0(WX) -0.01 0.65 104.00 0.00 0.04 0.00 10 210 = 1.2(DS+DE+AF)+0.5L+1.0(WZ) 0.01 0.68 105.45 0.01 0.05 0.00 11 211 = 0.9 (Ds + De) + 1.0Eex + 0.3Eez + 0.2*SDS*D -0.28 0.47 97.76 -0.03 0.61 0.00 12 212 = 0.9 (Ds + De) + 1.0Eex 0.3Eez + 0.2*SDS*D -0.28 0.63 97.76 0.03 0.61 0.00 13 213 = 0.9 (Ds + De) - 1.0Eex + 0.3Eez + 0.2*SDS*D 0.36 0.47 97.76 -0.03 -0.42 0.00 14 214 = 0.9 (Ds + De) - 1.0Eex 0.3Eez + 0.2*SDS*D 0.36 0.63 97.76 0.03 -0.42 0.00 = = = = 33 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 15 215 = 0.9 (Ds + De) + 0.3Eex + 1.0Eez + 0.2*SDS*D -0.09 0.28 97.76 -0.10 0.21 0.00 16 216 = 0.9 (Ds + De) + 0.3Eex 1.0Eez + 0.2*SDS*D -0.09 0.82 97.76 0.10 0.21 0.00 17 217 = 0.9 (Ds + De) - 0.3Eex + 1.0Eez + 0.2*SDS*D 0.12 0.28 97.76 -0.10 -0.10 0.00 18 218 = 0.9 (Ds + De) - 0.3Eex 1.0Eez + 0.2*SDS*D 0.12 0.82 97.76 0.10 -0.10 0.00 19 219 = 0.9 (Ds + Do) + 1.0Eex + 0.3Eez + 0.2*SDS*D -0.28 0.47 97.76 -0.03 0.61 0.00 20 220 = 0.9 (Ds + Do) + 1.0Eex 0.3Eez + 0.2*SDS*D -0.28 0.63 97.76 0.03 0.61 0.00 21 221 = 0.9 (Ds + Do) - 1.0Eex + 0.3Eez + 0.2*SDS*D 0.36 0.47 97.76 -0.03 -0.42 0.00 22 222 = 0.9 (Ds + Do) - 1.0Eex 0.3Eez + 0.2*SDS*D 0.36 0.63 97.76 0.03 -0.42 0.00 23 223 = 0.9 (Ds + Do) + 0.3Eex + 1.0Eez + 0.2*SDS*D -0.09 0.28 97.76 -0.10 0.21 0.00 24 224 = 0.9 (Ds + Do) + 0.3Eex 1.0Eez + 0.2*SDS*D 0.12 0.28 97.76 -0.10 -0.10 0.00 25 225 = 0.9 (Ds + Do) - 0.3Eex + 1.0Eez + 0.2*SDS*D -0.09 0.82 97.76 0.10 0.21 0.00 26 226 = 0.9 (Ds + Do) - 0.3Eex 1.0Eez + 0.2*SDS*D 0.12 0.82 97.76 0.10 -0.10 0.00 27 227 = 1.2 (Ds + Do) + 0.5L + 1.0Eox + 0.3Eoz + 0.2*SDS*D -0.56 0.55 100.90 -0.06 1.19 0.00 28 228 = 1.2 (Ds + Do) + 0.5L + 1.0Eox - 0.3Eoz + 0.2*SDS*D -0.56 0.88 100.90 0.06 1.19 0.00 29 229 = 1.2 (Ds + Do) + 0.5L - 1.0Eox + 0.3Eoz + 0.2*SDS*D 0.72 0.55 100.90 -0.06 -0.87 0.00 30 230 = 1.2 (Ds + Do) + 0.5L - 1.0Eox 0.3Eoz + 0.2*SDS*D 0.72 0.88 100.90 0.06 -0.87 0.00 31 231 = 1.2 (Ds + Do) + 0.5L + 0.3Eox + 1.0Eoz + 0.2*SDS*D -0.17 0.17 100.90 -0.20 0.39 0.00 32 232 = 1.2 (Ds + Do) + 0.5L + 0.3Eox - 1.0Eoz + 0.2*SDS*D -0.17 1.25 100.90 0.21 0.39 0.00 33 233 = 1.2 (Ds + Do) + 0.5L - 0.3Eox + 1.0Eoz + 0.2*SDS*D 0.22 0.17 100.90 -0.20 -0.23 0.00 34 234 = 1.2 (Ds + Do) + 0.5L - 0.3Eox 1.0Eoz + 0.2*SDS*D 0.22 1.25 100.90 0.21 -0.23 0.00 35 36 37 38 39 40 41 42 43 235 = 0.9 (Ds + De) + 1.0Wpx 236 = 0.9 (Ds + De) + 1.0Wpz 237 = 0.9 (Ds + De) - 1.0Wpx 238 = 1.2(DS+DT)+1.0(-WPZ)+1.0L 239 = 1.2 (Ds + Dt) + 1.0Wpx 240 = 1.2 (Ds + Dt) + 1.0Wpz 241 = 1.2 (Ds + Dt) - 1.0Wpx 242 = 1.2 (Ds + Dt) - 1.0Wpz 243 = 1.2 Ds + 1.6 H 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.49 0.49 0.49 0.49 0.64 0.64 0.64 0.64 0.66 96.70 96.70 96.70 96.70 113.80 113.80 113.80 113.80 99.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.4 Design of Pedestal Reinforcement Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Width of pedestal, Bp = 0.35 m = 350 mm Length of pedestal, Lp height of pedestal, Hp Concrete cover (cc) = = = 0.35 0.30 0.05 m m m = = = 350 300 50 mm mm mm = 20 mm Max. size of coarse aggregate (dagg) Ratio = Pedestal Height 0.30 0.35 = Width of pedestal = 0.86 < 2.50 Short Column Check slender effect : Slender effect could be neglected if kL/r less than 22. Inertia, I = Area, Ag radius gyration, r k slender = 4 125,052.1 cm 2 1,225.00 cm = 10.10 cm = = 2.00 5.94 Check rebar requirement Pedestal rebar are 0.5% from rebar area gross section 0.005 As = o= o Ag 0.005 350 x = D = 13 = 132.73 cm 2 n x 7 = < 350 = Vu Pu Mu kN kN kNm 1.25 122.18 1.19 Note : Mu = moment that occurs at bottom of pedestal Cross section area (Ab) Rebar number along length side (nL) Rebar number along width side (nB) Total number of rebar (n) n = 2 nL + 2 (nB - 2) Reinforcement steel (stirrups): Diameter of stirrups, hoops or ties (dt) Cross section area Ties spacing Cross tie spacing Properties of concrete: Compression strength (f'c) Modulus of elasticity (Ec) Ec = 4700√f'c 35 of 47 = = = = 13 132.73 3 3 = 8 (OK!) mm2 therefore, in application use 8 D Factored Loading Combination (LC) from StaadPro Output Reinforcement steel (main bars): Diameter of longitudinal bar (db) 22.00 mm mm 2 = 13 mm = = = 132.73 150 150 mm mm mm = = 28.00 24870 MPa MPa 2 613 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Properties of reinforcement steel: Yield stress (fy) = = 420.00 200000 Shear (øs) Axial tension (øa) = = = 0.90 0.75 0.90 Axial compression = 0.65 Modulus of elasticity (Es) Strength reduction factors: Moment (øm) Maximum factored shear force at pedestal (Vu) Corresponding axial force with Vu (Nu) Min. spacing = = MPa MPa 1.25 122.18 kN kN = max. of [2.5 × db ; 40 + db ; 4/3 × dagg + db] = max. of [2.5 × 13 mm ; (40 + 13) mm ; 4/3 × 20 mm + 13 mm] = max. of [33 mm ; 53 mm ; 40 mm] = Max. spacing 53 = 150 + db = = (150 + 13) mm 163 Rebar spacing along length side Rebar spacing along width side mm mm = (LP - (2 × cc + 2 × dt + db)) / (nL - 1) = = (350 mm - (2 × 50 mm + 2 × 13 mm + 13 mm)) / (3 - 1) (OK!) 105.50 mm ≥ 53 mm ≤ 163 mm (OK!) = (BP - (2 × cc + 2 × dt + db)) / (nB - 1) = (350 mm - (2 × 50 mm + 2 × 13 mm + 13 mm)) / (3 - 1) (OK!) 105.50 mm ≥ 53 mm ≤ 163 mm (OK!) = Pedestal gross area (Ag) Rebar area (Ast) = BP · L P = n · Ab Min. and max. reinforcement ratio check: 1062 mm2 ≥ 0.005 · Ag ≤ 0.08 · Ag = = 613 9800 Strength Check strain of concrete (εc) Factor relating depth of equivalent rectangular compressive stress block to depth of neutral axis (β1) If 17 MPa ≤ f'c ≤ 28 MPa, β1 = 0.85 If 28 MPa < f'c ≤ 55 Mpa, β1 = 0.85 - 0.05 (f'c - 28) / 7 If f'c ≥ 55 MPa, β1 = 0.65 36 of 47 122500 1062 = = mm2 mm2 (OK!) (OK!) = 0.003 = 0.85 2 mm 2 mm DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Pedestal capacity for pure compression ø P = ø (0.85 f'c (Ag - Ast) + fy Ast) = 3002.58 kN Pedestal capacity for pure tension ø T = ø (fy Ast) = 401.38 kN 37 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Table - Pedestal Capacity for Pure Moment Moment Y Moment Z Description Axis Axis Tensile reinforced steel area: AsX = nL · Ab 398.19 398.19 mm 2 AsZ = nB · Ab Compressive reinforced steel area: AsX' = AsX 2 Unit 398.19 398.19 mm AsZ' = AsZ Distance from extreme compression fiber to centroid of longitudinal compression reinforcement (d'): d' = cc + dt + db / 2 69.50 69.50 mm d' = cc + dt + db / 2 Distance from extreme compression fiber to centroid of longitudinal tension reinforcement (d): d = BP - d' 280.50 280.50 mm 0.002 0.002 - 0.002 416.50 167.240 20.08 23.62 0.002 416.50 167.240 20.08 23.62 kN kN mm - 0.03 No 80.12 72.11 0.03 No 80.12 72.11 kNm kNm d = LP - d' ε y = f y / Es cb = (0.003 / 0.003+εy) . 0.003 Cc = 0.85 f'c cc bw T = fy As a = (As fy) / (0.85 f'c bw) c = a / 1 εs = (0.003/c) d - 0.003 Compression reinforcement has yielded? Mn = Cc (h/2 - a/2) + T (d - h/2) øm M n Table - Pedestal Capacity Under Various Axial Forces and Moments Moment About Y Axis Moment About Z Axis Description Case 1 Case 2 Case 3 Case 1 Case 2 Case 3 strain of steel (εs) 0.001 0.002 0.005 0.001 0.002 0.005 Unit c = εc / (εc + εs) · d 208 165 105 208 165 105 mm εs' = (c - d') / c · εc 0.002 0.002 0.001 0.002 0.002 0.001 - εs = (c - d) / c · εc - -0.001 -0.002 -0.005 -0.001 -0.002 -0.005 - fs' = min. of [εs' · Es; fy] 399 347 204 399 347 204 MPa fs = min. of [εs · Es; fy] Cc = (0.85 f'c) (β1 c) b P' = fs' As ' -210 1471 159 -420 1168 138 -1000 745 81 -210 1471 159 -420 1168 138 -1000 745 81 MPa kN kN -84 -167 -398 -84 -167 -398 kN Mc = Cc (h / 2 - β1 c / 2) M' = P' (h/2 - d') M = P (h/2 - d) Pn = Cc + P' + P 128 17 9 1547 123 15 18 1139 97 9 42 428 128 17 9 1547 123 15 18 1139 97 9 42 428 kNm kNm kNm kN Mn = Mc + M' + M ø ø Pn 153 0.90 1392 155 0.90 1025 148 0.90 385 153 0.90 1392 155 0.90 1025 148 0.90 385 kNm kN ø Mn 138 139 133 138 139 133 kNm P = f s As Table - Pedestal Capacity 38 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation GATHMGNO000-CIV-CAL-PHR-2009-00 SLON-GATHMGNO000 Rev. A2 7-Jun-23 Date: Moment About X Axis No. Description Moment About Z Axis P M P M (kN) (kNm) (kN) (kNm) -401.38 0.00 -401.38 0.00 0.00 72.11 0.00 72.11 1 Pure compression 2 Pure moment 3 Case 3 384.88 132.84 384.88 132.84 4 5 Case 2 Case 1 1025.39 1391.89 139.28 137.82 1025.39 1391.89 139.28 137.82 6 Pure tension 3002.58 0.00 3002.58 0.00 Interaction Diagram (Moment About X Axis 3500.00 Axial Capacity (kN) 3000.00 2500.00 2000.00 1500.00 1000.00 500.00 0.00 00 -500.000. 20. 00 40.00 -1000.00 60.00 80. 00 100.00 120.00 140.00 160.00 Moment Capacity (kN/m) Pedestal Interaction Diagram (Moment About Y Axis) Interaction Diagram (Moment About Z Axis 3500.00 Axial Capacity (kN) 3000.00 2500.00 2000.00 1500.00 1000.00 500.00 0.00 -500.000. -1000.00 00 20. 00 40.00 60. 00 80.00 100.00 120.00 140.00 140 160.00 Moment Capacity (kN/m) Pedestal Interaction Diagram (Moment About Z Axis) 39 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Shear Reinforcement Shear Reinforcement Maximum base shear, Vu = 0.126 ton Maximum axial load, Nu Rebar diameter, D Width of pedestal, BP = = = 122176.1 N 13 mm 350 mm Length of pedestal, LP = 350 mm Effective thickness, d = 280.50 mm Reduction factor, Ø Concrete strength, f'c Nominal shear strength, ØVc = = = 0.75 28 MPa N .0.17.1 u 14A g f c'b wd = 7.24 ton = No shear reinforcement required, Use minimum reinforcement 0.5ϕVc > Vu Total leg Provided shear area (Av) = = 2 265.46 legs 2 mm Minimum shear reinforcement: Avmin = max. of [0.062 √f'c bw s / fyt ; 0.35 bw s / fyt] = max. of [41 mm²; 44 mm²] 2 mm = 41.01 ≤ 265.46 mm 2 (OK!) = Use Stirrup D13 with spacing max (d/2, ph/8, 300) mm = 125 D 13 - 100 So, use : = 8.5 Base Plate and Anchor Bolts Analysis Baseplate and Concrete Data Baseplate thickness tp 19 mm 22 cm 22 cm = Baseplate size N B = = Column size : H100X100X6 d = bf tw = = tf = Yield strength stress, Fy = Concrete Strength, Bolt diameter, fc' db = = w1 = w2 w3 = = nb = Fu Fv = = for shear reinforcement. 10 cm 10 cm 0.6 cm 0.8 cm 2400 kg/cm2 214 kg/cm2 20 mm 6 mm 6 mm 6 mm 4 nos 4914 kg/cm2 1400 kg/cm2 40 of 47 = 2.0 cm (welding E70XX Electrode) (welding E70XX Electrode) (welding E70XX Electrode) (number of bolts) (welding E70XX Electrode) (welding E70XX Electrode) DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Anchor Bolt design Anchor Bolt Capacity Tension Capacity Ab Ta = = 0.25.pi.db^2 6500 kg T = nb.Ta 3.1 cm2 = (ASTM A 307) 26000 kg = Shear Capacity 3.1 cm2 Ab Fv = = 0.25.pi.db^2 700 kg/cm2 = Va V = = Ab.Fv nb.Va = = 2198 kg 8792 kg = 6565 kg m Moment Capacity M = T/2.z 0.505 z = M = Weld Capacity: m T/2.z Tension/Shear Capacity te1 = 0.707.w1 = te2 = 0.707.w2 = te3 = w3 = Le1 Le2 = = 2(d-2.tf) 2(bf-2.tw) = = Le3 T = = bf V Moment Capacity Tension capacity of Le2 = Le3 = T = z M = = = = = Fv (Le1.te1+Le2.te2+Le3.te3) weld in column flange area (F) = M/(d-tf) bf-tw = bf = Fv (Le2.te2+Le3xte3) = d-tf T.z 0.4242 cm 0.4242 cm 0.6 cm 16.8 cm 17.6 cm 10 cm 28829.472 kg 9.4 cm 10 cm 13982.5 kg m 9.2 cm 1286.387424 kg m = = Base Plate Capacity Compression Capacity A1 = B.N = A2 m = = Pedestal area (N - 0.95d)/2 = = n = (B - 0.8bf)/2 = tp = m (fp/0.25.Fy)^0.5; fp = tp^2.0.25.Fy/ m^2 = 55.4 fp A1 A2 = = = P / (B.N); P / (0.7.fc'); 1/A2 (P/ (0.35.fc'))^2; P P P = fp.B.N = A1*0.7*fc' = (A1.A2)^0.5.0.35.fc' = = = 26837.6 72550.6 Moment Capacity Me = 0.75.Fy.B.tp^2 /6 Ca = 1.13 for Fy = Cb = 36 ksi = (bf / B)^0.5 = = 41 of 47 484.0 cm2 1225.0 cm2 6 cm 7 cm 23826 kg/cm 36 ksi 0.7 57710.7 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Af = bf.tf = 8 cm2 Aw Pf = = (H-2.tf).tw 2.db = = Pe = = Pf-db / 4-0.707.w Ca.Cb(Af/Aw)^0.33.(Pe/db)^0.25 = = 5.04 cm2 4 cm 0.6 cm 0.6 = = 4 Me / (m.Pe) Ff.(d-tf) = = 264066.2733 kg 24294.09714 kg m = = = = 29.9 179.2 41.8 40128 m Ff M Shear Capacity An1 = tp (B-n / 4(db+25.4 / 16)) V = 0.3.Fu(2.An1) Ag = tp.B V = 0.4.Fy.Ag Overall Capacity Pa = Ta = Va Ma = = 26837.6 kg 26000.0 kg = 8792.0 kg 6565.0 kg m = 122.2 kg 8.8 ton 6.6 ton m = = Actual Loading on Top Base Plate : From staad Pro, maximum support reaction : 73.0 kg < Fx = 127.8 kg < Fz = Fy 26.8 ton 26.0 ton = < Va Ok Va Ok Pa Ok 42 of 47 cm2 cm cm2 kg DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.6 Foundation Stability Analysis 8.6.1 Foundation Analysis for Shallow Foundation : Manggala North GS Location Bearing Capacity Form Rect degree 31 c kPa 0 3 kN/m 18 B m 2.00 qult = 428.252 kPa qall = 142.751 kPa = Nc Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Ip 2 3 32.64 1.14 25.97 0.91 14.56 ton/m² 43 of 47 kN/m 18.00 L m 9.0 Df m 0.20 N I 20.61 1.13 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.6.2 Intensity of Soil Pressure (q) = Mx maximum Mx 0.15 kN.m = Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Mz = = Mz maximum kN.m 0.84 V = = Fy maximum 111.71 kN ex = = Mz / V 0.01 (chapter 9-5 at Foundation Analysis And Design, by Joseph E. Bowles ) m ez = = = = = Mx / V 0.00 0.20 m 9.00 m 2.00 m (chapter 9-5 at Foundation Analysis And Design, by Joseph E. Bowles ) m Hs Ls Bs ex ez < < Ls/6 Bs/6 q = = V/A 6.21 kN/m2 , , Ls/6 Bs/6 = = 1.500 0.333 So.. Excentricty not influent calculation of soil pressure So.. Excentricty not influent calculation of soil pressure A 6.21 kN/m² = Bs x Ls = 18.00 < 142.76 kN/m2 OK! 44 of 47 m2 m m DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: 7-Jun-23 8.6.3 Stability Against Sliding V = Fy maximum = 111.71 Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 kN Maximum horizontal loads : Fx = 0.50 kN Fz = 0.98 kN = Friction coefficient between soil and concrete = 0.5 HRX, Sliding Resistence = .V = 55.85 kN Stability against sliding safety factor : HRX / Fx > Sf minimum 1.5 111.04 > …… OK! HRZ, Sliding Resistence = .V = 55.85 kN Stability against sliding safety factor : HRZ / Fz > Sf minimum 1.5 56.93 > …… OK! 8.6.4 Stability Against Overturning V = = Fy maximum 111.71 Mx, Maximum Overturning = = Mx maximum 0.15 kN.m Mz, Maximum Overturning = = Mz maximum 0.84 kN.m Nox, Overturning Resistence Noz, Overturning Resistence kN = ½ Bs . V = 112 kN.m = ½ Ls . V = 503 kN.m Stability against Overturning safety factor : Nox / Mx > SF minimum 770.4 > 1.5 …… OK! Noz / Mz > SF minimum 599.8 > 1.5 8.6.5 Slab Reinforcement Length of Foundation, LF = Width of Foundation, BF = Slab Thickness = Concrete cover, c = Effective depth, d = fy = …… 9.000 2.000 0.200 0.040 0.154 420 OK! m m m m m Mpa 45 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 7-Jun-23 Moment Ultimate Lx Lz 9.00 2.00 = = 4.5 One Way Slab Load Ultimate = 6.79 kN/m² Momen Ultimate Mu = 137.448 kN.m 8.6.6 Rebar Requirement on X & Y-Direction Mu Rn = = 2.75 2 bd 8.6.7 P reg = As need As steel n S Use steel = = = = = d = 153.500 mm ø b = = 0.85 1 = 1098.58 132.732 8 150 D13-150 mm2 mm2 m 0.00716 for each 1 m 13 D for X & Y direction Crack Control EXTERIOR EXPOSURE Choose "1" or "2" : 1 1 EXTERIOR EXPOSURE 2 INTERIOR EXPOSURE s = 150 mm ; = 1.25 1,000 mm 46.50 bw = ; dc = 2 A = 2 * s* dc = 13950 mm 252 = fs = 0.6 * fy MPa 21814.4 N/mm z = fs * ( dc * A)^(1/3) = = w = 11* *fs* (dc*A)^(1/3) 100000 = (for Slab) mm ᵝ 21.81 kN/m < 25 kN/m 0.29995 mm < 0.3 mm 46 of 47 → → OK !! OK !! DED INSTALASI COOLING TOWER MANGGALA NORTH GS 7-Jun-23 Sketch Reinforcement 9000 X Z 2000 + 0.100 ± 0.00 200 Date: Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Rev. A2 Footing - 0.100 D 13 - 150 Top & Bottom Reinforcement 47 of 47 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 APPENDIX A PLOT PLAN Andri Suto Di git all y si gned by Andri Sutomo 15:03:11 +07' 00' mo Date: 2023.05.17 Digit ally signed by Soebronto Date: Diw 15:39:49 ang Soebr onto 2023.05.17 +07'00' Digitally signed by Di 15:40: 05 +07'00' Date: 2023.05. 17 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 APPENDIX B SOIL INVESTIGATION DATA GEOLOGIC DRILLING LOG Soil Investigation PROJECT : SOIL INVESTIGATION MENO GS : CHECKED BY : vv v vv : : : vv v vv : : : vv v vv : : : vv v vv : : : vv v vv : : : vv v vv : : : vv v vv : : : : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv : : : : vv vv ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: ::::::: 03 04 05 28 MARET 2023 10 0,00- 5,00 m 20 30 40 50 60 70 N1 N2 N3 Lempung Berpasir, Kuning Kecoklatan 01 vv v vv : : : 02 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 29 MARET 2023 SOIL TYPE vv v vv : : : vv v vv : : : 01 GRAPH N - VALUE SOIL AND / OR ROCK DESCRIPTION 22 Foto Corbox LOGGED BY M NO. OF BLOW / CM M 4.00 SOIL SAMPLE 22.45 : DEPTH ( M ) : FINAL GWL Company Name N / 15 CM TOTAL DEPTH BH - 02 BORE HOLE NUMBER N / 15 CM : INDRA GUNAWAN N / 15 CM DRILL MASTER DEPTH ( M ) : YBM 01 : 29 MARET 2023 TICKNESS OF ROCK / SOIL ( m ) BORING MACHINE DATE End of Depth (M) : 28 MARET 2023 DATE : MENO GS START G.WL (M) LOCATION 5 5 7 02 12 03 8 5,00- 9,00 m 9 13 04 22 05 Pasir sedikit berlempung , kuning gelap 6 10 16 06 26 07 9 9,00- 16,00 m 14 20 08 34 09 Pasir sedang, Abu-abu Kekuningan 13 15 17 10 32 11 13 18 21 12 39 13 10 14 22 14 36 15 16,00- 18,00 m Pasir sedang, Abu-abu Kemerahan 15 15 19 16 34 17 16,00- 22,45 m Pasir sedang, Abu-abu kekuningan 11 16 23 18 39 19 12 17 20 20 37 21 23 Stop Boring 22.45 m 24 14 21 25 22 46 23 24 25 25 26 26 27 27 28 28 29 29 30 30 Legend : === Lanau vv vv Lempung :: : Pasir/Gravel TT Timbunan WW Remark : Dikerjakan Oleh Diperiksa Oleh Diketahui Oleh Teknisi Lapangan PGN Solution Tripatra Gambut Undisturbed Sample (UDS) Disturbed Sample (DS) SPT DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 APPENDIX C INPUT & OUTPUT STAAD PRO DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 C OUTPUT & INPUT STAAD PRO C.1 Output Support Reaction-Unfactored Load Horizontal Vertical Horizontal Max Fx Min Fx Max Fy Min Fy Max Fz Min Fz Max Mx Min Mx Max My Min My Max Mz Min Mz C.2 Moment Node L/C Fx kN Fy kN Fz kN Mx kNm 29 29 29 14 14 34 14 34 34 14 29 29 132 = DS+DO-0.7EOX+0.21EOZ+0.2*SDS*D+AF 130 = DS+DO+0.7EOX+0.21EOZ+0.2*SDS*D+AF 101 = DS+DO+L+TF+AF+FF+H+VH 102 = 0.6(DS+DE+WX) 135 = DS+DO+0.21EOX-0.7EOZ+0.2*SDS*D+AF 134 = DS+DO+0.21EOX+0.7EOZ+0.2*SDS*D+AF 135 = DS+DO+0.21EOX-0.7EOZ+0.2*SDS*D+AF 134 = DS+DO+0.21EOX+0.7EOZ+0.2*SDS*D+AF 130 = DS+DO+0.7EOX+0.21EOZ+0.2*SDS*D+AF 131 = DS+DO+0.7EOX-0.21EOZ+0.2*SDS*D+AF 130 = DS+DO+0.7EOX+0.21EOZ+0.2*SDS*D+AF 132 = DS+DO-0.7EOX+0.21EOZ+0.2*SDS*D+AF 0.503 -0.483 0.009 0.002 -0.121 -0.121 -0.121 -0.121 -0.391 -0.391 -0.483 0.503 11.527 11.527 24.44 2.492 6.262 6.263 6.262 6.263 6.118 6.117 11.527 11.527 -0.152 -0.152 0 0.331 0.981 -0.981 0.981 -0.981 -0.716 0.716 -0.152 -0.152 -0.042 -0.042 0 0.002 0.145 -0.145 0.145 -0.145 -0.045 0.045 -0.042 -0.042 My kN m 0 0 0 0 0 0 0 0 0 0 0 Mz kNm 0 -0.751 0.838 0.039 0.054 0.233 0.234 0.233 0.234 0.685 0.684 0.838 -0.751 Output Support Reaction-factored Load Horizonta Vertical Horizonta Node L/C Max Fx 29 229 = 1.2(DS+DO)+0.5L-1.0EOX+0.3EOZ +0.2*SDS*D Min Fx Max Fy Min Fy 29 29 14 Max Fz 14 232 = 1.2(DS+DO)+0.5L+0.3EOX-1.0EOZ +0.2*SDS*D Min Fz 34 Max Mx Moment My Mx Mz kN kNm kNm m Fx kN Fy kN Fz kN 0.716 13.634 -0.218 -0.06 0 -1.084 27 = 1.2(DS+DO)+0.5L+1.0EOX+0.3EOZ+0.2*SDS* -0.693 202 = 1.2(DS+DO+TF+AF+FF)+1.6L 0.011 203 = 0.9(DS+DE)+1.0WX 0.003 13.634 34.911 3.604 -0.218 0 0.497 -0.06 0 0.003 0 0 0 1.186 0.047 0.086 -0.171 7.458 1.253 0.206 0 0.324 231 = 1.2(DS+DO)+0.5L+0.3EOX+1.0EOZ +0.2*SDS*D -0.171 7.458 -1.253 -0.206 0 0.324 14 232 = 1.2(DS+DO)+0.5L+0.3EOX-1.0EOZ +0.2*SDS*D -0.171 7.458 1.253 0.206 0 0.324 Min Mx 34 231 = 1.2(DS+DO)+0.5L+0.3EOX+1.0EOZ +0.2*SDS*D -0.171 7.458 -1.253 -0.206 0 0.324 Max My 34 227 = 1.2(DS+DO)+0.5L+1.0EOX+0.3EOZ +0.2*SDS*D -0.558 7.251 -0.875 -0.064 0 0.968 Min My 14 -0.558 7.25 0.875 0.064 0 0.967 Max Mz 29 -0.693 13.634 -0.218 -0.06 0 1.186 Min Mz 29 0.716 13.634 -0.218 -0.06 0 -1.084 228 = 1.2(DS+DO)+0.5L+1.0EOX-0.3EOZ +0.2*SDS*D 227 = 1.2(DS+DO)+0.5L+1.0EOX+0.3EOZ +0.2*SDS*D 229 = 1.2(DS+DO)+0.5L-1.0EOX+0.3EOZ +0.2*SDS*D DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 C.3 Joint Displacement Max X Min X Max Y Min Y Max Z Min Z Max rX Min rX Max rY Min rY Max rZ Min rZ Max Rs C.4 Rev. A2 Node L/C 31 21 9 48 9 52 44 8 60 32 59 49 48 DS+DO+0.7EOX-0.21EOZ+0.2*SDS* DS+DO-0.7EOX-0.21EOZ+0.2*SDS* DS+DO+0.7EOX-0.21EOZ+0.2*SDS* DS+DO+0.7EOX-0.21EOZ+0.2*SDS* DS+DO-0.21EOX+0.7EOZ+0.2*SDS* DS+DO+0.21EOX-0.7EOZ+0.2*SDS* 101 = DS+DO+L+TF+AF+FF+H+VH 101 = DS+DO+L+TF+AF+FF+H+VH DS+DO+0.7EOX-0.21EOZ+0.2*SDS* DS+DO+0.7EOX+0.21EOZ+0.2*SDS DS+DO-0.7EOX-0.21EOZ+0.2*SDS* DS+DO+0.7EOX+0.21EOZ+0.2*SDS DS+DO+0.7EOX-0.21EOZ+0.2*SDS* H X mm 3.25 -2.875 2.415 2.627 -0.532 0.82 0.123 0.14 2.561 2.563 -2.242 2.54 2.627 V Y mm -0.306 -0.304 2.1 -2.383 -0.49 -0.723 -0.153 0.06 -0.214 -0.214 -2.134 -2.366 -2.383 H Z mm -0.035 -0.025 -0.038 -0.037 0.125 -0.125 -0.001 0 -0.032 0.032 -0.038 0.038 -0.037 R mm 3.264 2.891 3.201 3.547 0.734 1.101 0.196 0.152 2.57 2.572 3.096 3.471 3.547 rX rad 0.0 0 0 0 0 0 0.001 -0.001 0 0 0 0 0 Output Member Unity Check Beam 98 59 58 57 56 55 43 42 41 40 28 27 26 25 24 Design Property H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 H100X100X6X8 Actual Ratio Allowable Clause L/C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C 227 202 227 227 202 227 227 202 202 229 202 228 228 202 228 Ratio Column (C1) 0.137 1 0.092 1 0.115 1 0.086 1 0.054 1 0.122 1 0.156 1 0.031 1 0.048 1 0.054 1 0.092 1 0.115 1 0.086 1 0.054 1 0.122 1 Rotational rY rad 0 0 0 0 0 0 0 0 0 0 0 0 0 rZ rad -0.002 0.002 -0.002 -0.002 0 -0.001 0 0 -0.002 -0.002 0.002 -0.002 -0.002 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 Rafter (RF1) Beam Design Property Actual Ratio 10 11 12 14 15 16 18 21 31 37 46 62 66 67 68 70 71 72 74 83 88 89 90 95 96 97 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 Beam Design Property Actual Ratio 1 2 3 4 5 6 7 8 9 13 17 19 20 22 23 29 30 32 33 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 0 0.051 0.055 0.09 0.055 0.051 0.044 0 0.025 0.066 0.025 0 0 0.044 0.067 0.067 0.076 0.077 0.085 Allowable Ratio 0.033 1 0.033 1 0.05 1 0.066 1 0.033 1 0.083 1 0.033 1 0.02 1 0.059 1 0.24 1 0.059 1 0.02 1 0.034 1 0.033 1 0.05 1 0.066 1 0.033 1 0.084 1 0.033 1 0.187 1 0.24 1 0.05 1 0.05 1 0.083 1 0.084 1 0.187 1 Beam 1 (B1) Clause L/C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 202 Clause L/C SHEAR-Y LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T SHEAR-Y LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C SHEAR-Y SHEAR-Y LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-C 201 202 202 202 202 202 202 201 202 202 202 201 201 202 202 202 202 202 202 Allowable Ratio 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 Rev. A2 38 39 44 45 50 51 53 54 60 61 63 64 65 69 73 75 76 77 78 79 80 81 82 84 85 86 87 91 92 93 94 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 H150X75X5X7 Beam Design Property 34 35 36 47 48 49 C150X75X6.5 C150X75X6.5 C150X75X6.5 C150X75X6.5 C150X75X6.5 C150X75X6.5 1 0.137 0.13 1 0.077 1 0.085 1 0.067 1 0.076 1 0.121 1 0.111 1 0.044 1 0.067 1 0 1 0 1 0.025 1 0.066 1 0.025 1 0.051 1 0.055 1 0.089 1 0.055 1 0.051 1 0.044 1 0 1 0 1 0.089 1 0.13 1 0.137 1 0.09 1 0.111 1 0.044 1 0.044 1 0.121 1 Beam 2 (B2) Actual Ratio 0.04 0.018 0.021 0.04 0.018 0.021 LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T SHEAR-Y SHEAR-Y LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T SHEAR-Y SHEAR-Y LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T 202 202 202 202 202 202 202 202 202 202 201 201 202 202 202 202 202 202 202 202 202 201 201 202 202 202 202 202 202 202 202 Clause L/C LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T LRFD-H1-1B-T 227 227 201 228 228 201 Allowable Ratio 1 1 1 1 1 1 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 C.5 INPUT STAAD PRO STAAD SPACE START JOB INFORMATION ENGINEER DATE 10-MAR-23 END JOB INFORMATION INPUT WIDTH 79 UNIT METER KN JOINT COORDINATES 1 -1 1.7 -8.5; 2 -1 1.7 -8.4; 3 -1 1.7 -6; 4 -1 1.7 -5; 5 -1 1.7 -4; 6 -1 1.7 -2; 7 -1 1.7 -1; 8 -1 1.7 0.4; 9 -1 1.7 0.5; 10 0 2 -8.5; 11 0 1.7 -8.5; 12 0 1.7 -8.4; 13 0 2 -8.4; 14 0 0 -8; 15 0 1.7 -8; 16 0 2 -8; 17 0 0.724613 -8; 18 0 0.224892 -8; 19 0 1.22449 -8; 20 0 1.7 -6; 21 0 2 -6; 22 0 1.7 -5; 23 0 2 -5; 24 0 1.7 -4; 25 0 0.724613 -4; 26 0 0.224892 -4; 27 0 1.22449 -4; 28 0 2 -4; 29 0 0 -4; 30 0 1.7 -2; 31 0 2 -2; 32 0 1.7 -1; 33 0 2 -1; 34 0 0 0; 35 0 2 0; 36 0 1.7 0; 37 0 0.724613 0; 38 0 0.224892 0; 39 0 1.22449 0; 40 0 1.7 0.4; 41 0 2 0.4; 42 0 2 0.5; 43 0 1.7 0.5; 44 1 1.7 -8.4; 45 1 1.7 -6; 46 1 1.7 -5; 47 1 1.7 -4; 48 1 1.7 -2; 49 1 1.7 -1; 50 1 1.7 0.4; 51 1 1.7 0.503; 52 1 1.7 -8.5; 53 1 1.7 -3; 54 0 2 -3; 55 0 1.7 -3; 56 -1 1.7 -3; 57 0 2 -7; 58 1 1.7 -7; 59 -1 1.7 -7; 60 0 1.7 -7; MEMBER INCIDENCES 1 2 1; 2 3 59; 3 4 3; 4 5 4; 5 6 56; 6 7 6; 7 8 7; 8 9 8; 9 2 12; 10 13 2; 11 21 3; 12 23 4; 13 5 24; 14 28 5; 15 31 6; 16 33 7; 17 8 40; 18 41 8; 19 12 11; 20 13 10; 21 12 13; 22 15 12; 23 16 13; 24 14 18; 25 15 16; 26 17 19; 27 18 17; 28 19 15; 29 20 60; 30 21 57; 31 20 21; 32 22 20; 33 23 21; 34 25 17; 35 26 18; 36 27 19; 37 22 23; 38 24 22; 39 28 23; 40 25 27; 41 27 24; 42 24 28; 43 29 26; 44 30 55; 45 31 54; 46 30 31; 47 37 25; 48 38 26; 49 39 27; 50 32 30; 51 33 31; 53 36 32; 54 35 33; 55 34 38; 56 36 35; 57 37 39; 58 38 37; 59 39 36; 60 40 36; 61 41 35; 62 40 41; 63 43 40; 64 42 41; 65 12 44; 66 13 44; 67 21 45; 68 23 46; 69 24 47; 70 28 47; 71 31 48; 72 33 49; 73 40 50; 74 41 50; 75 45 58; 76 46 45; 77 47 46; 78 48 53; 79 49 48; 80 50 49; 81 51 50; 82 44 52; 83 32 33; 84 53 47; 85 54 28; 86 55 24; 87 56 5; 88 55 54; 89 54 56; 90 54 53; 91 57 16; 92 58 44; 93 59 2; 94 60 15; 95 59 57; 96 57 58; 97 57 60; 98 26 25; DEFINE MATERIAL START ISOTROPIC STEEL E 2.05e+008 POISSON 0.3 DENSITY 76.8195 ALPHA 1.2e-005 DAMP 0.03 TYPE STEEL STRENGTH FY 253200 FU 407800 RY 1.5 RT 1.2 END DEFINE MATERIAL MEMBER PROPERTY JAPANESE *1 31 TO 33 55 56 58 59 TABLE ST H100X100X6X8 *43 44 46 47 TABLE ST H150X75X5X7 *38 42 45 48 TO 54 TABLE ST H150X75X5X7 34 TO 36 47 TO 49 TABLE ST C150X75X6.5 24 TO 28 40 TO 43 55 TO 59 98 TABLE ST H100X100X6X8 10 TO 12 14 TO 16 18 21 31 37 46 62 66 TO 68 70 TO 72 74 83 88 TO 90 95 TO 97 TABLE ST H150X75X5X7 Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 1 TO 9 13 17 19 20 22 23 29 30 32 33 38 39 44 45 50 51 53 54 60 61 63 TO 65 69 73 75 TO 82 84 TO 87 91 TO 94 TABLE ST H150X75X5X7 CONSTANTS BETA 90 MEMB 24 TO 28 43 55 TO 59 98 MATERIAL STEEL ALL SUPPORTS 14 29 34 FIXED *******************REFERENCE LOAD****************** DEFINE REFERENCE LOADS LOAD R1 LOADTYPE Dead TITLE SELFWEIGHT (D) SELFWEIGHT Y -1.1 ****************************************************************************** LOAD R2 LOADTYPE Dead TITLE STRUCTURE LOAD (DS) MEMBER LOAD 11 12 14 15 67 68 70 71 89 90 UNI GY -0.245 34 CON GY -0.25 1 0.075 34 CON GY -0.25 2 0.075 34 CON GY -0.25 3 0.075 47 CON GY -0.25 1 0.075 47 CON GY -0.25 2 0.075 16 72 95 96 UNI GY -0.294 10 18 66 74 UNI GY -0.184 47 CON GY -0.25 3 0.075 ***************************************************************************** LOAD R3 LOADTYPE Dead TITLE EMPTY DEADLOAD (DE) ****************************************************************************** LOAD R4 LOADTYPE Dead TITLE OPERATIONAL DEADLOAD (DO) ****************************************************************************** LOAD R5 LOADTYPE Dead TITLE TEST DEADLOAD (DT) ****************************************************************************** LOAD R6 LOADTYPE Live TITLE LIVE LOAD (L) MEMBER LOAD 11 12 14 15 67 68 70 71 89 90 UNI GY -1.472 16 26 72 95 96 UNI GY -1.766 10 18 66 74 UNI GY -1.104 ****************************************************************************** LOAD R7 LOADTYPE Live TITLE VEHICLE LOAD (VH) ****************************************************************************** LOAD R8 LOADTYPE None TITLE THERMAL EXPANSION (TF) ****************************************************************************** LOAD R9 LOADTYPE None TITLE PIPE ANCHOR&GUIDE (AF) ****************************************************************************** LOAD R10 LOADTYPE None TITLE THERMAL/FRICTION (FF) ****************************************************************************** LOAD R11 LOADTYPE Live TITLE IMPACT LOAD (I) ****************************************************************************** LOAD R12 LOADTYPE None TITLE DYNAMIC LOAD (J) ****************************************************************************** LOAD R13 LOADTYPE None TITLE EARTH/WATER PRESSURE (H) ****************************************************************************** LOAD R14 LOADTYPE Wind TITLE WIND LOAD X+ (WX+) Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 MEMBER LOAD 24 TO 28 40 TO 43 55 TO 59 98 UNI GX 0.031 16 95 UNI Y 0.465 72 96 UNI Y 0.279 11 12 14 15 89 UNI Y 0.388 67 68 70 71 90 UNI Y 0.233 10 18 UNI Y 0.291 66 74 UNI Y 0.174 ****************************************************************************** LOAD R15 LOADTYPE Wind TITLE WIND LOAD Z+ (WZ+) MEMBER LOAD 10 66 UNI Y 0.262 95 96 UNI Y 0.349 11 12 67 68 UNI Y 0.194 14 TO 16 18 70 TO 72 74 89 90 UNI Y 0.116 55 TO 59 UNI GZ 0.031 24 TO 28 UNI GZ 0.02 ****************************************************************************** LOAD R16 LOADTYPE Wind TITLE WIND LOAD X- (WX-) MEMBER LOAD 24 TO 28 40 TO 43 55 TO 59 98 UNI GX -0.031 72 96 UNI Y 0.465 16 95 UNI Y 0.279 67 68 70 71 90 UNI Y 0.388 11 12 14 15 89 UNI Y 0.233 10 18 UNI Y 0.174 66 74 UNI Y 0.291 ****************************************************************************** LOAD R17 LOADTYPE Wind TITLE WIND LOAD Z- (WZ-) MEMBER LOAD 18 74 UNI Y 0.262 16 72 UNI Y 0.349 15 71 89 90 UNI Y 0.194 10 TO 12 14 66 TO 68 70 95 96 UNI Y 0.116 55 TO 59 UNI GZ -0.031 24 TO 28 UNI GZ -0.02 ****************************************************************************** LOAD R18 LOADTYPE None TITLE RAIN LOAD (R) ****************************************************************************** LOAD R19 LOADTYPE Live TITLE MAINTENANCE LOAD (M) ****************************************************************************** LOAD R20 LOADTYPE Live TITLE BUNDLE PULL LOAD (BP) ****************************************************************************** LOAD R21 LOADTYPE None TITLE BLAST LOAD (BL) ****************************************************************************** END DEFINE REFERENCE LOADS ********************** * SEISMIC DEFINITION * ********************** ****************************************************************************** DEFINE IBC 2003 Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 SDS 0.41 SD1 0.392 S1 0.28 IE 1 RX 3.5 RZ 3.5 SCLASS 4 REFERENCE LOAD Y R1 1.0 LOAD 25 LOAD TYPE SEISMIC TITLE SEISMIC X (EEX) IBC LOAD X 0.5 PERFORM ANALYSIS PRINT STATICS CHECK CHANGE *JOINT LOAD *1 49 73 77 85 133 157 161 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 26 LOAD TYPE SEISMIC TITLE SEISMIC Z (EEZ) IBC LOAD Z 0.5 PERFORM ANALYSIS PRINT STATICS CHECK CHANGE *JOINT LOAD *1 49 73 77 85 133 157 161 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 27 LOAD TYPE SEISMIC TITLE SEISMIC X (EOX) IBC LOAD X 1 PERFORM ANALYSIS PRINT STATICS CHECK CHANGE *JOINT LOAD *4625 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 28 LOAD TYPE SEISMIC TITLE SEISMIC Z (EOZ) IBC LOAD Z 1 PERFORM ANALYSIS PRINT STATICS CHECK CHANGE *JOINT LOAD *4625 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 1 LOADTYPE None TITLE DEAD LOAD(D+DS) REFERENCE LOAD R1 1.0 R2 1.0 ******************************************************************************* LOAD 2 LOADTYPE None TITLE EMPTY LOAD(DE) REFERENCE LOAD R3 1.0 ******************************************************************************* LOAD 3 LOADTYPE None TITLE OPERATING LOAD(DO) REFERENCE LOAD R4 1.0 *********************************************************** LOAD 4 LOADTYPE None TITLE TEST LOAD(DT) REFERENCE LOAD R5 1.0 ******************************************************************************* LOAD 5 FLOOR LIVE LOAD(L) REFERENCE LOAD R6 1.0 ******************************************************************************* Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 LOAD 6 VEHICLE LOAD(VH) REFERENCE LOAD R7 1.0 ******************************************************************************* LOAD 7 THERMAL EXPANSION (TF) REFERENCE LOAD R8 1.0 ******************************************************************************* LOAD 8 PIPE ANCHOR & GUIDE (AF) REFERENCE LOAD R9 1.0 ******************************************************************************* LOAD 9 THERMAL & FRICTION LOAD (FF) REFERENCE LOAD R10 1.0 ******************************************************************************* LOAD 10 IMPACT LOAD (I) REFERENCE LOAD R11 1.0 ******************************************************************************* LOAD 11 DYNAMIC LOAD (J) REFERENCE LOAD R12 1.0 ******************************************************************************* LOAD 12 EARTH/WATER PRESSURE (H) REFERENCE LOAD R13 1.0 ******************************************************************************* LOAD 13 WIND LOAD X-DIRECTION(+WX) REFERENCE LOAD R14 1.0 JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 14 WIND LOAD Z-DIRECTION(+WZ) REFERENCE LOAD R15 1.0 JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 15 WIND LOAD X-DIRECTION(-WX) REFERENCE LOAD R16 1.0 JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 16 WIND LOAD Z-DIRECTION(-WZ) REFERENCE LOAD R17 1.0 JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 ******************************************************************************* LOAD 17 RAIN LOAD(R) REFERENCE LOAD R18 1.0 ******************************************************************************* LOAD 18 MAINTENANCE LOAD (M) REFERENCE LOAD R19 1.0 ******************************************************************************* LOAD 19 BUNDLE PULL (BP) REFERENCE LOAD R20 1.0 ******************************************************************************* LOAD 20 BLAST LOAD (BP) REFERENCE LOAD R21 1.0 ******************************************************************************* LOAD 21 WIND LOAD DURING MAINTENANCE X-DIR (+WPX) JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 22 WIND LOAD DURING MAINTENANCE Z-DIR (+WPZ) JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 23 WIND LOAD DURING MAINTENANCE X-DIR (-WPX) JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* LOAD 24 WIND LOAD DURING MAINTENANCE Z-DIR (-WPZ) JOINT LOAD 14 29 34 FX 0 FY 0 FZ 0 ******************************************************************************* ******************************************************* ** UNFACTORED LOAD COMBINATION * FOR STABILITY CHECK ** ******************************************************* LOAD COMB 101 = DS+DO+L+TF+AF+FF+H+VH 1 1.0 3 1.0 5 1.0 7 1.0 8 1.0 9 1.0 12 1.0 6 1.0 LOAD COMB 102 = 0.6(DS+DE+WX) 1 0.6 2 0.6 13 0.6 LOAD COMB 103 = 0.6(DS+DE+WZ) 1 0.6 2 0.6 14 0.6 LOAD COMB 104 = 0.6(DS+DE+(-WX)) 1 0.6 2 0.6 15 0.6 LOAD COMB 105 = 0.6(DS+DE+(-WZ)) 1 0.6 2 0.6 16 0.6 LOAD COMB 106 = DS+DO+0.75L+0.45WX+AF 1 1.0 3 1.0 5 0.75 13 0.45 8 1.0 LOAD COMB 107 = DS+DO+0.75L+0.45WZ+AF 1 1.0 3 1.0 5 0.75 14 0.45 8 1.0 LOAD COMB 108 = DS+DO+0.75L+0.45(-WX)+AF Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 1 1.0 3 1.0 5 0.75 15 0.45 8 1.0 LOAD COMB 109 = DS+DO+0.75L+0.45(-WZ)+AF 1 1.0 3 1.0 5 0.75 16 0.45 8 1.0 LOAD COMB 110 = DS+DO+0.6WX+AF 1 1.0 3 1.0 13 0.6 8 1.0 LOAD COMB 111 = DS+DO+0.6WZ+AF 1 1.0 3 1.0 14 0.6 8 1.0 LOAD COMB 112 = DS+DO+0.6(-WX)+AF 1 1.0 3 1.0 15 0.6 8 1.0 LOAD COMB 113 = DS+DO+0.6(-WZ)+AF 1 1.0 3 1.0 16 0.6 8 1.0 LOAD COMB 114 = 0.6(DS+DE)+0.7EEX+0.21EEZ+0.2*SDS*D+AF 1 0.6 26 0.21 25 0.7 1 0.101 8 1.0 LOAD COMB 115 = 0.6(DS+DE)+0.7EEX-0.21EEZ+0.2*SDS*D+AF 1 0.6 26 -0.21 26 0.7 1 0.101 8 1.0 LOAD COMB 116 = 0.6(DS+DE)-0.7EEX+0.21EEZ+0.2*SDS*D+AF 1 0.6 26 0.21 25 -0.7 1 0.1 8 1.0 LOAD COMB 117 = 0.6(DS + DE)-0.7EEX-0.21EEZ+0.2*SDS*D+AF 1 0.6 26 -0.21 25 -0.7 1 0.1 8 1.0 LOAD COMB 118 = 0.6(DS+DE)+0.21EEX-0.7EEZ+0.2*SDS*D+AF 1 0.6 25 0.21 26 0.7 1 0.1 8 1.0 LOAD COMB 119 = 0.6(DS+DE)+0.21EEX-0.7EEZ+0.2*SDS*D+AF 1 0.6 25 0.21 26 -0.7 1 0.1 8 1.0 LOAD COMB 120 = 0.6(DS+DE)-0.21EEX+0.7EEZ+0.2*SDS*D+AF 1 0.6 25 -0.21 26 0.7 1 0.1 8 1.0 LOAD COMB 121 = 0.6(DS+DE)-0.21EEX-0.7EEZ+0.2*SDS*D+AF 1 0.6 25 -0.21 26 -0.7 1 0.1 8 1.0 LOAD COMB 122 = DS+DO+0.75L+0.525EOX+0.1575EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 27 0.525 28 0.1575 1 0.1 8 1.0 LOAD COMB 123 = DS+DO+0.75L+0.525EOX-0.1575EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 27 0.525 28 -0.1575 1 0.1 8 1.0 LOAD COMB 124 = DS+DO+0.75L-0.525EOX+0.1575EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 27 -0.525 28 0.1575 1 0.1 8 1.0 LOAD COMB 125 = DS+DO+0.75L-0.525EOX-0.1575EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 27 -0.525 28 -0.1575 1 0.1 8 1.0 LOAD COMB 126 = DS+DO+0.75L+0.1575EOX+0.525EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 28 0.525 27 0.1575 1 0.1 8 1.0 LOAD COMB 127 = DS+DO+0.75L+0.1575EOX-0.525EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 28 0.525 27 -0.1575 1 0.1 8 1.0 LOAD COMB 128 = DS+DO+0.75L-0.1575EOX+0.525EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 28 -0.525 27 0.1575 1 0.1 8 1.0 LOAD COMB 129 = DS+DO+0.75L-0.1575EOX-0.525EOZ+0.2*SDS*D+AF 1 1.0 2 0.75 28 -0.525 27 -0.1575 1 0.1 8 1.0 LOAD COMB 130 = DS+DO+0.7EOX+0.21EOZ+0.2*SDS*D+AF 1 1.0 27 0.7 28 0.21 1 0.1 8 1.0 LOAD COMB 131 = DS+DO+0.7EOX-0.21EOZ+0.2*SDS*D+AF 1 1.0 27 0.7 28 -0.21 1 0.1 8 1.0 LOAD COMB 132 = DS+DO-0.7EOX+0.21EOZ+0.2*SDS*D+AF 1 1.0 27 -0.7 28 0.21 1 0.1 8 1.0 LOAD COMB 133 = DS+DO-0.7EOX-0.21EOZ+0.2*SDS*D+AF 1 1.0 27 -0.7 28 -0.21 1 0.1 8 1.0 Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 LOAD COMB 134 = DS+DO+0.21EOX+0.7EOZ+0.2*SDS*D+AF 1 1.0 28 0.7 27 0.21 1 0.1 8 1.0 LOAD COMB 135 = DS+DO+0.21EOX-0.7EOZ+0.2*SDS*D+AF 1 1.0 28 -0.7 27 0.21 1 0.1 8 1.0 LOAD COMB 136 = DS+DO-0.21EOX+0.7EOZ+0.2*SDS*D+AF 1 1.0 28 0.7 27 -0.21 1 0.1 8 1.0 LOAD COMB 137 = DS+DO-0.21EOX-0.7EOZ+0.2*SDS*D+AF 1 1.0 28 -0.7 27 -0.21 1 0.1 8 1.0 LOAD COMB 138 = DS+DE+0.6WPX 1 1.0 2 1.0 21 0.6 LOAD COMB 139 = DS+DE+0.6WPZ 1 1.0 2 1.0 22 0.6 LOAD COMB 140 = DS+DE+0.6(-WPX) 1 1.0 2 1.0 23 0.6 LOAD COMB 141 = DS+DE+0.6(-WPZ) 1 1.0 2 1.0 24 0.6 LOAD COMB 142 = DS+DT+0.6WPX+0.75L 1 1.0 4 1.0 21 0.6 5 0.75 LOAD COMB 143 = DS+DT+0.6WPZ+0.75L 1 1.0 4 1.0 22 0.6 5 0.75 LOAD COMB 144 = DS+DT+0.6(-WPX)+0.75L 1 1.0 4 1.0 23 0.6 5 0.75 LOAD COMB 145 = DS+DT+0.6(-WPZ)+0.75L 1 1.0 4 1.0 24 0.6 5 0.75 LOAD COMB 146 = DS+H 1 1.0 12 1.0 ********************************************************************* * FACTORED LOAD COMBINATION * FOR REINFORCEMENT CHECK * ********************************************************************* LOAD COMB 201 = 1.4(DS+DO+L+TF+AF+FF+H+VH) 1 1.4 3 1.4 5 1.4 7 1.4 8 1.4 9 1.4 12 1.4 6 1.4 LOAD COMB 202 = 1.2(DS+DO+TF+AF+FF)+1.6L 1 1.2 3 1.2 7 1.2 8 1.2 9 1.2 5 1.6 LOAD COMB 203 = 0.9(DS+DE)+1.0WX 1 0.9 2 0.9 13 1.0 LOAD COMB 204 = 0.9(DS+DE)+1.0WZ 1 0.9 2 0.9 14 1.0 LOAD COMB 205 = 0.9(DS+DE)+1.0(-WX) 1 0.9 2 0.9 15 1.0 LOAD COMB 206 = 0.9(DS+DE)+1.0(-WZ) 1 0.9 2 0.9 16 1.0 LOAD COMB 207 = 1.2(DS+DE+AF)+0.5L+1.0WX 1 1.2 2 1.2 8 1.2 5 0.5 13 1.0 LOAD COMB 208 = 1.2(DS+DE+AF)+0.5L+1.0WZ 1 1.2 2 1.2 8 1.2 5 0.5 14 1.0 LOAD COMB 209 = 1.2(DS+DE+AF)+0.5L+1.0(-WX) 1 1.2 2 1.2 8 1.2 5 0.5 15 1.0 LOAD COMB 210 = 1.2(DS+DE+AF)+0.5L+1.0(-WZ) 1 1.2 2 1.2 8 1.2 5 0.5 16 1.0 LOAD COMB 211 = 0.9(DS+DE)+1.0EEX+0.3EEZ+0.2*SDS*D 1 0.9 25 1.0 26 0.3 1 0.101 Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 LOAD COMB 212 = 0.9(DS+DE)+1.0EEX-0.3EEZ+0.2*SDS*D 1 0.9 25 1.0 26 -0.3 1 0.101 LOAD COMB 213 = 0.9(DS+DE)-1.0EEX+0.3EEZ+0.2*SDS*D 1 0.9 25 -1.0 26 0.3 1 0.101 LOAD COMB 214 = 0.9(DS+DE)-1.0EEX-0.3EEZ+0.2*SDS*D 1 0.9 25 -1.0 26 -0.3 1 0.101 LOAD COMB 215 = 0.9(DS+DE)+0.3EEX+1.0EEZ+0.2*SDS*D 1 0.9 26 1.0 25 0.3 1 0.101 LOAD COMB 216 = 0.9(DS+DE)+0.3EEX-1.0EEZ+0.2*SDS*D 1 0.9 26 -1.0 25 0.3 1 0.101 LOAD COMB 217 = 0.9(DS+DE)-0.3EEX+1.0EEZ+0.2*SDS*D 1 0.9 26 1.0 25 -0.3 1 0.101 LOAD COMB 218 = 0.9(DS+DE)-0.3EEX-1.0EEZ+0.2*SDS*D 1 0.9 26 -1.0 25 -0.3 1 0.101 LOAD COMB 219 = 0.9(DS+DO)+1.0EEX+0.3EEZ+0.2*SDS*D 1 0.9 25 1.0 26 0.3 1 0.101 LOAD COMB 220 = 0.9(DS+DO)+1.0EEX-0.3EEZ+0.2*SDS*D 1 0.9 25 1.0 26 -0.3 1 0.101 LOAD COMB 221 = 0.9(DS+DO)-1.0EEX+0.3EEZ+0.2*SDS*D 1 0.9 25 -1.0 26 0.3 1 0.101 LOAD COMB 222 = 0.9(DS+DO)-1.0EEX-0.3EEZ+0.2*SDS*D 1 0.9 25 -1.0 26 -0.3 1 0.101 LOAD COMB 223 = 0.9(DS+DO)+0.3EEX+1.0EEZ+0.2*SDS*D 1 0.9 26 1.0 25 0.3 1 0.101 LOAD COMB 224 = 0.9(DS+DO)+0.3EEX-1.0EEZ+0.2*SDS*D 1 0.9 26 1.0 25 -0.3 1 0.101 LOAD COMB 225 = 0.9(DS+DO)-0.3EEX+1.0EEZ+0.2*SDS*D 1 0.9 26 -1.0 25 0.3 1 0.101 LOAD COMB 226 = 0.9(DS+DO)-0.3EEX-1.0EEZ+0.2*SDS*D 1 0.9 26 -1.0 25 -0.3 1 0.101 LOAD COMB 227 = 1.2(DS+DO)+0.5L+1.0EOX+0.3EOZ+0.2*SDS*D 1 1.2 2 0.5 27 1.0 28 0.3 1 0.101 LOAD COMB 228 = 1.2(DS+DO)+0.5L+1.0EOX-0.3EOZ+0.2*SDS*D 1 1.2 2 0.5 27 1.0 28 -0.3 1 0.101 LOAD COMB 229 = 1.2(DS+DO)+0.5L-1.0EOX+0.3EOZ+0.2*SDS*D 1 1.2 2 0.5 27 -1.0 28 0.3 1 0.101 LOAD COMB 230 = 1.2(DS+DO)+0.5L-1.0EOX-0.3EOZ+0.2*SDS*D 1 1.2 2 0.5 27 -1.0 28 -0.3 1 0.101 LOAD COMB 231 = 1.2(DS+DO)+0.5L+0.3EOX+1.0EOZ+0.2*SDS*D 1 1.2 2 0.5 27 0.3 28 1.0 1 0.101 LOAD COMB 232 = 1.2(DS+DO)+0.5L+0.3EOX-1.0EOZ+0.2*SDS*D 1 1.2 2 0.5 27 0.3 28 -1.0 1 0.101 LOAD COMB 233 = 1.2(DS+DO)+0.5L-0.3EOX+1.0EOZ+0.2*SDS*D 1 1.2 2 0.5 27 -0.3 28 1.0 1 0.101 LOAD COMB 234 = 1.2(DS+DO)+0.5L-0.3EOX-1.0EOZ+0.2*SDS*D 1 1.2 2 0.5 27 -0.3 28 -1.0 1 0.101 LOAD COMB 235 = 0.9(DS+DE)+1.0WPX 1 0.9 2 0.9 21 1.0 LOAD COMB 236 = 0.9(DS+DE)+1.0WPZ 1 0.9 2 0.9 22 1.0 LOAD COMB 237 = 0.9(DS+DE)+1.0(-WPX) Rev. A2 DED INSTALASI COOLING TOWER MANGGALA NORTH GS Swicth Rack Shelter Structure & Foundation Calculation SLON-GATHMGNO000-CIV-CAL-PHR-2009-00 Date: 7-Jun-23 1 0.9 2 0.9 23 1.0 LOAD COMB 238 = 0.9(DS+DE)+1.0(-WPZ) 1 0.9 2 0.9 24 1.0 LOAD COMB 239 = 1.2(DS+DT)+1.0WPX+1.0L 1 1.2 4 0.9 21 1.0 5 1.0 LOAD COMB 240 = 1.2(DS+DT)+1.0WPZ+1.0L 1 1.2 4 0.9 22 1.0 5 1.0 LOAD COMB 241 = 1.2(DS+DT)+1.0(-WPX)+1.0L 1 1.2 4 0.9 23 1.0 5 1.0 LOAD COMB 242 = 1.2(DS+DT)+1.0(-WPZ)+1.0L 1 1.2 4 0.9 24 1.0 5 1.0 LOAD COMB 243 = 1.2DS+1.6H 1 1.2 12 1.6 ******************************************************************************* PERFORM ANALYSIS LOAD LIST 101 TO 133 201 TO 230 ******************************************************************************* *PERFORM ANALYSIS PRINT STATICS CHECK ******************************************************************************* DEFINE ENVELOPE 101 TO 133 ENVELOPE 1 TYPE SERVICEABILITY 201 TO 230 ENVELOPE 2 TYPE STRENGTH *1101 TO 1116 1401 TO 1420 1501 TO 1504 ENVELOPE 3 TYPE STRENGTH *1101 TO 1116 1401 TO 1404 1501 TO 1504 1511 TO 1514 1521 TO 1523 *1524 ENVELOPE 4 TYPE STRENGTH *1201 TO 1248 1601 TO 1608 ENVELOPE 5 TYPE STRENGTH *1301 TO 1396 1701 TO 1708 ENVELOPE 6 TYPE STRENGTH END DEFINE ENVELOPE ******************************************************** PARAMETER 1 CODE LRFD *METHOD LRFD FYLD 248213 ALL FU 413688 ALL TRACK 2 ALL RATIO 1 ALL MAIN 250 MEMB 24 TO 28 40 TO 43 55 TO 59 98 LY 2 MEMB 24 TO 28 40 TO 43 55 TO 59 98 LZ 0.5 MEMB 26 27 40 57 58 98 LZ 0.225 MEMB 24 43 55 LZ 0.476 MEMB 28 41 59 LZ 0.3 MEMB 25 42 56 CHECK CODE ALL STEEL MEMBER TAKE OFF ALL FINISH Rev. A2