PRE-TASK PLAN
Company Name: TYCO
Description of works:
Location of Work: ADMIN LEVEL 1, 2, 3, 4 & 5
Supervisor In Charge:
AH YAO
INSTALLATION OF SECURITY SYSTEM
Start Date/Time:
End Date/Time:
Number of workers:
Material Handling Plan (Method of delivery): NA
Hoisting Plan (Personnel & Permit): NA
Section 1: Please review the work to be performed onsite and check “Yes” or “No” below. (If answer below is “Yes”, Please
confirm physical hazards onsite and verify safety measures implemented written in approved RA/JHA
1
2
3
4
5
6
Does the work expose to falling from
height of more than 6feet or 1.8 metre
X Yes
No
Does the work involve in using of
hazardous chemical or gases?
Yes
X No
Does the work involve in “Live” electrical
system or energized equipment
Yes
X No
Does the work involve in non-routine
lifting, which is not approved previously
Yes
X No
Does the work involved in confined
space entry or excavation?
Yes
X No
Does the work involve in disable or
removing equipment safety interlocks?
Yes
X No
7
Does the work involve in transportation of
huge, bulky and/or heavy equipment?
Yes
X No
8
Does the work involve in using forklift for
moving load?
Yes
X No
9
Does the work involve in working at ceiling
sub-fab utilities areas or roof?
Yes
X No
10
Does the work involve in removing raised
floor tiles or work under raise floor?
Yes
X No
11
Does the work involve in any oxy-cutting or
welding hot work?
Yes
X No
12
Does the work involve in dismantling of
electrical or chemical system?
Yes
X No
Are any of the following permits or forms required? (Mark if apply. Permits and RA/JHA must be attached to this
Pre task planning)
X Permit to work
Confined Space
Excavation
MEWP
Road Blocking
X Working at height
Lifting
Hot Work
EEW
Demolition
Section 2: Pre-task planning have been reviewed in the work area and the workers have been given the safety
briefing
Construction Activity (In Sequences)
1. Daily inspection for tools, machinery and equipment 8.
before use.
2. Material arrangement at work area using manual
handling.
9.
3. Installation of door access system using ladder and
practice buddy system.
10.
4. Housekeeping at work area after work completed
11.
5.
12.
6.
13.
1/4
Potential Hazards: Please tick (√) if applicable
Hazard Identified
List Of Hazards - PHYSICAL
√
List Of Hazards - ENVIRONMENT
Falling material/object
Falling from height
Flying object/particles
Hit by moving machinery/equipment
Collide with moving vehicle/machinery/equipment
Sharp object/edge / protruding object
Soil Erosion
Poor excavation shoring protection
Improper/Unsafe scaffolding/No green tag
Crushing / Caught in between equipment/machine/material/object
Obstruction to firefighting systems, ERT equipment, emergency
exits signage/doors/pathways
Messy work area
Cutting / Severing caused by equipment/machine/material/object
Pinch Point
Stabbing / Puncture
Strike by overhead /equipment/machinery/object
Spark produced during Hot work(Welding/cutting/grinding)
Contacted hot material/equipment/tools
Working on ladder alone(no buddy system)
Slippery
Protrusion / Obstruction
Uneven ground/ Unstable Floor Board
Inadequate Illumination(Poor lighting)
Trailing of Cables / Hoses / Gas Lines
Floor / ground recess e.g. sump pit, drains, excavated trench
Strong adhesion on sticky mat
Rushing down stairs / Slip trip and fall at staircase
Exposure to excessive noise (Noise)
Body expose to excessive vibration(Hacking)
Work at height
Floor Openings
Wall Openings
Leading Edge Work / Unprotected or unguarded sides Work
Slippery work surface
Work above existing edge protection
Unauthorized entry
Contacted underground utilities
Improper/unsafe access
/
/
/
/
Lack of oxygen
Oxygen enriched atmosphere
Bad weather condition e.g. lightning, raining, windy
Hot weather condition
Exposure to dusty atmosphere / Haze
Poor indoor air quality-Odor/Fume
Oil spillage/leakage
Poor housekeeping
Scattered materials
List Of Hazards - BIOLOGICAL
Exposure to Bacterial / Virus / Fungus/Influenza/Covid19
Snakes/bees sting during outdoor work
Mosquitoes breeding
√
√
/
/
√
List Of Hazards - ERGONOMIC
/
Poor work posture
Forceful manual handling activity
Static working posture
Extreme repetitive motion
Hand-arm vibration(Hacking)
/
/
/
List Of Hazards - MECHANICAL
Impact caused by magnetic attraction force / movement
Impact caused by machine or equipment
Unexpected Start/Movement of equipment
Equipment break up during operation(Faulty)
Cutting / Shearing by moving/rotating equipment/machine
Entanglement
Damage ladder
√
List Of Hazards - CHEMICAL
Exposure to chemical-paint/oil/fuel
Exposure to harmful gas
√
List Of Hazards - ELECTRICAL
Contact with live equipment/machine
Contact with Capacitor with stored charge
Contact with faulty equipment/machinery/power tools
Contact with hot surfaces effects from overloads, short circuits
Live cable on wet floor
Cable below 7 feet height
Contacted underground cable
√
/
Please list hazards below if not on above table:
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
Remarks:_________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
2/4
Safety Measure: Please tick (√) if applicable
PPE
Required
Face Protection
(Uv Shield
/ Face
Shield)
Obtain
Permit
LOTO
/
/
Barrication
Needed
Do Not
Smoking
/
/
Signage’s
Needed
Use
Specific
Fall
Protection
Excavation
Shoring
Needed
Electrical
Safety
Needed/
Cohe
Do Not Work
Under
Suspended
Load
Conduct
Gas Test
When
Required
Traffic Controller/
Flagman Needed
/
/
No Drugs &
Alcohol
Ladder
Safety
Needed
Fire
Extinguisher
Needed
Authorized
Personal
Only
Housekeeping/
Material
Arrangement
/
Signalman
Needed
Confined
Space
Requirement
To Follow
Scaffolding
Tagging
Opening
Protection
Webbing
Sling In
Good
Condition
/
Dust Control
Needed
/
Machinery/
Equipment
Checklist To
Update
Inspection/
Tagging For
Power
Tools
/
/
Spillage
Containm
ent Tray
Needed
Trained
Person
Operate
Equipment/
Machine
Comply Task
Relevant PPE
/
/
Safety Harness
Anchor
Anchored
Not Allowed
To
Step/Stand
On Railing
No Chemical
Discharge Into
Drain
3/4
Company:
TYCO
Name
Sign
Name
Sign
Name
Sign
Name
1 USMAN ALI
27
53
79
2 AHSAN
28
54
80
3 NAWAZ
29
55
81
4 RAFAQAT
30
56
82
5
MEHMOOD
31
57
83
6
SUFYAN
32
58
84
7
ALI HAIDER
33
59
85
8
M. ZOHAIB
34
60
86
9 AMJAD
35
61
87
10
NADEEM
36
62
88
11 M. IRFAN
37
63
89
12 SULEMANS
38
64
90
13 SAMAR
39
65
91
14 ALI ABID
40
66
92
15 M. SAMAR
41
67
93
16 KUNDU RIPON
42
68
94
17 MAQSOOD
43
69
95
18
44
70
96
19
45
71
97
20
46
72
98
21
47
73
99
22
48
74
100
23
49
75
101
24
50
76
102
25
51
77
103
26
52
78
104
Sign
(IF WORK CONDITIONS CHANGE, WORK MUST STOP AND A NEW PLAN MUST BE PREPARED)