PROJECT SCHEDULE (Level 3)
ID
TASK
DUR.
시작
완료
2022년
2023
1분기
01월
0
1
2
5
8
Work plan_3_3
316.4 d?
22-02-01 (화 22-12-14 (수
1 MILESTONES & PREPARATION
1.1 Total Project Period
1.2 Offshore Campaign Period
1.3 Engineering Preparation
295 d
59 d
83 d
90 d
22-02-01 (화 22-11-23 (수
22-02-01 (화 22-04-01 (금
22-09-01 (목 22-11-23 (수
22-04-01 (금 22-06-30 (목
2 PREPARATION WORKS
2.1 Provision of Marine Spread
2.2 Provision of Subcontractor
2.3 Procurement of Project Material
2.4 Provision of Man-power
1 d?
1 d?
1 d?
1 d?
1 d?
22-04-01 (금 22-04-02 (토
22-04-01 (금 22-04-02 (토
22-04-01 (금 22-04-02 (토
22-04-01 (금 22-04-02 (토
22-04-01 (금 22-04-02 (토
3 SITE SURVEY
3.1 Preparion of material and tools
3.2 Mobilize worker
3.3 ATTAKA I_Survey
3.4 ATTAKA UA_Survey
3.5 ATTAKA EB_Survey
26 d
3d
7d
7d
5.5 d
7d
22-03-28 (월 22-04-23 (토
22-03-28 (월 22-03-31 (목
22-03-28 (월 22-04-04 (월
22-04-04 (월 22-04-11 (월
22-04-11 (월 22-04-16 (토
22-04-16 (토 22-04-23 (토
2분기
02월
11
12
13
14
15
16
17
18
19
20
21
34
47
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
4 Preparing Work
22.5 d
4.1 Installation of items for reinfocement, lug and remove obstruction items
22.5 d
4.1.1 UA
8.5 d
4.1.1.1 Load all material and move to UA
2d
4.1.1.2 Install scaffold and arrange tools
2d
4.1.1.3 Install Reinforce pieces, pad eyes, crossbeam to main structure
4d
4.1.1.4 Remove roof
1d
4.1.1.5 Remove any obstructed structure and items
3d
4.1.1.6 Lift down to barge and remove tool and scaffold
2d
4.1.1.7 Move to EB
0.5 d
4.1.2 EB
7d
4.1.2.1 Install scaffold and arrange tools
2d
4.1.2.2 Install Reinforce pieces, pad eyes, crossbeam to main structure
4d
4.1.2.3 Remove roof
1d
4.1.2.4 Remove any obstructed structure and items
3d
4.1.2.5 Lift down to barge
2d
4.1.2.6 Move to I
1d
4.1.3 I
8d
4.1.3.1 Install scaffold and arrange tools
2d
4.1.3.2 Install Reinforce pieces, pad eyes, crossbeam to main structure
6d
4.1.3.3 Remove Hatch
1d
4.1.3.4 Remove any obstructed structure and items
3d
4.1.3.5 Lift down to barge
2d
4.1.3.6 Move to offshore and lift down
2d
22-07-05 (화 22-07-27 (수
22-07-05 (화 22-07-27 (수
22-07-05 (화 22-07-13 (수
22-07-05 (화 22-07-07 (목
22-07-07 (목 22-07-09 (토
22-07-07 (목 22-07-11 (월
22-07-11 (월 22-07-12 (화
22-07-09 (토 22-07-12 (화
22-07-11 (월 22-07-13 (수
22-07-13 (수 22-07-13 (수
22-07-13 (수 22-07-20 (수
22-07-13 (수 22-07-15 (금
22-07-13 (수 22-07-17 (일
22-07-17 (일 22-07-18 (월
22-07-15 (금 22-07-18 (월
22-07-17 (일 22-07-19 (화
22-07-19 (화 22-07-20 (수
22-07-19 (화 22-07-27 (수
22-07-19 (화 22-07-21 (목
22-07-19 (화 22-07-25 (월
22-07-25 (월 22-07-26 (화
22-07-21 (목 22-07-24 (일
22-07-23 (토 22-07-25 (월
22-07-25 (월 22-07-27 (수
5 Purchase and Installation Work and demob equipment
5.1 Fabrication of Preparing work
5.2 Puchase of Dual& Single Pin Drill in Korea
5.3 PIN & Cutting Machine in Korea
22-04-01 (금 22-12-14 (수
22-06-01 (수 22-06-25 (토
22-04-01 (금 22-11-25 (금
22-06-15 (수 22-11-25 (금
85
86
87
91
96
257.4 d
24 d
238.4 d
163.4 d
IND001-PS-SCH-014-00001, REV. A02
7 OF 8
03월
04월
3분기
05월
06월
07월
4분기
08월
09월
10월
1
11월
12월
PROJECT SCHEDULE (Level 3)
ID
TASK
DUR.
시작
완료
2022년
2023
1분기
01월
101
106
117
5.4 Local Cutting Machine and Diver Equipment
5.5 Equipment for installation on vessel (Grillage, guid plate and ect.)
5.6 Lifting Material (Wire, Lug, Sharkle, Spread Bar and etc)
166.4 d
162.73 d
177.4 d
22-07-01 (금 22-12-14 (수
22-06-01 (수 22-11-10 (목
22-06-01 (수 22-11-25 (금
6 OFFSHORE SPREAD MOB
6.1 AWB 175T
6.2 HLB 800T
6.3 No. 1 Barge_Working
6.4 No. 2 Barge_Transport
6.5 No. 3 Barge_Transport
6.6 No.1 AHT
6.7 No.2 AHT
6.8 No.1 Tug
6.9 No.2 Tug
6.10 No.3 Tug
154.4 d
100.66 d
62.74 d
97.4 d
98.4 d
43.81 d
152.4 d
62.74 d
97.4 d
98.4 d
43.81 d
22-06-30 (목 22-12-01 (목
22-06-30 (목 22-10-08 (토
22-09-27 (화 22-11-29 (화
22-08-24 (수 22-11-29 (화
22-08-25 (목 22-12-01 (목
22-10-18 (화 22-12-01 (목
22-06-30 (목 22-11-29 (화
22-09-27 (화 22-11-29 (화
22-08-24 (수 22-11-29 (화
22-08-25 (목 22-12-01 (목
22-10-18 (화 22-12-01 (목
7 PLATFORM REMOVAL OFFSHORE CAMPAIGN
7.1 Removal of EB Topside & Jacket
79.03 d
41.13 d
22-09-01 (목 22-11-19 (토
22-09-01 (목 22-10-12 (수
7.2 Removal of UA Topside & Jacket
33.8 d
22-09-16 (금 22-10-20 (목
7.3 Removal of I Topside and Jacket
31.63 d
22-10-18 (화 22-11-19 (토
8 RIG TO REEF OPERATION
8.1 Rig to Reef Operation for EB & UA Jackets
8.2 Rig to Reef Operation for I Jackets
54.45 d
23.64 d
4.37 d
22-09-29 (목 22-11-23 (수
22-09-29 (목 22-10-23 (일
22-11-19 (토 22-11-23 (수
9 Demob plan
9.1 Demob HLV 800T
9.2 Demob W/B and T/B
10 d
7d
9d
22-11-22 (화 22-12-02 (금
22-11-22 (화 22-11-29 (화
22-11-23 (수 22-12-02 (금
2분기
02월
122
123
124
129
132
138
141
144
149
152
155
158
161
162
163
203
204
244
245
290
291
292
302
310
311
312
313
IND001-PS-SCH-014-00001, REV. A02