APPLICATION AND CERTIFICATE FOR PAYMENT TO (OWNER): Ely Sakhai PROJECT: 99 Powerhouse AIA DOCUMENT G702 APPLICATION NO: 4 PAGE ONE OF PAGES Distribution to: x OWNER ARCHITECT CONTRACTOR PERIOD TO: FROM (CONTRACTOR): VIA (ARCHITECT): ARCHITECT'S PROJECT NO: The Lombardo Group CONTRACT FOR: CONTRACT DATE: CONTRACTOR'S APPLICATION FOR PAYMENT CHANGE ORDER SUMMARY Change Orders approved in AIA Document G703, is attached. ADDITIONS DEDUCTIONS previous months by Owner TOTAL Approved this Month Number Date Approved 4 2/2/23 TOTALS Net change by Change Orders Application is made for Payment, as shown below, in connection with the Contract, Continuation Sheet, 20,000 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders $ $ 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) 5. RETAINAGE a. _5____% of Completed Work (Column D + E on G703) % of Stored Material b. (Column F on G703) Total Retainage (Line 5A + 5b or Total in Column I of G703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificates) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, PLUS RETAINAGE $ $ 24,000 $ $ $ $ $ $ 147,000 40,000.00 368,000 (Line 3 less Line 6) State of: By: $ 480,00 35,000 515,000 147,000 Date: 2/2/23 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. Subscribed and sworn to before me this Notary Public: My Commission expires: County of: day of AMOUNT CERTIFIED $ (Attach explanation if amount certified differs from the amount applied for.) ARCHITECT: 2/2/23 By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. CONTINUATION SHEET AIA DOCUMENT G703 PAGE AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification is attached. In tabulation below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for the line items may apply A B C ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Concrete on metal deck replacement Concrete on metal deck w/asphalt Underside Concrete slab Repair Concrete slab crack repair Steel Beam Replacement Steel Beam Flange Repair Asphalt topping slab replacement Asphalt Replacement Asphalt bump and slab replacement Waterproofing Concrete exterior stair underside Storm Drain replacement Storm Trench Grate Remove 4'0" Pipe Masonry Column Enclosure removal New Perimeter Angle ledge New sidewalk flags and curbs New concrete curb Exterior beam repair 310,000 25,000 2,500 2,500 10,000 20,000 15,000 10,000 3,500 40,000 1,500 8,000 4,500 2,500 2,500 6,500 7,000 7,000 7,500 D PAGES APPLICATION DATE: PERIOD TO: ARCHITECT'S PROJECT NO: E WORK COMPLETED FROM PREVIOUS THIS PERIOD APPLICATION (D + E) 147,000 OF APPLICATION NUMBER: 40,000 F G MATERIALS PRESENTLY STORED (NOT IN TOTAL COMPLETED AND STORED TO DATE D OR E) (D+E+F) % (G+C) H I BALANCE TO FINISH (C-G) RETAINAGE 123,000