BACHELOR OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT (HONS)
JANUARY 2020
BBPP 1103
PRINCIPLE MANAGEMENT
NO. MATRIKULASI
: 950209035554001
NO. KAD PENGNEALAN
: 950209-03-5554
NO. TELEFON
: 011-23094384
E-MEL
: nurulfatihah.nufa@gmail.com
PUSAT PEMBELAJARAN
:
SHAH ALAM LEARNING CENTRE
1
Isi Kandungan
No.
Huraian
Mukasurat
1.
Tugasan 1………………………………………………………
3-6
2.
Tugasan 2………………………………………………………
7-9
3.
Rujukan ……………………………………………………….
10
2
Tugasan 1
Schedule week 1
TIME
0745
0800
0830
Monday
1000
1030
1100
Wenesday
Friday
Saturday
Sunday
Safety Briefing, Toolbox
Safety Briefing, Toolbox Safety Briefing, Toolbox Safety Briefing, Toolbox
Meeting and Work
Meeting and Work
Meeting and Work
Mega Safety Briefing with all Meeting and Work
Arrangement by Person In subcontractors, Toolbox Arrangement by Person In Arrangement by Person In Arrangement by Person In
Charge
Charge
Charge
Charge
Meeting and Work
Arrangement by Person In
Charge
Briefing the whole work for
this week, Safety briefing,
Tollbox and head count.
WeeklyTower Crane and
Mobile Crane Inspection
0900
0930
Tuesday
DAY
Thursday
Supervise the all workers
during do the work to make
sure them follow the safety
Site walk with all the bosses requirement. Find the
to monitor the progress and findings and rectify the
Monthly internal audit from Supervise the all workers
current and pendings issue.
find the outcomes.
department QA/QC from during do the work to make
HQ. (checking all the
sure them follow the safety
document for each
requirement. Find the
department was follow the findings and rectify the
ISO)
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Friday Prayer
Rectify the current issue and
findings
1130
1200
Lunch Break
1230
0100
0130
Prepare the HIRARC for
update issue and forall
subcontractors.
0200
0230
0300
0330
0400
0430
0500
Remarks
Prepare the safety document
for checklist and inspection
(Weekly / Monthly)
Prepare the all issue and
update progress for the
meeting.
Rectify the current issue and
findings
Weekly inspection (First Aid
and Fire Extiguisher )
Meeting with all
subcontractor for weekly
meeting to update the Rectify the current issue and
progress, out coming issue
findings
and findings.
Weekly scaffoldings
inspection by scaffolders Supervise the all workers
inspection (monitor and during do the work to make
Do the weekly lava cidding
sure them follow the safety
supervise)
Supervise the all workers
to all work area include
requirement. Find the
during do the work to make
"kongsi".
findings and rectify the
sure them follow the safety
Do the weekly fogging for all
current and pendings issue. Weekly housekeeping for
requirement. Find the
works area include "kongsi".
the whole construction site
findings and rectify the Report to the scaffolding
inculde workers place.
current and pendings issue. contractor to rectify the
current issue that highlight by
inspectors scaffolders.
Job done
Job done
Job done
Job done
Job done
Job done
3
Schedule week 2
TIME
Monday
Tuesday
Wenesday
DAY
Thursday
Friday
Saturday
Sunday
0745
0800
0830
0900
0930
1000
1030
1100
1130
Safety Briefing, Toolbox Mega Safety Briefing with all Safety Briefing, Toolbox Safety Briefing, Toolbox Safety Briefing, Toolbox
Meeting and Work
Meeting and Work
Meeting and Work
Meeting and Work
subcontractors, Toolbox
Arrangement by Person In
Arrangement by Person In Arrangement by Person In Arrangement by Person In
Meeting and Work
Briefing the whole work for
Charge
Charge
Charge
Charge
Arrangement by Person In
this week, Safety briefing,
Charge
Tollbox and head count.
WeeklyTower Crane and
Mobile Crane Inspection
Supervise the all workers
during do the work to make
Supervise the all workers Site walk with all the bosses sure them follow the safety
during do the work to make to monitor the progress and requirement. Find the
Staff Meeting (Discuss for
sure them follow the safety
find the outcomes.
findings and rectify the
internal issue and current
requirement. Find the
current and pendings issue.
issue)
findings and rectify the
current and pendings issue.
1200
1230
0100
0130
Prepare the all issue and
Prepare the HIRARC for
update progress for the
update issue and forall
Rectify the current issue and
meeting.
Weekly inspection (First Aid
subcontractors.
findings
and Fire Extiguisher )
Prepare the safety document
for checklist and inspection
(Weekly / Monthly)
Remarks
Friday Prayer
Rectify the current issue and
findings
Meeting with all
subcontractor for weekly
meeting to update the Rectify the current issue and
progress, out coming issue
findings
and findings.
Weekly scaffoldings
inspection by scaffolders
inspection (monitor and
supervise)
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
Do the weekly lava cidding
sure them follow the safety
to all work area include
requirement. Find the
"kongsi".
findings and rectify the
Report to the scaffolding current and pendings issue. Weekly housekeeping for Do the weekly fogging for all
the whole construction site works area include "kongsi".
contractor to rectify the
inculde workers place.
current issue that highlight by
inspectors scaffolders.
Job done
Job done
0400
0430
0500
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Lunch Break
0200
0230
0300
0330
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Job done
Job done
Job done
Job done
4
Schedule week 3
TIME
0745
0800
0830
Monday
1000
1030
1100
Wenesday
Friday
Saturday
Sunday
Safety Briefing, Toolbox
Safety Briefing, Toolbox Safety Briefing, Toolbox Safety Briefing, Toolbox
Meeting and Work Mega Safety Briefing with all Meeting and Work
Meeting and Work
Meeting and Work
Arrangement by Person In subcontractors, Toolbox Arrangement by Person In Arrangement by Person In Arrangement by Person In
Charge
Charge
Charge
Charge
Meeting and Work
Arrangement by Person In
Charge
Briefing the whole work for
this week, Safety briefing,
Tollbox and head count.
WeeklyTower Crane and
Mobile Crane Inspection
0900
0930
Tuesday
DAY
Thursday
Supervise the all workers
during do the work to make
sure them follow the safety
Site walk with all the bosses requirement. Find the
to monitor the progress and findings and rectify the
Supervise the all workers
current and pendings issue.
find the outcomes.
during do the work to make
Staff Meeting (Discuss for
sure them follow the safety
internal issue and current
requirement. Find the
issue)
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Friday Prayer
Prepare the monthly safety
report
1130
1200
Lunch Break
1230
0100
0130
Prepare the HIRARC for
update issue and forall
subcontractors.
0200
0230
0300
0330
0400
0430
0500
Remarks
Prepare the safety document
for checklist and inspection
(Weekly / Monthly)
Prepare the all issue and
update progress for the
meeting.
Rectify the current issue and
findings
Weekly inspection (First Aid
and Fire Extiguisher )
Meeting with all
subcontractor for weekly
meeting to update the Rectify the current issue and
progress, out coming issue
findings
and findings.
Weekly scaffoldings
inspection by scaffolders Supervise the all workers
inspection (monitor and during do the work to make
Do the weekly lava cidding
sure
them
follow
the
safety
supervise)
Supervise the all workers
to all work area include
requirement. Find the
during do the work to make
"kongsi".
findings
and
rectify
the
sure them follow the safety
Do the weekly fogging for all
current and pendings issue. Weekly housekeeping for
requirement. Find the
works area include "kongsi".
the whole construction site
findings and rectify the Report to the scaffolding
inculde workers place.
current and pendings issue. contractor to rectify the
current issue that highlight by
inspectors scaffolders.
Job done
Job done
Job done
Job done
Job done
Job done
5
Schedule week 4
TIME
0745
0800
0830
Monday
1000
1030
1100
Wenesday
DAY
Thursday
Friday
Saturday
Sunday
Safety Briefing, Toolbox
Safety Briefing, Toolbox Safety Briefing, Toolbox Safety Briefing, Toolbox
Meeting and Work Mega Safety Briefing with all Meeting and Work
Meeting and Work
Meeting and Work
Arrangement by Person In subcontractors, Toolbox Arrangement by Person In Arrangement by Person In Arrangement by Person In
Charge
Charge
Charge
Charge
Meeting and Work
Arrangement by Person In
Charge
Briefing the whole work for
this week, Safety briefing,
Tollbox and head count.
WeeklyTower Crane and
Mobile Crane Inspection
0900
0930
Tuesday
Supervise the all workers
during do the work to make
sure them follow the safety
Site walk with all the bosses requirement. Find the
to monitor the progress and findings and rectify the
Supervise the all workers
current and pendings issue.
find the outcomes.
during do the work to make
Staff Meeting (Discuss for
sure them follow the safety
internal issue and current
requirement. Find the
issue)
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Supervise the all workers
during do the work to make
sure them follow the safety
requirement. Find the
findings and rectify the
current and pendings issue.
Friday Prayer
Prepare the monthly safety
report
1130
1200
Lunch Break
1230
0100
0130
Prepare the HIRARC for
update issue and forall
subcontractors.
0200
0230
0300
0330
0400
0430
0500
Remarks
Prepare the safety document
for checklist and inspection
(Weekly / Monthly)
Prepare the all issue and
update progress for the
meeting.
Rectify the current issue and
findings
Weekly inspection (First Aid
and Fire Extiguisher )
Meeting with all
subcontractor for weekly
meeting to update the Rectify the current issue and
progress, out coming issue
findings
and findings.
Weekly scaffoldings
inspection by scaffolders Supervise the all workers
Monthly internal training
inspection (monitor and during do the work to make
sure them follow the safety
from Head Quarters to staff
supervise)
Supervise the all workers
requirement.
Find
the
at site (OHSAS, ISO and
during do the work to make
findings and rectify the
etc)".
sure them follow the safety
Do the weekly fogging for all
current and pendings issue. Weekly housekeeping for
requirement. Find the
works area include "kongsi".
the whole construction site
findings and rectify the Report to the scaffolding
inculde workers place.
current and pendings issue. contractor to rectify the
current issue that highlight by
inspectors scaffolders.
Job done
Job done
Job done
Job done
Job done
Job done
6
Tugasan 2
Lekatkan Gambar
Terkini
PERMOHONAN JAWATAN
TARIKH TEMUDUGA
DIHADIRI
:______________________________
TEMPAT TEMUDUGA
:______________________________
MAKLUMAT-MAKLUMAT PERIBADI
Nama Penuh (Huruf Besar) :
No. Kad Pengenalan :
Kewarganegaraan :
Email:
Alamat Surat Menyurat:
Poskod :
Negeri :
Alamat Surat Menyurat:
Poskod :
Negeri :
No. Tel. 1 :
Umur semasa
memohon :
No. Tel. 2 :
Tarikh Lahir :
Tempat Lahir :
Pencarum PERKESO :
Ya
No. KWSP :
Tidak
Taraf Perkhawinan ( Potong yang mana tidak berkenaan ) :
Bujang / Berkhawin / Duda / Janda
Nama Bapa / Ibu / Suami / Isteri :
Pekerjaan :
7
Alamat Bapa / Ibu / Suami / Isteri :
No. Telefon Bapa / Ibu / Suami / Isteri :
MAKLUMAT PENGAJIAN
Maklumat-maklumat persekolahan
SIJIL
SPM / MCE / SPVM
TAHUN
PANGKAT
NAMA SEKOLAH
Mata Pelajaran
STPM / HSC / STAM
Gred
Mata Pelajaran
Maklmat-maklumat pengajian di Institut Pengajian Tinggi (IPT)
KELULUSAN
DIPLOMA
IJAZAH
TAHUN
NAMA IPT
PENGKHUSUSAN
KELAS
CGPA
PENGALAMAN BEKERJA
Jawatan
Nama Majikan
Gaji Sebulan
Tarikh Bekerja
(RM)
Dari
Gred
Hingga
KEMAHIRAN KOMPUTER DIMILIKI ( Tandakan (/) di Ruang Berkenaan)
MICROSOFT
Mahir
Kurang Mahir
OFFICE
APLIKASI LAIN
Mahir
Kurang Mahir
(Nyatakan)
Mahir
Kurang Mahir
Lesen Memandu
Kelas
Tarikh Diperolehi
Tarikh Tamat
8
PEGAWAI RUJUKAN (REFEREE)
PERTAMA
KEDUA
Nama Pegawai
Jawatan
Alamat Pejabat
No. Telefon
PEGAWAI DAN KAKITANGAN SYARIKAT YANG DIKENALI
Nama Pegawai
Jawatan
Bahagian / Unit
Hubungan
PENGAKUAN DIRI
Saya dengan ini mengakui bahawa:
i) Maklumat yang diberikan adalah benar dan sekiranya maklumat itu didapati palsu, permohonan saya
akan terbatal dan jika saya ditawarkan jawatan, perkhidmatan saya akan ditamatkan serta-merta;
ii) Saya pernah / tidak pernah* disabitkan atas tuduhan jenayah atau dihukum oleh mana-mana
mahkamah;
iii) Saya bukan seorang penagih dadah / saya seorang atau bekas penagih dadah*;
iv) Saya pernah / tidak pernah* dibuang kerja oleh Kerajaan / Badan-Badan Berkanun / Kuasa-Kuasa
Tempatan ; dan
v) Saya pernah / tidak pernah* dikenakan tindakan tatatertib oleh Kerajaan / Badan-Badan Berkanun /
Kuasa-Kuasa Tempatan.
*Sila potong mana yang tidak berkenaan
Tarikh :
__________________________
Tandatangan Pemohon
PERHATIAN KEPADA CALON :
Dokumen-dokumen yang dinyatakan di bawah hendaklah dikepilkan bersekali dengan borang ini
mengikut susunan berikut :a) Salinan Kad Pengenalan;
b) Salinan Surat Beranak;
c) Salinan Sijil Pelajaran Malysia (SPM);
d) Salinan Lesen Memandu; dan
e) Lain-lain Dokumen Sokongan.
9
Rujukkan
Shahrol, A.A., Azhari, R, Nasri, N., Azelin, A., & Santhi, R. (2013). Princple of Management (2nd ed).
Open University Malaysia.
PESTLEanalysis Contributor, Mar 2. (2015). https://pestleanalysis.com/14-principles-of-management/
Ashford University, May 29. (2019). https://www.ashford.edu/online-degrees/business/5-principles-of-greatmanagement
Henri Fayol’s Principle Of Management, https://www.mindtools.com/pages/article/henri-fayol.htm
Principles of Educational Leadership & Management.
10
Download