No 11
TITLE:
Electrical Scope Adjustment
PROJECT:
19-0150 165 Columbia Heights
TO:
Tim Dumbleton
TADA New York
566 Lorimer Street
Brooklyn, NY 11211
DATE:
1/22/20
DESCRIPTION OF PROPOSAL:
Scope Adjustment per TADA Electrical Drawings dated 11/18/2019
Credit for wiring and installing 16 ft of strip lights: ($800.00)
Credit for wiring and installing 2 pendant light fixtures: ($800.00)
Wire and install 3 additional light fixtures: $780.00
Net Credit: ($820.00)
Wire and Install 15 additional duplex receptacles to meet code per RFI 8 Answer: $2,850
Scope Adjustment per SSS revised RCP's dated 1/6/2020:
Wire and install 3 additional light fixtures: $780.00
Total: $2,810
Subtotal:
Description
Price Base
Mark up
Percent
$0.00
Mark up
Amount
General Conditions
$0.00
Insurance
$0.00
Overhead & Fee
$0.00
Total:
$0.00
APPROVAL:
By:
By:
Date:
Date:
Tim Dumbleton
Page 1 of 1