Dubai Building Code Where two ECCs are used, the ends of the ECC shall be terminated independently of each other at all connection points throughout the circuit, the DBs, junction boxes and socket outlets. To achieve this, an accessory shall be provided with two separate earth terminals. Where the cable incorporates metallic armouring, this shall be clamped to the cable gland. The main earth conductors shall be placed such that the metallic cable sheaths can be reliable and readily connected to it by bonds made to the cable gland. Part G: Incoming utilities Sr. No. Circuit/equipment/apparatus Rated operating current (mA) 1 13 A switched socket outlets 30 2 Water heater/coolers/dishwashers 30 3 Refrigerator/washing machine and similar apparatus 30 4 Domestic water pumps 30 5 Jacuzzi pumps 10 6 Under water lighting 10 7 15 A switched socket outlets (general purpose) 30 Earthing conductors shall be accessible for the connection of any detachable earthing devices used with the electrical equipment. 8 General lighting 30/100 9 Flood lighting 100/300 10 Window/split type air conditioner 100 G.4.19.4 11 Fan coil/AHU/VAV 100 12 Package type air-conditioning unit 100/300 13 Chiller 100/500/1,000 14 Irrigation pump 100 15 Electric cooker 100 16 Industrial machine 100/300 17 Elevators/escalators/hoist 300/500 18 Neon sign 300 Earth leakage protection Earth leakage protection shall be designed and incorporated in consumer installations in accordance with BS EN 61140 and IEC 61140. The ELCBs/RCCBs shall generally conform to BS EN 61008-1 and BS EN 61009-1. Recommended values of operating current of ELCBs/RCCBs are specified in Table G.21, though the designer shall verify with the manufacturer’s recommendations. G 63 Table G.21 Recommended value of operating current for ELCB/RCCB in consumer installations NOTE 1: Grouping of circuits under one ELCB/RCCB is permitted for lighting circuits, general purpose switched socket outlets, single-phase equipment/ appliances, etc. The maximum number of circuits proposed under each group should be selected taking into account the building type and the possible interruptions. NOTE 2: Wherever an uninterruptable power supply is required to provide power to equipment and circuits as part of a fire protection system (such as fire pump, jockey pump, sump pump, sprinkler pump, pressurization pump, smoke extract fans), a suitable earth leakage detection system with indication and/or alarm should be provided. For industrial installations that are designed with common operating systems for plant and machinery, the earth leakage protection shall be selected taking into account the safety and operational requirements. Operation of the ELCBs/RCCBs, earth leakage detection system, etc. shall be periodically checked and tested in accordance with the manufacturer’s recommendations to ensure consumer safety. Earth leakage sensors/relays with alarm/indicators shall be provided for fire pumps, jockey pumps, submersible pumps, sump pumps, or other essential circuit/equipment with sensor settings that allow for pre-fault warning notification and fault warning notification.