Safety Risk Assessment Hot Works SRA 0027 One Direct Maintenance Ltd Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity A – One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 07900 160656 B – Contractors/Sub contractors Hot works being undertaken by One Direct operatives C – Tenants D – Members of the public Hazard/Risk 1) Fire Ignition of flammable liquids / vapours / combustible materials, damage to property, Groups at Risk Severity A,B,C,D S Work Type Review Date Routine July 2019 Probability Risk Level before Controls P H Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls 1) Alternative ways of working should be sought where possible, i.e.; mechanical fixing, sawing adhesives, push fit, compression fittings M 2) H&S inspections should examine work to assess that they are being carried out in line with the standard operating procedure L 2) Where hot works are unavoidable, works assessed as low risk routine activities should be carried out under the ‘hot works standard operating procedure’ 3) Operations of a non-routine nature that cannot be adequately controlled under the standard operating procedure should be Actioned by 3) The permit to work should be issued by a competent person and recorded on a permit to work register 4) An adequate period of fire watch should be implemented for all hot works Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable, Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable Page 1 Safety Risk Assessment Hot Works SRA 0027 One Direct Maintenance Ltd Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls M 1) See working in communal areas risk assessment L Actioned by subjected to a hot works permit 2) Injury to operative and others A,B,C,D S P H 1) Ensure work areas in communal areas are appropriately cordoned off and safety signage is in place 3) Specific hot works hazards to be covered in site induction where appropriate 2) When working in occupied properties ensure that tenant is aware of works being under taken and any associated risks See contingency plan 3 3) Good communication should be maintained with other trades with regards to specific gas hazard 3) Exposure to Hazardous substances A,B,C,D S P H 1) Consult COSHH inventory list and control approach prior to the use of or creation of hazardous substances or materials M 2) PPE to be issued, recorded, monitored and replaced where appropriate L 2) Appropriate PPE to be supplied and worn as identified Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable, Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable Page 2 SRA 0027 One Direct Maintenance Ltd Safety Risk Assessment Hot Works Personal Protective Equipment required (PPE): Icon Glossary HARD HAT NO HAND PROTECTION YES SAFETY VISOR NO HIGH VIZ NO SAFETY FOOTWEAR YES DUST MASK YES EYE PROTECTION YES EAR PROTECTION NO Protective Clothing YES Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable, Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable Page 3 SRA 0027 One Direct Maintenance Ltd Safety Risk Assessment Hot Works Contingency Plan Item No Hazard/Risk Occurrence Contingency/Action 1 Unauthorised entry to working area. 1) Aggressive behaviour / damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One Direct supervisor informed. Emergency services called if required. Violence and aggression / public access to restricted work area 2 Electricity failure / flood / pipe leak / striking cable / pipework 2) Lone working procedure in place. 1) Severance of services / lighting failure. Lighting failure / water in premises / electrocution 3 Poor communication / lack of contact 1) Poor standard of work / low customer satisfaction / violent and aggressive behaviour from customer between direct labour and subcontractors 1) Work would cease and client would be informed by One Direct Supervisor so remedial work can be carried out in order for the work to re-start. 1) One Direct supervisor to keep all parties informed of work procedures and standards, H&S inspections to take place. Poor standards / work being carried out in an inappropriate manner 4 Disturbance of asbestos containing materials Exposure to asbestos related illness 1) Lack of appropriate asbestos information supplied for the property / task 1) Implement emergency asbestos procedure. 2) Failure to comply with asbestos procedures Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable, Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable Page 4