CATATAN
* MUTU BETON
STRAUSS PILE
: K 300 (Fc'= 25 MPa)
PILE CAP(PONDASI) : K 300 (Fc'= 25 MPa)
TIE BEAM (SLOOF)
: K 300 (Fc'= 25 MPa)
BALOK , PELAT
: K 300 (Fc'= 25 MPa)
KOLOM
: K 300 (Fc'= 25 MPa)
* SELIMUT BETON
PILE CAP :SISI BAWAH : 70 MM PELAT LANTAI LAINNYA : 20 MM
SISI SAMPING
: 70 MM TIE BEAM DAN,KOLOM : 40 MM
SISI ATAS
: 50 MM
BALOK : 30 MM
* MUTU BAJA :
Ø < 10 - BJTP U24 (Fy = 240MPa) Besi Polos
\
: Ø > 10 - BJTD U40 (Fy = 400MPa) Besi Ulir
: BJ 37 (Fy = 240MPa) Es 200000MPa
PEKERJAAN
DED PEMBANGUNAN GEDUNG
PUSAT ADMINISTRASI DAN
AUDITORIUM TERINTEGRASI
NAMA GEDUNG
B
PORTAL As - 5'
I
-
GEDUNG AUDITORIUM
LOKASI
KAMPUS REULET, UNIVERSITAS
MALIKUSSALEH, KECAMATAN MUATA BATU,
KABUPATEN ACEH UTARA, PROVINSI ACEH
JUDUL GAMBAR
SKALA
DETAIL & SECTION ROOF As indicated
A
PERENCANA:
C
B
B
NO
DISIAPKAN OLEH
KET.
PARAF
01 Ria Purnama, M.Arch, IAI Team Leader
C
A
02 M. Iqbal Zuchri, ST, IAI
Ahli Arsitektur
03 Ir. Budiono, MT
Ahli Struktur
04 Sarifudin, ST
Ahli Mekanikal
05 Mei Pranomo, ST
Draftman
PENANGGUNG JAWAB :
PT. ARTEFAK ARKINDO
DETAIL - Q
Ir BUDIONO ASKANDAR, MBA
Direktur
DIPERIKSA:
TIM PENDUKUNG TEKNIS PPK
PROYEK AKSI-ADB
PARAF
Ketua :
David Sarana, ST., MT
Anggota 1 :
Fasdarsyah, ST., MT
Anggota 2 :
T. Mudi Hafli, ST., MT
MENYETUJUI :
SECTION A-A
-
PEJABAT PEMBUAT KOMITMEN (PPK)
PEKERJAAN KONSTRUKSI DAN JASA KONSULTASI
UNIVERSITAS MALIKUSSALEH
MUKHLIS, S.T., M.T
NIP. 197806102005011002
NO. GAMBAR
SECTION B-B
-
SECTION B-B
-
STR-01-52B
JLH. GAMBAR
STR-01-54