TURCOMP ENGINEERING SERVICES SDN. BHD. (243046-P) DOC NO:P1TA17-PARONE19PLANT 1, 17th TA 2021 DOCUMENT TITLE MECH-ST-PRC-006 REV NO: 0 P1TA17 DRY OUT OF REFRACTORY LINING PROCEDURE FOR APPROVAL EQUIPMENT NO:E-103 Page 1 of 10 Rev No Date Issued Rev Revision Description Prepared by (PERFECT INDUCTION) Reviewed by (TESSB) : PAR Coordinator Reviewed by (PCMSB) : Mechanical Engineer Reviewed by (PCMSB): Mechanical Engineer Sign: Sign: Sign: Sign: Name: Baihaqi Date:28/02/2021 Name: Alfred Augustine Date:02/03/2021 Name: Liew Kok Beng Date: Name: Boby Sugara M Terang Date: 0