R U S S I A N M A R I T I M E REGISTER OF S H I P P I N G Electronic version of printed document approved on 28.06.16 RULES FOR TECHNICAL SUPERVISION DURING CONSTRUCTION OF SHIPS AND MANUFACTURE OF MATERIALS AND PRODUCTS F O R SHIPS Volume 1 Parti GENERAL REGULATIONS FOR TECHNICAL SUPERVISION Part II TECHNICAL DOCUMENTATION ND No. 2-020101-040-E Saint-Petersburg 2016 Rules f o r Technical Supervision during Construction o f Ships a n d Manufacture o f Materials a n d Products for Ships have b e e n approved i n compliance w i t h t h e established approval procedure a n d c o m e into force o n 1 July 2016. T h e present e d i t i o n h a s b e e n p r e p a r e d o n the basis o f the latest e d i t i o n o f the R u l e s f o r T e c h n i c a l S u p e r v i s i o n during Construction o fShips a n dM a n u f a c t u r e o f Materials a n dProducts for Ships ( 2 0 1 5 ) taking into account t h e amendments developed immediately before publication o f the Rules. T h e R u l e s a r epublished i nf o u r v o l u m e s containing t h ef o l l o w i n g parts. V o l u m e 1 - Part I "General Regulations for Technical Supervision"; Part I I "Technical Documentation". V o l u m e 2 - P a r t 1П " T e c h n i c a l S u p e r v i s i o n d u r i n g M a n u f a c t u r e o f M a t e r i a l s " . V o l u m e 3 - Part I V "Technical Supervision during Manufacture o f Products". V o l u m e 4 - Part V "Technical Supervision during Construction o f Ships". O n t h e entry into force o fthese R u l e s , t h eR u l e s for Technical S u p e r v i s i o n during C o n s t r u c t i o n o f Ships a n d Manufacture o f Materials and Products for Ships (2015) become void. I n case o f discrepancies b e t w e e n the R u s s i a n and E n g l i s h versions, the R u s s i a n v e r s i o n shall prevail. ISBN 978-5-89331-331-4 © Р о с с и й с к и й м о р с к о й р е г и с т р судоходства, 2 0 1 6 As compared amendments. to the previous edition (2015), the present edition of the Rules P A R T I . G E N E R A L R E G U L A T I O N S F O RT E C H N I C A L (2016) contains the following SUPERVISION 1. S e c t i o n 1 :para 1.1.1 h a s b e e n s u p p l e m e n t e d w i t h a n e w d e f i n i t i o n " M a n u f a c t u r e r " ; Chapter 1.2h a s b e e n s u p p l e m e n t e d w i t h a n e w a b b r e v i a t i o n " S E C C " . 2. Section 2 : i npara 2 . 1 0 t h er e q u i r e m e n t h a s been specified ( i n R u s s i a n v e r s i o n only). 3. Section 3 h a sbeen supplemented w i t h n e w paras 3.6.7 - 3.6.10 containing requirements for expiry o f validity o f R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ), R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ), R e c o g n i t i o n C e r t i f i c a t e (СП) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП); para 3.8hasbeen amended. 4. S e c t i o n 5 : p a r a 5 . 2 h a s b e e n s u p p l e m e n t e d w i t h a n e w r e q u i r e m e n t . 5. S e c t i o n 7 : p a r a 7 . 1 . 2 h a s b e e n a m e n d e d ; Chapter 7.1 hasbeen supplemented w i t h paras 7.1.3.6 - 7.1.3.10 containing requirements for the f i r m t o submit the necessary documents; Chapter 7.2 has been supplemented w i t h paras 7.2.9, 7.2.9.1, containing requirements for the f i r m to submit to the Register the information o nalterations t ot h ecertified service operation system. 6. S e c t i o n 8 h a s b e e n c o m p l e t e l y a m e n d e d c o n s i d e r i n g L A C S U R Z 1 7 . 7. S e c t i o n 9 h a s b e e n s u p p l e m e n t e d w i t h p a r a s 9 . 3 . 1 1 , 9 . 3 . 1 1 . 1 - 9 . 3 . 1 1 . 5 c o n s i d e r i n g L M O r e s o l u t i o n M S C . 2 1 5 ( 8 2 ) , I A C S U I SC223 and L M O resolution MSC.288(87). 8. S e c t i o n 1 1 : p a r a 1 1 . 1 . 2 h a s b e e n a m e n d e d ; i n Table 11.1.1 t h ecode 2 2 0 2 1 0 0 0 M K h a s been deleted d u et otransfer o f this k i n d o factivity t o Section 8; para 11.3.2 h a sbeen deleted, paras 11.3.2 - 11.3.5 have been renumbered 11.3.1 - 11.3.4 accordingly; i n para 11.3.5.2.1 t h elast sentence h a s b e e n deleted. 9. A p p e n d i x 1 : t h e N o m e n c l a t u r e o f I t e m s o f t h e R e g i s t e r T e c h n i c a l S u p e r v i s i o n h a s b e e n a m e n d e d . 10. A p p e n d i x 3 : S e c t i o n 9 " P r o o f o f t h e C o n s i s t e n c y o f S u r v e y s " a n d t h e T a b l e " S u r v e y R e q u i r e m e n t s " h a v e b e e n amended considering L A C S U R Z 2 3 (Rev.5 Feb 2015). 11. E d i t o r i a l a m e n d m e n t s h a v e b e e n m a d e . P A R T П. T E C H N I C A L D O C U M E N T A T I O N 1. S e c t i o n 4 : para 4 . 5 h a s b e e n a m e n d e d regarding t h e Register r e v i e w o ft h e d o c u m e n t a t i o n s u b m i t t e d f o r approval. 2 . S e c t i o n 5 : i n p a r a 5 . 1 t h e t e x t "С, СТО* o r C 3 " h a s b e e n a m e n d e d t o r e a d : "С, СТО*, С* o r C 3 " ; has been supplemented w i t h para 5.10 specifying duration o f r e v i e w o f the technical documentation o n products; has been supplemented w i t h para 5.11 containing t h ereference f o r Part L V "Technical Supervision during Manufacture o f Products" o f the Rules considering L A C S U R M 4 4 (Rev. 8 M a r 2015) regarding submission for review and approval o f the I C E technical documentation. 3. Section 6 : i npara 6 . 4t h ereference t o 5.5 - 5 . 9 h a s been replaced w i t h t h ereference t o 5.5 - 5.10. 4. S e c t i o n 8 : p a r a 8 . 4 h a s b e e n s p e c i f i e d r e g a r d i n g s t a m p i n g o f t h e e l e c t r o n i c d o c u m e n t s . 5. S e c t i o n 1 1 : p a r a 1 1 . 1 h a s b e e n s u p p l e m e n t e d w i t h t h e r e q u i r e m e n t t o t h e s c o p e o f f i n a l d o c u m e n t a t i o n f o r o i l t a n k e r s a n d b u l k c a r r i e r s s u b j e c t t o S O L A S C h a p t e r LT-1 P a r t A - l R e g u l a t i o n 3 - 1 0 . 6. A p p e n d i x : p a r a s 1 1 . 1 , 1 1 . 2 a n d 1 1 . 3 h a v e b e e n s p e c i f i e d ; i n para 13.1.7 t h eexisting reference h a s been replaced w i t h t h ereference t o t h ecurrent L M O resolutions. 7. E d i t o r i a l a m e n d m e n t s h a v e b e e n m a d e . CONTENTS 15 PART I.G E N E R A L REGULATIONS F O R TECHNICAL SUPERVISION 1 1.1 1.2 2 3 T e r m s , definitions, abbreviations 5 Definitions and explanations 5 Abbreviations 7 General 8 Services rendered in technical supervision during manufacture of materials and products. Documents issued 10 4 Requests, contracts a n d agreements on technical supervision Technical supervision during manufacture of materials a n d products Approval of type materials, products, production processes a n d software . . . . 5 6 A p p e n of A p p e n of A p p e n A p p e n A p p e n 54 d i x 1 . Nomenclature o f items the Register technical supervision 55 d i x 2 . Instructions o n branding o f items the Register technical supervision 84 d i x 3 . H u l l survey for n e w construction . 9 2 d i x 4 . F o r m Shipyard Review Record. 106 d i x 5 . Requirements for o i l tankers and b u l k carriers subject to S O L A S Chapter I I - l Part A - l Regulation 3-10 120 12 14 P A R T П. T E C H N I C A L D O C U M E N T A T I O N 15 1 Application 16 16 16 18 18 19 21 36 36 36 37 42 42 42 43 43 43 44 2 3 4 5 6 7 8 Definitions a n d explanations 126 General 126 Technical documentation on ships . . . . 128 Technical documentation on products . . 129 Technical documentation on materials . . 130 Normative documents 130 Preparation o f results o f technical documentation review 131 Duration o f validity o f technical documentation approval (agreement) 134 7 7.1 7.2 8 8.1 8.2 8.3 9 9.1 9.2 9.3 10 10.1 10.2 11 11.1 11.2 11.3 12 General requirements for firms General Requirements Recognition of service suppliers General Requirements Special requirements Recognition of testing laboratories . . . . General Requirements Special requirements Recognition of manufacturers General Requirements Audits of firms General Requirements Special requirements Technical supervision at the firm (manufacturer) 13 Technical supervision at the shipyard during construction of ships 47 Technical supervision on behalf of the Register 53 14 Technical supervision on behalf of another classification society 46 9 10 11 12 126 Introduction of a m e n d m e n t s into approved (agreed) technical documentation . . . . 135 Final documentation o n a ship to be submitted to the Register 135 Programmes for computer-aided calculations 136 12.1 Definitions 12.2 T y p e approval o f p r o g r a m m e s 12.3 A p p r o v a l o f computer software used for solving problems o n evaluation o f trim, stability and strength (for a particular ship). A p p e n d i x . List o f final documentation o n a ship to be submitted to the Register . 136 136 139 141 PART I.GENERAL REGULATIONS FOR TECHNICAL SUPERVISION 1 TERMS, DEFINITIONS, ABBREVIATIONS Definitions and explanations relating to general terminology o f the Rules for Technical Supervision during Construction o f Ships and Manufacture o f M a t e r i a l s a n d Products f o r S h i p s are g i v e n i n Part I "Classification" o f the Rules for the Classification and Construction o f Sea-Going Ships. F o r the purpose o f these R u l e s the f o l l o w i n g t e r m s a n d definitions are applied. 1 1.1 D E F I N I T I O N S A N D E X P L A N A T I O N S 1.1.1 Definitions. A d m i n i s t r a t i o n is the A d m i n i s t r a t i o n i n accordance w i t h the definitions i n international conventions. R S H e a d O f f i c e is the m a n a g e m e n t o f the Register and departments o f the H e a d Office. P r o t o t y p e s h i p is a single-built ship o r the first ship o f the series, w h i c h is b u i l t u n d e r the R e g i s t e r technical supervision. I n case o f ships b u i l t u n d e r the s a m e design at different shipyards, the first ship b u i l t at e a c h s h i p y a r d is considered to be the prototype ship. P r o t o t y p e ( f i r s t l o t ) is a m a t e r i a l o r p r o d u c t (lot) used b y the Register to check and c o n f i r m b y means o f tests a n d surveys that it c o m p l i e s w i t h the R S requirements and m a y be used for the intended purpose i f produced at the f i r m (manufacturer) concerned. K e e l l a y i n g date or the date o n w h i c h t h e s h i p w a s at a s i m i l a r s t a g e o f c o n s t r u c t i o n — for the purposes o f application o f the R S R u l e s as w e l l as I M O C o n v e n t i o n s a n d C o d e s ( q u a l i t y standards, technical standards, resolutions and circular letters) is the date (day, m o n t h , year) o n w h i c h the installation at the b u i l d i n g b e r t h o f a base section o r block (island) i n section or block (island) construction respectively, o r s u c h a stage o f c o n s t r u c t i o n at w h i c h construction identifiable w i t h a specific ship begins and a s s e m b l y o f that ship has c o m m e n c e d c o m p r i s i n g at least 5 0 t or 1 per cent o f the estimated mass o f all structural m a t e r i a l s , w h i c h e v e r is less. F o r fibre-reinforced plastic ( F R P ) ships the k e e l l a y i n g date s h a l l b e interpreted as t h e d a t e t h a t t h e first s t r u c t u r a l reinforcement o f the complete thickness o f the approved h u l l l a m i n a t e schedule is l a i d either i n o r o n t h e m o u l d . D a t e o f d e l i v e r y o f the ship is t h e c o m p l e t i o n date (day, m o n t h and year) o f the survey 1 Hereinafter referred a s "the R u l e s " . o n w h i c h the certificate is based (i.e. the initial s u r v e y before the ship is p u t i n t o service a n d certificate issued for the first time), p r o v i d e d S O L A S and M A R P O L m a n d a t o r y r e q u i r e m e n t s are a p p l i e d t o n e w s h i p s , a n d as entered o n the relevant statutory certificates. D a t e o f b u i l d o f t h e s h i p is the date, m o n t h a n d y e a r at w h i c h the n e w c o n s t r u c t i o n s u r v e y process o f the Register is actually completed, and the Classification Certificate is issued t o the ship. W h e r e there is substantial delay b e t w e e n c o m p l e t i o n o f construction survey process and the ship c o m m e n c i n g active service, the date o f c o m m i s s i o n i n g m a y be also specified. D a t e o f b u i l d o f the ship f o r the p u r p o s e o f a p p l i c a t i o n o f the r e q u i r e m e n t s o f i n t e r n a t i o n a l c o n v e n t i o n s is the day, m o n t h a n d year i n accordance w i t h the definitions i n international conventions. C o n t r a c t o n t e c h n i c a l s u p e r v i s i o n is an agreement i n the written f o r m defining rights and responsibilities o f the Register and organization (firm) during technical supervision o f the items o f supervision. A d d i t i o n a l r e q u i r e m e n t s are the requirem e n t s caused b y the i t e m features o r its operational conditions, w h i c h are n o t p r o v i d e d f o r b y the rules imposed b y R S i n writing to ensure the safety o f items o f technical supervision. U n d e r safety i n this particular case is m e a n t safe n a v i g a t i o n o f ships, fixed offshore platforms, safely o f life at sea, safe carriage o f g o o d s , environmental protection. M a n u f a c t u r e r is a n organization ( f i r m ) responsible for the material or product compliance w i t h the applicable R S requirements. S u r v e y o r i s a n R S official authorized to perform certain types o f the R S technical supervision. T e s t is a technical o p e r a t i o n o n d e t e r m i n a t i o n o f one o r m o r e characteristics o r operating parameters o f a n i t e m o f supervision i n compliance w i t h the established or defined procedure. C o m p e t e n t o r g a n i z a t i o n is a n o r g a n i z a t i o n r e c o g n i z e d as h a v i n g a d e q u a t e k n o w l e d g e a n d e x p e r i ence i n the particular area. C o m p e t e n t p e r s o n i s a p e r s o n c o n s i d e r e d as adequately qualified to do a j o b i n the particular area, using appropriate k n o w l e d g e and experience. N o r m a t i v e d o c u m e n t s are standards, regulations, technical requirements, norms, calculation procedures, instructions, guidelines and other documents, w h i c h provide design, technical or production require- 6 Rules for Technical Supervision during Construction of Ships and Manufacture merits f o rdesign, construction (manufacture), installation, testing and service o f the items o f the R S technical supervision. I t e m s o ft e c h n i c a l s u p e r v i s i o n ( i t e m s o f s u p e r v i s i o n ) are ships a n d other floating facilities, fixed offshore platforms, products, materials, w o r k s , services a n dprocesses w i t h i n t h e R S terms o f reference i ncompliance w i t h the current legislation and the Charter. A p p r o v a l o f a m a t e r i a l , p r o d u c t o r p r o c e s s is confirmation b y branding and/or t h e R S document o f a material, product o r process c o m pliance w i t h the R Srequirements based o nthe positive results o f their survey. A p p r o v a l ( a g r e e m e n t ) o f t e c h n i c a l d o c u m e n t a t i o n is confirmation b y t h eR S stamp and/or document o f compliance o f technical documentation with t h e R S requirements based o n t h e positive results o f its r e v i e w . T y p e a p p r o v a l o f a m a t e r i a l , p r o d u c t o r p r o c e s s is a n approval o f a material, product, process considered b y R S as a representative o f t h e particular production w i t h o u t attribution t othe particular item o f technical supervision. P i l o t s p e c i m e n ( p i l o t l o t ) isa material o r a product (lot) produced i n accordance w i t h n e w l y developed technical documentation t o determine a possibility o f its u s e f o r t h e intended purpose i n compliance w i t h the R Srequirements, based o n review o f technical documentation and checking i n the course o f tests o r research o f structural s o l u t i o n s as w e l l as combination o f properties and parameters. O r g a n i z a t i o n ( f i r m ) is a legal entity o f any legal f o r m , f o r m o f ownership and affiliation, as w e l l as a physical person i n v o l v e d i n business n o t being a legal person i n v o l v e d i n activity related t othe items o f supervision. S u r v e y including: i sa n integral part o f technical supervision, checking availability o f approved technical mentation o nthe items o f technical supervision; docu- checking availability o fthe R S documents, recognized a n d competent organizations o r persons o n t h e items o f technical supervision; examinations, including ( w h e r e necessary) and dismantling; opening-up p a r t i c i p a t i o n i n m e a s u r e m e n t s a n d tests; assessment o f the m e a s u r e m e n t and test results; drawing-up, endorsement, renewal and extension o f the R S documents; branding and sealing (where necessary) o f the i t e m o f technical supervision. C o n v e r s i o n o f a ship o f s u b s t a n t i a l n a t u r e ( m a j o r c o n v e r s i o n ) is conversion resulting i n substantial changes o f t h e ship principal characteristics o r structural parameters (such as w e i g h t characteristics, gross tonnage, o v e r a l l dimensions, free- of Materials and Products for Ships board; p o w e r output o f the m a i n propulsion installation, ice strengthening, etc.), w h i c h c a ncause change o f the ship type, principal dimensions, passenger capacity, cargo carrying capacity, extension o f the ship service life o rc h a n g e i n the class n o t a t i o n . N a t u r e o f c o n v e r s i o n (major/minor), unless expressly provided otherwise b y international conventions, shall b e determined b yt h e R S H e a d O f f i c e i ne a c h particular case. R S B r a n c h O f f i c e is a branch office, a district office o fthe branch office, a representative office, a n affiliated company. Regulations for the R S B r a n c h Office d e t e r m i n e its legal status, tasks a n d functions w i t h i n the certain processes, duties, rights and responsibility o f the Director as w e l l as t h e area o fthe R S B r a n c h Office activity. R S r u l e s are a code o f normative technical requirements for items o f technical supervision. R e c o g n i t i o n o f a m a n u f a c t u r e r is confirmation b y t h e R S document o f capability o f a manufacturer t o manufacture materials and products i n compliance w i t h the R S requirements. R e c o g n i t i o n o f a t e s t i n g l a b o r a t o r y is confirmation b y t h eR S d o c u m e n t o ftechnical c o m p e tence o f a testing l a b o r a t o r y i n c o n d u c t i n g tests i n compliance w i t h the R S requirements. R e c o g n i t i o n o f a n o r g a n i z a t i o n ( f i r m ) i s ronfirmation b y t h e R S d o c u m e n t o f c a p a b i l i t y o f a n organization (firm) t o render services (carry o u t w o r k ) in compliance w i t h the R S requirements. P l a n a p p r o v a l d o c u m e n t a t i o n ( t e c h n i c a l d e t a i l e d d e s i g n ) is a set o f design documents that give full understanding o f the ship design i n the scope sufficient f o r d e t e r m i n a t i o n o f its c o n f o r m i t y w i t h the requirements o f the Register and ( i fapplicable) o f international conventions, p r o v i s i o n o f technical superv i s i o n d u r i n g its c o n s t r u c t i o n a n d class assignment. D e t a i l e d ( d e s i g n ) d o c u m e n t a t i o n is a set o f d e s i g n d o c u m e n t s i n t e n d e d f o r c o n s t r u c t i o n (manufacture), checking, acceptance, delivery, service and repair o f the item o f supervision. S i n g l e a p p r o v a l o f a m a t e r i a l , p r o d u c t , p r o c e s s is approval o f a material, product, process t o b e used o r installed o n a particular item o f supervision under construction o r i n service. R e v i e w o ft e c h n i c a l d o c u m e n t a t i o n is determination o f an extent o f documentation compliance w i t h the R S requirements. R e c o m m e n d a t i o n s o f t h e I n t e r n a t i o n a l M a r i t i m e O r g a n i z a t i o n ( I M O ) are provisions o f resolutions, codes a n d other normative documents adopted b y t h e governments, w h i c h have authorized t h e Register t o supervise t h e fulfillment o f those provisions. C e r t i f i c a t e o f c o n f o r m i t y ( C e r t i f i c a t e ) is a R S document certifying t h ecompliance o f an item o f supervision w i t h the R S requirements. Part I . General Regulations for Technical A g r e e m e n t o n S u r v e y is a n agreement i na written f o r m establishing interrelations between t h e Register a n d a firm (manufacturer), based o n w h i c h technical personnel o f t h e firm (manufacturer) is entrusted w i t h p e r f o r m a n c e o f c h e c k tests o rpart t h e r e o f and filling-in o f certificates o f c o n f o r m i t y , w h i c h a r e submitted t o t h e Register f o r drawing-up (affirmation) together w i t h the test reports. Special c o n s i d e r a t i o n is determination o f an extent o fc o n f o r m i t y o fa n i t e m o ftechnical super­ vision w i t h the additional requirements. T e c h n i c a l d o c u m e n t a t i o n is construction and production documentation as w e l l as t h e normative documents o n items o f technical supervision, w h i c h contain the data necessary for checking the fulfillment o f the R S requirements. T e c h n i c a l s u p e r v i s i o n is checking o f con­ formity o f items o f supervision w i t h the R S requirements during: review a n d approval (agreement) o f technical documentation; survey o f items o f supervision at manufacture, construction, service stages, i n c l u d i n g conversion, m o ­ d e r n i z a t i o n a n d repair. T e c h n i c a l d e s i g n i s a set o f d e s i g n d o c u m e n t s that give understanding o f the i t e m design and engineer­ ing solutions. R e q u i r e m e n t s o quirements o finternational governments, w h i c h have supervise the fulfillment o f 1 Supervision f c o n v e n t i o n s arer e ­ conventions ratified b y t h e authorized t h e Register t o those requirements. R S r e q u i r e m e n t s a r e requirements o ft h e R S rules, international conventions a n d agreements, recommendations o fthe International M a r i t i m e O r g a n i ­ zation ( I M O ) , governments having granted R S t h e relevant authorization, a n dadditional requirements. T y p e p r o d u c t i o n p r o c e s s is a production p r o c e s s i n t e n d e d f o r s p e c i f i c field a n d c o n d i t i o n s o f application w i t h n oreference t o a particular ship o r i t e m o f supervision. C o n c e p t u a l d e s i g n is a set o fdesign docu­ ments that give general understanding o f the i t e m design, operating principles, principal engineering solutions a n d p r o v i d e data d e t e r m i n i n g the i t e m fitness f o r its purpose. 1.1.2 E x p l a n a t i o n s . M e a s u r e m e n t o f d i s t a n c e s — unless explicitly stipulated otherwise i n t h e text o ft h e regulations i n S O L A S , L o a d L i n e a n d M A R P O L C o n v e n t i o n s a n da n yo ftheir m a n d a t o r y codes a n d t h e R S rules and regulations, distances such as tank length, height, width, ship (or subdivision o r waterline) length, etc. s h a l l b e m e a s u r e d b y u s i n g m o u l d e d d i m e n s i o n s . 1.2 Register, Shipping. ABBREVIATIONS R S — Russian Maritime Register o f R H O — R S Head Office. M A R P O L 73/78 — International Convention f o r Prevention o fPollution f r o m Ships as modified b y t h e Protocol 1978 o frelating thereto, h a v i n g regard t o t h e amendments adopted b y t h e Marine Environmental Protection Committee o f t h e International Maritime Organization (IMO). С — Certificate filled-in and signed b ythe ( F o r m 6.5.30). Register СДС — W e l d e r A p p r o v a l T e s t Certificate ( F o r m 7.1.30). C 3 — Certificate filled-in a n dsigned b y a n official o f a firm (manufacturer) and drawn u p (affirmed) b y the Register ( F o r m 6.5.31). C O — Agreement o nSurvey ( F o r m 430.1.7). C O C M — Certificate o f A p p r o v a l f o r W e l d i n g Consumables ( F o r m 6.5.33). СОТИ — certificates o f t y p e test ( F o r m s 2.4.13 a n d 2.4.19). C O T O — certificates o f type approval (Forms 2.4.11.1,2.4.12, 2.4.13.1,2.4.16.1 and 2.4.17.1). СОТПС — W e l d i n g Procedure A p p r o v a l Test Certificate ( F o r m 7.1.33). СП — R e c o g n i t i o n Certificate ( F o r m 7.1.4.2). СПИ — R e c o g n i t i o n Certificate f o r M a n u f a c t u r e r ( F o r m 7.1.4.1). СПЛ — R e c o g n i t i o n Certificate o fT e s t i n g L a b o r a ­ tory ( F o r m 7.1.4.3). СПП — Certificate o f V o c a t i o n a l T r a i n i n g ( F o r m 7.1.34). ССП — Certificate o f F i r m Conformity ( F o r m 7.1.27). СТО — T y p e A p p r o v a l C e r t i f i c a t e ( F o r m 6.8.3). СТПК — T y p e A p p r o v a l Certificate f o r F i r e - P r o o f D i v i s i o n ( F o r m 6.8.4). СТОП — T y p e A p p r o v a l Certificate f o r P r o g r a m ( F o r m 6.8.5). Computer E I A P P Certificate — Engine International A i r Pollution Prevention Certificate ( F o r m 2.4.40). Report 6.3.18 — Report o n Survey o f Prototype/ Serial/Pilot Specimen o f Product/Material/Type Structure ( F o r m 6.3.18). Report 6.3.19 — Report o n Survey o f F i r m ( F o r m 6.3.19). R S N o m e n c l a t u r e — N o m e n c l a t u r e o fItems o f the Register Technical Supervision. SECC - S O ( F o r m 2.4.42). x Emission Compliance Certificate 8 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 2 GENERAL 2.1 T h e R S activity o ntechnical supervision during manufacture o f materials and products, technical super­ v i s i o n o f services, processes a n dconstruction, conver­ sion, m o d e r n i z a t i o n and repair o f ships is based o n the Regulations f o r Classification o f Ships a n d Offshore Fixed Platforms. 2.2 A l l technical supervision services a r e rendered b y the Register based o n requests and agreements w i t h organizations, firms and individuals involved i n design, manufacture o f materials a n d products, production processes, construction, conversion, modernization a n d repair o f ships, a n d rendering o f services (refer t o Section 4). 2.3 Items o f t h e R S technical supervision a n d technical requirements thereto are defined i nthe Rules and a r e listed i n t h e R S Nomenclature (refer t o A p p e n d i x 1). 2.4 Items not regulated b y t h eR S rules o fa n o n conventional design o r intended f o rspecial operating conditions, as w e l l as materials and production processes w h e r e special requirements are placed thereupon are specified b y t h e Register as items o ftechnical super­ v i s i o n i n each particular case, a n d technical r e q u i r e m e n t s for such items a r especified as additional requirements. Later, based o n the results o f technical supervision during manufacture and i n service, the items o f technical supervision m a y b e introduced i n the relevant parts o f the R S rules and the R S Nomenclature. 2.5 N e w type materials, products a n d production processes, w h i c h are presented t o R S f o r the first t i m e and w h i c h are t h e items o f technical supervision shall b e approved b y R S for application for the intended purpose. 2.6 T y p e production processes a r e subject R S r e v i e w i n the f o l l o w i n g cases: t ot h e .1 where the requirements for the particular produc­ t i o n process are p r o v i d e d b y the R S rules; .2 w h e r e t h e tests r e q u i r e d b y t h e R S rules a r e provided for i n the type production process. 2.7 A possibility o f deviations f r o m the R S require­ ments, where application o f methods a n d scope o f supervision prescribed b y R S is impracticable o r unreasonable, is decided b y R H O u p o n presentation b y the R S Branch Offices. 2.8 Items subject t o t h e Register technical super­ vision i n accordance w i t h the R S Nomenclature m a y b e used f o r their intended purpose o n l y i ncase documents o f the Register o r other classification societies issued o n its b e h a l f are available. 2.9 W h e r e defects a r e f o u n d o r doubts arise i n a possibility o f using items o f technical supervision for the intended purpose, necessary check surveys shall b e conducted. I f the results o f check surveys are unsatisfac­ tory, the items o f technical supervision are n o t a l l o w e d t o be used whether o r n o t t h e documents required are available. 2.10 Construction o f ships classed w i t h the Register and manufacture o f materials and products for the ships classed w i t h the Register shall b e i n c o n f o r m i t y w i t h the technical documentation approved b y the Register. 2.11 W h e r e conformity o f a material, product, ship w i t h t h erequirements o fconventions a n d I M O r e c o m ­ mendations is required, the technical documentation shall be prepared w i t h d u eregard t o such requirements a n d recommendations a n d submitted t o t h e Register f o r approval. After carrying o u t necessary surveys i n compliance w i t h these requirements a n d recommenda­ tions t h e Register issues documents prescribed b y t h e international conventions o r the Register certificates o f the established f o r m w i t h indication o fthe c o n f o r m i t y w i t h those requirements and recommendations. 2.12 T h e procedure o f review a n d approval b y t h e Register o f technical documentation o n items o f technical supervision, scope o f surveys i n the course o f t e c h n i c a l s u p e r v i s i o n a t t h e firm ( m a n u f a c t u r e r ) a n d production operations t o b e controlled as w e l l as documents to b e issued during supervision, and branding procedure are governed b y the relevant sections and parts o f these Rules. 2.13 Technical documentation o n construction o f ships a n d manufacture o f materials a n d products is reviewed a n d approved i n compliance with Part П "Technical Documentation". 2.14 T h e scope o f the Register technical supervision in t h e course o f construction o f a particular ship a n d manufacture o f a particular product i sstated i n the L i s t o f Items o f Technical Supervision (refer t o Sections 12 a n d 13), w h i c h i s elaborated as a w o r k i n g document o f technical s u p e r v i s i o n a t t h e p a r t i c u l a r firm ( m a n u f a c t u r e r ) . 2.15 Based o n the agreement o n m u t u a l substitution, the Register m a y authorize another classification society or competent body t o perform technical supervision (totally o r partially) o f t h e construction o f t h e ship classed w i t h t h eRegister a n d manufacture o f products for the ships classed w i t h the Register o r b e authorized b y another classification society t o carry out technical supervision during construction o f the ship o r manufac­ ture o f materials and products. I n s u c h cases, the scope a n d procedure o f technical supervision a n d documents t o b e issued shall b e specified i n the appropriate agreements or authorizations. 2.16 A possibility o f recognition o fdocuments for materials a n d products manufactured under technical supervision o f another classification society without the Register authorization is decided b ythe Register i n each Part I . General Regulations for Technical Supervision particular case d u r i n g s u r v e y o f these materials a n d products t o a n extent sufficient t o confirm their compliance w i t h t h e R S requirements, conventions, I M O recommendations, standards a n d normative documents. 2.17 W h e n c a r r y i n g o u t t e c h n i c a l s u p e r v i s i o n , t h e Register reserves the right to check the compliance o f the design, t e c h n o l o g y a n d p r o d u c t i o n standards, w h i c h a r e not required b u t affect the fulfillment o f the R S rules. 2.18 S t a n d a r d s u s e d i n e l a b o r a t i o n o f t e c h n i c a l documentation, i n construction o fships a n d manufacture o f materials a n d products referred t o t h e items o f t h e R S technical supervision, o f production processes, calculat i o n a n d design standards, testing, c h e c k i n g a n d q u a l i t y control procedures shall b e agreed u p o n w i t h the Register. T h e Register checks t h e compliance w i t h t h e standards agreed u p o n therewith o n l y as regards t h e technical requirements, w h i c h are w i t h i n its terms o f reference. 2.19 T e c h n i c a l s u p e r v i s i o n d u r i n g m a n u f a c t u r e o f materials and products is performed i n relation o f those properties only, w h i c h are regulated b y the R S rules, as w e l l as parameters a n d characteristics indicated i n t h e approved technical documentation. D u r i n g technical supervision t h e Register does n o t determine a grade and category o f product quality o r check the fulfillment o f safety engineering, sanitary a n d labor organization requirements, o r other p r o d u c t i o n aspects, w h i c h a r e b e y o n d the Register terms o f reference. 2.20 I n i t s a c t i v i t y t h e R e g i s t e r d o e s n o t s u b s t i t u t e the prescribed a c t i v i t y o f the state s u p e r v i s i o n authorities or officials o f shipowner, shipyard o r firm. 2.21 T h e R e g i s t e r m a y i m p o s e i n t h e c o u r s e o f technical supervision the necessary requirements for the items a n dproduction processes n o tsupervised b y t h e 9 Register i f it appears that application thereof has resulted or is likely t o result i n violation o f the R S rules. 2.22 T h e R e g i s t e r c a r r i e s o u t t e c h n i c a l s u p e r v i s i o n during construction o f ships at t h e shipyard a n d manufacture o f materials a n d products at t h e f i r m (manufacturer) b y means o f surveys. T h u s a l l t h e questions shall b e settled w i t h i n t h e frames regulated b y the R S requirements. 2.23 T h e R e g i s t e r c a n e n t r u s t t e c h n i c a l p e r s o n n e l a t the f i r m ( m a n u f a c t u r e r ) w i t h t h e check tests o r part thereof aiming t o check the compliance o f materials o r products w i t h the R S requirements (refer t o Section 4). 2.24 I n c a s e o f t h e d i f f e r e n c e s a s s o c i a t e d with requirements and decisions o f the S u r v e y o r carrying out t e c h n i c a l s u p e r v i s i o n , a d e s i g n e r , s h i p o w n e r o r firm m a y apply directly t o t h eR S Branch Office t o resolve t h e p r o b l e m . I ncase o f the differences w i t h the R S B r a n c h Office, a nappeal containing justifications together w i t h a copy o f the R S B r a n c h Office decision m a y b e sent t o RHO. 2.25 T h e R e g i s t e r p e r f o r m s i t s s u p e r v i s i o n a c t i v i t i e s on condition that manufacturers a n d individuals meet their c o m m i t m e n t s o nmanufacturing adequate products. I n case o f a n y deficiencies o f t h e i t e m o f technical supervision, unsteady production process, l o w technological discipline a n d inadequate efficiency o f quality s y s t e m a t t h e firm, t h e R e g i s t e r d o e s n o t a d m i t a n y claims for delays i n production, caused b ya n increase i n the scope o f surveys o f the products because o f the above reasons. 2.26 F o r t h e s e r v i c e s r e n d e r e d t h e R e g i s t e r c h a r g e s fees i na c c o r d a n c e w i t h t h e p r o c e d u r e established i n t h e General Conditions for Rendering Services b y Russian Maritime Register o f Shipping. 10 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 3 SERVICES RENDERED IN TECHNICAL SUPERVISION DURING MANUFACTURE OF MATERIALS AND PRODUCTS. DOCUMENTS ISSUED 3.1 W h e n c a r r y i n g o u t t e c h n i c a l s u p e r v i s i o n d u r i n g manufacture o f materials a n d products, construction, conversion, m o d e r n i z a t i o n a n d repair o f ships, t h e Register carries out: type approval o f materials o rproducts w i t h issue o f t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО); recognition o f t h e manufacturer w i t h issue o f t h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ); r e c o g n i t i o n o f t h e testing l a b o r a t o r y c o n d u c t i n g tests a n d measurements i naccordance w i t h Table 9.1.1 w i t h issue o f t h e R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ); recognition o f service suppliers performing t h e activity i n accordance w i t h Table 8.1.1 w i t h issue o f t h e R e c o g n i t i o n C e r t i f i c a t e (СП); audit o f t h e firms performing t h e activity i n accordance w i t h Table 11.1.1 w i t h issue o f the Certificate o f F i r m C o n f o r m i t y (ССП). 3.2 T h e R e g i s t e r k e e p s r e c o r d s o f t h e a b o v e s e r v i c e s and c a ngive relevant information thereon. 3.3 B a s e d o n t h e r e s u l t s o f t e c h n i c a l s u p e r v i s i o n , t h e Register issues t h e f o l l o w i n g d o c u m e n t s o f t h e estab­ lished f o r m that certify t h e conformity o f t h e i t e m o f technical supervision w i t h t h eR S requirements, as w e l l as i t s m a n u f a c t u r e ( c o n s t r u c t i o n ) u n d e r t h e R e g i s t e r technical supervision: t h e c e r t i f i c a t e s (С, C 3 ) a r e d o c u m e n t s c e r t i f y i n g t h e conformity o f the particular materials, products o r groups o f products w i t h t h e requirements o f the R S rules a n d normative documents; t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s a d o c u m e n t certifying t h ec o n f o r m i t y o f types o f materials, products or groups o f products, type production processes w i t h the requirements o f the R S rules (refer t o Section 6); t h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ) is a d o c u m e n t c e r t i f y i n g t h er e c o g n i t i o n b y t h e R e g i s t e r o f the f i r m as manufacturer o f materials and products for ships subject t o t h eRegister technical supervision (refer to Section 10); the Recognition Certificate o f Testing Laboratory (СПЛ) i s a d o c u m e n t c e r t i f y i n g t h e c o m p e t e n c e o f t h e laboratory i n carrying o u t certain types o f tests o f t h e materials and products (refer t o Section 9); t h e R e c o g n i t i o n C e r t i f i c a t e (СП) i s a d o c u m e n t certifying t h erecognition o f the service supplier render­ ing services (carrying out w o r k s ) i ncompliance w i t h the R S requirements (refer t o Section 8); t h e C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) i s a d o c u m e n t c e r t i f y i n g t h e c o n f o r m i t y o f t h e firm w i t h t h e R S requirements i n rendering services (carrying o u t w o r k s ) indicated i nthe request (refer t o Section 11). 3.4 V a l i d i t y p e r i o d o f t h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ), R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ), R e c o g n i t i o n C e r t i f i c a t e (СП) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) s h a l l n o t e x c e e d five y e a r s . C e r t i f i c a t e s a r e s u b j e c t t o e n d o r s e m e n t n o t less t h a n o n c e a year. I n w e l l - g r o u n d e d cases, unless otherwise specified, certificates m a y b e endorsed n o t less than once every 2 , 5 years. E n d o r s e m e n t shall b e done w i t h i n t h eperiod l i m i t e d b y thirty ( 3 0 ) days before a n d thirty ( 3 0 ) days after t h e date o f t h e subsequent endorsement o f t h e certificates. U p o n e x p i r y o f t h e v a l i d i t y p e r i o d the certificates a r er e n e w e d o n request o f the firm. R S reserves the right t o carry out occasional surveys o f a firm h a v i n g a v a l i d R S c e r t i f i c a t e i n c a s e s t h a t : .1 a n i t e m o ftechnical s u p e r v i s i o n h a s b e e n f o u n d n o n - c o m p l y i n g w i t h t h e R S requirements, i n particular, based o n information f r o m a third party; .2 t h e firm h a s n o t n o t i f i e d R S o f c h a n g e s t o a n i t e m o f technical supervision stated o n t h e certificate. 3.5 V a l i d i t y o f t h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ), R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ), R e c o g n i t i o n C e r t i f i c a t e (СП) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) m a y b e s u s p e n d e d for a period agreed u p o n w i t h the f i r m but not m o r e than ninety (90) days f r o m the specified date o f endorsement, provided: .1 m i n o r n o n - c o n f o r m i t i e s o f the f i r m a c t i v i t y t o t h e R S requirements have been found; .2 r e c o r d s h a v e n o t b e e n p r o p e r l y d r a w n u p ; .3 t h e firm h a s n o t a p p l i e d w i t h t h e r e q u e s t t o endorse t h ecertificate w i t h i n t h eestablished period; .4 t h e firm h a s n o t i n f o r m e d t h e R e g i s t e r o f t h e changes i nthe activity specified i nthe certificate. 3.6 T h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ), R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ), R e c o g n i t i o n C e r t i f i c a t e (СП) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) b e c o m e i n v a l i d : .1 u p o n e x p i r y o f the certificate p e r i o d o f validity; .2 i n c a s e c a u s e s o f t h e c e r t i f i c a t e s u s p e n s i o n h a v e not been eliminated w i t h i n the agreed period; .3 m a j o r n o n - c o n f o r m i t i e s o f t h e f i r m a c t i v i t y t o t h e R S requirements have been found; .4 i n c a s e t h e c e r t i f i c a t e w i t h i n t h especified period; .5 vision .6 .7 results has n o t been endorsed i f the contract o r agreement o n technical super­ h a s b e c o m e i n v a l i d i n cases p r o v i d e d f o r i n 4.6; i n c a s e o f t h e firm b a n k r u p t c y o r l i q u i d a t i o n ; w h e r e the service was improperly provided o r the were improperly reported; Part I . General Regulations for Technical Supervision . 8 w h e r e t h e firm f a i l e d t o i n f o r m t h e R e g i s t e r i n w r i t i n g o f a n y alterations t o its q u ality s y s t e m related t o the R S area o f recognition; .9 w h e r e a n yo m i s s i o n s o r acts n o t agreed w i t h t h e Register a r e ascertained; . 1 0 w h e r e t h e firm s u b m i t s i n f o r m a t i o n k n o w n t o b e false. 3 . 7 R S i n f o r m s t h e firm i n t h e w r i t t e n f o r m o f suspension a n dloss o f validity o f the certificate. 3.8 Compliance o fthe equipment w i t h t h e require­ ments o f Section 17, Part V "Technical Supervision during Construction o f Ships" o f t h e present Rules is certified b y t h eCertificates o fT y p e A p p r o v a l ( C O T O ) , o r C e r t i f i c a t e s o f T y p e T e s t s (СОТИ) a n d S O E m i s s i o n Compliance Certificate ( S E C C ) . Validity period o f СОТО, СОТИ и S E C C i s n o t specified. x 3.9 Compliance o f t h e marine engine w i t h t h e requirements o f A n n e x V I t o M A R P O L 73/78 is confirmed b y t h e E I A P P Certificate. T h e E I A P P Certificate is issued to: .1 the basic engine o f the engine family o r group; .2 the m e m b e r engine o f the engine f a m i l y o r group (refer t o 5.2). 3.10 Compliance o f welding consumables a n d welding procedures w i t h t h erequirements o fthe Rules for t h e Classification a n d Construction o f Sea-Going Ships is certified b y t h e Certificate o f A p p r o v a l f o r Welding Consumables ( C O C M ) and Welding Procedure A p p r o v a l T e s t C e r t i f i c a t e (СОТПС). 3.11 I n case o f technical supervision o n b e h a l f o f the Register, certificates a n d other documents o f t h e organization carrying o u t o f technical supervision o n 11 behalf o f the Register i n accordance w i t h Section 1 4 are recognized. 3.12 T h e documents confirming the performance o f t h e s u r v e y s o f m a t e r i a l s a n d p r o d u c t s , firms a n d t e s t i n g laboratories and being the basis for issuance o f the T y p e A p p r o v a l C e r t i f i c a t e (СТО), C e r t i f i c a t e o f A p p r o v a l f o r Welding Consumables ( C O C M ) , Recognition Certificate (СП), R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r ( С П И ) , R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) a r e t h e R e p o r t 6.3.18 a n d t h e R e p o r t 6.3.19 (refer t o 1.2) d r a w n up b y the Register u p o n completion o f surveys. T h e r e p o r t s a r e i s s u e d t o t h e firms i n t h e f o l l o w i n g cases: w h e n u p o n t h e results o f surveys t h e requirements are established, w h i c h shall b e m e t b y the f i r m ; w h e n t h e report is t h e o n l y Register document confirming rendering o f t h e Register technical super­ v i s i o n services. I n other cases, i t i s n o t required t o issue t h e a b o v e reports t o the firms. 3.13 Branding o f items o ftechnical supervision i n cases specified i n t h e R S N o m e n c l a t u r e i s m a d e i n accordance w i t h the Instructions o nB r a n d i n g o f Items o f the Register Technical Supervision (refer to A p p e n d i x 2). 3.14 I n case o f changing a n y detail o f t h e v a l i d certificate issued i n compliance w i t h the provisions o f the R u l e s , e x c e p t f o r t h e c e r t i f i c a t e s (С, C 3 ) , t h e c e r t i f i c a t e b e c o m e s invalid. I n such case, a n e w certificate m a y b e issued based o n the results o f technical supervision, t h e scope o f w h i c h is determined b y t h e Register i n each particular case. 12 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 4 REQUESTS, CONTRACTS AND AGREEMENTS ON TECHNICAL SUPERVISION 4.1 W h e r e s u p e r v i s i o n o f t h e R e g i s t e r i s s p e c i f i e d i n the ordered (contracted) documentation o n design, construction, conversion, modernization a n d repair o f ships, manufacture o f materials a n d products f o r shipbuilding a n d ship repairing, as w e l l as rendering services referred t o i n 3 . 1 , a f i r m shall apply t ot h e Register w i t h a written request t o carry o u t technical supervision a n dt o guarantee payment o fthe Register services, reimbursement o f the Register expenses, as w e l l as w i t h t h e c o n f i r m a t i o n o f f a m i l i a r i z a t i o n a n d a g r e e m e n t w i t h the General Conditions for Rendering Services b y Russian Maritime Register o f Shipping. T h e General Conditions for Rendering Services b yRussian M a r i t i m e Register o f Shipping areconstituent and integral part o f all the contracts concluded b y the Register. 4 . 1 . 1 I f t h e firm i s n o t t h e m a n u f a c t u r e r o f t h e p r o d u c t s , t h e firm s h a l l , i n a d d i t i o n t o t h e p r o v i s i o n s o f 4.1, b e authorized b y the manufacturer (which shall b e documented) t o d o the following: .1 t os u b m i t technical d o c u m e n t a t i o n f o r the product for R S review a n d approval o r t o u s e t h e technical documentation approved b y R S ; .2 t o a r r a n g e f o r s u r v e y o f t h e p r o d u c t w i t h i n t h e necessary scope; .3 t o a r r a n g e f o r t e s t i n g o f t h e p r o d u c t w i t h i n t h e necessary scope o r t o u s e reports o f t h e tests earlier conducted b y the manufacturer; .4 t o s u p p l y t h e p r o d u c t , a n d t o i n s t a l l a n d m o u n t i t i f necessary. 4.1.2 D e v i a t i o n s f r o m t h e p r o v i s i o n s o f 4 . 1 . 1 s h a l l b e r e g u l a t e d w i t h 2.7. 4.2 T h e r e q u e s t s h a l l p r o v i d e t h e i n f o r m a t i o n t o a n extent sufficient f o r r e v i e w a n d execution thereof. I n reviewing t h e request for technical supervision during manufacture o f t h e material o r product, a k i n d o f approval (single o rtype approval) shall b e identified. 4.3 U p o n r e v i e w i n g t h e r e q u e s t d e p e n d i n g o n t h e particular conditions o f the future technical supervision (scope a n d i t e m o f supervision, duration, etc.), t h e Register, being guided b y t h e regulations i n force, decides o n t h e necessity t o conclude a contract o n technical supervision o rcarries o u t technical supervision based o nthe request w i t h o u t concluding the contract. 4.4 T h e c o n t r a c t o n t e c h n i c a l s u p e r v i s i o n o f t h e Register a t t h e manufacturer specifies t h e items o f technical supervision a n d regulates m u t u a l relations, rights and responsibilities o f the parties i n the course o f the Register technical supervision during construction o f ships and manufacture o f materials and products, as w e l l as w h e n r e n d e r i n g s e r v i c e s s p e c i f i e d i n 3 . 1 . T h e contract specifies cost o f technical supervision, procedure a n dterms o fp a y m e n t W h e r e technical super­ v i s i o n is carried o u t based o n the request, w i t h o u t c o n c l u d i n g the contract, services a r e p a i d a n d expenses r e i m b u r s e d according t o the invoices m a d e o u t b y the Register. F o r concluding t h e contract f o r t h e Register technical supervision, u s e is m a d e o f t h e established f o r m s o r t h e c o n t r a c t m a y b e d r a w n u p i n a f r e e f o r m . See circular 911c 4.5 T h e R e g i s t e r m a y e n t r u s t t h e f i r m ( m a n u f a c t u r e r ) technical p e r s o n n e l w i t h p e r f o r m a n c e o f the check tests or part thereof, t ow h i c h effect the A g r e e m e n t o n S u r v e y ( C O ) i s s i g n e d w i t h t h e firm ( m a n u f a c t u r e r ) . F o r signing t h eA g r e e m e n t o n S u r v e y ( C O ) u s e i s m a d e o f t h e established f o r m o r t h e A g r e e m e n t o n S u r v e y ( C O ) m a y b e signed i n a free f o r m . The Agreement o n Survey ( C O ) is made based o n s u r v e y o f t h e firm ( m a n u f a c t u r e r ) c a r r i e d o u t t o t h e extent a n d according t o t h e procedure described i n Section 1 0 and type approval o f the material o r product (refer t o Section 6). R i g h t s a n d r e s p o n s i b i l i t i e s o f t h e firm ( m a n u f a c ­ turer), responsibilities o f t h e Register a n d terms o f payment t o t h e Register f o r technical supervision are stated i n the A g r e e m e n t o n S u r v e y ( C O ) . I n order to provide the adherence t othe R S require­ ments for products, t o draw u p covering documentation and t o fulfill the terms and conditions o f the Agreement o n Survey ( C O ) , a nofficial competent i n production and quality control o f the items o f technical supervision shall b e a p p o i n t e d a t t h e firm ( m a n u f a c t u r e r ) . Based o n the Agreement o n Survey ( C O ) concluded, the items o f technical supervision shall b e delivered w i t h t h e C e r t i f i c a t e ( C 3 ) t o b e filled i n a n d s i g n e d b y t h e f i r m (manufacturer) official a n dd r a w n u p (affirmed) b y t h e Register (refer t o 5 . 2 ) o r w i t h t h e T y p e A p p r o v a l C e r t i f i c a t e ( С Т О ) c o p y a n d t h e firm ( m a n u f a c t u r e r ) document (refer t o 4.1.1) w h i c h shall contain: name, type and serial n u m b e r o f the item; n a m e and address o f the manufacturer; address o f the manufacturing location; n a m e o ftechnical documentation for t h e i t e m a n d date o f its approval b y the Register; name o f t h e document containing data o n item s u r v e y s a n d t e s t s p e r f o r m e d b y t h e firm ( m a n u f a c t u r e r ) ; t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) n u m b e r , d a t e o f issue and period o f validity; firm statement o n item conformity t o t h e approved t y p e s p e c i f i e d i n t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО); s i g n i t u r e o f t h e firm ( m a n u f a c t u r e r ) a u t h o r i z e d p e r s o n . A c o p y o f t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) m a y be replaced b y t h ereference t o t h ei n f o r m a t i o n o n t h e i s s u e d T y p e A p p r o v a l C e r t i f i c a t e (СТО) a v a i l a b l e o n t h e R S official website http://www.rs-class.org. I nthis case this reference shall b e specified i n t h e T y p e A p p r o v a l Part I . General Regulations for Technical Supervision 13 C e r t i f i c a t e (СТО) a f t e r t h e t y p e o f t h e d o c u m e n t i s s u e d for the item o f technical supervision. See circular 911c 4.5.1 T h e A g r e e m e n t o n S u r v e y ( C O ) c o m e s i n t o force f r o m the date o f signing and remains valid for at m o s t 5 years subject to: 4.6 T h e c o n t r a c t o r a g r e e m e n t o n t e c h n i c a l s u p e r ­ v i s i o n b e c o m e s i n v a l i d i ncase o f inadequate fulfilment o f the c o m m i t m e n t s under t h e contract o r agreement, including payments for the R S services as w e l l as i n the f o l l o w i n g cases: .1 satisfactory results o f survey o f t h e i t e m o f technical supervision a n d t h e firm (manufacturer) i n accordance w i t h t h erequirements o fSection 10, t o b e carried o u t n o t less t h a n o n c e a y e a r ( i n w e l l - g r o u n d e d cases t o b e c a r r i e d o u t n o t less t h a n o n c e e v e r y 2,5 years, unless otherwise specified); .1 u p o n e x p i r y o f type approval f o r material o r p r o d u c t m a n u f a c t u r e d b y t h e firm ( m a n u f a c t u r e r ) ; .2 t h e v a l i d i t y o f t h e a p p r o v a l o f t h e t y p e i t e m o f technical supervision as certified b y the R S type approval certificate, o r validity o f the R e c o g n i t i o n Certificate for M a n u f a c t u r e r (СПИ). 4.5.2 T h e v a l i d i t y o f t h e A g r e e m e n t o n S u r v e y ( C O ) is e x t e n d e d f o r t h e n e x t p e r i o d n o t e x c e e d i n g 5 years subject t o compliance w i t h t h erequirements set o u t i n 4.5.1.1 and 4.5.1.2. .2 s u b j e c t t o n o n - c o m p l i a n c e o f t h e turer) w i t h the requirements o f survey; firm (manufac­ .3 i f t h e R e c o g n i t i o n C e r t i f i c a t e ( С П ) , R e c o g n i t i o n C e r t i f i c a t e o f T e s t i n g L a b o r a t o r y (СПЛ), R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ) a n d C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) b e c o m e i n v a l i d i n c o m p l i a n c e w i t h 3.6; .4 u p o n e x p i r y o f v a l i d i t y o f t h e c o n t r a c t o r agreement; .5 c a n c e l l a t i o n o f t h e c o n t r a c t o r a g r e e m e n t . T h e A g r e e m e n t o n Survey ( C O ) m a y b e cancelled i f desired b y the parties w h o signed it. 14 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 5 TECHNICAL SUPERVISIONDURING MANUFACTURE OF MATERIALS AND PRODUCTS 5.1 M a t e r i a l s a n d p r o d u c t s u s e d i n c o n s t r u c t i o n o f ships a n d floating facilities classed w i t h t h e Register shall b e supplied t o t h eshipyard w i t h the certificate o f conformity o r other documents confirming their c o m ­ pliance w i t h t h e R S requirements, conventions o r t h e I M O recommendations. List o f materials and products subject t o m a n d a t o r y technical supervision w i t h indication o f a type o f the d o c u m e n t issued thereon i s g i v e n i nthe R S N o m e n c l a ­ ture (refer t o A p p e n d i x 1). I n separate cases, a t t h e R S discretion, technical supervision m a yb e performed o f t h e materials a n d products not contained i nthe R SNomenclature, w h i c h are n e w l y developed o r a r e t h e c o m p o n e n t s o f t h e products listed i n t h e R S Nomenclature a n d w h i c h functionally provide the safety o f the items o f technical supervision (refer t o 2.4). 5.2 F o r d r a w i n g u p o f r e s u l t s o f t h e R e g i s t e r s u p e r ­ vision during manufacture o f the materials and products, use is m a d e o f three types o f the certificates o f c o n f o r m i t y : Certificate filled-in and signed b ythe Register (C); Certificate filled-in and signed b y a f i r m (manufac­ turer) official a n d d r a w n u p (affirmed) b y t h e Regis­ ter ( C 3 ) . S i g n i n g a n dd r a w i n g u p o f the Certificate a r e allowed t o carry out b y digital signature. type approval certificate d r a w n u pb y a S u r v e y o r a n d signed b y the Directors/Heads o f the R H O Locations o r t h e R S B r a n c h O f f i c e s (СТО, СТПК). T h e c o n t e n t s o f t h e a b o v e c e r t i f i c a t e s (С, СЗ, СТО) shall identify t h e material o r product, its types, m a i n parameters, as w e l l as the manufacturer o f materials and products. Validity p e r i o d o f t h e certificates specified. (С, C 3 ) i s n o t Validity period o f t h e T y p e A p p r o v a l Certificate (СТО) i s u p t o 5 y e a r s ( r e f e r t o 6 . 5 ) . The E I A P P Certificate (refer t o 3.9) signed b y t h e Register. Validity period Certificate is n o t specified. 5.3 I n o r d e r t o o b t a i n t h e c e r t i f i c a t e the f i r m (manufacturer) shall apply to the request. is filled-in and o f the E I A P P o fconformity, Register w i t h a Technical documentation o n t h e materials o r pro­ ducts w i t h i n the scope regulated b ythe R S rules shall b e submitted together w i t h the request. 5.4 U p o n r e v i e w o f t h e t e c h n i c a l d o c u m e n t a t i o n t h e Register sends a conclusion letter t o t h e f i r m ( m a n u ­ facturer). W h e r e d e e m e d necessary, t h ef i r m (manufac­ turer) shall s u b m i t the testing p r o g r a m m e t othe Register to b e agreed upon. 5.5 W h e r e i n c o l u m n 5 o f t h e R S N o m e n c l a t u r e " C " or " C 3 " is indicated, t h e n u p o n satisfactory results o f s u r v e y o f t h e m a t e r i a l o r p r o d u c t t h e c e r t i f i c a t e s (С, C 3 ) or a certificate o f a special f o r m for the particular type o f products ( i f a n y ) shall b e issued. B r a n d i n g shall b e m a d e w h e r e necessary (refer t o Appendix 2). 5.6 W h e r e i n c o l u m n 5 o f t h e R S N o m e n c l a t u r e "СТО" i s i n d i c a t e d , t h e n t h e d o c u m e n t t o b e i s s u e d i s a c o p y o f t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) ( r e f e r to 4.5) supplied b ythe f i r m (manufacturer) together w i t h the m a t e r i a l o r product. I n w e l l - g r o u n d e d cases, t h e c e r t i f i c a t e s (С, C 3 ) m a y b e i s s u e d . A c o p y o f t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) m a y be replaced b y t h ereference t o t h ei n f o r m a t i o n o n t h e i s s u e d T y p e A p p r o v a l C e r t i f i c a t e (СТО) a v a i l a b l e o n t h e R S official website as specified i n 4.5. 5.7 I n c a s e o f a s i n g l e a p p r o v a l , t h e m a t e r i a l o r product is surveyed t othe extent o f the prototype. I n c a s e t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) f o r t h e materials a n d products i n question is available, t h e e x a m i n a t i o n a n d a p p r o v a l o f technical d o c u m e n t a t i o n are not required, a n d the test results f o r the t y p e s p e c i m e n are t a k e n i n t o account. W h e r e a single approval is issued to single products, approval o f technical d o c u m e n t a t i o n and s u r v e y results for the prototype cover o n l y the material o rproduct, for w h i c h the certificates o f c o n f o r m i t y h a v e b e e n issued. 5.8 W h e r e t h e firm ( m a n u f a c t u r e r ) f a b r i c a t e s f o r gings, castings, m a c h i n e r y a n d e q u i p m e n t c o m p o n e n t s n e e d e d f o r i t s o w np r o d u c t i o n (further processing, assembling, construction), as w e l l as mass-production products (ship fittings, h u l l fittings, etc.), technical s u p e r v i s i o n m a y b e c o n f i r m e d b y t h e firm ( m a n u f a c t u r e r ) documents affirmed b y the Register. W h e r e the above products are fabricated b y the s a m e firm ( m a n u f a c t u r e r ) f o r c o o p e r a t i o n s h i p m e n t s o r a s t h e spare parts, supervision shall b e c o n f i r m e d b y t h e c e r t i f i c a t e s (С, СЗ, СТО) a c c o r d i n g t o t h e R S N o m e n ­ clature. Part I . General Regulations for Technical Supervision 15 6 APPROVAL OF TYPE MATERIALS, PRODUCTS, PRODUCTION AND SOFTWARE 6.1 T h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s a document o f t h e Register, w h i c h certifies that a construction, properties, parameters, characteristics o f a type material o rproduct, f o u n d i nthe course o f surveys and indicated i nt h eapproved technical documentation, meet the R S requirements and m a y b e used for ships and items o f technical supervision for the intended purpose. T h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) f o r t h e t y p e p r o d u c t i o n process certifies that a n i t e m o f supervision manufactured according t o t h eparticular type production process a n d h a v i n g characteristics a n d parameters indicated in t h e approved technical documentation meets t h e R S requirements and m a y b e used for the intended purpose. 6.2 T h e T y p e A p p r o v a l C e r t i f i c a t e ( С Т О ) c e r t i f i e s that t h e approval o f t h e technical documentation a n d positive results o f surveys o f material a n d product prototype areaccounted for b y the Register i n technical supervision o f these materials a n d products manufac­ tured under t h e established production conditions a n d intended f o r m u l t i p l e deliveries t o ships a n d floating facilities o f various types. 63 I n order t o obtain t h e T y p e A p p r o v a l Certificate (СТО) t h e f i r m ( m a n u f a c t u r e r ) s h a l l a p p l y t o t h e R e g i s t e r w i t h a request and submit the technical documentation o n the material, product, software or production process, as w e l l as t h e p r o g r a m m e a n d s c h e d u l e o f tests. W h e n r e v i e w i n g a n d approving this documentation, t h escope o f surveys during manufacture a n d testing o f specimens shall b e specified. 6.4 T h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s i s s u e d b y the Register u p o n approval o f the technical documentation a n d positive results o f the surveys o f the material, product, software o rproduction process submitted. For the material o rproduct manufactured according to the established production process the T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s i s s u e d , h a v i n g r e g a r d t o t h e d a t a o n earlier tests, p r o d u c t i o n a n d o p e r a t i o n experience. Account m a y b e taken o f the T y p e A p p r o v a l Certificate (СТО) o f a n o t h e r c l a s s i f i c a t i o n s o c i e t y o r c o m p e t e n t b o d y o rresults o f the tests o f a t y p e s p e c i m e n conducted w i t h participation o f t h e above organizations. T h e n u m b e r o f documents t o b e submitted i s i n each case subject t o special consideration b y the Register proceeding f r o m t h etype o fmaterial o r product i n order t o confirm compliance w i t h the requirements o f the R S Rules. PROCESSES (СТО) i s r e n e w e d , t e c h n i c a l d o c u m e n t a t i o n i s r e approved and the material, product o r production process is s u r v e y e d t o t h ee x t e n t agreed u p o n w i t h t h e Register. 6 . 6 T h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s i s s u e d b y R H O o rthe R SBranch Offices. T h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) b e c o m e s i n v a l i d i f d e s i g n o f t h e p r o d u c t , its properties, etc. h a v e been changed w i t h o u t agreement w i t h t h e Register; operational suitability o fthe material o r product is n o t provided, requirements o f the R S rules and international conventions, w h i c h have c o m e into force after i t s issuance a n d w h i c h prescribe m a n d a t o r y compliance w i t h the requirements, arenot met. 6.7 F o r w e l d i n g consumables t h e Certificate o f A p p r o v a l for W e l d i n g Consumables ( C O C M ) is issued, being at the same time t h e document certifying r e c o g n i t i o n b y t h e Register o f t h e f i r m as t h e manufacturer o f welding consumables i n accordance w i t h the requirements o f the R S rules. T h e Certificate o f A p p r o v a l f o r W e l d i n g Consu­ mables ( C O C M ) is issued for a period o f u p t o 5 years subject t o itsannual endorsement. 6.8 T h e W e l d i n g P r o c e d u r e A p p r o v a l Test C e r t i f i ­ cate (СОТПС) i s a R e g i s t e r d o c u m e n t c e r t i f y i n g t h a t a w e l d i n g p r o c e d u r e u s e d a t a s h i p y a r d o r firm ( m a n u ­ facturer) o f w e l d e d structures h a s been tested a n d approved b y the Register for application. T h e W e l d i n g Procedure A p p r o v a l Test Certificate (СОТПС) s h a l l b e e n d o r s e d n o t less t h a n o n c e e v e r y 2,5 years. 6.9 F o r p r o g r a m m e s f o r computer-aided calcula­ tions, i ncompliance w i t h Section 12, Part П "Technical Documentation", t h e Type A p p r o v a l Certificate f o r C o m p u t e r P r o g r a m (СТОП) i s i s s u e d . 6.5 T h e T y p e A p p r o v a l C e r t i f i c a t e ( С Т О ) i s i s s u e d for a period o f u p t o 5 years. 6.10 T h e m a n u f a c t u r e r s o f i t e m s o f t h e R S t e c h n i c a l supervision w i t h codes 0 6 0 1 0 1 0 0 M K , 0 6 0 2 0 0 0 0 , 0 7 0 1 0 0 0 8 , 07010009, 0700600, 07020300, 07020301, 08011400MK, 08030000, 08120000MK, 09010000, 09020000, 09024000, 09025000, 09030000, 09040000, 09050000, 09060000, 09060100, 09070000, 09080000, 09100000, 09120000, 10010000, 10020000, 10030000, 11000000 (as regards insulation materials), 12090000 a n d other items listed i n I A C S U I S C 2 4 9 shall develop the procedure for purchase a n d c o n t r o l o f asbestos-free materials a n d c o m p o n e n t s applicable t o a l l e q u i p m e n t , c o m p o n e n t s a n d spare parts. This procedure shall include the following: 6.5.1 V a l i d i t y o f t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) shall n o t exceed t h e period o f approval o f t h e technical documentation o nthe i t e m o f technical supervision. methods o f assessment and selection o f suppliers; procedures f o r c h e c k i n g o f the supplied asbestos-free products; 6.5.2 A f t e r t h e e x p i r y o f v a l i d i t y , t h e T y p e A p p r o v a l C e r t i f i c a t e (СТО) i s r e n e w e d o n r e q u e s t f r o m t h e f i r m (manufacturer). W h e r e t h e T y p e A p p r o v a l Certificate d r a w i n g - u p o f asbestos-free declarations as s u p p o r t i n g documentation f o r t h e manufactured item o f technical supervision. 16 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 7 GENERAL REQUIREMENTS F O R FIRMS 7.1 GENERAL 7.1.1 T h e r e q u i r e m e n t s o f t h i s S e c t i o n a p p l y t o a l l firms, w h i c h activity is associated w i t h t h e items o f t h e R S technical supervision a n dissubject t o t h eR S audit o r recognition. 7.1.2 A u d i t o f c o n f o r m i t y o r r e c o g n i t i o n o f t h e f i r m b y t h e Register includes: .1 r e v i e w o f t h e documents c o n f i r m i n g t h e c o m pliance o fthe firm w i t h the R S requirements; .2 s u r v e y o f t h e f i r m , i n c l u d i n g p r a c t i c a l d e m o n s t r a t i o n o fc o m p l e t i o n o ft h e w o r k s indicated i n t h e request, verification o f t h e records t o ascertain that t h e f i r m organization a n dm a n a g e m e n t are i ncompliance w i t h t h e submitted documents a n dthat t h ef i r m isable t op e r f o r m w o r k s a n d render services, f o r w h i c h t h e approval (recognition) is requested. D u r i n g periodical o r r e n e w a l survey, t o c o m p l y w i t h this requirement t h eresults o f w o r k s o r services affirmed b y t h e Register m a y b e used instead o f t h e practical demonstration. T h e w o r k s p e r f o r m e d o r services rendered after t h e preceding s u r v e y m a yb e accepted f o r r e v i e w . 7 . 1 . 3 T h e firm s h a l l s u b m i t f o r r e v i e w : .1 documents o r their copies corifirming fulfillment o f t h e requirements o f 7.2.1, 7.2.2, 7.2.6, 7.2.7, 7.2.8.3 (with d u e regard t o t h e requirements o f t h e appropriate items i nSections 8 — 11); .2 l i s t o f t h e a c t i v i t i e s p e r f o r m e d ( a r e a o f a c t i v i t y ) ; .3 l i s t s o f t h e p e r s o n n e l c o n t a i n i n g i n f o r m a t i o n o n compliance o f t h e personnel with t h e requirements o f 7.2.2.1 (with d u eregard t o t h erequirements o f t h e appropriate items i nSections 8 — 11); .4 l i s t s o f t h e e q u i p m e n t a n d f a c i l i t i e s i n d i c a t e d in 7.2.3.1, 7.2.4.1 (with d u eregard t o t h e requirements o f the appropriate items i nSections 8 — 11); .5 lists o ft h e d o c u m e n t s indicated i n7.2.4.3, 7.2.5.1 (with d u e regard t o t h e requirements o f t h e appropriate items i nSections 8 — 11); .6 v e r i f i c a t i o n o f a p p r o v a l / r e c o g n i t i o n b y o t h e r authorities, i f any; .7 i n f o r m a t i o n o n o t h e r a c t i v i t i e s , w h i c h m a y a f f e c t a conflict; .8 l i s t a n d d o c u m e n t a t i o n o n m a n u f a c t u r e r ' s l i c e n s e s , w h e r e applicable; .9 l i s t o f a p p o i n t e d a g e n t s ; .10 f i r m e x p e r i e n c e i n t h e a r e a o f s e r v i c e s r e n d e r e d . 7 . 1 . 4 S u r v e y o f t h e firm a i m s a t c o n f i r m i n g t h e c o m p l i a n c e o f t h e firm w i t h t h e r e q u i r e m e n t s o f 7 . 2 . T h e r e q u i r e m e n t s f o r t h e firms p e r f o r m i n g c e r t a i n activities a r esetforth i n t h e relevant sections. 7.2 R E Q U I R E M E N T S 7.2.1 L e g a l s t a t u s . 7.2.1.1 L e g a l status o f t h e f i r m s h a l l c o m p l y w i t h t h e current legislation. 7.2.1.2 T h e f i r m s h a l l h a v e o r g a n i z a t i o n a l s t r u c t u r e and the Head. 7.2.2 P e r s o n n e l . 7.2.2.1 P e r s o n n e l o ft h e f i r m s h a l l h a v e a n a p p r o priate education, professional a n d special training, qualification a n dexperience necessary f o r performance o f activity i n t h e area indicated i n t h e request. 7.2.2.2 T h e f i r m i s r e s p o n s i b l e f o r q u a l i f i c a t i o n a n d professional training o fits personnel i ncompliance w i t h the national, international a n d b r a n c h standards; i n case o f absence o fthese standards — i n c o m p l i a n c e w i t h t h e standards o f t h e firm. This requirement shall b e established i n t h e documents o fthe firm. 7.2.3 T e c h n i q u e . 7.2.3.1 T h e f i r m s h a l l h a v e t h e t e c h n i q u e n e c e s s a r y for performance o fthe activity i nt h earea indicated i nt h e request, i n c l u d i n g appropriate equipment, premises a n d facilities certified i n t h e established order. 7.2.3.2 T h e f i r m s h a l l p r o v i d e t h e m a i n t e n a n c e o f t h e equipment a n d facilities i n compliance w i t h their operating a n d maintenance documentation. 7.2.3.3 T h e f i r m s h a l l p e r f o r m t h e a c t i v i t y o n t h e d o c u m e n t a t i o n corresponding t oeach activity i nt h e area indicated i nt h erequest w i t h regard t ot h e environmental conditions. 7.2.4 M e a s u r e m e n t a s s u r a n c e . 7.2.4.1 T h e f i r m s h a l l h a v e a n d a p p l y n e c e s s a r y measurement assurance i n compliance w i t h t h e procedures f o r testing a n d checking o f items o ft h e R S technical supervision, including: .1 m e a s u r i n g e q u i p m e n t checked (calibrated) i n t h e established order; .2 t e s t i n g e q u i p m e n t c e r t i f i e d i n t h e e s t a b l i s h e d order; .3 r e f e r e n c e a n d s t a n d a r d s p e c i m e n s ; .4 a p p r o p r i a t e c o n s u m a b l e s ( c h e m i c a l s , s u b s t a n c e s , etc). 7 . 2 . 4 . 2 T h e firm s h a l l p r o v i d e t h e m a i n t e n a n c e o f measuring a n d testing equipment i n compliance w i t h their operating a n d maintenance documentation. 7.2.4.3 T h e firm s h a l l h a v e a n d a d h e r e t o t h e c u r r e n t standards a n d certified i n t h e established order procedures: .1 f o rtesting o f items o f technical supervision w i t h the required accuracy; .2 f o r h a n d l i n g o f s a m p l e s . Part I . General Regulations for Technical Supervision 17 7.2.5 F i l e s o f t h e f i r m d o c u m e n t s . 7.2.5.1 T h e f i r m s h a l l h a v e t h e v a l i d n o r m a t i v e a n d technical documents necessary t op e r f o r m activity i n t h e area indicated i n t h e request, including: .11 f u l l n a m e , p o s i t i o n a n d s i g n a t u r e o f t h e p e r s o n w h o approved t h e report; .12 n u m b e r o f e v e r y p a g e a n d t h e t o t a l n u m b e r o f pages i nt h e report. .1 documents containing requirements f o r items o f technical supervision, including t h e R S rules; 7.2.6.2 R e p o r t s s h a l l b e s t o r e d i n t h e f i r m f o r n o t l e s s than five years under conditions o f confidentiality. T h i s r e q u i r e m e n t s h a l l b e s p e c i f i e d i n t h e firm d o c u m e n t s . .2 t e c h n i c a l d o c u m e n t a t i o n o n i t e m s o f t e c h n i c a l supervision; .3 p r o d u c t i o n d o c u m e n t a t i o n o n p e r f o r m a n c e , checking a n d control o f each k i n d o factivity. 7.2.5.2 T h e d o c u m e n t a t i o n s h a l l b e a v a i l a b l e f o r t h e firm p e r s o n n e l w h e r e n e c e s s a r y . 7.2.6 R e p o r t i n g . 7.2.6.1 F o r m a n d c o n t e n t o f r e p o r t s i n t h e area indicated i nt h e request shall b e acceptable f o rR S a n d shall include: . 1 n a m e a n d a d d r e s s o f t h e firm; .2 i d e n t i f i c a t i o n o f t h e r e p o r t , e . g . r e p o r t n u m b e r ; .3 n a m e a n d a d d r e s s o f t h e c u s t o m e r ; .4 which .5 which 7.2.7 C h e c k i n g a n d c o n t r o l 7.2.7.1 T h e firm s h a l l d o I h e c h e c k i n g a n d e x e r c i s e control specified i n t h e documentation f o r each k i n d o f activity. 7 . 2 . 7 . 2 T h e firm s h a l l t a k e m e a s u r e s o n e l i m i n a t i o n and p r e v e n t i o n o fnon-conformities a n dclaims against t h e firm a c t i v i t y i n t h e a r e a i n d i c a t e d i n t h e r e q u e s t . T h i s r e q u i r e m e n t s h a l l b e s p e c i f i e d i n t h e firm d o c u m e n t s . 7.2.8 S u b c o n t r a c t o r s . 7 . 2 . 8 . 1 S u b c o n t r a c t o r s r e c r u i t e d b y t h e firm f o r performance o f activity i n t h e area indicated i n t h e request s h a l l f u l f i l l t h e r e q u i r e m e n t s o f S e c t i o n 7. reference t o t h edocuments, i n compliance w i t h the activity has been performed; description (name) o f t h e item, i n relation t o the activity has been performed; 7.2.8.2 T h e firm s h a l l p r o v i d e t h e a u d i t o f s u b c o n tractors' a c t i v i t y i n t h e area indicated i n t h e request. 7.2.8.3 T h e f i r m s h a l l h a v e a g r e e m e n t s with subcontractors i n t h e area indicated i n t h e request. .6 p l a c e w h e r e t h e a c t i v i t y h a s b e e n p e r f o r m e d ; .7 d a t e w h e n t h e a c t i v i t y h a s b e e n p e r f o r m e d ; .8 i n f o r m a t i o n o n c o n d i t i o n s , u n d e r w h i c h t h e activity has been performed; 7.2.9 I n f o r m a t i o n o n a l t e r a t i o n s t o t h e c e r t i f i e d service operation system. .9 i n f o r m a t i o n o n d e v i a t i o n s f r o m t h e r e q u i r e m e n t s o f the documents, i ncompliance with w h i c h the activity has been performed; .10 e n t r y t o t h e e f f e c t t h a t t h e a c t i v i t y h a s b e e n performed under the R S technical supervision; 7.2.9.1 I n case w h e r e a n y a l t e r a t i o n t o t h e c e r t i f i e d service operation system o f t h e supplier is made, such alteration shall b e i m m e d i a t e l y i n f o r m e d t ot h e Register. Re-audit m a yb e required w h e n deemed necessary b yt h e Register. 18 Rules for Technical Supervision during Construction of Ships and Manufacture 8 RECOGNITION O FSERVICE 8.1 G E N E R A L 8.1.1 T h e r e q u i r e m e n t s o f t h i s S e c t i o n a p p l y t o t h e firms i n v o l v e d i nt h e activities related t o t h e items o f the R S technical supervision. K i n d s o f t h e activities are indicated i n T a b l e 8.1.1. of Materials and Products for Ships SUPPLIERS 8.1.1.1 F o r t h e p u r p o s e o f t h i s S e c t i o n , t h e f o l l o w i n g definitions shall apply: .1 M a n u f a c t u r e r - i s a f i r m that manufactures equipment required t o b e periodically serviced and/or maintained; 1 T a b l e 8.1.1 Code 22001000 22001001 22001002 22002000 22003000 22004000MK 22005000 22005001MK 22005002 22005003MK 22005004 22005005 22005006MK 22005007MK 22005008 22005009 22005010MK 22005011 22005012 22005013 22006000 22006001 22006002MK 22006003 22006004MK 22006006MK 22006007MK 22006008MK 22007000MK 22008000MK 22012000 22015000MK 22016000MK 22019000 22021000MK 22022000 22023000MK 22024000MK 22025000 K i n d s o f activity Thickness measurements o f ships under supervision o f R S surveyor: Category I : thickness measurements under supervision o f R S surveyor o n all ships regardless o f their gross tonnage C a t e g o r y П: t h i c k n e s s m e a s u r e m e n t s u n d e r s u p e r v i s i o n o f t h e R S s u r v e y o r o n f i s h i n g v e s s e l s r e g a r d l e s s o f t h e i r g r o s s t o n n a g e a n d n o n - E S P s h i p s l e s s t h a n 500 g r o s s t o n n a g e T i g h t n e s s testing o f hatches, doors etc. w i t h ultrasonic e q u i p m e n t In-water surveys o f ships a n d offshore installations Inspection a n d maintenance o f fire-extinguishing equipment, s y s t e m s a n d outfit S u r v e y a n d maintenance o flife-saving appliances: inflatable liferafts containers f o r inflatable liferafts hydrostatic release units lifebuoys position-indicating lights o flife-saving appliances, self-activating s m o k e signals inflatable lifejackets inflated rescue/fast rescue boats e q u i p m e n t o f lifeboats a n d liferafts other life-saving appliances marine evacuation systems, inflatable m e a n s o f rescue w e a k link, automatic g a s inflation system, embarkation ladders, lifelines non-inflatable lifejackets, i m m e r s i o n suits, anti-exposure suits, thermal protective aids combined rescue/fast rescue boats Servicing a n dInspection o f radio a n d navigational equipment: shore-based maintenance a n drepair o f G M D S S equipment i n compliance with the requirements o f regulation IV/15 o f S O L A S - 7 4 C o n v e n t i o n , a s a m e n d e d a n d I M O r e s o l u t i o n A.702(17) s e r v i c i n g a n d t e s t i n g o f r a d i o a n d n a v i g a t i o n a l e q u i p m e n t o n b o a r d s h i p s o r m o b i l e o f f s h o r e d r i l l i n g u n i t s a n d fixed offshore platforms for compliance with the requirements o f S O L A S - 7 4 Convention, as amended (preliminary survey o f radio equipment) installation, commissioning, maintenance a n drepair o f radio a n d navigational equipment, replacement o fbuilt-in p o w e r supply components, programming o fradio equipment annual performance testing o f v o y a g e data recorders ( V D R ) a n d simplified v o y a g e data recorders ( S - V D R ) i n accordance w i t h regulation V/18.8 o f S O L A S - 7 4 C o n v e n t i o n , a s a m e n d e d a n n u a l testing o f E P I R B s o f t h e satellite s y s t e m C O S P A S - S A R S A T s h o r e - b a s e d m a i n t e n a n c e o f E P I R B s o f the satellite s y s t e m C O S P A S - S A R S A T inspection, testing a n dmaintenance o f automatic identification s y s t e m (AIS) Inspection a n dtesting o f centralized gas-welding a n dgas-cutting equipment Inspection a n dmaintenance o f self-contained breathing apparatus E x a m i n a t i o n o fro-ro ships b o w , stern, side a n d inner doors Inspections o f l o w location lighting systems using photo luminescent materials a n d evacuation guidance systems used as a n alternative to low-location lighting systems S o u n d pressure level measurements o fpublic address a n d general alarm systems o nboard ships Confirmation o f compliance o f service suppliers' quality m a n a g e m e n t systems Maintenance, repair, inspection a n d testing o flifeboats, rigid rescue boats a n d rescue boats, w h i c h are a combination o f rigid a n d inflatable construction, launching appliances, on-load release g e a r a n d davit-launched liferaft automatic release h o o k s Underwater thickness measurements o f ships a n doffshore installations under supervision o f R S surveyor Expertise o f safe carriage o fb u l k cargoes b y s e a Measurements o fnoise level onboard ships T i g h t n e s s testing o f p r i m a r y a n d s e c o n d a r y barriers o f g a s carriers w i t h m e m b r a n e cargo containment s y s t e m s f o r ships i n service ' F o r S e c t i o n s 10 a n d 12, t h e d e f i n i t i o n " M a n u f a c t u r e r " g i v e n i n 1.1.1 s h a l l b e u s e d . Part I . General Regulations for Technical Supervision • 2 S e r v i c e s u p p l i e r ( a s e r v i c e s u p p l i e r or c a t e g o r y o f s e r v i c e s u p p l i e r m a yb e r e f e r r e d t o h e r e a f t e r s i m p l y as " S u p p l i ­ e r " ) is a person o r f i r m n o t e m p l o y e d b y the Register, w h o at t h e request o f a n e q u i p m e n t manufacturer, shipyard, s h i p o w n e r o r other client provides services f o r a ship o r a m o b i l e o f f s h o r e drilling u n i t , s u c h as m e a s u r e m e n t s , tests o r maintenance o f safety systems a n d equipment, the results o f w h i c h areused b y the R S surveyors i nm a k i n g decisions affecting classification o rstatutory certification a n d services; .3 A g e n t i s a p e r s o n o r f i r m a u t h o r i s e d t o act f o r o r to represent a manufacturer o r approved/recognized service supplier; .4 S u b s i d i a r y isa firm partly or w h o l l y o w n e d b y a manufacturer o r approved/recognized service supplier; .5 S u b c o n t r a c t o r i s a p e r s o n o rf i r m p r o v i d i n g services t o a manufacturer o r approved/recognized service supplier, w i t h a f o r m a l contract defining t h e assumption o f the obligations o f the service supplier. 8.1.2 T h e firms that p e r f o r m the activities listed i n Table 8.1.1 shall b e recognized b y R S . 8.1.3 T h e firms that p e r f o r m the activities related t o the items o f the R S technical supervision shall comply w i t h t h e applicable general requirements listed i n Section 7 , t h erequirements i n 8.2, appropriate specific requirements i n 8.3 and those o f M a r i t i m e Administra­ tions, i f any. 8.1.4 R e c o g n i t i o n is conditional o n a practical demonstration o f the performance o f the specific service as w e l l a s s a t i s f a c t o r y r e p o r t i n g b e i n g c a r r i e d o u t . 8.1.5 R e c o g n i t i o n o f the f i r m b y the Register shall b e c o r i f i r m e d b y t h e R e c o g n i t i o n C e r t i f i c a t e (СП) i s s u e d i n compliance w i t h 3 . 4- 3 . 7 a n dw i t h regard t o specific requirements depending o n the area o f the f i r m activities. T h e i s s u e d R e c o g n i t i o n C e r t i f i c a t e (СП) s h a l l c e r t i f y t h a t the procedure f o r rendering t h e service b y t h e f i r m complies w i t h the R SR u l e s i nthe scope prescribed b y the R S R u l e s and that the results o f rendering services prescribed b ythe R S Rules m a y b e recognized and used b y the Register i n m a k i n g decisions affecting classifica­ tion o r statutory certification and services, as applicable. T h e R e c o g n i t i o n C e r t i f i c a t e (СП) s h a l l c l e a r l y i n d i c a t e the type and scope o f services as w e l l as a n y restrictions imposed. 8.1.5.1 W h e n any alteration t o t h ecertified service operating system o f the supplier ismade, such alteration is t o b e i m m e d i a t e l y i n f o r m e d t o t h e Register. R e - a u d i t m a y b e required w h e n deemed necessary b y the Register. 8.1.5.2 T h e Register reserves the right t o cancel the recognition and t o i n f o r m another classification society ( A C S ) - L A C S m e m b e r accordingly. 8.1.5.3 T h e f i r m w h o s e recognition w a s cancelled m a y apply for re-recognition, provided i t h a s corrected the non-conformities, w h i c h resulted i n cancellation, and the Register is able t o c o n f i r m i t h a s effectively implemented the corrective action. 19 8.2 GENERAL 8.2.1 E x t e n t o f recognition. 8.2.1.1 T h e f i r m shall demonstrate, as required b y 8.2.2 - 8.2.11, that i t h a s t h e competence a n d c o n t r o l needed t o p e r f o r m the services for w h i c h recognition is sought. 8.2.1.2 W h e r e several servicing stations are o w n e d b y a g i v e n f i r m , each station shall b e assessed a n d approved except as specified i n 8.2.12.3. 8.2.2 T r a i n i n g o f p e r s o n n e l . T h e f i r m is responsible f o rt h e qualification a n d training o f its personnel t o a recognised national, international o r industry standard as applicable. W h e r e such standards d o n o t exist, t h e f i r m shall define standards f o r t h e training a n d qualification o fits personnel relevant t o t h e functions each is authorised to perform. T h epersonnel shall also have adequate experience a n db e familiar w i t h t h e operation o f any necessary equipment. Operators/technicians/inspectors shall have h a d a m i n i m u m o f o n e year tutored on-the-job training. W h e r e i tis not possible t o perform internal training, a program o f external training m a y b e considered as acceptable. 8.2.3 S u p e r v i s i o n . T h e f i r m shall p r o v i d e supervision f o r all services provided. T h e responsible supervisor shall have h a d a m i n i m u m o f t w o years o f experience as a n operator/ technician/inspector w i t h i n t h e activity f o rw h i c h t h e supplier is recognized. F o r a supplier consisting o f one person, that person shall meet t h e requirements o f a supervisor. 8.2.4 P e r s o n n e l r e c o r d s . T h e f i r m shall keep records o f the approved operators/ technicians/inspectors. T h e record shall contain i n f o r m a t i o n o n age, f o r m a l education, t r a i n i n g a n d experience f o r the services f o r w h i c h t h e y are recognized. 8.2.5 E q u i p m e n t a n d facilities. T h e firm shall have t h e necessary equipment a n d facilities f o r the service t o b e supplied. A record o f the equipment used shall b e kept and available. T h e record shall contain i n f o r m a t i o n o nmaintenance and results o f calibration a n d verifications. T h e R e g i s t e r shall assess and record t h e validity o f previous measuring results when the equipment is found n o t t o conform t o requirements. T h e Register shall take appropriate action o n the e q u i p m e n t affected. 8.2.6 C o n t r o l o f d a t a . W h e n computers are used f o r t h e acquisition, processing, recording, reporting, storage, measurement assessment a n d m o n i t o r i n g o f data, t h e ability o f computer software t o satisfy t h e intended application shall b e documented a n d confirmed b y t h e service supplier. T h i s shall b e undertaken p r i o r to initial use and reconfirmed as necessary. 20 Rules for Technical Supervision during Construction of Ships and Manufacture N o t e . Commercial off-the-shelf software (e.g. word processing, database a n d statistical p r o g r a m m e s ) i n general u s e within their designed application range m a yb e considered t o b e sufficiently validated a n d d o not require a n y subsequent confirmation. 8.2.7 The technical activity i Files o fthe firm documents. firm shall have t h e valid normative a n d documents necessary f o r performance o f t h e n t h e area indicated i n t h e request, including: . 1 o u t l i n e o f firm, e . g . o r g a n i z a t i o n a n d m a n a g e m e n t structure, including subsidiaries t o b e included i n t h e recognition/certification; .2 l i s t o f n o m i n a t e d subcontractors; agents, subsidiaries a n d . 3 e x p e r i e n c e o f t h e firm i n t h e s p e c i f i c s e r v i c e a r e a ; . 4 f o r c a t e g o r i e s o f firms t h a t r e q u i r e a u t h o r i z a t i o n from manufacturers, manufacturer's documentary evi­ dence that t h ef i r m h a sbeen authorised o r licensed t o service t h eparticular m a k e s a n dm o d e l s o fe q u i p m e n t f o r which recognition is sought shall b e provided; .5 l i s t o f o p e r a t o r s / t e c h n i c i a n s / i n s p e c t o r s d o c u m e n t ­ ing training a n dexperience w i t h i n t h erelevant service area, a n d qualifications according t orecognised n a t i o n a l , international o r industry standards, as relevant; .6 d e s c r i p t i o n o f e q u i p m e n t u s e d f o r t h e p a r t i c u l a r service f o rw h i c h recognition i s sought; .7 g u i d e s f o r o p e r a t o r s o f s u c h e q u i p m e n t ; .8 t r a i n i n g p r o g r a m m e s f o r o p e r a t o r s / t e c h n i c i a n s / inspectors; .9 c h e c k l i s t s a n d r e c o r d f o r m a t s f o r r e c o r d i n g r e s u l t s o f t h e services; .10 Q u a l i t y M a n u a l a n d / o r d o c u m e n t e d p r o c e d u r e s c o v e r i n g r e q u i r e m e n t s i n 8.2.12; .11 d o c u m e n t e d p r o c e d u r e s f o r c o m m u n i c a t i o n w i t h the c r e w p r i o r t o c o m m e n c i n g w o r k , s o that i ti s safe t o decommission t h eequipment being maintained, a n d t o p r o v i d e a safe s y s t e m o f w o r k i n place; .12 e v i d e n c e bodies, i f any; o f approval/recognition b y other .13 i n f o r m a t i o n o n t h e o t h e r a c t i v i t i e s w h i c h m a y present a conflict o f interest; .14 r e c o r d o f c u s t o m e r c l a i m s a n d c o r r e c t i v e a c t i o n s ; .15 d o c u m e n t e d p r o c e d u r e s a n d i n s t r u c t i o n s s h a l l b e available f o r t h e recording o f d a m a g e s a n d defects f o u n d during inspection, servicing a n d repair w o r k . This d o c u m e n t a t i o n shall b e m a d e available u p o n request. 8.2.8 P r o c e d u r e s . T h e firm shall have documented w o r k procedures covering a l lservices supplied. 8.2.9 S u b c o n t r a c t o r s . T h e firm s h a l l g i v e i n f o r m a t i o n o f a g r e e m e n t s a n d arrangements i f a n y parts o f t h e services p r o v i d e d a r e subcontracted. Subcontractors p r o v i d i n g a n y t h i n g other t h a n equipment shall also m e e t t h e general requirements i n 8.2. 8.2.10 V e r i f i c a t i o n . T h e f i r m shall verify that t h e services p r o v i d e d are carried o u ti n accordance w i t h approved procedures. of Materials and Products for Ships 8.2.11 R e p o r t i n g . Reports o n t h e results o f activity p e r f o r m e d shall c o n t a i n a c o p y o f t h e R e c o g n i t i o n C e r t i f i c a t e (СП), i n addition t o t h e information specified i n 7.2.6.1. T h e reports shall detail t h eresults o finspections, measure­ m e n t s , tests, m a i n t e n a n c e a n d / o r repairs carried o u t . 8.2.12 Q u a l i t y System. 8 . 2 . 1 2 . 1 T h e firm s h a l l h a v e a d o c u m e n t e d covering a t least t h e f o l l o w i n g : system .1 t h eC o d e o f Ethics t o conduct t h e relevant activity; .2 m a i n t e n a n c e o f e q u i p m e n t ; .3 m e a s u r e m e n t a s s u r a n c e , c h e c k i n g ( c a l i b r a t i o n ) o f measuring equipment; .4 t r a i n i n g p r o g r a m m e s f o r o p e r a t o r s / t e c h n i c i a n s / inspectors; .5 s u p e r v i s i o n a n d v e r i f i c a t i o n t o e n s u r e c o m p l i a n c e w i t h operational procedures; .6 r e c o r d i n g a n d r e p o r t i n g o f i n f o r m a t i o n ; .7 q u a l i t y m a n a g e m e n t o f s u b s i d i a r i e s , a g e n t s a n d subcontractors; .8 j o b p r e p a r a t i o n ; .9 c o r r e c t i v e complaints; a n d preventive actions related t o .10 p e r i o d i c r e v i e w o f w o r k p r o c e s s p r o c e d u r e s , complaints, corrective actions, a n d issuance, m a i n t e ­ nance a n d control o f documents. 8.2.12.2 A d o c u m e n t e d Q u a l i t y S y s t e m c o m p l y i n g w i t h t h em o s t current v e r s i o n o fI S O 9 0 0 0 series a n d including t h e above items, w o u l d b e considered acceptable according t o 8.2.12.1. 8.2.12.3 I f a m a n u f a c t u r e r o f e q u i p m e n t ( a n d / o r i t s service supplier) applies t o t h e Register f o rinclusiono f its n o m i n a t e d agents a n d / o r subsidiaries i n t h e R e c o g n i ­ t i o n C e r t i f i c a t e (СП), t h e n i t s h a l l i m p l e m e n t a Q u a l i t y System certified i n accordance w i t h t h e most current v e r s i o n o fI S O 9 0 0 0 series. T h e Q u a l i t y S y s t e m s h a l l contain effective controls o f the manufacturer's (and/or service supplier's) agents and/or subsidiaries. T h e n o m i n a t e d agents/subsidiaries shall also h a v e i n place an equally effective Quality S y s t e m c o m p l y i n g w i t h t h e m o s t current v e r s i o n o f I S O 9 0 0 0 series. S u c h r e c o g n i ­ tion shall b e based u p o n a n evaluation o fthe Quality S y s t e m i m p l e m e n t e d b y t h e parent c o m p a n y against t h e m o s t current v e r s i o n o fI S O 9 0 0 0 series. T h e R e g i s t e r m a y require follow-up audits o n such agents o r subsidiaries against t h e most current version o f I S O 9 0 0 0 series t o c o n f i r m adherence t o this q u a l i t y system. 8.2.13 S e r v i c e s u p p l i e r s r e l a t i o n s w i t h t h e e q u i p ­ ment manufacturer. 8.2.13.1 A f i r m , w h i c h w o r k s a s a s e r v i c e s t a t i o n f o r manufacturers) o fequipment ( a n d as a service supplier i n this field), shall b e assessed b y t h e m a n u f a c t u r e r s ) a n d n o m i n a t e d as their agent. T h e manufacturer shall ensure that appropriate instruction manuals, materialetc. are available f o rt h e agent as w e l l as proper t r a i n i n g o f Part I . General Regulations for Technical the agent's technicians. Such suppliers shall b e recog­ n i z e d either o n a case b y case basis, o r i n accordance w i t h 8.2.12.3. 8.3 S P E C I A L 21 Supervision REQUIREMENTS 8.3.1 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n t h i c k n e s s m e a s u r e m e n t s o n s h i p s ( c o d e s 22001001, 22001002). T h e firms engaged i n thickness measurements ( h e r e i n a f t e r r e f e r r e d t o a s T M firms) o n s h i p s c o m p l y the f o l l o w i n g categories: Category I : those engaged i n thickness measure­ ments under supervision o fR S surveyor o n a l l ships regardless o ftheir gross tonnage; C a t e g o r y П: t h o s e e n g a g e d i n t h i c k n e s s m e a s u r e ­ ments under supervision o fthe R S surveyor o nfishing vessels o n l y regardless o f their gross tonnage a n d n o n E S P ships less t h a n 5 0 0 gross tonnage. 8.3.1.1 R e q u i r e m e n t s f o r C a t e g o r y I f i r m s . 8.3.1.1.1 S u p e r v i s o r . T h e responsible supervisor shall b equalified accord­ ing t othe recognized national o rinternational industrial N D T standard (e.g. I S O 9 7 1 2 , L e v e l I I as amended). T h e supervisor shall have adequate knowledge o f ship structures a n d b e able t o assess t h e results o f measurements performed i n compliance with t h e R S normative documents. 8.3.1.1.2 O p e r a t o r s . T h e operators carrying o u tt h e measurements shall b e certified t o a recognised national o r international industrial standard (e.g. I S O 9 7 1 2 level I as a m e n d e d ) a n d shall h a v e adequate k n o w l e d g e o f ship structures sufficient t o elect a representative position f o r each m e a s u r e m e n t 8.3.1.1.3 O p e r a t o r / s u p e r v i s o r s h a l l h a v e a p p r o p r i a t e qualification documents i n ultrasonic testing (ultrasonic thickness) issued b y t h e accredited b o d y for training a n d certification o f N D T personnel (hereinafter referred t o as the N D T training a n dcertification b o d y ) specified i n 8.3.1.1.4. I f these documents o foperator/supervisor are issued b y t h e N D Ttraining a n d certification body w i t h o u t accreditation (refer t o 8.3.1.1.4), t h e possibility o f t h e T M f i r m recognition shall b e subject t o special consideration b yR H O . F o r each service provided, a n operator/supervisor shall have t h e p o w e r o f attorney d u l y signed a n d sealed b y a T M firm t o e n a b l e h i m / h e r c a r r y i n g o u t t h i c k n e s s measurements o f h u l l structures o n a particular ship. T h e validity o fthe p o w e r o f attorney shall b e established b y the firm management. This t e r m shall n o t exceed t h e term o fthe validity o fthe qualification document i n ultrasonic testing (ultrasonic thickness measurements) o r R e c o g n i t i o n C e r t i f i c a t e (СП) i s s u e d f o r t h e o p e r a t o r / supervisor, w h i c h e v e r i s earlier. 8.3.1.1.4 N D T t r a i n i n g a n d c e r t i f i c a t i o n b o d i e s . Pursuant t o E N I S O 9 7 1 2 , N D T training a n d certification bodies (operators/supervisors) shall b e accredited b y t h e international o r national N D T certifica­ tion authority forcompliance with ISO/LEC 17024. Self-declaration o fcompliance isn o t allowed. T h e list o fN D T accreditation bodies - m e m b e r s o f the f o l l o w i n g international associations for N D T , c a n b e found b ythe links below: the European Federation f o r Non-Destructive Test­ ing ( E F N D T ) : http://www.efndt.org/Members.aspx the International Committee f o rNon-Destructive Testing ( I C N D T ) : http://www.icndt.org/Directory.aspx Asia Pacific Federation for N o n Destructive Testing (APFNDT): http://apfndt.org/apfndt3.html Certification bodies accredited f o r training a n d certification o f N D T personnel f o ritems o f t h e R S technical supervision (e.g. i n shipbuilding a n d repair sector) according t o E N I S O 9 7 1 2m a y b e additionally certified b y t h e R S i n compliance w i t h t h e requirements o f S e c t i o n 1 1 u p o n their request o n t h e v o l u n t a r y basis. Certification bodies that a r en o t accredited b y t h e N D T accreditation bodies f o r personnel training a n d certification i nnon-destructive testing o fitems o f the R S technical supervision according t o E N I S O 9712 shall b e certified b y R S o n a m a n d a t o r y basis. 8.3.1.1.5 E q u i p m e n t . O n coated surfaces, instruments u s i n g p u l s e d echo technique (either w i t h oscilloscope o r digital instruments using m u l t i p l e echoes, single crystal technique) are required. Single echo instruments m a yb e used o n uncoated surfaces, w h i c h h a v e been cleaned a n d ground. 8.3.1.1.6 P r o c e d u r e s . D o c u m e n t e d w o r k procedures are a t least t o c o n t a i n information o n inspection preparation, selection a n d identification o f test locations, surface preparation, protective coating preservation, calibration checks, a n d report preparation a n d content. 8.3.1.1.7 R e p o r t i n g . I n addition t o 8.2.11, thereport shall b e based o n the requirements o f Appendix 2 t o t h e Rules f o r t h e Classification Surveys o f Ships i nService a n d Instruc­ tion o n Residual Thickness Measurements o f Ship's Elements. 8.3.1.1.8 D e t a i l s o f C a t e g o r y I T M f i r m r e c o g n i t i o n . T M f i r m recognition a n dissuance o f the R e c o g n i t i o n C e r t i f i c a t e (СП) ( f o r m ( 7 . 1 . 4 . 2 ) a r e c o n d i t i o n a l o n a practical demonstration o fthickness measurements o n board the ship performed under supervision o f the R S surveyor, as w e l l as satisfactory reporting being carried out based o n t h e results o f thickness measurement. T h e Register shall issue t h e Certificate o f V o c a t i o n a l Training (Cllll) (form 7.1.34) t o the operator/supervisor confirming his/her appropriate qualification f o r carrying out thickness measurements o n ships i n compliance w i t h the R S normative documents. 22 Rules for Technical Supervision during Construction of Ships and Manufacture A n entry o n t h e type o fservice shall b e made i n t h e A n n e x t o t h e R e c o g n i t i o n C e r t i f i c a t e (СП) r e a d i n g a s follows: "Category I : thickness measurements o n a l l ships regardless o ftheir gross tonnage". During survey o f recognized T M firms f o r confirmation/renewal o f t h e Recognition Certificate (СП), i t s h a l l b e c o n f i r m e d t h a t t h e y f u l l y c o m p l y w i t h the applicable requirements o f t h e R S normative documents concerning T M f i r m recognition, a n d that the residual thickness measurements during t h e period o f v a l i d i t y o f t h e R e c o g n i t i o n C e r t i f i c a t e (СП) h a v e b e e n carried o u t o nparticular ships under supervision o f t h e surveyors t o t h e Register, o r subject t o special con­ sideration b y R H O , under supervision o f the surveyors t o A C S - L A C S m e m b e r w h o s e Recognition Certificates (СП) a r e a l s o a v a i l a b l e a t t h e T M f i r m , i t s h a l l b e a l s o corifirmed that thickness measurements reports have been duly signed a n d stamped b y t h e R S o rA C S surveyors. Particular attention shall b e paid t o t h e relevance o f the list o f the T M f i r m operators/supervisors and t o t h e availability o f t h e necessary documents confirming theN D T personnel qualification. 8.3.1.1.9 S u p e r v i s i o n f o r s e r v i c e s recognized T M firm. rendered b y a Thickness measurements o n t h e RS-classed ships carried o u tb y t h e T M f i r m shall b e provided under supervision o f the R S surveyor o rthe surveyor t o A C S L A C S m e m b e r i f t h e ship is submitted i n location inaccessible f o r survey b y t h e Register. T h e fact o f t h e supervision a n d performance o fw o r k s shall b e certified b y signature a n d stamp o fthe R S s u r v e y o r o nt h e cover page o f thickness m e a s u r e m e n t report (refer t o 8.3.1.1.7). 8.3.1.1.10 I n f o r m a t i o n o n t h e T M status. firms recognition 8.3.1.1.10.1 T h e I A C S w e b s i t e p r o v i d e s l i n k s t o t h e databases o fofficial websites o fclassification societies participating i nI A C S P R N o . 2 3 (hereinafter referred t o as t h e p a r t i c i p a t i n g s o c i e t y ) , w h i c h c o n t a i n t h e i n f o r m a ­ t i o n o n t h e r e c o g n i z e d T M f i r m s (www.iacs.org.uk i n "Ship/Company data/Thickness Measurement F i r m s " Section). E a c h participating society is responsible t o provide i n f o r m a t i o n o n alterations o f the links i norder t o update the I A C S website. 83.1.1.102 A C S - I A C S member, including t h e Register, shall n o t i f y t h e other classification societies (participating societies) a n dt h e I A C S P e r m a n e n t Secretary o n c a n c e l l a t i o n o f t h e R e c o g n i t i o n C e r t i f i c a t e s (СП) o f t h e T M firms d u e t o a n y r e a s o n s s p e c i f i e d i n 3 . 6 . 2 , 3 . 6 . 7 t o 3.6.9. R H O shall send a notification o f cancellation o f the r e c o g n i t i o n ( R e c o g n i t i o n C e r t i f i c a t e (СП)) i n t h e f o r m g i v e n i n I A C S P R N o . 2 3 t o classification societies v i a e-mails posted i n the " P R 2 3 Contact Details" Section o n the I A C S website as w e l l as t ot h e I A C S Permanent Secretary v i a e - m a i l : efs@iacs.org.uk w i t h i n five ( 5 ) w o r k i n g d a y s from t h e d a t e o f c a n c e l l a t i o n . O n r e c e i p t b y t h e R e g i s t e r o f notification o n cancellation o f the recognition (Recognition of Materials and Products for Ships C e r t i f i c a t e (СП)) o f t h e T M firm from A C S o r o t h e r classification societies, R H O shall request A C S o r other classification societies f o r a n y additional i n f o r m a t i o n o n the reason f o r cancellation o f t h e recognition (Recognition C e r t i f i c a t e (СП)), i f r e q u i r e d . T h e o b t a i n e d i n f o r m a t i o n i s subject t o t h e R H O review, a n d t h e decision i s t a k e n w i t h regard t o the possibility o f maintaining t h eT M recognition b y t h e Register, i f any, o r the possibility o fissuance o f the R e c o g n i t i o n Certificate i f the T M f i r m applies t o R S f o r the f i r s t time. T h e R H O a n d participating societies shall t i m e l y advise I A C S P e r m a n e n t Secretary o na m e n d m e n t s m a d e to their contact details i norder t o update i n f o r m a t i o ni n the "PR23 Contact Details" Section i ntheI A C S website accordingly. 8.3.1.1.10.3 P r i o r t o i s s u a n c e o f a n e w R e c o g n i t i o n C e r t i f i c a t e (СП) t o a T M f i r m o r r e n e w a V c o n f i r m a t i o n o f a v a l i d one, t h e R S surveyor shall check t h ei n f o r m a t i o n on cancellation o fthe T M firm recognition b y A C S o n the R S internal website i nSection "Information Systems/ Industry Database/Lnformation o n Supervision i n Indus­ try/List o f T M Firms Recognized b y Other Classification Societies, w h o s e Certificates a r e Cancelled" b y link http://gur.rs-head.spb.ru/win/survey/sto/tmcan.htm I n cases w h e r e t h e R S s u r v e y o r reveals that t h e r e c o g n i t i o n o f a n y T M firm h a s b e e n c a n c e l l e d b y A C S , he/she ( i fnecessary) m a ycontact R H O for further instructions o nthis occasion. 8.3.1.2 R e q u i r e m e n t s f o r C a t e g o r y I I T M f i r m s limited recognition. - 8.3.1.2.1 T h e o b j e c t i v e o f t h i s l i m i t e d r e c o g n i t i o n i s recognition p r o g r a m m e is verify that t h e T Mf i r m has qualified personnel that are able t o measure thicknesses, recognize types o f wear, understand hull structural drawings, have adequate k n o w l e d g e o f ship structures in addition t o having t h e necessary technical equipment to render professional assistance. T h e firm recognition b y t h e Register w i t h regard t o 8.3.1.2.6 shall include t h e f o l l o w i n g : .1 r e v i e w o f t h e documents c o n f i r m i n g t h e f i r m compliance w i t h the R S requirements; .2 s u r v e y o f t h e f i r m . 8.3.1.2.2 S u b m i s s i o n o f d o c u m e n t s . T h e following documents shall b e submitted t o t h e Register for review: organization a n d m a n a g e m e n t structure; list o f operators supervisors h a v i n g documented training tutorial, qualifications a n d experience; description o f t h e equipment used, including m a i n ­ tenance a n d calibration procedures; operator's m a n u a l f o rsuch equipment. 8.3.1.2.3 N D T p e r s o n n e l d o c u m e n t s . T h e T M firm s h a l l k e e p N D T p e r s o n n e l d o c u m e n t s . These documents shall contain information o nage, education, training a n d experience i nthickness measure­ ments. Part I . General Regulations for Technical Supervision A n operator carrying o u tt h e measurements shall b e certified i nnon-destructive testing m i n i m u m at level I , according t o a recognized national a n d international standard f o r qualification a n d certification o f N D T (i.e. I S O 9 7 1 2as amended). A n operator shall have a m i n i m u m o f o n e year tutored on-job, a program o f external training m a y b e considered as acceptable. A n operator shall have adequate k n o w l e d g e o f ship struc­ ture, sufficient t o select a representative p o s i t i o n f o r each measurement. A n operator shall have relevant qualification docu­ ments i nultrasonic testing (ultrasonic thickness) issued b y t h e accredited b o d y (refer t o 8.3.1.1.4). I f these documents a r e issued b y t h e certification b o d y w i t h o u t accreditation (refer t o 8.3.1.1.4), t h e matter o n r e c o g n i t i o n o f t h i s T M firm s h a l l b e s u b j e c t t o s p e c i a l consideration b y R H O . F o r each o fservice provided, a n operator shall have a p o w e r o f attorney d u l y signed a n dsealed b y a T M firm, to enable him/her t o carry out thickness measurements o f h u l l structures o na particular ship. 8.3.1.2.4 E q u i p m e n t . Requirements f o requipment specified i n 8.3.1.1.5. 8.3.1.2.5 R e p o r t i n g . are similar t o those 23 less t h a n 5 0 0 gross t o n n a g e " . T h e R e g i s t e r s h a l l issue t h e C e r t i f i c a t e o f V o c a t i o n a l T r a i n i n g (СПП) ( f o r m 7 . 1 . 3 4 ) to t h eoperator w h o h a s carried o u t thickness measure­ ments confirming his/her training i n thickness measure­ ments o n board ships as p e r t h e R S n o r m a t i v e documents. D u r i n g s u r v e y o f r e c o g n i z e d T M firms f o r c o n ­ firmation/renewal o f t h e R e c o g n i t i o n C e r t i f i c a t e (СП), i t shall b e verified that t h e applicable requirements o f t h e R S normative documents as regards T M f i r m recognition are observed, i n particular, that thickness m e a s u r e m e n t s within the period o f validity o f the Recognition C e r t i f i c a t e (СП) a r e c a r r i e d o u t o n b o a r d s h i p s c o n c e r n e d under technical supervision o f t h e R S surveyors o r surveyors t o A C S- I A C S members with Recognition C e r t i f i c a t e s (СП) a v a i l a b l e a t t h i s T M f i r m ( s u b j e c t t o special consideration b y R H O ) . I t shall b e verified that all thickness measurement reports a r e signed a n d sealed b y t h e R S o rA C S surveyors. Special consideration shall be g i v e n t o t h e relevance o f t h e list o f operators e m p l o y e d i n t h e T M firm a n d a v a i l a b i l i t y o f r e q u i r e d documents confirming the qualification o f N D T personnel. T h e R e c o g n i t i o n C e r t i f i c a t e (СП) s h a l l b e r e n e w e d according t o Section 3. I n addition t o 8.2.11, t h ereport shall b e based o n Appendix 2 t o theRules for the Classification Surveys o f Ships i n Service a n dInstruction o n Residual Thicknesses Measurements o f Ship's Elements. The Register shall b e immediately notified o f a n y a m e n d m e n t m a d e t o t h e s y s t e m f o rservice rendering b y the supplier, i f any. T h erepeated check m a y b e required as d e e m e d n e c e s s a r y b y t h e R e g i s t e r . 8 . 3 . 1 . 2 . 6 D e t a i l s o f C a t e g o r y П firm r e c o g n i t i o n . U p o n reviewing the submitted documents with T h e r e c o g n i t i o n m a y b e cancelled i n cases specified i n 3.6. T h e Register reserves its right t o cancel t h e recognition. satisfactory results, t h e T M f i r m shall b e audited t o ascertain that t h e supplier ( T M firm) i s d u l y organized and managed i n accordance w i t h t h e submitted docu­ ments, a n di s capable o frendering t h e services w h i c h recognition o f supplier ( T M firm)/issuance o ft h e R e c o g n i t i o n C e r t i f i c a t e (СП) i s r e q u i r e d . T h e T M f i r m recognition a n d issuance o ft h e R e c o g n i t i o n C e r t i f i c a t e (СП) a r e c o n d i t i o n a l o n a practical demonstration o f thickness measurement o n board t h e ship p e r f o r m e d under supervision o ft h eR S surveyor, as w e l l as satisfactory reporting being carried out based o n t h e N D T results. U p o n satisfactory completion o fsurvey o fthe T M firm, t h e demonstration test a n d p r o p e r r e p o r t i n g , t h eR e g i s t e r s h a l l issue relevant r e p o r t s o n s u r v e y a n d a R e c o g n i t i o n C e r t i f i c a t e s (СП) stating that t h e procedures a n d methods f o rcarrying o u t thickness measurements used b yt h e T M firm have been recognized b y t h e Register a n dm a y b e accepted a n d used b y t h eR S surveyors i n m a k i n g decisions during ship surveys. T h e f o l l o w i n g shall b e specified i n t h e A p p e n d i x t o t h e R e c o g n i t i o n C e r t i f i c a t e (СП) ( f o r m 7 . 1 . 4 . 2 ) : " 2 2 0 0 1 0 0 1 - C a t e g o r y П: t h i c k n e s s m e a s u r e m e n t s u n d e r supervision o f t h e R S s u r v e y o r o n fishing vessels regardless o f their gross tonnage a n d n o n - E S P ships T h e supplier w h o s e recognition w a s cancelled m a y apply f o r re-recognition, provided i t h a s corrected t h e non-conformities, w h i c h resulted i n cancellation, a n d t h e Register is able t o c o n f i r m i t has effectively i m p l e m e n t e d the corrective action. 8.3.1.2.7 S u p e r v i s i o n f o r s e r v i c e s p r o v i d e d b y t h e recognized T M firm. T h e fact o fsupervision a n dperformance o f w o r k s i n compliance with the requirements o f the R S normative documents shall b e certified b y signature a n d stamp o f the R S surveyor o n t h e cover page o f thickness measurement report (refer t o 8.3.1.2.5). 8.3.2 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n t i g h t n e s s testing o f closing appliances such a s hatches, doors etc. w i t h u l t r a s o n i c e q u i p m e n t ( c o d e 22002000). 8.3.2.1 E x t e n t o f e n g a g e m e n t - u l t r a s o n i c t i g h t n e s s testing o f closing appliances such as hatches, doors etc. 8.3.2.2 O p e r a t o r s . T h e operator shall have t h e following qualifications: have knowledge o f different closing appliances, including their design, f u n c t i o n i n g a n d sealing features; have experience w i t h the operation a n d maintenance o f different closing appliances; 24 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships be able t o document theoretical and practical training onboard i n using t h e ultrasonic equipment specified. t w o - w a y c o m m u n i c a t i o n b e t w e e n diver a n d surface staff; 8.3.2.3 E q u i p m e n t . It shall b e demonstrated for t h eR S surveyor that t h e e q u i p m e n t i s fit f o r t h e p u r p o s e o f d e t e c t i n g l e a k a g e s i n losing appliances such as hatches, doors etc. video recording device connected t o t h e closed circuit television; still p h o t o g r a p h y camera; equipment f o rcarrying o u tthickness gauging, n o n destructive testing a n d measurements (e.g. clearances, indents, etc.,as relevant t o t h e w o r k t ob e performed); 8.3.2.4 P r o c e d u r e s . T h e supplier shall have documented w o r k procedures, w h i c h shall include t h e m a n u a l f o rt h e ultrasonic equipment specified, itsadjustment, maintenance, operation a n d approval criteria. 83.3 R e q u i r e m e n t s for firms carrying o u t in-water surveys o f ships a n d offshore installations (code 22003000). 8.3.3.1 E x t e n t o f e n g a g e m e n t - i n - w a t e r s u r v e y o f ships a n d offshore installations b y diver o r remote operated vehicle ( R O V ) . 8.3.3.2 T r a i n i n g o f p e r s o n n e l . equipment f o rcleaning o fthe hull; R O V , i f applicable. 8.3.3.7 P r o c e d u r e s a n d g u i d e l i n e s . T h e supplier shall have documented operational procedures a n d guidelines f o r h o wt o carry o u t t h e inspection a n dh o w t ohandle t h eequipment. These shall include: t w o - w a y c o m m u n i c a t i o n b e t w e e n diver a n d surface; video recording a n d closed circuit television operation; T h e firm i s r e s p o n s i b l e f o r t h e q u a l i f i c a t i o n o f i t s divers a n d the diving equipment utilized w h e n carrying out inspection. K n o w l e d g e o f t h e following shall b e documented: guidance o f t h e diver along t h e hull t o provide complete coverage o fthe parts t ob e inspected. 8.3.3.8 V e r i f i c a t i o n o f s e r v i c e s r e n d e r e d b y t h e recognized firm. ship's underwater structure a n d appendages, shaft, propeller, rudder a n d its bearings, etc.; A l l in-water surveys o fships a n d offshore installat i o n s s h a l l b e p e r f o r m e d b y t h e firm u n d e r t h e s u p e r vision o f the R S surveyor. T h e supplier shall have t h e surveyor's verificationo feach separate j o b p e r f o r m e d i n compliance with t h e Register normative documents, documented i n t h e report b y t h e attending surveyor's signature a n d seal. tail non-destructive testing i naccordance w i t h a recognised national o r international industrial N D T standard. T h i s requirement o n l y applies i f a n in-water survey c o m p a n y p e r f o r m s non-destructive testing (e.g., v i s u a l and dimensional examination, ultrasonic testing, ultrasonic thickness m e a s u r e m e n t , etc.); bearing clearance measurements o nrudders a n d tail shaft; underwater video monitoring with TV-monitors o n deck, as w e l l as still picture w o r k ; underwater c o m m u nication systems; special e q u i p m e n t a n d tools e.g. h u l l cleaners, grinders, cutters, etc. 8.3.3.3 A p l a n f o r t r a i n i n g o f p e r s o n n e l i n t h e reporting system, m i n i m u m requirements o f the Register rules f o r relevant ship types, ship's underwater structure, measuring o f bearing clearances, t h e recognition o f corrosion damage, b u c k l i n g a n d deteriorated coatings, etc. s h a l l b e i n c l u d e d . 8.3.3.4 S u p e r v i s o r . The supervisor shall b e qualified according t o t h e supplier's general requirements a n dshall have a m i n i m u m o ft w o years' experience as a diver carrying o u t inspection. 8.3.3.5 D i v e r . T h e d i v e r shall h a v e h a d a t least o n eyear's experience as a n assistant d i v e r c a r r y i n g o u t i n s p e c t i o n s ( i n c l u d i n g participation i n a m i n i m u m o f1 0different assignments). 8.3.3.6 E q u i p m e n t . T h e firms s h a l l h a v e t h e f o l l o w i n g : closed circuit colour television w i t h illumination equipment; sufficient 8.3.4 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n i n s p e c tion a n d maintenance o ffire-extinguishing equipment a n d systems (code 2200400MK). 8.3.4.1 E x t e n t o f e n g a g e m e n t . Inspections a n d maintenance o f fire-extinguishing e q u i p m e n t a n d s y s t e m s s u c h a s fixed f i r e e x t i n g u i s h i n g systems, portable fire extinguishers a n d fire detection and alarm systems. 8.3.4.2 L e g a l s t a t u s . The firm shall have valid documents allowing t o p e r f o r m t h e s u r v e y a n d m a i n t e n a n c e o f fire e x t i n g u i s h e r s issued b y t h e state authorities c o m p e t e n t i n fire safety area according t o t h e laws o f t h e firm's country o f residence, i f required. 8.3.4.3 F i l e s o f t h e f i r m d o c u m e n t s . 8 . 3 . 4 . 3 . 1 T h e firm s h a l l h a v e a c c e s s t o t h e f o l l o w i n g documents: .1 manufacturer's servicing manuals, servicing bulletins, instructions a n d training manuals, as appropriate; .2 T y p e A p p r o v a l C e r t i f i c a t e s s h o w i n g a n y c o n d i tions that m a y b e appropriate during t h eservicing and/or maintenance o f fire-extinguishing equipment a n d systems; .3 S O L A S , M S C . l / C i r c u l a r . 1 3 1 8 ( G u i d e l i n e s f o r t h e M a i n t e n a n c e a n d Inspections o fF i x e d C a r b o n D i o x i d e Fire-Extinguishing Systems), International Code for Fire Part I . General Regulations for Technical Supervision Safety Systems ( F S S Code), I S O 6406 (Periodic inspection a n d testing o fseamless steel gas cylinders), and a n y documentation specified i n t h e authorizationo r license f r o m t h e equipment manufacturer; .4 M S C / C i r c . 6 7 0 ( G u i d e l i n e s f o r t h e P e r f o r m a n c e and Testing Criteria a n d Surveys o f H i g h Expansion F o a m Concentrates f o rF i x e d Fire-Extinguishing Systems); .5 M S C / C i r c . 7 9 8 ( G u i d e l i n e s f o r t h e P e r f o r m a n c e and Testing Criteria a n d Surveys o fM e d i u m Expansion F o a m Concentrates f o rF i x e d Fire-Extinguishing Systems); .6 M S C / C i r c . 7 9 9 ( G u i d e l i n e s f o r t h e P e r f o r m a n c e and Testing Criteria a n d Surveys o fExpansion F o a m Concentrates f o r F i x e d Fire-Extinguishing Systems o f Chemical Tankers); .7 M S C . l / C i r c . 1 3 1 2 ( R e v i s e d G u i d e l i n e s f o r t h e Performance a n d Testing Criteria a n d Surveys o f F o a m Concentrates f o r F i x e d Fire-Extinguishing Systems as corrected b y M S C / C i r c . l 3 1 2 / C o r r . l ) ; .8 M S C . l / C i r c . 1 4 3 2 ( R e v i s e d G u i d e l i n e s f o r t h e Maintenance a n d Inspection o fFire Protection Systems and Appliances); .9 L M O r e s o l u t i o n A . 9 5 1 ( 2 3 ) - I m p r o v e d g u i d e l i n e s f o r m a r i n e p o r t a b l e fire e x t i n g u i s h e r s ; .10 M S C . l / C i r c . 1 3 7 0 - G u i d e l i n e s f o r t h e d e s i g n , construction a n d testing o f fixed hydrocarbon gas detection systems; .11 G u i d e l i n e s a d o p t e d b y I M O f o r fire-extinguishing equipment a n d systems specifically intended f o r service b y service suppliers. 8.3.4.3.2 I n a d d i t i o n t o t h e d o c u m e n t s l i s t e d i n 8 . 3 . 4 . 3 . 1 , t h e firm s h a l l h a v e a p p l i c a b l e documents specified i n4 . 3 , Part L V "Technical Supervision during M a n u f a c t u r e o fProducts" as w e l l as recognized international and/or national standards prescribing t h e requirem e n t s a n d test procedures f o r i t e m s u n d e r technical supervision. 8.3.4.4 E x t e n t o f r e c o g n i t i o n . 25 equipment and/or system. These are t o either contain o r m a k e reference t ot h e manufacturer's servicing manuals, servicing bulletins, instructions a n d training manuals, as appropriate, a n dt o international requirements. A d d i t i o n ally they shall m a k e reference t o valid requirements (e.g. what markings shall b e appended t o t h e equipment/ system). 8.3.4.6 E q u i p m e n t a n d f a c i l i t i e s . 8.3.4.6.1 G e n e r a l r e q u i r e m e n t s . I f t h e firms undertake shore-based inspecting a n d maintenance, they shall maintain a n d implement procedures f o rw o r k s h o p cleanliness, ventilation a n d arrangement, w i t h d u e cognizance o f t h e spares a n d e x t i n g u i s h i n g m e d i a b e i n g stored, t o ensure safe a n d effective w o r k i n g procedures. T h efirms undertaking inspecting a n d maintenance o f equipment a n d systems onboard shall provide t h e appropriate facilities to either complete t h e w o r k onboard o r r e m o v e t h e necessary items t o their workshops. 8.3.4.6.2 E q u i p m e n t . Sufficient a n d appropriate spares a n d tools shall b e available as applicable, w h i c h shall include: .1 v a r i o u s scales t o w e i g h items; .2 m e a n s t o h y d r o s t a t i c a l l y p r e s s u r e t e s t nents/systems/storage bottles; compo- .3 l i q u i d / g a s , f l o w m e t e r s , a s a p p r o p r i a t e ; .4 p r e s s u r e g a u g e s ; .5 i n t h e c a s e s o f f o a m c o n c e n t r a t e s a n d p o r t a b l e fire-extinguishers, chemical analysis equipment a n d a testing bay,respectively; a n d .6 s p e c i f i c e q u i p m e n t / s p a r e s a s m a y b e s p e c i f i e d b y the manufacturer; .7 l e v e l m e a s u r i n g e q u i p m e n t f o r b o t t l e s ; .8 r e c h a r g i n g f a c i l i t i e s f o r p r e s s u r i z e d b o t t l e s , extinguishers a n d cartridges. 83.5 R e q u i r e m e n t s f o r firms e n g a g e d i n s u r v e y a n d maintenance o f life-saving appliances (codes 2 2 0 0 5 0 0 1 M K , 22005002, 2 2 0 0 5 0 0 3 M K , 2 2 0 0 5 0 0 6 M K , 2 2 0 0 5 0 0 7 M K , 22005008, 22005009, 2 2 0 0 5 0 1 0 M K ) . 8.3.4.4.1 R e p r e s e n t a t i v e s o f t h e f i r m s h a l l h a v e p r o f e s s i o n a l k n o w l e d g e o f fire t h e o r y , f i r e - f i g h t i n g a n d fire-extinguishing appliances sufficient t o carry o u t t h e maintenance and/or inspections, a n d t o m a k e t h e necessary evaluations o ft h e c o n d i t i o n o f t h e equipment. 8.3.5.1 E x t e n t o f e n g a g e m e n t . .1 servicing o f inflatable liferafts, inflatable lifejackets, hydrostatic release units and/or inflatable rescue boats; .2 s e r v i c i n g o f m a r i n e e v a c u a t i o n s y s t e m s . 8.3.4.4.2 I n d e m o n s t r a t i n g p r o f e s s i o n a l k n o w l e d g e , r e p r e s e n t a t i v e s o f t h e firm s h a l l h a v e a n u n d e r s t a n d i n g o f the various types o ffires a n d t h e e x t i n g u i s h i n g m e d i a t o be used o n them. 8.3.5.2 E q u i p m e n t a n d f a c i l i t i e s . L M O Res. A . 7 6 1 ( 1 8 ) as amended b y I M O resolution M S C . 5 5 ( 6 6 ) gives recommendations o n conditions f o r the approval o f servicing stations f o r inflatable liferafts w h i c h shall b e observed as relevant. 8.3.4.4.3 F o r f i x e d f i r e - e x t i n g u i s h i n g s y s t e m s , representatives o f t h e f i r m shall demonstrate a n understanding o f t h e principles involved w i t h gas, foam, deluge, sprinkler a n dwater- mist systems, as relevant f o r the approval being sought. 8.3.4.5 P r o c e d u r e s . T h e firms s h a l l h a v e d o c u m e n t e d p r o c e d u r e s a n d instructions o n h o w t o carry o u tt h e servicing o f t h e W h e r e inflatable liferafts a r e subject t o extended service intervals, M S C . l / C i r c . 1 3 2 8 shall also b e followed. 8.3.5.3 P r o c e d u r e s a n d i n s t r u c t i o n s . The firm shall have documented procedures a n d instructions f o rh o wt o carry o u t service o f equipment. W h e r e inflatable liferafts are subject t o extended service 26 Rules for Technical Supervision during Construction of Ships and Manufacture intervals i n accordance w i t h the requirements o f S O L A S R e g u l a t i o n Ш/20.8.3, M S C . l / C i r c . 1 3 2 8 s h a l l b e f o l ­ lowed i n addition t o L M O resolution A . 7 6 1 ( 1 8 ) as amended b yL M O resolutionMSC.55(66). 8 . 3 . 5 . 4 T h e firm s h a l l p r o v i d e e v i d e n c e t h a t i t h a s been authorised o r licensed t o service t h e particular makes andmodels o fequipment for w h i c h recognition is sought b y the equipment's manufacturer. 8.3.5.5 R e f e r e n c e d o c u m e n t s . T h e f i r m shall h a v e access t o t h e f o l l o w i n g documents: .1 I M O resolution A . 7 6 1 ( 1 8 ) " R e c o m m e n d a t i o n o n Conditions f o r t h e A p p r o v a l o f Servicing Stations f o r Inflatable Liferafts" (adopted o n 4 N o v e m b e r 1993), amended b yL M O resolutionMSC.55(66); .2 L M O r e s o l u t i o n M S C . 5 5 ( 6 6 ) ; .3 M S C . l / C i r c . 1 3 2 8 " G u i d e l i n e s f o r t h e A p p r o v a l o f Inflatable Liferafts Subject t o Extended Service Intervals Not Exceeding 3 0Months"; .4 m a n u f a c t u r e r ' s s e r v i c i n g m a n u a l s , s e r v i c i n g bulletins, instructions a n d training manuals, as appro­ priate; .5 T y p e A p p r o v a l C e r t i f i c a t e s , s h o w i n g a n y c o n d i ­ tions that m a yb e appropriate during t h e servicing and/or maintenance o f inflatable liferafts, inflatable rescue boats, inflatable lifejackets, a n d hydrostatic release units; .6 L S A C o d e / C h a p t e r L V , 1 9 9 5 S O L A S C o n f e r e n c e Resolution 4 regarding marine evacuation systems. 8.3.6 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n s u r v e y a n d maintenance o f life-saving appliances (codes 22005004, 22005005, 22005011, 22005012, 22005013). 8.3.6.1 T h e f i r m s 22005011 (weak link, 22005013, shall meet resolution A.761(18) MSC.55(66). engaged i n activities w i t h codes automatic gas inflation system), applicable requirements o f L M O as amended b y L M Oresolution 8 . 3 . 6 . 2 T h e firm s h a l l h a v e d o c u m e n t e d p r o c e d u r e s and instructions o nmethods o f equipment maintenance. T h e procedures shall include requirements t orecord the nature a n d dimensions o f damages as w e l l as defects revealed d u r i n g m a i n t e n a n c e a n d repair. T h e s h i p o w n e r shall b e notified o fall revealed defects affecting e further use o fthis equipment. I n case o f differences, relevant i n f o r m a t i o n f r o m t h e firm ( s e r v i c e s u p p l i e r ) s h a l l b e f o r w a r d e d t o t h e nearest R S B r a n c h O f f i c e t o settle t h e differences. These data shall b e m a d e available t o t h e Register u p o n request. 83.63 T h e f i r m shall provide evidence that i t has been authorised o r licensed t o serve t h eparticular types a n d models o f equipment b y the equipment manufacturer. 8.3.7 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n s e r v i c i n g a n d inspection o fradio a n dnavigational e q u i p m e n t w i t h c o d e s 22006000 (22006001 - 2 2 0 0 6 0 0 8 M K ) . 8 . 3 . 7 . 1 S p e c i a l r e q u i r e m e n t s f o r firms e n g a g e d i n activities with codes 2 2 0 0 6 0 0 1 , 22006003, 22006004MK and22006007MK. of Materials and Products for Ships 8.3.7.1.1 L e g a l status. T h e firm s h a l l s u b m i t a g r e e m e n t s w i t h t h e e q u i p ­ m e n t manufacturers entitling t h e f i r m t o p e r f o r m specific kinds o factivities a n dlaying d o w n t h eprocedure f o r p r o v i d i n g t h e f i r m w i t h spare parts. 8.3.7.1.2 P e r s o n n e l . T h e firm s h a l l s u b m i t d o c u m e n t s c e r t i f y i n g t h a t t h e firm's personnel have completed training i n t h e equip­ ment manufacturer's premises entitling t h e m t o perform specific kinds o factivity. 8 . 3 . 7 . 2 R e q u i r e m e n t s f o r firms e n g a g e d i n i n s p e c ­ tion o f radio a n d navigational equipment (codes 22006002MK, 22006008MK). 8.3.7.2.1 E x t e n t o f e n g a g e m e n t . I n s p e c t i o n a n d tests o f r a d i o e q u i p m e n t a n d a u t o ­ matic identification s y s t e m ( A I S ) o n board ships o r mobile offshore drilling units f o r compliance w i t h S O L A S - 7 4 / 7 8 Convention as amended. 8.3.7.2.2 R e f e r e n c e documents. T h e f i r m shall h a v e access t o t h e f o l l o w i n g documents: .1 S O L A S 1 9 7 4 as amended; .2 L M O r e s o l u t i o n A . 7 8 9 ( 1 9 ) " S p e c i f i c a t i o n o n t h e survey a n d certification functions o f recognised organi­ sations acting o nb e h a l f o f t h e administration"; .3 M S C . l / C i r c . 1 2 5 2 " G u i d e l i n e s o n A n n u a l T e s t i n g of the Automatic Identification System (AIS)"; .4 S N / C i r c . 2 2 7 , S N / C i r c . 2 2 7 / C o r r . 1 a n d2 4 5 "Guidelines for the Installationo fa Shipborne A u t o m a t i c Identification S y s t e m ( A I S ) " a n d amendments thereto; .5 I T U R a d i o R e g u l a t i o n s ; .6 L M O P e r f o r m a n c e S t a n d a r d s f o r r a d i o nication equipment; commu­ .7 F l a g State A d m i n i s t r a t i o n requirements; .8 r e l e v a n t p a r t s , i f a n y , o f t h e R e g i s t e r r u l e s a n d guidelines. 8.3.7.2.3 S u p e r v i s o r . T h e supervisor shall have a m i n i m u m t w o years education f r o m a technical school, experience as inspector, a n d shall preferably h o l d a General Operator's Certificate ( G O C ) o r a G M D S S Radioelectronic Certi­ ficate ( R E C ) , recognised b y t h e I T U , t o operate o r test radio transmitters. H e shall b e aware o f a n y local conditions f o rradio signal propagation, o fregional radio stations a n d their facilities, a n d o f t h e G M D S S infrastructure. 8.3.7.2.4 R a d i o inspector. T h e inspector carrying o u t the inspection shall have passed t h e internal training o f t h e supplier i n Radiotelephony, G M D S S , a n d initial a n d renewal surveys, as applicable. T h e inspector shall also h a v e a t least o n e year's technical school training o r as alternative h o l d evidence that h efollowed a technical course approved b y the relevant A d m i n i s t r a t i o n , a t least o n eyear's e x p e r i ­ ence as a nassistant radio inspector a n d s h o u l d preferably h o l d a nappropriate N a t i o n a l R a d i o Operators Certificate, Part I . General Regulations for Technical Supervision recognised b y t h e I T U , such as a G M D S S General Operator's Certificate ( G O C ) o r a G M D S S Radioelectronic Certificate ( R E C ) . H eshall b e aware o fa n y local conditions for radio signal propagation, o f regional radio stations a n d their facilities, a n d o f t h e G M D S S infrastructure. 8.3.7.2.5 E q u i p m e n t . 8 . 3 . 7 . 2 . 5 . 1 T h e firm s h a l l h a v e t h e m a j o r a n d auxiliary equipment required f o rcorrectly performing the inspection. A record o fthe equipment used shall b e kept. T h erecord shall contain i n f o r m a t i o n o n manufac­ turer a n d type o f equipment, a n d a l o g o f maintenance and calibrations. 8.3.7.2.5.2 A s t a n d a r d w h i c h i s r e l e v a n t t o t h e r a d i o equipment t o b e tested shall b e available f o r t h e equipment a n d shall b e cited i n t h e inspection report. 8.3.7.2.5.3 F o r e q u i p m e n t e m p l o y i n g s o f t w a r e i n conjunction w i t h t h etesting/examination, this software shall b e fully described a n dverified. 8.3.7.2.5.4 M i n i m u m r e q u i r e d i n s t r u m e n t s : .1 e q u i p m e n t f o r m e a s u r i n g frequency, voltage, current a n d resistance; .2 e q u i p m e n t f o r m e a s u r i n g o u t p u t a n d r e f l e c t e f f e c t on V H F and MF/HF; .3 e q u i p m e n t f o r m e a s u r i n g m o d u l a t i o n o n M F / H F and V H F ; .4 a c i d t e s t e r f o r c h e c k i n g s p e c i f i c g r a v i t y o f l e a d batteries; .5 e q u i p m e n t f o r t e s t i n g t h e p e r f o r m a n c e o f a u t o ­ matic identification system (AIS). 8.3.7.2.6 P r o c e d u r e s a n d i n s t r u c t i o n s . T h e firm shall have documented procedures a n d instructions f o r h o w t o carry o u t testing a n d examination o f radio equipment. Procedures a n d instructions f o r operating each item o ft h e testing/inspection equipment shall also b e kept a n d b e available at a l l times. 8.3.7.3 F i r m s e n g a g e d i n a n n u a l p e r f o r m a n c e t e s t i n g o f Voyage Data Recorders ( V D R ) a n dsimplified Voyage Data Recorders ( S - V D R ) i n accordance w i t h S O L A S Chapter V Regulation 18.8 (code 2 2 0 0 6 0 0 4 M K ) . 8.3.7.3.1 E x t e n t o f e n g a g e m e n t . Testing a n d servicing o f Voyage Data Recorders ( V D R ) a n d Simplified Voyage Data Recorders ( S - V D R ) in accordance w i t h S O L A S Chapter V Regulation 18.8 and MSC.l/Circular. 1222 "Guidelines o nA n n u a l Testing o f Voyage Data Recorders ( V D R ) a n dSimplified Voyage D a t a Recorders ( S - V D R ) " , as applicable. 21 .1 t h e manufacturer i s responsible f o r appointing manufacturer's authorised service stations t o carry o u t annual performance testing; .2 t h e m a n u f a c t u r e r i s r e q u i r e d t o b e a r e c o g n i z e d service supplier a n dshall satisfy t h erequirements f o r the firms engaged i nannual performance testing o f V D R a n d S - V D R , as applicable; .3 t h e m a n u f a c t u r e r ' s a u t h o r i s e d s e r v i c e s t a t i o n i s not required t ob e a recognized service supplier; .4 t h emanufacturer shall demonstrate that M S C . l / Circ.1222 i s applied i nits entirety. 8.3.7.3.4 P r o c e d u r e s . 8 . 3 . 7 . 3 . 4 . 1 T h e firm s h a l l h a v e d o c u m e n t e d p r o c e ­ dures a n d instructions. 8 . 3 . 7 . 3 . 4 . 2 W h e r e t h e firm i s a l s o t h e m a n u f a c t u r e r o f V D R o r S - V D R a n dh a s selected t o apply M S C . l / Circ.1222 i n itsentirety f o r the purpose o facting as a Service Supplier engaged i n annual performance testing, the following shall apply: .1 t h e manufacturer shall have d o c u m e n t e d proce­ dures f o rt h e assessment a n d authorization o f manufac­ turer's authorised service stations w h ocarry o u t annual performance testing; .2 t h e m a n u f a c t u r e r s h a l l h a v e d o c u m e n t e d p r o c e ­ dures f o rthe r e v i e w o f manufacturer's authorised service stations a n n u a l p e r f o r m a n c e test reports, analysis o f t h e V D R / S - V D R 12-hour l o g a n d t h e issue o f annual p e r f o r m a n c e test certificates t o t h e s h i p o w n e r / o p e r a t o r ; .3 t h e m a n u f a c t u r e r s h a l l m a i n t a i n a l i s t o f manufacturer's authorised service stations that c a nb e accessed ( b y a n y available means, e.g. v i aa n o m i n a t e d c o n t a c t p o i n t o r from t h e m a n u f a c t u r e r ' s w e b s i t e ) u p o n request. 8.3.7.3.5 R e f e r e n c e d o c u m e n t s . 8.3.7.3.5.1 T h es e r v i c e s u p p l i e r s h a l l h a v e access t o the following documents: .1 I M O- International C o n v e n t i o n o nt h e Safely o f Life at Sea( S O L A S ) , 74/78, Chapter V ,Regulation18.8 "Approval, surveys a n d performance standards o f navigational systems a n d equipment a n d voyage data recorder"; .2 M S C . l / C i r c . 1 2 2 2 " G u i d e l i n e s o n A n n u a l T e s t i n g o f Voyage Data Recorders ( V D R ) a n dSimplified Voyage D a t a Recorders ( S - V D R ) " . ( 1 1D e c e m b e r 2006); .3 I M O r e s o l u t i o n А . 8 6 Ц 2 0 ) a s a m e n d e d b y I M O resolution M S C . 2 1 4 ( 8 1 ) a n d revised b y I M Oresolution MSC.333(90); 8.3.7.3.2 T h e f i r m s h a l l p r o v i d e e v i d e n c e t h a t h e h a s been authorised o r licensed b y t h e equipment's m a n u ­ facturer t o service t h eparticular m a k e s a n dm o d e l s o f equipment f o r w h i c h recognition is sought. .4 I M O resolution M S C . l 6 3 ( 7 8 ) "Performance Standards f o r Shipborne Simplified Voyage Data R e ­ corders ( S - V D R s ) " (adopted o n 1 7 M a y2 0 0 4 ) as amended b yI M Oresolution 214(81). 8 . 3 . 7 . 3 . 3 W h e r e t h e firm i s a l s o t h e m a n u f a c t u r e r o f V D R o r S - V D R a n d h a s elected t o apply M S C . l / Circular. 1222 i nitsentirety f o r t h e purpose o f acting as a service supplier engaged i na n n u a l performance testing, the following shall apply: 8.3.7.3.5.2 T h e s e r v i c e s u p p l i e r s h a l l h a v e access t o applicable industry p e r f o r m a n c e standards, e.g.: .1 I E C 6 1 9 9 6 " M a r i t i m e n a v i g a t i o n a n d radio communication equipment a n d systems - Shipborne voyage data recorder ( V D R ) " ; 28 Rules for Technical Supervision during Construction of Ships and Manufacture .2 TEC 6 1 9 9 6 - 2 " M a r i t i m e n a v i g a t i o n a n d r a d i o communication equipment a n d systems - Shipborne v o y a g e data recorder ( V D R ) - Part 2 : Simplified v o y a g e data recorded ( S - V D R ) - Performance requirements, m e t h o d o f testing a n d required test results". of Materials and Products for Ships .2 s c r e e n e d r o o m o r t h e r e l e v a n t s c r e e n i n g e q u i p ­ ment preventing t h etransmission o fa signal f r o m t h e ЕРПШ-406 b e i n g c h e c k e d t o a s a t e l l i t e ; 8.3.7.3.5.3 T h e s e r v i c e s u p p l i e r s h a l l a l s o h a v e access t o a n y d o c u m e n t a t i o n specified i nt h e authoriza­ tion o r license f r o m t h e equipment manufacturer. .3 s e t o f s p a r e p a r t s , s p a r e s u p p l y u n i t s a p p r o v e d b y the manufacturer, as w e l l as t h e reserve stock o f E P I R B - 4 0 6 i n amounts agreed w i t h t h e manufacturer (for a t e m p o r a r y E P I R B - 4 0 6 replacement o na ship f o r a period o f servicing). 8.3.7.3.6 E q u i p m e n t a n d f a c i l i t i e s . T h e service supplier shall h a v e e q u i p m e n t as specified i n t h e authorization o r license f r o m t h e equipment manufacturer. 8.3.7.4.4 P r o c e d u r e s a n d g u i d e l i n e s . The firm shall have the following: .1 d o c u m e n t e d operating procedures a n d guidelines regulating E P I R B - 4 0 6 servicing performance; 8.3.7.3.7 R e p o r t i n g - T e s t R e p o r t . 8.3.7.3.7.1 T h e f i r m s h a l l i s s u e a c e r t i f i c a t e o f compliance as specified i n S O L A S 1974, as amended, Chapter V , Regulation 18.8. .2 l o g o f s e r v i c i n g w i t h d e t a i l s o f t h e s c o p e o f inspections carried o u t a n d t h e components replaced; 8.3.7.3.7.2 A n n u a l p e r f o r m a n c e t e s t o f V D R a n d S V D R s h a l l b e recorded i n t h e f o r m o f t h e m o d e l test report given i n t h eA p p e n d i x t o M S C . l / C i r c u l a r . 1 2 2 2 , signed a n d stamped b y t h e f i r m a n d attached t ot h e a n n u a l p e r f o r m a n c e test certificate. 8.3.7.3.7.3 W h e r e t h e s e r v i c e s u p p l i e r i s a l s o t h e manufacturer o fV D R / S - V D R a n d has selected t o apply MSC.l/Circ.1222 "Guidelines o n A n n u a l Testing o f Voyage Data Recorders ( V D R ) a n dSimplified Voyage Data Recorders ( S - V D R ) " i n its entirely for the purpose o f acting as a service supplier engaged i n annual performance testing, t h e manufacturer shall m a k e arrangements for the following: .1 r e v i e w o ft h e manufacturer's authorised service station a n n u a l p e r f o r m a n c e test report; .2 a n a l y s i s o f t h e r e c o r d e r ' s 1 2 - h o u r l o g ; .3 c h e c k i n g o f t h e m a s t e r r e c o r d / d a t a b a s e f o r t h e recorder. 8.3.7.3.7.4 I s s u e o f t h e a n n u a l p e r f o r m a n c e test certificate t o t h eshipowner/operator w i t h i n 4 5 days o f c o m p l e t i o n o f t h e a n n u a l p e r f o r m a n c e test. 8.3.7.4 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n s h o r e based servicing a n d testing o f E P I R B s o f C O S P A S S A R S A T satellite system (code 2 2 0 0 6 0 0 6 M K , 22006007MK). 8.3.7.4.1 E x t e n t o f e n g a g e m e n t . Shore-based servicing emergency radio beacons ( E P I R B - 4 0 6 ) o ft h e C O S P A S - S A R S A T satellite system. A n n u a l tests o f E P I R B s o fC O S P A S - S A R S A T satellite system. 8.3.7.4.2 O p e r a t o r . The firm personnel shall undergo t h e relevant training a n dhold theCertificate for E P I R B manufacturer confirming its right f o r E P I R B - 4 0 6 shore-based servi­ cing performance. 8.3.7.4.3 E q u i p m e n t . T h e firm s h a l l h a v e t h e f o l l o w i n g : .1 set o f calibrated e q u i p m e n t f o r servicing t h e E P I R B - 4 0 6 i n accordance with t h e provisions o f MSC/Circ.1039; .3 s e t o f t e c h n i c a l d o c u m e n t a t i o n f o r t h o s e t y p e s o f E P I R B - 4 0 6 , w h i c h t h e f i r m is authorised t o service; .4 s e r v i c e - b u l l e t i n s d i s t r i b u t e d b y t h e E P I R B - 4 0 6 manufacturer; .5 l a s t v e r s i o n o f t h e s o f t w a r e p r o v i d e d b y t h e E P I R B - 4 0 6 manufacturer o r t h e manufacturer o f t h e e q u i p m e n t used d u r i n g inspection, as w e l l as access t o the renewal o fthat software. 8.3.7.4.5 C o n f i r m a t i o n o f a u t h o r i t i e s . F i r m s shall present t h e c o n f i r m a t i o n o fauthority, i.e. contractual relations w i t h t h emanufacturer for supply o f spare parts, p o w e r supply units a n d consumables, as w e l l as t h e d o c u m e n t a u t h o r i z i n g s h o r e b a s e d s e r v i c i n g performance f o r t h e specific E P I R B - 4 0 6 type(s) o n behalf o fthe E P I R B - 4 0 6 manufacturer. 8.3.7.4.6 A n n u a l t e s t i n g o f E P I R B . A n n u a l tests o f E P I R B s h a l l b e p e r f o r m e d a c c o r d i n g to I M O Circular ИМО M S C .1/Circ. 1040/rev. 1 and/or MSC.l/Circ.1123. 8.3.7.5 R e c o g n i t i o n C e r t i f i c a t e s (СП) i s s u e d t o f i r m s engaged i nactivities w i t h codes 2 2 0 0 6 0 0 0 ( 2 2 0 0 6 0 0 1 t o 2 2 0 0 6 0 0 8 M K ) shall b e subject t o e n d o r s e m e n t a t least once a year. I n specific cases, as agreed u p o n w i t h R H O , the endorsement period m a y b e extended u p t o 20 months. 8.3.8 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n i n s p e c ­ tion a n d testing o fcentralized gas-welding a n d gascutting e q u i p m e n t (code 22007000MK). The firm shall document a n d demonstrate its k n o w l e d g e gas w e l d i n g , associated central g a s installa­ tion systems a n d current safely requirements applicable to such equipment b y national Administrations. This knowledge shall b e sufficient t o carry out inspections a n d testing a n d t o m a k e t h e necessary evaluations o f t h e equipment condition. 8.3.9 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n s u r v e y s a n d maintenance o f self-contained breathing appara­ tus (code 22008000MK). 8.3.9.1 E x t e n t o f e n g a g e m e n t . Inspections a n d maintenance o f self-contained breathing apparatus a n d emergency escape breathing devices ( E E B D ) . Part I . General Regulations for Technical 8.3.9.2 T h e f i r m s h a l l d o c u m e n t a n d d e m o n s t r a t e that i t h a s knowledge o f t h e equipment a n d systems sufficient t o carry o u tt h e inspections a n d testing o f selfcontained breathing apparatus t o identify standards a n d to m a k e t h enecessary evaluation o fthe condition o f the equipment. In demonstrating professional knowledge, firms shall have a n understanding o f t h e operational requirements i n v o l v e d w i t h self-contained breathing apparatus and h o w these shall b e maintained. Additionally, t h e firms shall demonstrate t h e necessary safely requirements applicable t o such equipment. 8.3.9.3 F i l e s o f t h e f i r m d o c u m e n t s . T h e firm shall have documented procedures a n d instructions o n h o w t o carry o u tt h e servicing o f t h e equipment and/or system. These are t o either contain o r m a k e reference t ot h e manufacturer's servicing manuals, servicing bulletins, instructions a n d training manuals, as appropriate. Additionally they shall m a k e reference t o a n y requirements (e.g.w h a t markings shall b e appended t o the equipment/system) a n d h o w they shall b e applied. 8.3.9.4 R e f e r e n c e d o c u m e n t s . T h e f i r m shall h a v e access documents: 29 Supervision t o the following manufacturers' servicing manuals, servicing bulletins, instructions a n d training manuals, as appropriate; T y p e A p p r o v a l Certificates s h o w i n g a n y conditions, w h i c h m a y b e appropriate during t h e servicing and/or maintenance o f self-contained breathing apparatus. 8.3.9.5 E q u i p m e n t a n d f a c i l i t i e s . 8.3.9.5.1 G e n e r a l r e q u i r e m e n t s . I f firms undertake shore-based inspecting a n d maintenance, they shall maintain a n d implement procedures for w o r k s h o p cleanliness, ventilation a n d arrangement, w i t h d u e cognisance o fthe spares a n d pressurised bottles b e i n g stored, t oensure safe a n deffective w o r k i n g procedures. T h e firms undertaking inspecting a n d maintenance o f equipment a n d systems onboard shall provide t h e appropriate facilities t o either complete t h e w o r k onboard or r e m o v e t h e necessary items t otheir workshops. 8.3.9.5.2 E q u i p m e n t . Sufficient a n d appropriate spares a n d tools shall b e available f o r repair, maintenance a n dservicing o f selfcontained breathing apparatus i n accordance w i t h t h e requirements o fthe manufacturers. These shall include, as required b y t h e self-contained breathing apparatus equipment and/or systems: .1 v a r i o u s scales t o w e i g h items; .2 m e a n s t o h y d r o s t a t i c a l l y p r e s s u r e t e s t c o m p o nents/systems/storage bottles; .3 f l o w m e t e r s ; .4 p r e s s u r e g a u g e s ; .5 e q u i p m e n t f o r c h e c k i n g a i r q u a l i t y ; .6 r e c h a r g i n g f a c i l i t i e s f o r b r e a t h i n g a p p a r a t u s . 8.3.10 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n e x a m ination o fro-ro ships bow, stern, side a n d inner doors ( c o d e 22012000). 8.3.10.1 E x t e n t o f e n g a g e m e n t . Inspection o fsecuring a n d l o c k i n g devices, h y d r a u lic operating system, electric control s y s t e m f o r t h e hydraulics, electric indicator systems, a n d supporting, securing a n d locking devices a n d tightness testing. 8.3.10.2 T h e f i r m current version o fI S O 8.3.10.3 R e f e r e n c e The firm shall have documents: shall b e certified t o t h e most 9 0 0 0 series. documents. access t ot h e f o l l o w i n g reference S O L A S 74/78, as amended; I S O 9 0 0 1 "Quality systems - M o d e l f o r quality assurance i nproduction, installation a n d servicing"; I A C S U n i f i e d R e q u i r e m e n t ( U R )Z 2 4 " S u r v e y Requirements f o r Shell a n d Inner Doors o f R o - R o Ships"; the Register normative documents related t o inner doors. 8.3.10.4 S u p e r v i s o r . I n addition t o 8.2.3, a technician/supervisor shall have a m i n i m u m t w o years related education f r o m a technical school. 8.3.10.5 T r a i n i n g o f p e r s o n n e l . Operators carrying o u t non-destructive testing shall be qualified t o a recognised national o r international standard for t h e methods used. 8.3.10.6 R e q u i r e d e q u i p m e n t . 8.3.10.6.1 F o r i n s p e c t i o n o fs u p p o r t i n g s e c u r i n g a n d locking devices, hinges a n d bearings, t h e equipment f o r measuring clearances (i.e. feeler gauges, vernier calipers, micrometers) shall b e provided. Inspection shall b e performed b y non-destructive testing (i.e. d y e penetrant, magnetic particle inspection). 8.3.10.6.2 F o r t i g h t n e s s t e s t i n g u l t r a s o n i c l e a k detector o r equivalent shall b e provided. 8.3.10.6.3 F o r i n s p e c t i o n o f h y d r a u l i c system, the following shall b e provided: operating pressure gauges; particle counter f o ranalysing t h e quality o f h y d r a u lic fluid. 8.3.10.6.4 F o r i n s p e c t i o n o f e l e c t r i c c o n t r o l s y s t e m and indication system, the following shall b e provided: digital multi-meter; earth fault detector. 8.3.10.7 P r o c e d u r e s a n d i n s t r u c t i o n s . 8.3.10.7.1 T h e s u p p l i e r s h a l l h a v e access t o d r a w ings a n d documents, including t h e Operating a n d Inspection Manual. 8.3.10.7.2 T h e f i r m s h a l l h a v e a c c e s s t o a c c e s s t o t h e service history o fthe doors. 8.3.10.7.3 T h e s u p p l i e r s h a l l u s e , c o m p l e t e a n d s i g n a checklist w h i c h h a s been f o u n d acceptable b yt h e Register. 30 Rules for Technical Supervision during Construction of Ships and Manufacture 8.3.11 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n i n s p e c ­ tions o f l o w location lighting systems using photo luminescent materials a n d evacuation guidance sys­ tems used a s a nalternative t o low-location lighting systems (code 22015000MK). 8.3.11.1 E x t e n t o f e n g a g e m e n t . L u m i n a n c e measurements o n board ships o f l o w location lighting systems using photo luminescent materials. 8.3.11.2 O p e r a t o r s . T h e operator shall have t h eappropriate qualification, adequate k n o w l e d g e o f t h e applicable international requirements (namely S O L A S - 7 4 / 7 8 / 0 0 Regulation П-2/13.3.2.5, I M O r e s o l u t i o n A . 7 5 2 ( 1 8 ) , I S O 1 5 3 7 0 - 2 0 1 0 , F S S S C o d e Chapter 1 1 ) , shall b e able t o document theoretical a n d practical training onboard i n using equipment specified. of Materials and Products for Ships 8.3.12 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n s o u n d pressure level m e a s u r e m e n t s o fpublic address a n d general alarm systems o n board ships (code 22016000MK). 8.3.12.1 E x t e n t o f e n g a g e m e n t . Sound pressure level measurements o f public address a n d general a l a r m systems o nb o a r d ships. 8.3.12.2 O p e r a t o r s . T h e operator shall have t h eappropriate qualification, have adequate k n o w l e d g e o fthe applicable international r e q u i r e m e n t s ( n a m e l y , R e g u l a t i o n s П1/4 a n d П1/6 o f S O L A S 74/78, as amended, L S A C o d e Chapter VTI/7.2, I M O C o d e o n alarms a n d indicators, 1995), shall b e able to document theoretical a n dpractical training onboard i n using equipment specified. 8.3.12.3 E q u i p m e n t . The measuring instrument shall b e a n integrating sound level meter w i t h frequency analyser capabilities 8.3.11.3 E q u i p m e n t . c o m p l y i n g w i t h ГЕС 6 0 6 5 1 a n d ГЕС 6 9 1 6 7 2 , t y p e 1 T h e m e a s u r i n g i n s t r u m e n t shall incorporate a fastr e s p o n s e p h o t o m e t e r h e a d w i t h C I E ( I n t e r n a t i o n a l p r e c i s i o n class w i t h , a t least a n A - w e i g h t i n g frequency r e s p o n s e c u r v e a n d 1/3 o c t a v e a n d 1 o c t a v e b a n d filters, Commission o n Illumination) photopic correction a n d complying t o I E C61260, as appropriate f o r t h e h a v e a m e a s u r e m e n t range o f a t least 1 0 ~ t o 1 0 c d / m . measurements t ob e carried out. I naddition, microphones 8.3.11.4 P r o c e d u r e s . shall b e o f the r a n d o m incidence type, complying w i t h D o c u m e n t e d w o r k procedures are a t least t o c o n t a i n IEC 60651. information o n inspection preparation, selection a n d identification o ftest locations. 8.3.12.4 P r o c e d u r e s . 8.3.11.5 R e p o r t i n g . D o c u m e n t e d w o r k procedures are a t least t o c o n t a i n i n f o r m a t i o n o ninspection preparation, calibration, selec­ T h e report shall c o n f o r m t o A n n e x С o f I S O 15370¬ t i o n a n d i d e n t i f i c a t i o n o f test locations. 2010. 4 2 8.3.11.6 V e r i f i c a t i o n . T h e supplier shall have the R S surveyor's verifica­ tion o f each separate j o b , documented i n t h ereport b yt h e attending surveyor's signature. 8.3.11.7 R e f e r e n c e d o c u m e n t s . T h e service supplier shall h a v e access t o t h e following documents: .1 I M O - International C o n v e n t i o n o nt h e Safely o f L i f e a t S e a ( S O L A S ) , 7 4 / 7 8 C h a p t e r П-2, P a r t D , Regulation 13.3.2.5 " M a r k i n g o f escape routes"; .2 I M O - F i r e S a f e t y S y s t e m s ( F S S C o d e ) , Chapter 11 " L o w - l o c a t i o nlighting systems"; .3 I M O r e s o l u t i o n A . 7 5 2 ( 1 8 ) " G u i d e l i n e s f o r t h e Evaluation, Testing a n d Application o f L o w - L o c a t i o n Lighting o nPassenger Ships" (adopted o n4 N o v e m b e r 1993); .4 I S O 1 5 3 7 0 : 2 0 1 0 " S h i p s a n d m a r i n e t e c h n o l o g y L o w - l o c a t i o n lighting o n passenger ships - Arrange­ ment"; .5 M S C / C i r c . 1 1 6 8 " I n t e r i m g u i d e l i n e s f o r t h e testing, approval a n d maintenance o f evacuation gui­ dance systems used as a n alternative t o l o w - l o c a t i o n lighting systems". 8.3.12.5 R e p o r t i n g . T h e report shall describe, as a m i n i m u m , t h e e n v i r o n m e n t a l c o n d i t i o n s o f t h e tests a n d , f o r e a c h test location, t h e ambient noise level o r t h e speech interference level, as appropriate f o r t h e measurements to b e carried out. T h ereport shall c o n f o r m t o a n y other specific requirement o fthe Register. 8.3.12.6 V e r i f i c a t i o n . T h e supplier must have the R Ssurveyor's verifica­ tion o f each separate j o b , documented i n t h ereport b yh i s signature. 8.3.12.7 R e f e r e n c e d o c u m e n t s . T h e service supplier shall h a v e access t o t h e following documents: .1 S O L A S 7 4 / 7 8 , C h a p t e r Ш, P a r t A , R e g u l a t i o n 4 "Evaluation, testing a n d approval o f life-saving appli­ ances a n d arrangements"; .2 S O L A S 7 4 / 7 8 , C h a p t e r Ш , P a r t B , R e g u l a t i o n 6 "Communications"; .3 I n t e r n a t i o n a l L i f e - S a v i n g A p p l i a n c e ( L S A ) C o d e , Chapter V I I , Regulation 7.2"General alarm a n d public address system"; Part I . General Regulations for Technical Supervision .4 ГМО C o d e o n A l a r m s a n d I n d i c a t o r s , 1 9 9 5 a s amended; .5 I E C 6 0 6 5 1 ( 2 0 0 1 - 1 0 ) " S o u n d l e v e l m e t e r s " ; .6 I E C 6 1 6 7 2 " E l e c t r o a c o u s t i c s - S o u n d l e v e l meters"; .7 I E C 6 1 2 6 0 " E l e c t r o a c o u s t i c s - O c t a v e - b a n d a n d fractional-octave-band filters". 8.3.13 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n t h e servicing a n d maintenance o f lifeboats, launching appliances, on-load release gear a n d davit-launched liferaft automatic release h o o k s (code 22021000MK). 8.3.13.1 E x t e n t o f e n g a g e m e n t . T h o r o u g h examination, maintenance, repair a n d testing o f lifeboats, rigid rescue boats a n d rescue boats, which are a combination o f rigid a n d inflatable construction, l a u n c h i n g appliances, o n - l o a d release gear a n d davit-launched liferaft automatic release h o o k s . 8.3.13.2 E x t e n t o f r e c o g n i t i o n . 8.3.13.2.1 T h e c o n t e n t s o f t h i s p r o c e d u r e a p p l y equally t omanufacturers w h e n they are acting as service suppliers. 8.3.13.2.2 A n yf i r m e n g a g e d i n t h e t h o r o u g h examination, operational testing, repair a n d overhaulo f lifeboats, launching appliances, o n - l o a d release gear a n d davit-launched liferaft automatic release h o o k s carried o u t i n a c c o r d a n c e w i t h S O L A S R e g u l a t i o n П1/20 s h a l l b e qualified i n these operations f o reach m a k e a n d type o f equipment, f o r w h i c h they provide t h e service, a n d provide R S t h emanufacturer documentary evidence that they have been s o authorized o r they are certified i n accordance w i t h a n established system f o rtraininga n d authorization i n accordance w i t h M S C . l / C i r c . 1 2 7 7 , as amended. 8.3.13.3 I n cases w h e r e a n e q u i p m e n t m a n u f a c t u r e r is n o l o n g e r i n business o r n o l o n g e r p r o v i d e s t e c h n i c a l support, t h ef i r m m a y b e authorised for t h eequipment o n the basis o f prior authorization for t h e equipment and/or long t e r m experience a n d demonstrated expertise as a n authorized service provider. 8.3.13.4 Q u a l i f i c a t i o n s a n d t r a i n i n g o f p e r s o n n e l . The firm personnel shall b e trained a n d qualified i n the operations, f o rw h i c h they are authorised, f o r each m a k e a n dtype o fequipment, for w h i c h they provide t h e service. S u c h training a n d qualification shall include t h e following, as a m i n i m u m . 8.3.13.4.1 E m p l o y m e n t a n d d o c u m e n t a t i o n o f p e r ­ sonnel certified i n accordance w i t h a recognized national, international o r industry standard as applicable, o r a n equipment manufacturer's established certification pro­ g r a m . I n either case, t h ecertification p r o g r a m s h a l l b e based o n the guidelines i nthe appendix f o reach m a k e and type o f equipment, f o r w h i c h service shall b e provided. 8.3.13.4.2 T h e e d u c a t i o n a n d t r a i n i n g f o r i n i t i a l certification o f personnel shall b e documented a n d address, as a m i n i m u m : 31 .1 causes o f lifeboat accidents; .2 r e l e v a n t r u l e s a n d r e g u l a t i o n s , i n c l u d i n g i n t e r n a ­ tional conventions; .3 d e s i g n a n d c o n s t r u c t i o n o f l i f e b o a t s a n d r e s c u e boats, including on-load release gear a n d launching appliances, as w e l l as o n - l o a d release gear a n d davitlaunched liferaft automatic release h o o k s ; .4 e d u c a t i o n a n d p r a c t i c a l t r a i n i n g i n t h e p r o c e d u r e s specified i n A n n e x 1 t o M S C . l / C i r c . l 2 0 6 / R e v . l , f o r w h i c h certification is sought; .5 d e t a i l e d p r o c e d u r e s f o r t h o r o u g h e x a m i n a t i o n a n d inspection, maintenance, testing a n drepair o flifeboats a n d rescue boats, including launching appliances a n d on-load release gear, as w e l l as o n - l o a d release gear a n d d a v i t launched liferaft a u t o m a t i c release h o o k s , as applicable; .6 p r o c e d u r e s f o r i s s u i n g a r e p o r t o f s e r v i c e a n d statement o f fitness f o r purpose based o n M S C . l / Circ.l206/Rev.l ( A n n e x 1 ,paragraph 15). 8.3.13.5 T h e e d u c a t i o n a n d t r a i n i n g f o r t h e p e r s o n n e l shall include practical technical training o n actual inspection, maintenance, repair a n d testing using t h e equipment (lifeboats a n d rescue boats, launching appli­ ances and/or o n - l o a d release gear), f o r w h i c h t h e personnel shall b e certified. T h etechnical training shall include disassembly, reassembly, correct operation a n d adjustment o fthe equipment. Classroom training shall b e supplemented b y field experience i n t h eoperations, f o r w h i c h certification is sought, under t h e supervision o fa n experienced senior certified person. 8.3.13.6 A t t h e t i m e o f i n i t i a l c e r t i f i c a t i o n a n d a t each renewal o f certification, t h e f i r m shall provide documentation t overify personnel's satisfactory comple­ tion o fa competency assessment using t h e equipment, for w h i c h t h e personnel a r ecertified. 8.3.13.7 T h e s e r v i c e s u p p l i e r s h a l l r e q u i r e r e f r e s h e r training as appropriate t orenew t h ecertification. 8.3.13.8 R e f e r e n c e d o c u m e n t s . T h e service supplier shall h a v e access t o t h e following documents: .1 M S C . l / C i r c . 1 2 0 6 (Rev. 1 ) ,as amended, " M e a ­ sures t o Prevent Accidents w i t h Lifeboats"; .2 M S C . l / C i r c . 1 2 7 7 , a s a m e n d e d , " I n t e r i m R e c o m ­ mendation o n Conditions f o r Authorization o f Service Providers f o rLifeboats, L a u n c h i n g Appliances a n d O n ¬ L o a d Release Gear"; .3 ГМО r e s o l u t i o n A . 6 8 9 ( 1 7 ) " R e c o m m e n d a t i o n o n testing o f life-saving appliances a n d , f o r lifesaving appliances installed o nboard o n o r after 1 J u l y 1999"; .4 ГМО r e s o l u t i o n M S C . 8 1 ( 7 0 ) " R e v i s e d r e c o m ­ m e n d a t i o n o n testing o f life-saving appliances", as amended; .5 f o r s e r v i c i n g a n d r e p a i r w o r k i n v o l v i n g d i s a s ­ s e m b l y o r adjustment o f o n - l o a d release m e c h a n i s m s , availability o f t h e equipment manufacturer's specifica­ tions a n d instructions; 32 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships .6 T y p e A p p r o v a l c e r t i f i c a t e s h o w i n g a n y c o n d i t i o n s that m a yb e appropriate during t h e servicing and/or maintenance o flifeboats, launching appliances a n d o n l o a d release gear. T h e thickness gauge data shall b e transmitted t ot h e ship t h r o u g h a connecting cable a n ddisplayed o n a digital repeater or a personal computer t o facilitatem o n i t o r i n g o f thickness measurements b ythe R S surveyor. 8.3.13.9 E q u i p m e n t a n d f a c i l i t i e s . 8.3.2.19.1 T h e f i r m s h a l l h a v e following: 8.3.15 S p e c i a l r e q u i r e m e n t s f o r f i r m s e n g a g e d i n e x p e r t i s e o fsafe c a r r i a g e o fb u l k c a r g o e s b y s e a (code 22023000MK). access to the .1 sufficient tools, a n d i n particular a n y specialized tools specified i nt h e e q u i p m e n t manufacturer's instructions, including portable tools as needed f o rw o r k t ob e carried o u t o nb o a r d ship; .2 s u f f i c i e n t m a t e r i a l s , s p a r e p a r t s a n d a c c e s s o r i e s a s specified b y t h e equipment manufacturer f o r repairing lifeboats, l a u n c h i n g appliances a n d o n - l o a d release gear, as a p p l i c a b l e ; .3 f o r s e r v i c i n g a n d r e p a i r w o r k i n v o l v i n g d i s a s s e m b l y o r adjustment o f o n - l o a d release m e c h a n i s m s , availability o f genuine replacement parts as specified o r supplied b y the equipment manufacturer. 8.3.13.10 R e p o r t i n g . The report shall conform t o t h e requirements o f M S C . l / C i r c . 1 2 0 6 ( R e v . 1 ) , A n n e x 1 , paragraph 15. W h e n repairs, t h o r o u g h examinations a n d annual servicing are completed, a statement confirming that t h e l i f e b o a t a r r a n g e m e n t s r e m a i n fit f o r p u r p o s e s h a l l b e promptly issued b yt h e firm. 8.3.14 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n u n d e r water thickness m e a s u r e m e n t s o fships a n d offshore installations u n d e r s u p e r v i s i o n o fR S s u r v e y o r (code 22022000). 8.3.14.1 F i r m . The firm shall comply with requirements f o r firms engaged i n in-water surveys o f ships a n d offshore installations (code 2 2 0 0 3 0 0 0 ) a n d i n thickness measurements o f ships under supervision o f R S surveyor (code 22001000). 8.3.14.2 P e r s o n n e l . 8.3.14.2.1 I n a d d i t i o n t o t h e r e q u i r e m e n t s i n 8 . 3 . 1 , the personnel i n v o l v e d i nunderwater thickness measurem e n t s o f ships shall b e q u a l i f i e d b o t h as a d i v e r a n da n operator/supervisor o nthickness measurements (refer t o 8.3.3). 8.3.14.2.2 I n a d d i t i o n t o a p p l i c a b l e r e q u i r e m e n t s i n 8.3.1.1, divers-operators/supervisors o n thickness measurements shall have a Certificate o f Vocational Training ( F o r m 7.1.34), confirming that they are trained i n thickness measurements o n b o a r d ships. 8.3.14.2.3 F o r u n d e r w a t e r t h i c k n e s s m e a s u r e m e n t s , special-purpose instruments shall b e used capable o f p r o v i d i n g a t least t h e f o l l o w i n g : metal thickness measurements without preliminary preparation o f t h e surface a n d r e m o v a l o f protective coating; option t o u s et h e equipment together w i t h t h e data display a n dstorage unit o nboard t h e ship such as digital repeater or personal computer w i t h customized software. 8.3.15.1 L e g a l status. 8.3.15.1.1 T h e f i r m a n d i t s p e r s o n n e l s h a l l n o t b e involved i n a n y activities that m a y impair their independence a n d impartiality i n respect o f services rendered. T h e firm a n d i t s p e r s o n n e l i n v o l v e d i n t h i s k i n d o f activity shall n o t interact w i t h t h e developer, manufacturer, supplier, purchaser, owner, user o r accompanying person (forwarder/agent), ship o w n e r a n d underwriter o ra n y representative thereof. 8 . 3 . 1 5 . 1 . 2 T h e firm a c t i v i t i e s o n e x p e r t i s e o f s a f e carriage o f b u l k cargoes b y sea shall b e independent f r o m any other k i n d o fc o m m e r c i a l activities. 8.3.15.2 P e r s o n n e l . 8.3.15.2.1 T h e f i r m s h a l l h a v e a s u f f i c i e n t n u m b e r o f technical, m a n a g i n g a n d service personnel capable o f p r o v i d i n g up-to-date expertise o f safe carriage o f b u l k cargoes b y sea, including those specialized i n t h e f o l l o w i n g areas: .1 cargo carriage b ysea; .2 a n a l y s i s o f p h y s i c a l a n d c h e m i c a l p r o p e r t i e s o f b u l k cargoes; .3 s h i p t h e o r y a n d d e s i g n . 8 . 3 . 1 5 . 2 . 2 T h e firm p e r s o n n e l i n v o l v e d i n d e v e l o p m e n t o f Declarations o f t h e Transportation Characteristics a n d C o n d i t i o n s f o r t h e Safe S h i p m e n t o f B u l k Cargoes b y S e a a n d Certificates o fC a r g o Characteristics at t h e T i m e o f L o a d i n g as w e l l as i n d e v e l o p m e n t a n d implementation o f the procedures f o r sampling, laboratory testing a n d water content m o n i t o r i n g shall have: .1 higher education a n d field-specific c o n t i n u i n g professional education corresponding t o t h e area o f recognition; .2 a p p r o p r i a t e s k i l l s a n d c o m p e t e n c e w i t h r e g a r d t o the expertise o f safe b u l k cargo carriage b y s e a a n d monitoring o f safety precautions during t h e cargo carriage b ysea; .3 c o n f i r m e d w o r k e x p e r i e n c e i n e x p e r t i s e o f s a f e b u l k cargo carriage b y seaa n d development o f Declarations o n Transportation Characteristics a n d Conditions for t h e Safe Carriage o f B u l k Cargoes b y S e a a n d Certificates o f Cargo Characteristics at t h e T i m e o f L o a d i n g n o t less t h a n 3 years. 8 . 3 . 1 5 . 2 . 3 T h e f i r m s h a l l h a v e a t l e a s t five e m p l o y ees i n v o l v e d i n f u l l - t i m e a c t i v i t i e s c o m p l y i n g w i t h 8.3.8.2.2. 8.3.15.2.4 E m p l o y e e s n o t c o m p l y i n g w i t h 8 . 3 . 8 . 2 . 2 m a y b e involved i nactivities,provided that they p e r f o r m these activities under supervision o f t h e employees c o m p l y i n g w i t h these requirements. Part I . General Regulations for Technical Supervision 8 3 . 1 5 2 . 5 T h e firm s h a l l s u b m i t t h e f o l l o w i n g d o c u ­ ments ronfirming fulfilment o f the established requirements: .1 e m p l o y m e n t agreements o r their copies; .2 c i v i l l a w a g r e e m e n t s o r t h e i r c o p i e s ; .3 c e r t i f i c a t e s o n h i g h e r e d u c a t i o n , secondary vocational education o r continuing professional educa­ tion o r their copies; .4 e m p l o y m e n t r e c o r d b o o k s o r t h e i r c o p i e s . 8.3.15.3 M e a s u r e m e n t a s s u r a n c e . T h e f i r m shall incorporate a testing laboratory accredited b y t h e Federal Accreditation Service c o m p l y ­ ing w i t h 9.3.9. 8.3.15.4 F i l e s o f t h e f i r m d o c u m e n t s . 8.3.15.4.1 T h e f i r m s h a l l d e v e l o p a n d k e e p i t s o w n r e g i s t e r a n d i n f o r m a t i o n files o f n a t i o n a l a n d i n t e r n a ­ tional rules a n dregulations applicable t ot h e expertise o f safe b u l k cargo carriage b y s e ai n c l u d i n g cargo h a n d l i n g operations i n ports. 8.3.15.4.2 T h e f i r m s h a l l h a v e v a l i d n o r m a t i v e a n d technical documents required f o rperformance o f activ­ ities i nt h e expertise o fsafe b u l k cargo carriage b y s e a including the following: .1 n a t i o n a l a n d international n o r m a t i v e regulating carriage o fb u l k cargoes b ysea; documents .2 t e c h n i c a l r e g u l a t i o n s , i n t e r s t a t e , s t a t e a n d i n d u s t r y standards, technical specifications, safely data sheets f o r materials t ob e declared a n d certified; 33 B u l k Cargoes b y S e a a n d Certificates o f Cargo Characteristics a t t h e T i m e o fL o a d i n g w i t h regard t o international a n d national n o r m a t i v e documents as w e l l as t h e R e g i s t e r p r o c e d u r e s ; .2 d e v e l o p m e n t a n d i m p l e m e n t a t i o n o f p r o c e d u r e s for sampling, laboratory testing a n d water content monitoring as p e r International M a r i t i m e Solid B u l k C a r g o e s ( I M S B C ) C o d e , ГМО r e s o l u t i o n M S C . 3 5 4 ( 9 2 ) and MSC.l/Circ. 1454; 3 sampling, sample recording a n dpreparation o f b u l k cargo samples. T h eprocedures shall b e approved b y t h e Register, c o m p l y w i t h t h e effective edition o f the I M S B C Code a n dprovide f o rliability o f a person, i n v o l v e d i n sampling a n d sample preparation, f o r compliance w i t h applicable procedures a n d liability o fthe head o fthe firm for fulfilment o f t h e sampling a n d sample preparation procedures b y t h e personnel a n d assignment o f o n l y qualified personnel f o r t h e sampling. T h e sampling documents (reports, certificates) shall b e signed b y a person having directly performed t h e sampling; .4 l i a b i l i t y o f t h e firm m a n a g e m e n t a n d p e r s o n n e l f o r failure t o c o m p l y w i t h international a n d national documents a n dt h eRegister procedures w h e n carrying o u t t h e activities o n t h e expertise o f safe b u l k cargo carriage b ysea; .3 i n t e r n a t i o n a l a n d n a t i o n a l s t a n d a r d s r e g u l a t i n g s a m p l i n g , s a m p l e p r e p a r a t i o n a n d l a b o r a t o r y tests o f materials t ob e declared a n d certified. .5 d e v e l o p m e n t a n d i m p l e m e n t a t i o n o f m e a s u r e s t o prevent a n d settle t h e conflict o f interest; .6 g u a r a n t e e s o f t h e f i r m i n d e p e n d e n c e from commercial, financial, administrative o r other pressures that m a y affect t h e quality o fthe activities performed; 8.3.15.4.3 T h e f i r m s h a l l m a i n t a i n , k e e p w i t h i n 1 0 years a n d submit t o t h e Register t h e following report documents both i nRussian andEnglish: .7 r e s p o n s i b i l i t y f o r i m p a r t i a l d e c i s i o n - m a k i n g o f t h e f i r m w h e n p e r f o r m i n g works/rendering services as w e l l as m e t h o d s t o p r o v i d e i m p a r t i a l i t y ; .1 list o f t h e personnel authorized t o p e r f o r m b u l k cargo sampling w i t h specimen signatures; .8 d i s c l o s u r e o f i n f o r m a t i o n o n a f f i l i a t e s o f t h e recognized f i r m as p e r antitrust laws o f t h e Russian Federation; .2 t r a i n i n g r e c o r d b o o k s f o r t h e p e r s o n n e l i n v o l v e d in sampling a n d sample preparation; .3 r e p o r t s o n i n t e r n a l a u d i t o f p r o c e d u r e s f o r sampling a n d sample preparation; .4 r e c o r d s o f s p o t s a m p l e s a n d r e p r e s e n t a t i v e preparation; sample .5 m a i n t e n a n c e r e c o r d b o o k s f o r s a m p l i n g a n d sample preparation devices; .6 r e p o r t s o n d e v i a t i o n s f r o m a p p r o v e d s a m p l i n g a n d sample preparation procedures a n d amendments thereto. 8.3.15.5 Q u a l i t y S y s t e m . 8 . 3 . 1 5 . 5 . 1 T h e firm s h a l l d e v e l o p , i m p l e m e n t a n d maintain as w e l l as certify t h e Q u a l i t y S y s t e m f o r compliance w i t h t h eeffective version o f I S O 9 0 0 1 b yt h e certification authority accredited i ncompliance w i t h t h e effective version o f КОЛЕС 1 7 0 2 1 o r its national equivalent. 8 . 3 . 1 5 . 5 . 2 T h e firm s h a l l d e v e l o p a n d i m p l e m e n t t h e procedures prescribing t h e following: .1 d e v e l o p m e n t o f D e c l a r a t i o n o n Transportation Characteristics a n d Conditions f o rt h e Safe Carriage o f .9 i d e n t i f i c a t i o n o f r i s k s r e l a t e d t o i m p a r t i a l i t y d u r i n g w o r k , elimination a n d m i n i m i z a t i o n o f t h e specified risks; . 1 0 a s s u r a n c e o f t h e firm i n d e p e n d e n c e f r o m t h e manufacturers, sellers, executors a n d purchasers i n c l u d ­ ing consumers; . 1 1 r e q u i r e m e n t s t o firm e m p l o y e e s r e g a r d i n g t h e obligation t o notify t h e f i r m o n t h eprevious a n d actual relations w i t h designers, developers, manufacturers, sellers, product (work/service) operators, o r other circumstances, w h i c h m a y result i n a potential conflict o f interest. 8.3.16 S p e c i a l r e q u i r e m e n t s f o r f i r m s e n g a g e d i n m e a s u r e m e n t s o f noise level o n b o a r d ships (code 22024000MK). 8.3.16.1 E x t e n t o f e n g a g e m e n t . S o u n d pressure level measurements onboard ships. 8.3.16.2 S u p e r v i s o r . T h e supervisor shall have a m i n i m u m o f2 years o f experience as a n operator i n sound pressure level measurements. 34 Rules for Technical Supervision during Construction of Ships and Manufacture 8.3.16.3 O p e r a t o r s . T h e operator shall have the following qualifications: . 1 k n o w l e d g e i n t h e field o f n o i s e , s o u n d m e a s u r e ­ ments a n d handling o fmeasurement equipment; .2 a d e q u a t e k n o w l e d g e o f t h e a p p l i c a b l e i n t e r n a ­ t i o n a l r e q u i r e m e n t s ( S O L A S R e g u l a t i o n П-1/3-12, a s a m e n d e d , a n d ГМО C o d e o n N o i s e L e v e l s o n b o a r d Ships, as amended); .3 a t l e a s t 1 y e a r ' s e x p e r i e n c e , i n c l u d i n g p a r t i c i p a ­ tion i n a m i n i m u m o f5 measurement campaigns as a n assistant operator; .4 t r a i n i n g c o n c e r n i n g t h e p r o c e d u r e s s p e c i f i e d i n ГМО C o d e o n N o i s e L e v e l s o n b o a r d S h i p s ; .5 b e a b l e t o d o c u m e n t t h e o r e t i c a l a n d p r a c t i c a l training onboard i n using a sound level meter. 8.3.16.4 E q u i p m e n t . 8.3.16.4.1 S o u n d l e v e l m e t e r s . M e a s u r e m e n t o f sound pressure levels shall b e carried o u t using precision integrating sound level meters. Such meters shall b e manufactured t o IEC 61672-1(2002-05) "Recommendation f o r sound level meters", as amended, type/class 1 standard as applicable, o r t o a nequivalent standard acceptable t o t h e A d m i n i s t r a t i o n . A t that s o u n d level meters class/type 1 m a n u f a c t u r e d a c c o r d i n g t o I E C 651ЯЕС 8 0 4 m a y b e used until 1 July 2016. 8.3.16.4.2 O c t a v e f i l t e r s e t . W h e n used alone, o r i n conjunction w i t h a sound l e v e l m e t e r , a s a p p r o p r i a t e , a n o c t a v e filter s e t s h a l l conform t o I E C61260 (1995) "Octave-band a n d fractional-octave-band filters", as amended, o r a n equivalent standard acceptable t ot h e Administration. 8.3.16.4.3 S o u n d c a l i b r a t o r . S o u n d calibrators shall c o m p l y w i t h t h e standard I E C 6 0 9 4 2 (2003-01), as amended, a n d shall b e approved b y the manufacturer o fthe sound level meter used. 8.3.16.4.4 C a l i b r a t i o n . of Materials and Products for Ships contain information o n inspection preparation, selection and identification o fsound level measurement locations, calibration checks a n d report preparation. 8.3.16.5.2 T h e s u p p l i e r s h a l l h a v e a c c e s s t o t h e following documents: . 1 S O L A S 1 9 8 8 , a s a m e n d e d ( R e g u l a t i o n П-1/3-12); .2 ГМО r e s o l u t i o n A . 4 6 8 ( X U ) a n d ГМО r e s o l u t i o n M S C . 3 3 7 ( 9 1 ) " C o d e o nN o i s e L e v e l s o n b o a r d Ships"; .3 ГМО r e s o l u t i o n A . 3 4 3 ( L X ) " R e c o m m e n d a t i o n o n methods o fmeasuring noise levels at listening posts"; .4 t h e R e g i s t e r r u l e s a n d g u i d e l i n e s . 8.3.16.6 R e p o r t i n g . A noise inspection report shall b e made f o r each ship. T h e report shall comprise i n f o r m a t i o n o nt h e noise levels i nt h e various spaces o n board. T h e report shall s h o w t h ereading at each specified measuring point. T h e points shall b e m a r k e d o n a general arrangement plan, o r o n a c c o m m o d a t i o n drawings attached t o t h ereport, o r shall otherwise b e identified. T h e format for noise inspection reports is seto u t i n Appendix 1 o fI M O Code o n Noise Levels onboard Ships a n d m a y c o n f o r m t o a n yother specific r e q u i r e m e n t o f t h e s o c i e t y ( r e f e r t o ГМО C i r c u l a r M S C . 3 3 7 ( 9 1 ) ) . 8.3.16.7 V e r i f i c a t i o n . T h e supplier shall have thesurveyor's verification o f each separate j o b , documented i n t h e report b y h i s signature. 8.3.17 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n t i g h t ­ ness testing o fp r i m a r y a n d s e c o n d a r y b a r r i e r s o f g a s carriers with m e m b r a n e cargo containment systems for ships i nservice (code 22025000MK). 8.3.17.1 E x t e n t o f e n g a g e m e n t . .1 global v a c u u m testing o f p r i m a r y a n d secondary barriers; .2 a c o u s t i c e m i s s i o n ( A E ) t e s t i n g ; .3 t h e r m o g r a p h i c t e s t i n g . 8 . 3 . 1 7 . 2 R e q u i r e m e n t s f o r firms e n g a g e d i n g l o b a l testing o fp r i m a r y a n d secondary barriers. 8.3.17.2.1 T e s t i n g p r o c e d u r e s . S o u n d calibrator a n d sound level meter shall b e verified a t least e v e r y t w o years b y a n a t i o n a l Standard laboratory o r a competent laboratory accredited accord­ ing t o I S O 17025 (2005), as amended. A record w i t h a complete description o f the equipment used shall b e kept, including a calibration log. Testing shall b e carried out i naccordance w i t h cargo containment system designer's procedures as approved b y t h e Register. 8.3.17.2.2 A u t h o r i z a t i o n . 8.3.16.4.5 M i c r o p h o n e w i n d s c r e e n . A m i c r o p h o n e w i n d screen shall b e used w h e n taking readings outside, e.g. o nnavigating bridge w i n g s or o n deck, a n d b e l o w deck w h e r e there is a n y substantial a i r m o v e m e n t . T h e w i n d screen shall n o t affect t h e m e a s u r e m e n t level o f s i m i l a r sounds b y m o r e than 0,5 d B ( A ) i n" n ow i n d " conditions. 8.3.17.2.3 E q u i p m e n t . E q u i p m e n t shall b e maintained a n d calibrated i n accordance w i t h recognized national o r international industrial standards. 8.3.17.2.4 R e p o r t i n g . 8.3.16.5 P r o c e d u r e s 8 . 3 . 1 6 . 5 . 1 T h e firm dures a n d instructions equipment. Documented a n d instructions. shall have documented proce­ t o carry o u t service o ft h e w o r k procedures shall a t least T h e supplier shall b e authorized b y t h e system designer t o carry o u tt h e testing. T h e report shall contain the following: .1 date o f testing; .2 i d e n t i t y o f t e s t p e r s o n n e l ; .3 v a c u u m d e c a y d a t a f o r e a c h t a n k ; .4 s u m m a r y o f t e s t r e s u l t s . Part I . General Regulations for Technical Supervision 8 3 . 1 7 3 Requirements f o r f i r m s engaged i nA E testing. 8.3.17.3.1 T e s t i n g p r o c e d u r e s . T h e firm s h a l l h a v e d o c u m e n t e d p r o c e d u r e s b a s e d upon recognized national o r international industrial standards t o p e r f o r m ultrasonic leak test u s i n g A E sensors f o rt h e secondary barrier o f m e m b r a n e cargo containment systems. T h e procedures shall include details o f personnel responsibilities a n d qualification, instrumentation, test preparation, test m e t h o d , signal processing, evaluation a n d reporting. Note. T h e differential pressure during testing shall n o t e x c e e d the containment s y s t e m designer's limitations. 8.3.17.3.2 Supervisor. T h e responsible supervisor shall b e certified t o a recognized national o r international industrial standard ( e . g . L e v e l П, I S O - 9 7 1 2 a s a m e n d e d o r S N T - T C - 1 A a s amended) a n d have o n e year experience at L e v e l I I . 8.3.17.3.3 Operators. T h e operators carrying o u t t h e A E testing shall b e certified t o a recognized national o r international industrial standard (e.g. L e v e l I , I S O - 9 7 1 2 as a m e n d e d or S N T - T C - 1 A as amended) a n d shall have adequate k n o w l e d g e o f ship structures sufficient t o determine sensor placement. 8.3.17.3.4 E q u i p m e n t . E q u i p m e n t shall b e maintained a n d calibrated i n accordance w i t h recognized national o r international industrial standards o requipment manufacturer's recom­ mendations. 8.3.17.3.5 E v a l u a t i o n o f A E t e s t i n g . E v a l u a t i o n o f A E testing shall b e carried o u t b y t h e supervisor o r individuals certified t o a recognized national o r i n t e r n a t i o n a l i n d u s t r i a l s t a n d a r d ( e . g . L e v e l П, I S O - 9 7 1 2 as a m e n d e d o r S N T - T C - 1 A a s a m e n d e d ) a n d h a v e o n e y e a r e x p e r i e n c e a t L e v e l П. 8.3.17.3.6 R e p o r t i n g . T h e report shall contain t h e following: .1 date o f testing; .2 s u p e r v i s o r a n d o p e r a t o r s ) c e r t i f i c a t i o n s ; 3 d e s c r i p t i o n o f time a n d p r e s s u r e o f e a c h c y c l e o f t e s t ; .4 l i s t a n d s k e t c h d e t a i l i n g l o c a t i o n o f p o s s i b l e defects. 8.3.17.4 R e q u i r e m e n t s f o r f i r m s e n g a g e d i n t h e r m o ­ graphic testing. 8.3.17.4.1 T e s t i n g p r o c e d u r e s . Testing shall b e carried o u t i naccordance w i t h t h e cargo containment system designer's procedures as approved b y t h e Register. 35 8.3.17.4.2 A u t h o r i z a t i o n - T h e f i r m s h a l l b e authorized b y t h e system designer t o carry o u t t h e testing. 8.3.17.4.3 S u p e r v i s o r . T h e responsible supervisor shall b e certified t o a recognised national o r international industrial standard ( e . g . L e v e l П, I S O - 9 7 1 2 a s a m e n d e d o r S N T - T C - 1 A a s amended) w i t h additional certification i n infrared/thermal testing. Certification b y t h e supplier is n o t a l l o w e d a n d shall b e obtained through a n independent certification body. 8.3.17.4.4 O p e r a t o r s . T h e operators carrying o u t t h e imaging shall b e certified t o a recognized national o r international industrial standard (e.g. L e v e l I , I S O - 9 7 1 2 as a m e n d e d or S N T - T C - 1 A as amended) w i t h additional certification in infrared/thermal testing a n d shall have adequate k n o w l e d g e o f ship structures sufficient t o determine position f o r each identified image, a n do ft h e contain­ m e n t system t o understand t h e basis o f t h e testing. Certification b y t h e supplier i s n o t allowed a n d shall b e obtained through a n independent certification body. 8.3.17.4.5 E q u i p m e n t . T h e r m a l cameras a n d sensors shall b e i n accordance w i t h t h e system designer's procedures w i t h regards t o sensitivity, accuracy a n d resolution. Equipment shall b e i n accordance w i t h recognized s t a n d a r d (ГЕС, e t c . ) w i t h r e g a r d t o t h e i r s a f e t y c h a r a c t e r ­ istics f o r t h e u s e i n h a z a r d o u s areas ( i n g a s e x p l o s i v e atmosphere), maintained a n d calibrated i n accordance w i t h the manufacturer's recommendations. 83.17.4.6 E v a l u a t i o n o f t h e r m o g r a p h i c i m a g e s shall b e carried o u t b y t h e supervisor o r individuals certified t o a recognized n a t i o n a l o r i n t e r n a t i o n a l industrial standard (e.g. L e v e l I I , I S O - 9 7 1 2 as amended o r S N T - T C - 1 A as amended) w i t h additional certification i n infrared/thermal testing. Certification b y the supplier is n o t a l l o w e d a n d shall be obtained through a n independent certification body. 8.3.17.4.7 R e p o r t i n g . T h e report shall contain t h e following: .1 date o f testing; .2 s u p e r v i s o r a n d o p e r a t o r s ) c e r t i f i c a t i o n s ; .3 d i f f e r e n t i a l p r e s s u r e s o f a l l p h a s e s ; .4 l i s t a n d s k e t c h d e t a i l i n g l o c a t i o n o f t h e r m a l indications; .5 t h e r m o g r a p h i c i m a g e s o f a l l p h a s e s o f t e s t i n g f o r thermal indications; .6 e v a l u a t i o n o f t h e r m a l i m a g e s i n d i c a t i n g p o s s i b l e leaks. 36 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 9 R E C O G N I T I O N O FT E S T I N G L A B O R A T O R I E S 9.1 GENERAL 9.2 R E Q U I R E M E N T S 9.1.1 T h e r e q u i r e m e n t s o f this S e c t i o n a p p l y t o t h e testing laboratories c o n d u c t i n g tests a n d m e a s u r e m e n t s specified i nTable 9.1.1. 9.2.1 P e r s o n n e l . 9.2.1.1 P e r s o n n e l o f t e s t i n g l a b o r a t o r y s h a l l h a v e n o t less t h a n t w o years o fpractical training. 9.1.2 T e s t s o f i t e m s o f t h e R S t e c h n i c a l s u p e r v i s i o n s h a l l be conducted b yt h e testing laboratories recognized b y R S . 9.1.3 T h e t e s t i n g l a b o r a t o r y s h a l l m e e t g e n e r a l requirements listed i n Section 7 , requirements o f 9 . 2 , relevant special requirements o f9.3 a n dt h e requirements o f Administrations ( i f any). 9.2.1.2 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e d o c u m e n t s on itspersonnel containing the following information: 9.1.4 R e c o g n i t i o n o f t h e t e s t i n g l a b o r a t o r i e s b y t h e Register shall b e confirmed b y t h e Recognition Certifi­ cate o f T e s t i n g L a b o r a t o r y (СПЛ) i s s u e d i n a c c o r d a n c e with 3.4 t o 3.7. 9.1.5 I n i n d i v i d u a l c a s e s , a t t h e R S d i s c r e t i o n , t e s t s m a y b e conducted i n t h e testing laboratories n o t r e c o g n i z e d b y R S . A t that p r i o r t o p e r f o r m a n c e o f tests, compliance o ft h e testing laboratory w i t h t h e require­ ments o f Section 7 a n d requirements o f 9.2.1.1, 9.2.2.1, 9.2.2.2, 9.2.4.1, 9.2.4.2, 9.2.5, 9.2.6shall b e verified. 9.1.6 T h e t e s t i n g l a b o r a t o r i e s c a r r y i n g o u t a c t i v i t i e s w i t h code 2 1 0 0 3 0 0 0 M K shall c o m p l y w i t h t h e require­ ments o fSection 7 , Part I "General Provisions" o fthe Rules f o rt h e Classification Surveys o f Ships i n Service. .1 functional duties; .2 e d u c a t i o n ; .3 e x p e r i e n c e ; .4 r e - t r a i n i n g a n d t e r m s o f i t s v a l i d i t y ; .5 c e r t i f i c a t i o n a n d t e r m s o f i t s p e r f o r m a n c e . 9.2.1.3 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e t h e r e g u l a r staff o f specialists. 9.2.1.4 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e a n d a d h e r e to t h e plans (schedules) o ft h e following: .1 training a n d re-training; .2 r e f r e s h e r t r a i n i n g ; .3 c e r t i f i c a t i o n o f t h e p e r s o n n e l w i t h r e s p e c t t o p e r f o r m a n c e o f certain tests. 9.2.2 T e c h n i q u e . 9.2.2.1 T h e t e c h n i q u e o f t e s t i n g l a b o r a t o r i e s s h a l l c o m p l y w i t h t h e testing procedures, according t o w h i c h tests specified i n t h e R S r e q u i r e m e n t s a r ec o n d u c t e d f o r items o ftechnical supervision. T a b l e 9.1.1 Codes 21001000 21001100 21001101MK 21001200 21001300 21001301 21001302 21001400 21001500 21001600 21001700 21001800 21001900 21002000 21002100 21002200 21002300 21002400 21002500 21002600 21002700 21002800 21002900MK 21003000MK 21003100 21004000MK Tests and measurements Vibroacoustic m e a s u r e m e n t s a n d tests P h y s i c a l a n d c h e m i c a l m e a s u r e m e n t s a n d tests S a m p l i n g a n d c h e c k tests (analysis) o f anti-fouling s y s t e m i n accordance w i t h A F S C o n v e n t i o n Fire tests o fproducts a n d materials E l e c t r o m a g n e t i c m e a s u r e m e n t s a n d tests: electrical m e a s u r e m e n t s a n d tests electromagnetic compatibility ( E M C ) tests Ionizing measurements M e c h a n i c a l m e a s u r e m e n t s a n d tests Radio measurements Non-destructive tests Optical measurements H e a t engineering m e a s u r e m e n t s a n d tests E q u i p m e n t protection tests Climatic tests Oily water analysis Fuel and oil analysis A n a l y s i s o f g a s e o u s e m i s s i o n s from m a r i n e d i e s e l e n g i n e s Checking o f software and/or performance algorithms o f radio and navigational equipment Tests o f fire-fighting s y s t e m s a n d fire-fighting outfit Tests a n d periodical checks o f f o a m concentrates Oil product cargo analysis S a m p l i n g a n d check test (analysis) o fballast water i n compliance w i t h t h e International C o n v e n t i o n for t h e Control a n d M a n a g e m e n t o f S h i p s ' B a l l a s t W a t e r a n d S e d i m e n t s , 2004 ( B W M C o n v e n t i o n ) Testing o f coating systems i n accordance with I M O resolution MSC.215(82) a n d / o r MSC.288(87) Full-scale tests d u r i n g s u r v e y o f o n s h o r e facilities: G M D S S s e aareas A l a n d A 2 ; N A V T E X service; v e s s e l traffic service ( V T S ) Testing o fb u l k cargoes t o determine transport performance Part I . General Regulations for Technical 9.2.2.2 T e s t s s h a l l b e c o n d u c t e d i n a c c o r d a n c e w i t h the relevant testing procedures, including those h a v i n g regard t o theenvironmental conditions, corresponding t o each t y p e o ftests i nt h earea indicated i n t h erequest. U s e shall b e made o fthe following: .1 m e a s u r i n g e q u i p m e n t c h e c k e d (calibrated) i n t h e established order; .2 c e r t i f i e d t e s t i n g e q u i p m e n t ; .3 a n c i l l a r y e q u i p m e n t ; .4 r e f e r e n c e s a n d s t a n d a r d s p e c i m e n s f o r t e c h n i c a l support a n d measurement assurance o f measuring equipment; .5 a p p r o p r i a t e ces, etc.). consumables 31 Supervision (chemicals, substan- 9.2.2.3 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e v a l i d contracts f o r rented measuring a n d testing equipment. 9.2.2.4 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e t h e l i s t s o f the following: .1 m e a s u r i n g e q u i p m e n t , i n c l u d i n g t h o s e u s e d f o r certification o fthe testing equipment; .2 t e s t i n g a n d a n c i l l a r y e q u i p m e n t ; .3 r e f e r e n c e s a n d s t a n d a r d e q u i p m e n t . 9.2.2.5 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e a n d a d h e r e to t h e schedules o ft h e f o l l o w i n g : .1 m a i n t e n a n c e o fm e a s u r i n g a n d t e s t i n g e q u i p m e n t ; .2 c h e c k i n g ( c a l i b r a t i o n ) o f m e a s u r i n g e q u i p m e n t ; .3 c e r t i f i c a t i o n o f t e s t i n g e q u i p m e n t . 9.2.3 F i l e s o f t h e t e s t i n g l a b o r a t o r y d o c u m e n t s . 9.2.3.1 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e t h e v a l i d normative a n d technical documents necessary f o r p e r f o r m a n c e o ftests i n t h e area o fr e c o g n i t i o n indicated i n t h e request, i n c l u d i n g : .1 list o f a c t i v i t i e s p e r f o r m e d (area o f r e c o g n i t i o n ) ; .2 t h e Q u a l i t y M a n u a l o r a n o t h e r s i m i l a r d o c u m e n t ; .3 d u t y r e g u l a t i o n s ; .4 o p e r a t i n g a n d m a i n t e n a n c e i n s t r u c t i o n s o n measuring a n d testing equipment; .5 d o c u m e n t s o n r e c o r d s k e e p i n g a n d a r c h i v e s maintenance. 9.2.4 R e p o r t i n g . 9.2.4.1 I n a d d i t i o n t o t h e i n f o r m a t i o n s p e c i f i e d i n 7 . 2 . 6 . 1 , test reports shall c o n t a i n t h e f o l l o w i n g : .1 d e s i g n a t i o n : " T e s t R e p o r t " o r " C o n c l u s i o n " ; .2 n a m e a n d a d d r e s s o f t h e t e s t i n g l a b o r a t o r y ; .3 d e s i g n a t i o n o f t h e t e s t i n g m e t h o d w i t h r e f e r e n c e to t h e d o c u m e n t s , i n accordance w i t h w h i c h t h e tests have been conducted; .4 r e f e r e n c e t o t h e S a m p l i n g R e p o r t ; .5 test r e s u l t s w i t h i n d i c a t i o n o f u n i t s o f m e a s u r e m e n t s i naccordance w i t h t h e testing procedures; .6 i n d i c a t i o n t h a t t h e t e s t r e s u l t s a r e v a l i d o n l y f o r t h e products tested; .7 e n t r y t h a t t h e t e s t s h a v e b e e n w i t n e s s e d b y the R S representative. 9.2.4.2 S a m p l i n g r e p o r t s , w h e r e a p p l i c a b l e , contain: shall .1 date o f t h e s p e c i m e n s e l e c t i o n ( s a m p l i n g ) ; .2 i n f o r m a t i o n t h a t a l l o w s f o r u n a m b i g u o u s i d e n t i fication o fspecimens (samples) taken; .3 p l a c e o f t h e s p e c i m e n s e l e c t i o n ( s a m p l i n g ) ; .4 i n f o r m a t i o n o n c o n d i t i o n s o f t h e s p e c i m e n selection (sampling); .5 r e f e r e n c e t o t h e d o c u m e n t s , i n a c c o r d a n c e w i t h w h i c h the specimens have been taken (sampling has been done). 9.2.4.3 D a t a ( d o c u m e n t s ) c o n f i r m i n g p e r f o r m a n c e o f tests ( s a m p l i n g reports, test reports, etc.)s h a l l b e k e p t i n t h e testing l a b o r a t o r y f o r n o t less t h a n f i v e years u n d e r conditions o fconfidentiality. T h i s requirement shall b e established i n t h e documents o ft h e testing laboratory. 9.2.5 C h e c k i n g a n d c o n t r o l 9.2.5.1 T h e t e s t i n g l a b o r a t o r y s h a l l d o t h e c h e c k i n g a n d exercise c o n t r o l o v e r t h e p e r f o r m a n c e o ftests a n d their results. 9.2.5.2 T h e p e r s o n n e l o f t h e t e s t i n g l a b o r a t o r y responsible f o r c h e c k i n g ( c o n t r o l ) s h a l l h a v e n o t less than t w o years o fexperience as a p e r f o r m e r i nt h earea o f activity indicated i n t h e request. 9.2.5.3 T h e t e s t i n g l a b o r a t o r y s h a l l c o n d u c t c h e c k tests i nc o m p l i a n c e w i t h t h e area o fr e c o g n i t i o n indicated in t h e request witnessed b y t h e R S representative. 9.2.6 C o n d i t i o n s o f t a k i n g , t r a n s p o r t a n d s t o r a g e of samples. 9.2.6.1 C o n d i t i o n s o f t a k i n g , t r a n s p o r t a n d s t o r a g e o f samples shall meet t h e requirements o f t h e testing procedures. 9.2.6.2 T h e t e s t i n g l a b o r a t o r y s h a l l i d e n t i f y t h e samples. 9.3 S P E C I A L REQUIREMENTS 9.3.1 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s engaged i nd y epenetrant examination, radiographic examination, ultrasonic examination, magnetic particle e x a m i n a t i o n o f w e l d s q u a l i t y ( c o d e 21001700). 9.3.1.1 R e p o r t i n g . 9.3.1.1.1 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e a n d m a i n t a i n e x a m i n a t i o n results logs. 9.3.1.1.2 A S t a t e m e n t ( T e s t R e p o r t ) , i n a d d i t i o n t o the i n f o r m a t i o n specified i n 9.2.4.1, a n d examination results logs shall contain: .1 a reference t o t h e R S rules o r o t h e r n o r m a t i v e d o c u m e n t as agreed w i t h R H O regarding t h e u s e o f criteria f o r assessing t h e q u a l i t y o f w e l d s a t radiographic e x a m i n a t i o n ; .2 a r e f e r e n c e t o n o r m a t i v e d o c u m e n t s r e g a r d i n g t h e use o f criteria f o r assessing t h e quality o f welds at ultrasonic examination, d y e penetrant examination,a n d magnetic particle examination; .3 t h i c k n e s s o f c o m p o n e n t s a t u l t r a s o n i c e x a m i n a t i o n and radiographic examination (refer t o Part X I V "Welding" o f t h e Rules f o r t h e Classification a n d Construction o f Sea-Going Ships); 38 Rules for Technical Supervision during Construction of Ships and Manufacture .4 d e s c r i p t i o n o f d e f e c t s i n a c c o r d a n c e w i t h a p p l i c ­ able national o r international standards. 93.1.13 Designation o fchecked lengths f o r duplicating radiographic examination shall correspond t o the designation o f t h e checked lengths used at ultrasonic examination. 9.3.1.2 F i l e s o f t h e t e s t i n g l a b o r a t o r y d o c u m e n t s . 9.3.1.2.1 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e i n s t r u c ­ tions o nperforming assessment o f t h e quality o f welds taking into account t h e R S requirements. 9.3.1.3 T h e r e c o g n i t i o n c e r t i f i c a t e s o f t e s t i n g l a b o r a t o r y (СПЛ) a r e s u b j e c t t o e n d o r s e m e n t n o t less t h a n once a year. 9.3.2 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s carrying o u tfire tests o f p r o d u c t s a n d materials ( c o d e 21001200). 9.3.2.1 I n g e n e r a l , t h e t e s t i n g l a b o r a t o r y s h a l l b e recognized b y t h e Register. T h eR e c o g n i t i o n Certificate o f T e s t i n g L a b o r a t o r y (СПЛ) i s i s s u e d t o t h e t e s t i n g l a b o r a t o r y , c a r r y i n g o u t fire tests, b y R H O o r t h e R S Branch Offices o n behalf o f R H O . F i r e tests carried o u t b y t h e testing laboratories n o t recognized b y R S shall b ewitnessed b y theR S surveyor. 9.3.2.2 L e g a l s t a t u s . 9.3.2.2.1 T h e t e s t i n g l a b o r a t o r y , as i t s r o u t i n e activity, carries o u t checks a n dtests identical t o those i n t h erelevant parts o ft h e F i r e Test Procedures C o d e (refer t o 1.2, Part V I " F i r e P r o t e c t i o n " o f t h e R u l e s f o r the Classification a n d Construction o fSea-Going Ships) or similar t o them. 9.3.2.2.2 T h e t e s t i n g l a b o r a t o r y s h a l l n o t b e l o n g t o the manufacturer, seller o r supplier o f t h e product/ material t o b e tested a n d shall n o tb e under their control. 9.3.2.3 F a c i l i t i e s . 9.3.2.3.1 T h e t e s t i n g l a b o r a t o r y h a s access t o arrangements, equipment, personnel a n d calibrated i n s t r u m e n t a t i o n n e e d e d f o r checks a n dtests p e r f o r m a n c e . 9.3.2.4 C h e c k i n g a n d c o n t r o l . 9.3.2.4.1 T h e t e s t i n g l a b o r a t o r y s h a l l u s e t h e q u a l i t y control system being audited b y competent bodies. 9.3.3 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s c a r r y i n g o u t tests o f fire-fighting systems a n d firef i g h t i n g o u t f i t ( c o d e 21002600). 9.3.3.1 F a c i l i t i e s . 9.3.3.1.1 T h e t e s t i n g l a b o r a t o r y f a c i l i t i e s s h a l l b e consistent w i t h t h e test p r o c e d u r e s specified i n applicable documents mentioned i nChapter 4.3, Part I V "Technical Supervision during Manufacture o f Products". 9.3.4 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s carrying o u ttests a n d periodical checks o f f o a m c o n c e n t r a t e s ( c o d e 21002700). 9.3.4.1 F a c i l i t i e s . 9.3.4.1.1 T h e t e s t i n g l a b o r a t o r y f a c i l i t i e s s h a l l b e consistent w i t h t h e test p r o c e d u r e s specified i nt h e guidelines f o r performance a n d testing criteria a n d s u r v e y s o f f o a m c o n c e n t r a t e s ( r e f e r t o ГМО c i r c u l a r s MSC.l/Circ.1312, MSC/Circ.670,MSC/Circ.798). of Materials and Products for Ships 9.3.5 S p e c i a l r e q u i r e m e n t s f o r t h e t e s t i n g l a b o r a ­ tories c a r r y i n g o u ts a m p l i n g a n dc h e c k tests (analy­ sis) o f anti-fouling s y s t e m i n a c c o r d a n c e w i t h A F S C o n v e n t i o n ( c o d e 2 1 ООП 0 1 M K ) . 9.3.5.1 F a c i l i t i e s . 9.3.5.1.1 T h e t e s t i n g l a b o r a t o r y f a c i l i t i e s s h a l l b e consistent w i t h t h eprocedures f o r s a m p l i n g a n d check t e s t s ( a n a l y s i s ) o f a n t i - f o u l i n g s y s t e m s p e c i f i e d i n ГМО resolution M E P C . 104(49) "Guidelines f o rBrief Sam­ pling o fAnti-Fouling Systems o n Ships". 93.6 Special r e q u i r e m e n t s f o rt h e testing l a b o r a ­ t o r i e s c a r r y i n g o u t o i l y w a t e r a n a l y s i s ( c o d e 21002200). 9.3.6.1 L e g a l status. 93.6.1.1 W h i l e carrying o u to i l y w a t e r analysis t h e testing laboratory w i t h t h e status o ft h e legal entity shall b e independent o ft h e parties interested i n t h e analysis results. 9.3.6.1.2 T h e t e s t i n g l a b o r a t o r y c a r r y i n g o u t a n a l y s i s d u r i n g tests o fe q u i p m e n t , systems a n d arrangements f o r the prevention o f pollution b y oily water shall n o t belong to t h emanufacturer, seller o r supplier a n d shall n o tb e under their control. 9.3.6.1.3 T h e t e s t i n g l a b o r a t o r y s h a l l b e a r r e s p o n s i ­ bility f o r t h e i m p a r t i a l i t ya n dobjectivity o ft h e o i l y w a t e r analysis results. 9.3.6.2 T e c h n i q u e . 9.3.6.2.1 T h e t e s t i n g l a b o r a t o r y t e c h n i q u e s h a l l comply w i t h t h e methods o f oily water analysis prescribed b y t h einternational a n d national documents regarding t h e environment pollution prevention ( I M O r e s o l u t i o n s МЕРС.бО(ЗЗ), М Е Р С . 1 0 7 ( 4 9 ) , e t c . ) . Tn s o m e cases o n a g r e e m e n t w i t h R S p r o v i s i o n a l application o f otiier time-tested methods a n d relevant measur­ ing a n d testing equipment is allowed. M e a n w h i l e , I h e analysis results shall c o m p l y w i t h t h e requirements o f I h e international documents i n respect o f I h e reliability a n d accuracy. 9.3.6.2.2 M e a s u r i n g a n d t e s t i n g e q u i p m e n t b e l o n g ­ ing t oother firms, organizations o rindividuals as w e l l as being t h e property o f t h e testing laboratory shall b e identified a n d registered i n t h e documents o ft h e testing laboratory (passport, record sheet o r card). 9.3.6.3 F i l e s o f t h e t e s t i n g l a b o r a t o r y d o c u m e n t s . 93.63.1 T h e testing laboratory shall have instructions o n t h e procedure o f sampling, testing, issue o f testing results a n dn o r m a t i v e d o c u m e n t a t i o n o n o i l y w a t e r analysis (bilge water, dirty ballast a n d flushing water). 93.7 Special r e q u i r e m e n t s f o rt h e testing labora­ t o r i e s c a r r y i n g o u t f u e l a n d o i l a n a l y s i s ( c o d e 21002300), o i l p r o d u c t c a r g o a n a l y s i s ( c o d e 21002800). 9.3.7.1 L e g a l status. 9.3.7.1.1 W h i l e c a r r y i n g o u t f u e l , o i la n d o i l p r o d u c t cargo analysis t h etesting laboratory w i t h t h estatus o f the legal entity shall b e independent o ft h e parties interested i n t h e analysis results. 9.3.7.1.2 T h e t e s t i n g l a b o r a t o r y s h a l l b e a r r e s p o n s i ­ bility f o rt h e impartiality a n d objectivity o ft h e results o f fuel, o i la n d o i lproduct cargo analysis. Part I . General Regulations for Technical Supervision 39 9.3.7.2 P e r s o n n e l . condition o fthe ship technical m e a n s (usually measured by the monitoring system); 93.72.1 Besides t h e relevant qualification, training, .2 w e a r d e b r i s . experience a n d satisfactory k n o w l e d g e i n respect o f t h e analysis carried o u t ,t h e personnel responsible f o r t h e 9.3.7.3.2.5 F o r l u b r i c a t i n g o i l u s e d i n p r o p e l l e r a n d contents o f t h e protocols (reports, conclusions) o n t h e sterntube shafts i n operation: analysis results shall h a v e necessary k n o w l e d g e as regards: .1 w a t e r content; .1 possible consequences o fthe o n b o a r d u s e o f fuel and o i l o f degraded quality ( n o t complying w i t h t h e relevant technical specifications, standards) a n d o f t h e transport o f o i lproduct cargo w i t h inappropriate characteristics; .2 p o s s i b l e r e a s o n s f o r c h a n g e o f p h y s i c a l a n d chemical properties o f t h e o i lused i n machinery a n d equipment i n operation. .2 c h l o r i d e s c o n t e n t ; .3 c o n t e n t o f b e a r i n g m e t a l p a r t i c l e s ; .4 o i l a g i n g ( r e s i s t a n c e t o o x i d a t i o n ) . 9.3.7.3.3 M e a s u r i n g a n d t e s t i n g e q u i p m e n t b e l o n g ing t oother firms, organizations o rindividuals as w e l l as being t h e property o f t h e testing laboratory shall b e identified a n d registered i n t h e documents o fthe testing laboratory (passport, record sheet o r card). 9.3.7.3 T e c h n i q u e . 9.3.7.3.1 T h e t e s t i n g l a b o r a t o r y t e c h n i q u e s h a l l provide f o r laboratory testing a n d quick analysis t o m o n i t o r quality characteristics o fo i l products w i t h i n t h e area o frecognition indicated i n t h e request. 9.3.7.4 F i l e s o f t h e t e s t i n g l a b o r a t o r y d o c u m e n t s . 9.3.7.4.1 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e i n s t r u c tions o n t h e procedure o f sampling, testing, issue o f testing results a n d n o r m a t i v e documentation o nfuel, o i l and o i l product cargo analysis. T h e testing l a b o r a t o r y s h a l l b e equipped w i t h its o w n measuring a n d testing equipment providing f o r t h e required types o ffuel, o i l a n d o i l product cargo analysis: 9.3.7.5 R e p o r t i n g . 9.3.7.5.1 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e a n d m a i n t a i n t h e analysis results logs. .1 b u n k e r o i l ; .2 n e w o i l l o a d e d o n b o a r d ; .3 o i l u s e d i n m a c h i n e r y a n d e q u i p m e n t i n o p e r a t i o n , to evaluate their fitness f o r u s e against defect criteria a n d t o assess t e c h n i c a l c o n d i t i o n o f t h e ship i t e m s w i t h i n survey systems o nt h e basis o f c o n d i t i o n m o n i t o r i n g . 9.3.7.5.2 R e c o r d s ( c o n c l u s i o n s , t e s t p r o t o c o l s a n d results logs) o n analysis o f test samples o f b u n k e r o i la n d n e w o i l loaded onboard shall contain values o f t h e physical a n dchemical properties specified i n passports (delivery notes) f o rordered fuel a n d o i l . 9.3.7.3.2 T h e t e s t i n g l a b o r a t o r y t e c h n i q u e s h a l l p r o v i d e f o r e v a l u a t i o n o fa t least t h ef o l l o w i n g q u a l i t y characteristics o f o i l products. 9.3.7.3.2.1 F o r b u n k e r o i l : .1 density; .2 v i s c o s i t y ; .3 s u l p h u r f r a c t i o n o f t o t a l m a s s ; .4 w a t e r c o n t e n t ; .5 a s h c o n t e n t ; .6 f l a s h p o i n t ; .7 c h i l l i n g p o i n t ; .8 c o k i n g a b i l i t y ; .9 m e c h a n i c a l i m p u r i t i e s c o n t e n t ; .10 v a n a d i u m , a l u m i n i u m , s i l i c i u m c o n t e n t s . 9.3.7.3.2.2 F o r n e w l u b r i c a t i n g o i l : .1 flashpoint; .2 v i s c o s i t y ; .3 w a t e r c o n t e n t ; .4 a l k a l i n e u t r a l i z a t i o n n u m b e r ; .5 i n s o l u b l e r e s i d u e c o n t e n t . 9.3.7.3.2.3 F o r n e w h y d r a u l i c o i l : .1 viscosity; .2 w a t e r c o n t e n t ; .3 a c i d n u m b e r . 9.3.7.3.2.4 F o r l u b r i c a t i n g a n d h y d r a u l i c o i l u s e d i n machinery a n d equipment i n operation: .1 physical a n d chemical properties indicating change o f t h e quality o f analysed oils a n d technical 9.3.7.5.3 T h e t e s t i n g l a b o r a t o r y s h a l l i m m e d i a t e l y notify t h e customer o f each case o f t h e b u n k e r o i l properties non-compliance w i t h t h e requirements o f regulations 1 4 a n d 1 8 o fA n n e x V I t o M A R P O L 73/78 identified w i t h i n t h e scope o fthe analysis carried out. 9.3.8 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s carrying o u t sampling a n d check test (analysis) of ballast water i n accordance with International Convention f o rt h e Control a n d Management o f Ship's Ballast Water a n dSediments, 2004 ( B W M Convention) (code 21002900MK). 9.3.8.1 T e c h n i q u e . 9.3.8.1.1 T h e t e s t i n g l a b o r a t o r i e s s h a l l b e c o n s i s t e n t w i t h methods for sampling a n d analysis o f ballast water, as s p e c i f i e d i n I M O r e s o l u t i o n M E P C . 1 7 3 ( 5 8 ) a n d MEPC.174(58). 9.3.8.1.2 T h e a n a l y s i s r e s u l t s s h a l l c o m p l y w i t h t h e requirements o fthe B W M Convention. 9.3.8.1.3 T h e t e s t i n g l a b o r a t o r i e s t e c h n i q u e s h a l l enable e v a l u a t i o n o f the f o l l o w i n g q u a l i t y characteristics o f t h e ballast w a t e r a t least. 9.3.8.1.3.1 Q u a n t i t y o f v i a b l e o r g a n i s m s : .1 p e r cubic meter; .2 p e r m i l l i l i t e r . 9.3.8.1.3.2 I n d i c a t o r m i c r o b e s c o n t e n t : .1 toxicogenic V i b r i o cholerae; .2 e s c h e r i c h i a c o l i ; .3 i n t e s t i n a l E n t e r o c o c c i . 40 Rules for Technical Supervision during Construction of Ships and Manufacture 9.3.9 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a t o r i e s carrying o u t testing o f b u l k cargoes t o determine transport p e r f o r m a n c e (code 21004000MK). 9.3.9.1 S a m p l i n g a n d s a m p l e p r e p a r a t i o n p r o c e d u r e s shall c o m p l y w i t h t h e requirements o f I M S B C Code, I M O resolution M S C . 3 5 4 ( 9 2 ) , a n d circulars M S C . l / C i r c . 1 4 5 3 a n d M S C .1/Circ. 1 4 5 4 as w e l l as they shall b e approved b y t h e Register. 9.3.9.2 A t e s t i n g l a b o r a t o r y s h a l l k e e p , s t o r e f o r 10 years a n ds u b m i t t o t h eRegister the f o l l o w i n g records drawn u pboth i nRussian and English: .1 training record b o o k s f o rt h e personnel i n v o l v e d in sample preparation a n d testing; .2 r e p o r t s o n i n t e r n a l t e s t i n g o f s a m p l e p r e p a r a t i o n procedure a n d testing; .3 r e c o r d b o o k s o f p o i n t s a m p l i n g a n d r e p r e s e n t a t i v e samples preparation; .4 t e s t r e p o r t s ; .5 c a l i b r a t i o n a n d m a i n t e n a n c e l o g s f o r i n s t r u m e n t a t i o n a n d test equipment; .6 r e p o r t s o n d e v i a t i o n s f r o m t h e a p p r o v e d s a m p l e preparation procedures as w e l l as testing a n d amendments t ob e introduced thereto. of Materials and Products for Ships program shall comply with t h e approved testing procedure a n d consider t h e technical specification requirements f o r full-scale tests a n d e n v i r o n m e n t a l c o n d i t i o n s , i n w h i c h t h e tests a r e carried o u t . T h e test program shall b e approved b y a n authorized body a n d agreed w i t h t h e customer. 9.3.10.4 T h e t e s t i n g l a b o r a t o r y s h a l l h a v e t h e facilities necessary f o rtesting i n accordance w i t h t h e approved testing procedure. 9.3.10.5 M e a s u r i n g a n d t e s t i n g e q u i p m e n t b e i n g t h e property o f the testing laboratory as w e l l as belonging t o other firms, organizations o r individuals, shall b e calibrated i n t h e established order, identified a n d registered i n t h e testing laboratory passport. 9.3.10.6 I n c a s e t h e s o f t w a r e i s u s e d t o c o n t r o l measuring a n d testing equipment, t o accumulate, process, r e c o r d i n g a n dstorage o f t h e test data, i t s h a l l b e detailed, identified a n d submitted f o r t h e Register approval as part o f the testing laboratory documentation. T h e software for t h e data storage shall b e backed u pa n d protected against a n u n a u t h o r i z e d access. 9.3.10.7 P o s s i b l e a d j u s t m e n t o f t h e t e s t i n g a n d calibration equipment, including t h e hardware a n d software, w h i c h m a y i n v a l i d a t e t h e test results, s h a l l b e eliminated. 9.3.10 S p e c i a l r e q u i r e m e n t s f o r t e s t i n g l a b o r a tories carrying o u t full-scale tests d u r i n g s u r v e y o f o n s h o r e facilities: G M D S S s e a a r e a s A l a n d A 2 ; 9.3.10.8. T h e t e s t i n g l a b o r a t o r y p e r s o n n e l s h a l l N A V T E X service; vessel traffic service ( V T S ) (code consist o f , a t least, 3 specialists w i t h h i g h e r p r o f e s s i o n a l 21003100) education proved b y a nationally recognized document, h a v i n g , a t least, 3 years o f practical experience i n testing 9.3.10.1 T e s t i n g p r o c e d u r e s h a l l b e s u b m i t t e d f o r t h e specified b y t h e applicant. Register approval as part o f t h e testing laboratory documentation. 9.3.10.2 T e s t i n g p r o c e d u r e s h a l l i n c l u d e , a t least, t h e following information: .1 appropriate identification; .2 s c o p e o f a p p l i c a t i o n ; .3 d e s c r i p t i o n calibration; o f a n item subject t o testing o r 9.3.10.9 I n c a s e t h e t e s t i n g l a b o r a t o r y s u b c o n t r a c t s another laboratory, t h e latter shall have t h e R e c o g n i t i o n Certificate issued b y the Register. T h e area o f recognition o f t h e testing laboratory-subcontractor shall correspond to code 2 1 0 0 3 1 0 0 . T h econtract w i t h t h e laboratorysubcontractor shall b e concluded o n a long-term basis and included i n t h e testing laboratory documentation. .6 r e q u i r e d e n v i r o n m e n t a l c o n d i t i o n s a n d s t a b i l i z a tion time; .7 p r o c e d u r e s , i n c l u d i n g : checks prior t o commencement o f works; checks o fproper functioning a n d , w h e r e required, calibration a n d adjustment o f the e q u i p m e n t p r i o r t ouse; m e t h o d o f observations a n d results recording; safety measures t ob e m e t ; .8 c r i t e r i a a n d / o r r e q u i r e m e n t s f o r a c c e p t a n c e o r rejection o f results; 9.3.10.10 T h e t e s t i n g l a b o r a t o r y s h a l l n o t b e l o n g t o the firms-owners o fonshore facilities as w e l l as t o t h e manufacturers, suppliers o f t h e equipment used i n construction o fonshore facilities, a n d shall n o tb e under their control. T h e testing laboratory being part o f t h e organization carrying out, i n addition, t h e activities other than testing, shall demonstrate that t h e duties o f t h e organization t o pmanagement, participating o r influencing t h e testing laboratory activities, shall b e clearly defined t o e l i m i n a t e t h e potential conflicts o f interest. T h e testing laboratory shall b e capable o f demonstrating its i m p a r t i a l i t y a n d that n e i t h e r t h e testing l a b o r a t o r y itself, n o r its e m p l o y e e s d on o texperience c o m m e r c i a l o r other pressures t o compromise their technical solutions. .9 d a t a t o b e r e c o r d e d , m e t h o d o f a n a l y s i s a n d d a t a reporting form. 9.3.10.3 P r i o r t o test, t h e t e s t i n g l a b o r a t o r y s h a l l d e v e l o p t h e p r o g r a m o f o n s h o r e f a c i l i t y tests. T h e test 9.3.10.11 T h e T e s t R e p o r t s h a l l c o m p l y w i t h t h e approved testing p r o g r a m a n d contain t h e list o f t h e measuring a n d testing equipment applied during t h e tests. be .4 p a r a m e t e r s a n d q u a n t i t a t i v e i n d i c e s a n d r a n g e s t o specified; .5 f a c i l i t i e s a n d e q u i p m e n t , i n c l u d i n g to technical specifications; requirements Part I . General Regulations for Technical 41 Supervision 9.3.11 S p e c i a l r e q u i r e m e n t s f o r f i r m s e n g a g e d i n testing o f coating systems i n accordance with I M O resolution MSC.215(82), a s amended, a n d I A C S U I SC223 and/or I M O resolution MSC288(87), as a m e n d e d (code 21003000MK). 9.3.11.1 E x t e n t o f e n g a g e m e n t - t e s t i n g o f c o a t i n g s s y s t e m s a c c o r d i n g t o ГМО r e s o l u t i o n M S C . 2 1 5 ( 8 2 ) , a s corrected b y M S C .1/Circ. 1381 a n d amended b y ГМО r e s o l u t i o n 3 4 1 ( 9 1 ) a n d I A C S U I S C 2 2 3 a n d / o r I M O r e s o l u t i o n M S C . 2 8 8 ( 8 7 ) , as corrected b y MSC.l/Circ.1381 andamended b y I M O resolution 341(91). 9.3.11.2 T h e t e s t i n g l a b o r a t o r y s h a l l p r o v i d e t o t h e Register the following information: .1 a detailed list o ft h e l a b o r a t o r y test e q u i p m e n t f o r t h e c o a t i n g a p p r o v a l a c c o r d i n g t o t h e ГМО r e s o l u t i o n M S C . 2 1 5 ( 8 2 ) as a m e n d e d and/or M S C . 2 8 8 ( 8 7 ) as amended; .2 a d e t a i l e d l i s t o f r e f e r e n c e d o c u m e n t s c o m p r i s i n g a m i n i m u m those referred t o i nI M O resolutionM S C . 2 1 5 ( 8 2 ) as a m e n d e d a n d / o r M S C . 2 8 8 ( 8 7 ) a s a m e n d e d f o r t h e coating approval; .3 d e t a i l s o f t e s t p a n e l p r e p a r a t i o n , p r o c e d u r e o f t e s t p a n e l identification, coating application, test procedures a n d a s a m p l e test report; .4 d e t a i l s o f e x p o s u r e m e t h o d a n d s i t e f o r w e a t h e r i n g p r i m e d test panels; .5 a s a m p l e d a i l y o r w e e k l y l o g / f o r m f o r r e c o r d i n g test c o n d i t i o n s a n d observations i n c l u d i n g u n f o r e s e e n interruption o f t h e exposure cycle w i t h corrective actions; .6 d e t a i l s applicable; o f a n y sub-contracting agreements, i f .7 c o m p a r i s o n t e s t r e p o r t s w i t h a n a p p r o v e d c o a t i n g system o rlaboratory i f available. 9.3.11.3 R e p o r t i n g . Reference shall b e made t o t h e following I A C S recommendations: Recommendation 1 0 1- Model Report f o r I M O resolution M S C . 2 1 5 ( 8 2 ) A n n e x 1 "Test Procedures f o r Coating Qualification"; Recommendation 102- I A C S M o d e l Report f o r ГМО r e s o l u t i o n M S C . 2 1 5 ( 8 2 ) A n n e x 1 " T e s t P r o c e d u r e s f o r C o a t i n g Q u a l i f i c a t i o n " ,S e c t i o n 1.7 - C r o s s o v e r Test. 9.3.11.4 A u d i t o f t h e t e s t l a b o r a t o r y s h a l l b e b a s e d o n t h e requirements o fthis Section a n dt h e standards l i s t e d i n t h e ГМО r e s o l u t i o n M S C . 2 1 5 ( 8 2 ) a s a m e n d e d a n d / o r ГМО r e s o l u t i o n M S C . 2 8 8 ( 8 7 ) a s a m e n d e d f o r t h e coating approval. 9.3.11.5 F o r t h e t e s t i n g l a b o r a t o r i e s e n g a g e d i n testing o f coating systems i n accordance with I M O resolution M S C . 2 1 5 ( 8 2 ) , as amended, a n d L A C S U I S C 2 2 3 and/or L M O resolution M S C . 2 8 8 ( 8 7 ) , as amended, t h e definitions g i v e n i n 8.1.1.1 shall b e used. 42 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 10 R E C O G N I T I O N O F M A N U F A C T U R E R S 10.1 GENERAL 10.1.1 T h e r e q u i r e m e n t s o f t h i s S e c t i o n a p p l y to the manufacturers o f materials a n d products listed i n the R S Nomenclature. 10.1.2 T h e f i r m s ( m a n u f a c t u r e r s ) m a n u f a c t u r i n g materials a n d products i ncompliance w i t h t h e require­ m e n t s o f1.3.1.3, Part X " B o i l e r s , H e a t E x c h a n g e r s a n d Pressure vessels" a n d Part ХШ "Materials" o ft h e Rules for t h e Classification a n d Construction o f Sea-Going S h i p s s h a l l b e r e c o g n i z e d b y t h e Register. I n o t h e r cases, manufacturers m a yb e recognized o n t h ev o l u n t a r y basis. 10.1.3 T h e m a n u f a c t u r e r s h a l l m e e t g e n e r a l r e q u i r e ­ ments listed i n Section 7 , requirements o f 10.2 a n d requirements o fthe Administrations ( i f any). 10.1.4 R e c o g n i t i o n o f t h e m a n u f a c t u r e r b y t h e R e g i s t e r is c o n f i r m e d b y t h eR e c o g n i t i o n Certificate f o r M a n u f a c t u r e r (СПИ), w h i c h i s i s s u e d i n c o m p l i a n c e w i t h 3 . 4 t o 3 . 7 . 10.2 R E Q U I R E M E N T S 10.2.1 P e r s o n n e l . 10.2.1.1 T h e m a n u f a c t u r e r s h a l l h a v e d o c u m e n t s on the personnel containing the following information: .1 functional duties; .2 r e - t r a i n i n g a n d i t s t e r m s o f v a l i d i t y ; .3 c e r t i f i c a t i o n a n d t e r m s o f i t s p e r f o r m a n c e . 10.2.1.2 T h e m a n u f a c t u r e r s h a l l h a v e t h e r e g u l a r staff o f specialists. 10.2.1.3 T h e m a n u f a c t u r e r s h a l l h a v e a n d a d h e r e to t h e plans (schedules) o f t h e following: .1 training a n d re-training o f t h e personnel; .2 r e f r e s h e r t r a i n i n g o f t h e p e r s o n n e l ; .3 c e r t i f i c a t i o n o f t h e p e r s o n n e l to performance o f certain activities. with respect 10.2.2 T e c h n i q u e . 10.2.2.1 T h e m a n u f a c t u r e r s h a l l h a v e t h e lists o f equipment, premises a n d facilities necessary f o r perfor­ mance o f activity i n t h e area indicated i n t h e request 10.2.2.2 T h e m a n u f a c t u r e r s h a l l h a v e a n d a d h e r e to t h e schedules o f maintenance o f equipment a n d instrumentation. 10.2.3 M e a s u r e m e n t a s s u r a n c e . 10.2.3.1 W h e n tests o f m a t e r i a l s a n d p r o d u c t s s h a l l be conducted i n a testing laboratory, this laboratory shall meet the requirements o f Section 9. 10.2.4 F i l e s o f t h e m a n u f a c t u r e r ' s d o c u m e n t s . 10.2.4.1 T h e m a n u f a c t u r e r s h a l l h a v e t h e v a l i d norma-tive a n d technical documents necessary f o r performance o f activities i n t h e area indicated i n t h e request, including: .1 list o f activities p e r f o r m e d (area o f activity); .2 o p e r a t i n g a n d m a i n t e n a n c e d o c u m e n t a t i o n o n equipment; .3 o p e r a t i n g a n d m a i n t e n a n c e d o c u m e n t a t i o n o n measuring a n d testing equipment; .4 d u t y r e g u l a t i o n s ; .5 d o c u m e n t s maintenance. o n records keeping a n d archives Part I . General Regulations for Technical Supervision 43 11 A U D I T S O F F I R M S 11.1 GENERAL 11.1.1 T h er e q u i r e m e n t s o f t h i s S e c t i o n a p p l y t o t h e firms p e r f o r m i n g t h e a c t i v i t y i n c o n n e c t i o n w i t h i t e m s o f the R S technical supervision, t h e kinds o f w h i c h are specified i nTable 11.1.1. 11.1.2 W h e r e t e c h n i c a l s u p e r v i s i o n i s c o n d u c t e d i n the firms engaged i nt h e activity w i t h codes 2 2 0 0 9 0 0 0 , 22013000, 22014000, 22014001, 22014002, 22014003, 22014004, 22017000, 22017010, 22017020, 22020000, 2 2 0 2 4 0 0 0 , these firms shall b e audited b y R Sf o r compliance w i t h the requirements i nSection 7, relevant special requirements i n 11.3, a n d requirements o f t h e Administration ( i f any). (ССП), w h i c h i s i s s u e d i n a c c o r d a n c e w i t h 3 . 4 t o 3 . 7 . I n c a s e t h e C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) i s available, t h eaudits are conducted i n accordance w i t h the conditions f o rits issue. 11.2 R E Q U I R E M E N T S 11.2.1 P e r s o n n e l . 11.2.1.1 T h e f i r m s h a l l h a v e d o c u m e n t s o n t h e personnel containing the following information: .1 functional duties; .2 p r o f e s s i o n a l a n d s p e c i a l t r a i n i n g a n d i t s t e r m s o f validity; I n future, t h e Register reserves t h e right t o audit t h e firm f o rcompliance w i t h the requirements i nSection 7, relevant special requirements i n 11.3, w h e r e necessary. In addition t o requirements i n Section 7, t h e firm m a y b e audited o n a v o l u n t a r y basis against t h e requirements i n 11.2. .3 c e r t i f i c a t i o n a n d t e r m s (if necessary). 11.1.2.1 T h e f i r m s t h a t p e r f o r m a c t i v i t y w i t h c o d e 2 2 0 2 1 0 0 0 M K shall b e audited b y R S f o r compliance w i t h t h erequirements o fSection 7 ,requirements o f 11.2, relevant special requirements o f 11.3 a n d t h e require­ ments o f Administrations ( i fany). Compliance o f t h e f i r m shall b e c o n f i r m e d i naccordance w i t h 11.1.4. .1 .2 .3 certain 11.1.3 A u d i t s o f d e s i g n o f f i c e s e n g a g e d i n t h e activity w i t h code 22018000 are only conducted o n a v o l u n t a r y basis. I n this case, t h e design o f f i c e s h a l l m e e t the general requirements listed i n Section 7 (except f o r 7.2.4, 7.2.5.1.2, 7.2.6.1.8, 7.2.6.1.10, 7.2.6.1.12), the requirements o f11.2 (except f o r 11.2.3, 11.2.4.1.3), special requirements a n d t h e Administrations' require­ ments ( i f any). 11.1.4 C o m p l i a n c e o f t h e f i r m w i t h t h e r e q u i r e m e n t s o f Section 7 , requirements o f 11.2, relevant special requirements a n d Administrations' requirements ( i f any) is c o n f i r m e d b y t h e Certificate o f F i r m C o n f o r m i t y o f its performance 11.2.1.2 T h e f i r m s h a l l h a v e t h e r e g u l a r s t a f f o f specialists. 1 1 . 2 . 1 . 3 T h e firm s h a l l h a v e a n d a d h e r e t o t h e p l a n s (schedules) o f t h e following: training a n d re-training o fthe personnel; refresher training o ft h e personnel; certification o f t h e personnel w i t h respect t o activities. 11.2.2 T e c h n i q u e . 1 1 . 2 . 2 . 1 T h e firm s h a l l h a v e t h e l i s t s o f e q u i p m e n t , premises a n d facilities necessary f o r performance o f activity i n t h e area indicated i n t h e request. 1 1 . 2 . 2 . 2 T h e firm s h a l l h a v e a n d a d h e r e t o t h e schedules o fmaintenance o f equipment a n dfacilities. 11.2.3 M e a s u r e m e n t a s s u r a n c e . 11.23.1 T h ef i r m shall h a v e t h e lists o ft h e f o l l o w i n g : .1 m e a s u r i n g equipment, i n c l u d i n g those f o r certifi­ cation o ftesting equipment; .2 t e s t i n g a n d a n c i l l a r y e q u i p m e n t ; .3 r e f e r e n c e s a n d s t a n d a r d s p e c i m e n s . 11.2.3.2 T h e f i r m s h a l l h a v e a n d a d h e r e t o t h e schedules o ft h e following: Table Code 22009000 22013000 22014000 22014001 22014002 22014003 22014004 22017000 22017010 22017020 22018000 22020000 22024000 11.1.1 K i n d s o f activity Diagnostics o f devices, installations, machinery, equipment, hull structures a n d other items o f technical supervision Measurement assurance o f items o f technical supervision C o n v e r s i o n , m o d e r n i z a t i o n a n d repair o f items o f technical s u p e r v i s i o n (ships, hull structures, ship equipment, products, etc.) Installation a n d c o m m i s s i o n i n g o f electrical a n d automation e q u i p m e n t M a i n t e n a n c e a n d repair o f electrical a n d automation e q u i p m e n t H u l l construction f o r ships (Z23) Constructions o f ships, including mobile offshore drilling units ( M O D U ) a n d fixed offshore platforms ( F O P ) T h e o r e t i c a l training a n d w e l d e r s ' practical qualification tests (at certification centers) Training a n d certification o f personnel for thickness m e a s u r e m e n t o n ships (ultrasonic examination) i n shipbuilding a n d shiprepair sector Training a n d examination o f coating inspectors Design Inclining test a n d light-weight c h e c k o f ships Manufacture o fN S S S equipment o f 1, 2 a n d 3 safety classes 44 Rules for Technical Supervision during Construction of Ships and Manufacture .1 maintenance o fm e a s u r i n g a n d testing equipment; .2 t e s t i n g ( c a l i b r a t i o n ) o f m e a s u r i n g e q u i p m e n t ; .3 c e r t i f i c a t i o n o f t e s t i n g e q u i p m e n t . 11.2.4 F i l e s o f t h e f i r m d o c u m e n t s . 1 1 . 2 . 4 . 1 T h e firm s h a l l h a v e t h e v a l i d n o r m a t i v e a n d technical documents necessary f o r performance o f activity i n t h e area indicated i n t h e request, including: .1 list o f activities p e r f o r m e d (area o f activity); .2 o p e r a t i n g a n d m a i n t e n a n c e d o c u m e n t a t i o n o n equipment; .3 o p e r a t i n g a n d m a i n t e n a n c e d o c u m e n t a t i o n o n measuring a n d testing equipment; .4 d u t y r e g u l a t i o n s ; .5 d o c u m e n t s maintenance. o n records 11.3 S P E C I A L keeping a n d archives REQUIREMENTS 11.3.1 S p e c i a l r e q u i r e m e n t s f o r t h e f i r m s p e r f o r m activity with code 22021000MK. that 1 1 . 3 . 1 . 1 T h e firms s h a l l c o m p l y w i t h t h e r e q u i r e m e n t s o f I M O circulars M S C . l / C i r c . l 2 0 6 / R e v . l , MSC.l/ Circ.1277 a n dtherequirements o f Administrations (if any). 11.3.2 S p e c i a l r e q u i r e m e n t s f o r t h e f i r m s t h a t perform activity "Training a n d examination o fcoat­ i n g i n s p e c t o r s " ( c o d e 22017020) a r e specified i n 3.2.9.3.1.1 t o3.2.9.3.1.3, Part Ш "Technical Supervision during Manufacture o fMaterials". 11.3.3 S p e c i a l r e q u i r e m e n t s f o r t h e f i r m s t h a t perform activity "Training a n d certification of personnel f o rthickness measurement o n ships (ultrasonic examination) i nshipbuilding a n d shiprep a i r s e c t o r " ( c o d e 22017010). 11.3.3.1 L e g a l status. 11.3.3.1.1 T h e f i r m s h a l l h a v e d o c u m e n t s c o n f i r m i n g its c o m p e t e n c e i n t h e k i n d o f a c t i v i t y i n d i c a t e d i n t h e request, issued b y a n organization authorized i n accordance w i t h the current legislation. 1 1 . 3 . 3 . 1 . 2 T h e firm s h a l l b e g u i d e d i n i t s a c t i v i t y b y the r e q u i r e m e n t s o fI S O / T E C 1 7 0 2 4 " C o n f o r m i t y assess­ ment — General requirements f o r bodies operating certification o f persons". 11.3.3.2 P e r s o n n e l . 1 1 . 3 . 3 . 2 . 1 T h e firm s h a l l h a v e d o c u m e n t s o n t h e personnel containing the following information: .1 full n a m e ; .2 e d u c a t i o n ; .3 q u a l i f i c a t i o n l e v e l a c c o r d i n g I S O 9712 o r a corresponding level system; to E N 473or i n the national .4 n u m b e r a n d d a t e o f i s s u e o f a c e r t i f i c a t e a c c o r d i n g to E N4 7 3 o rI S O 9 7 1 2 o rt o a corresponding document in the national system; .5 n o n - d e s t r u c t i v e e x a m i n a t i o n s e c t o r ( s ) ; .6 f u n c t i o n a l d u t i e s ; of Materials and Products for Ships .7 w o r k i n g e x p e r i e n c e i n m e t h o d s a n d s e c t o r s o f non-destructive examination. 11.3.3.2.2 T h e m e m b e r s o f t h e e x a m i n a t i o n b o a r d shall h a v e qualification level Ш according t oE N4 7 3o r I S O 9712 o r a corresponding level i n the national system. 11.3.3.2.3 P l a c e o f w o r k o f m e m b e r s o f t h e examination board shall b e specified i n addition to information given i n 11.3.4.2.1. 1 1 . 3 . 3 . 2 . 4 T h e firm s h a l l h a v e a n d a d h e r e t o t h e personnel training, re-training a n d certification pro­ grammes. 11.3.3.2.5 T h e f i r m s h a l l h a v e a n d a d h e r e t o p l a n s (schedules) o f : .1 training a n d re-training o f t h e personnel; .2 r e f r e s h e r t r a i n i n g o f t h e p e r s o n n e l ; .3 c e r t i f i c a t i o n o f t h e p e r s o n n e l w i t h r e s p e c t to performance o fcertain activities. 11.3.3.3 T e c h n i q u e . 1 1 . 3 . 3 . 3 . 1 T h e firm s h a l l h a v e e x a m i n a t i o n s a m p l e s as r e g a r d s n o n - d e s t r u c t i v e e x a m i n a t i o n , i n a c c o r d a n c e w i t h i t e m s o f t h e firm a r e a o f a c t i v i t y . 11.3.3.4 M e a s u r e m e n t a s s u r a n c e . 11.3.3.4.1 M e a s u r e m e n t s s h a l l b e p e r f o r m e d i n t h e testing laboratory c o m p l y i n g w i t h t h erequirements o f Section 9. 11.3.3.4.2 T h e t e s t i n g l a b o r a t o r y s h a l l b e a u t h o r i z e d to perform measurements i n accordance w i t h the current legislation. 1 1 . 3 . 3 . 5 F i l e s o f t h e firm d o c u m e n t s . 11.3.4.5.1 T h e f i r m s h a l l h a v e p r o g r a m s f o r t r a i n i n g and certification o f personnel for thickness measurement o n ships (ultrasonic e x a m i n a t i o n ) i n shipbuilding a n d shiprepair sector a n d sets o f e x a m i n a t i o n q u e s t i o n s b y the following topics: .1 m a i n i n f o r m a t i o n o n t h e items o f e x a m i n a t i o n , their p r o d u c t i o n technology, repair, operating conditions (cargo h a n d l i n g gear, M O D U , F O P , sea-going ships, ships o f river-sea navigation, r i v e r ships, pipelines, heat exchangers, welded joint connections o f structural elements, welding materials); .2 m a t e r i a l s a p p l i e d i n i t e m s , n o n - d e s t r u c t i v e examination methods; .3 r e q u i r e m e n t s o f t h e R S r u l e s f o r t h e h u l l s t r u c t u r e o f ships, M O D U , F O P etc. (ship types a n d their structural particulars, n a m e a n d designation o f ship's h u l l m e m b e r s etc.); .4 R S r e q u i r e m e n t s f o r u s e a n d i n t e r p r e t a t i o n o f results o f thickness measurement o n ships (ultrasonic examination) ( n o r m a t i v e base, types o f w e a r a n d methods o f their identification, n o r m s o fwear, prepara­ tion o freports o n thickness measurement, preparation o f items f o r t h e examination, safety precautions during works). 1 1 . 3 . 3 . 5 . 2 T h e firm s h a l l h a v e e x a m i n a t i o n s a m p l e s list as regards thickness m e a s u r e m e n t o n ships (ultra­ sonic examination) w i t h passports issued f o r every Part I . General Regulations for Technical Supervision examination sample i n accordance w i t h E N4 7 3 o r a corresponding document i n the national system. 11.3.3.5.3 T h e f i r m s h a l l h a v e t h e v a l i d n o r m a t i v e and technical documents necessary f o r performance o f activity i n t h e area indicated i n t h e request, including: .1 list o f activities p e r f o r m e d (area o f a c t i v i t y ) ; .2 t h e Q u a l i t y M a n u a l o r a s i m i l a r d o c u m e n t ; .3 d e s c r i p t i o n o f p r o c e s s f o r t h e t r a i n i n g a n d certification o fpersonnel f o r non-destructive examina­ tion; .4 o p e r a t i n g a n d m a i n t e n a n c e technical equipment; documentation o n .5 o p e r a t i n g a n d m a i n t e n a n c e measuring a n d testing equipment; documentation o n .6 d u t y r e g u l a t i o n s ; .7 d o c u m e n t s o n r e c o r d s maintenance. 11.3.3.6 R e p o r t i n g . keeping a n d archives 11.3.3.6.1 I n a d d i t i o n t o t h e i n f o r m a t i o n s p e c i f i e d i n 7.2.6.1, reports o n t h eresults o factivity performed, shall contain: .1 i n f o r m a t i o n o n trainers; .2 i n f o r m a t i o n o n m e m b e r s o f t h e e x a m i n a t i o n board; .3 t h e p r o g r a m s f o r t r a i n i n g o f p e r s o n n e l f o r thickness measurement o n ships (ultrasonic examination) i n shipbuilding a n d shiprepair sector; .4 l i s t o f sets o f e x a m i n a t i o n q u e s t i o n s i n c l u d i n g shipbuilding a n d shiprepair sector; 45 .5 t h e e x a m i n a t i o n s a m p l e s l i s t f o r s h i p b u i l d i n g a n d shiprepair sector; .6 i n f o r m a t i o n o n t r a i n e e s . 11.3.3.7 C h e c k i n g a n d c o n t r o l . 11.3.3.7.1 P e r s o n n e l o f t h e f i r m r e s p o n s i b l e f o r t h e c h e c k i n g ( c o n t r o l ) s h a l l h a v e q u a l i f i c a t i o n l e v e l П o r 1П according t o E N 4 7 3 o r I S O 9 7 1 2 o r a corresponding level i n the national system. 11.3.3.7.2 T h e f i r m s h a l l c o n d u c t c o n t r o l c h e c k s i n the area indicated i n t h erequest witnessed b y t h e R S representative. 11.3.4 S p e c i a l r e q u i r e m e n t s f o r t h e f i r m s t h a t p e r f o r m activity " M a n u f a c t u r e o fN S S S e q u i p m e n t o f 1, 2 a n d 3 s a f e t y c l a s s e s " ( c o d e 22024000). 11.3.4.1 L e g a l status. 11.3.4.1.1 T h e f i r m s h a l l h a v e a l i c e n s e o f t h e state safety regulatory b o d y i n t h e field o fnuclear energy use to p e r f o r m t h e activity " D e s i g n a n d manufacture o f nuclear plant equipment" as provided b y applicable law. 11.3.4.2 F i l e o f t h e f i r m d o c u m e n t s . 11.3.4.2.1 T h e f i r m s h a l l h a v e a n d m a i n t a i n t h e procedures f o r development a n d agreement o fthe quality plans. T h e recommended content o f the quality plan is given i n A p p e n d i x 1 t o federal codes a n d rules N P - 0 7 1 06 "Regulations f o r Assessment o f Conformity o f Equipment, Materials a n d S e m i - F i n i s h e d Products t ob e Delivered t oNuclear Facilities". 46 Rules for Technical Supervision during Construction of Ships and Manufacture 12 T E C H N I C A L S U P E R V I S I O N A T T H E F I R M 12.1 T h e Register performs technical supervision at t h e firm ( m a n u f a c t u r e r ) o n t h e b a s i s o f t h e c o n t r a c t o r request o ntechnical supervision (refer t o Section 4). W h e n c o n c l u d i n g t h e c o n t r a c t t h e firm ( m a n u f a c t u r e r ) shall b e audited for conformity w i t h t h e requirements o f Sections 1 0 o r 1 1 . W h e r e d e e m e d necessary, c h e c k tests o f t h e firm ( m a n u f a c t u r e r ) p r o d u c t s m a y b e r e q u i r e d . I n performing technical supervision o n a single request at t h e f i r m (manufacturer), fulfillment o f t h e requirements o f7.2.2.1, 7.2.3, 7.2.4, 7.2.5, 7.2.7, 7.2.8 regarding the production process o f the item o f technical supervision shall b e preliminarily verified. I n compliance w i t h the provisions o f Sections 1 0 o r 1 1 , t h e R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ) o r t h e C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССП) m a y b e issued t o t h e f i r m (manufacturer). T h e f i r m (manufac­ t u r e r ) s h a l l b e regularly a u d i t e d f o r c o m p l i a n c e w i t h t h e requirements o f Sections 1 0 o r 11 w i t h i n t h e terms agreed u p o n w i t h t h e Register, w h i c h are established w h e n the contract i s concluded; i ncase the R e c o g n i t i o n C e r t i f i c a t e f o r M a n u f a c t u r e r (СПИ) o r C e r t i f i c a t e o f F i r m C o n f o r m i t y (ССГГ) i s a v a i l a b l e , t h e a u d i t s a r e carried o u ti n accordance w i t h t h e conditions o f their issuance. 12.2 Before c o m m e n c e m e n t o f the technical super­ v i s i o n t h e firm ( m a n u f a c t u r e r ) s h a l l d r a w u p a l i s t o f t h e items o f technical supervision i n order t o specify t h e scope a n d procedure o f the i t e m surveys a n d tests o f the items o f the Register technical supervision. T h e list shall be based o nthe requirements o f the R Srules and these Rules a n d shall b e agreed u p o n w i t h t h e R S Branch Office. T h e items o f technical supervision, detailed technical documentation o nmanufacture o f the material o r product, o r construction o f the ship, surveys a n d tests to b e performed i nthe course o f technical supervision, their procedure, as w e l l as t h edocuments t o b e issued and a necessity for branding shall b e indicated therein. 12.3 T h e i t e m s o f technical s u p e r v i s i o n are generally s u r v e y e d b y t h e R e g i s t e r a t t h e final s t a g e o f p r o d u c t i o n (finished products) after acceptance o f the products b y t h e firm ( m a n u f a c t u r e r ) t e c h n i c a l c o n t r o l b o d y a n d i s s u e o f the appropriate documents. I n separate cases, w h e r e i t i s m o t i v a t e d b y t h e production process and/or design o f the product, at the discretion o f the Register, surveys m a y b e performed o n a step-by-step basis a n d simultaneously w i t h t h e manufacturer's control. of Materials and Products for Ships (MANUFACTURER) Surveys a t the intermediate stages o f p r o d u c t i o n the items o f technical supervision arecarried out i n cases prescribed b y t h e R e g i s t e r after c o m p l e t i o n manufacturer's functional control o r at the discretion the Register, i f motivated b ythe particular conditions production. o f the o f o f of 1 2 . 4 T h e R e g i s t e r m a y require i n c o m i n g c h e c k o f m a t e r i a l s a n d c o m p o n e n t p a r t s a t t h e firm ( m a n u f a c ­ turer), i f i t is found that they d o n o t meet t h e R S requirements, or, i f t h e y are used, the i t e m s o f technical supervision w i l l n o t meet those requirements. I n case o f unsatisfactory results o f the i n c o m i n g check use o f such m a t e r i a l s i s n o t a l l o w e d , regardless o f a v a i l a b i l i t y o f t h e certificates a n d other documents certifying their c o n ­ formity w i t h the R S requirements. 12.5 I n t h e course o ftechnical supervision at t h e firm ( m a n u f a c t u r e r ) t h e R e g i s t e r c h e c k s t h e m a i n t e n a n c e o f the conditions, under w h i c h firms (manufacturers) and laboratories have been recognized and/or the contract o n technical supervision concluded. 12.6 I n carrying o u t technical supervision t h e Register m a y allow deviations from t h e approved technical d o c u m e n t a t i o n o n l y w i t h i n its authorities. 1 2 . 7 T h e firm ( m a n u f a c t u r e r ) s h a l l p r o v i d e a l l t h e conditions necessary f o r t h e Register t o carry o u t t h e technical supervision atthe firm (manufacturer), namely: t o p r e s e n t t h e required t e c h n i c a l d o c u m e n t a t i o n , i n particular, manufacturer's documents o n quality control o f the products; to prepare t h e items o f technical supervision f o r survey i n the scope required; to provide for safely o f surveys; to provide for availability o f the officials authorized to present the items o f technical supervision for surveys a n d tests; to timely inform the Register o f the time and place o f surveys a n d tests o f the i t e m s o f technical supervision. W h e r e t h econditions required for performance o f s u r v e y s a r e n o t f u l f i l l e d b y t h e firm ( m a n u f a c t u r e r ) , t h e Register has the right t o refuse t ocarry o u t surveys o r t o w i t n e s s tests. 1 2 . 8 U p o n s a t i s f a c t o r y results o f s u r v e y s a n d t e s t s , the Register issues t h e appropriate documents f o r t h e items o f technical supervision and puts the brands i n the prescribed cases (refer t o Sections 3 , 4 a n d A p p e n ­ dices 1, 2). Part I . General Regulations for Technical 41 Supervision 13 T E C H N I C A L S U P E R V I S I O N A T T H E S H I P Y A R D DURING CONSTRUCTION O F SHIPS 1 13.1 T e c h n i c a l s u p e r v i s i o n d u r i n g c o n s t r u c t i o n o f s h i p s is p e r f o r m e d o n t h e basis o f t h e contract s i g n e d b e t w e e n t h e Register and the shipyard (refer t o Section 4 ) . F o r the purpose o f technical supervision the shipyard is audited f o r c o n f o r m i t y w i t h t h e r e q u i r e m e n t s o f Section 1 1 . Based o nthe audit results, the Certificate o f F i r m C o n f o r m i t y (ССП) ( r e f e r t o S e c t i o n 1 1 ) m a y b e issued t o t h e shipyard. I n case t h e Certificate o f F i r m C o n f o r m i t y (ССП) i s a v a i l a b l e , t h e a u d i t s are c o n d u c t e d i n accordance w i t h the c o n d i t i o n s o f its issuance. Special requirements for t h e shipyards engaged i n h u l l construction f o r ships, specified i n para 3 o f Appendix 3 t oPart I "General Regulations for Technical Supervision" o f the R u l e s (code 2 2 0 1 4 0 0 3 ) , are specified i n the Appendices 3 and 4 t oPart I "General Regulations for Technical Supervision" o f the Rules. 13.2 S c o p e a n d p r o c e d u r e o f t h e t e c h n i c a l s u p e r ­ v i s i o n , types o f checks, tests a n d c o n t r o l are indicated i n the List o f Items o f Technical Supervision . 2 A l o n g with t h esurveys performed under t h e List, additional patrols shall b e conducted (refer t o1 3 . 4 and 13.5). T h e List is the basic w o r k i n g document used i n the course o f technical supervision at the shipyard. 13.3 T h e L i s t s h a l l b e e l a b o r a t e d b y t h e s h i p y a r d a n d agreed u p o n w i t h t h eR S B r a n c h Office . T h e List is compiled o nthe basis o f the R S Nomenclature for each p r o t o t y p e (single) ship, as w e l l a s ships o f a series. 3 13.3.1 T o b e i n d i c a t e d i nt h e L i s t a r e h u l l structure items o f technical supervision a n d hull construction processes, machinery, equipment a n d outfit, electrical and radio equipment. 4 I n case o f m o d u l e construction o f ships, structural m o d u l e s c o m p r i s i n g h u l l structures i n the f o r m o f panels, sections or blocks, w h i c h are used directly i n assembling hulls o r intended f o rassembly units (zone, mounting blocks, block modules) shall b e indicated. Referred t o t h e items o ftechnical supervision are also production processes a n d i n d i v i d u a l w o r k s subject to technical supervision b y the Register. Scope o f surveys, numbers o f drawings, layouts, p r o c e d u r e s a n d p r o g r a m m e s o f tests, p r o d u c t i o n p r o ­ cesses, etc. s h a l l b e i n d i c a t e d i n t h e L i s t f o r e a c h i t e m o f technical supervision. 1 O n e presentation to the Surveyor, covering one or several items o f technical supervision or w o r k s completed i n the particular production w o r k s h o p o r at the particular stage o f ship construction shall b e made for each i t e m o f the List. Account shall b e taken o fconstruction sequence and other conditions o f building a ship. T h e shipyard and the R S Branch Office shall take measures for m i n i m u m n u m b e r o f presentations. 13.3.2 O n a g r e e m e n t w i t h t h e R S B r a n c h O f f i c e , u s e m a y b e made as t h eList o fone o r several documents elaborated b y the s h i p y a r d i n accordance w i t h its e x i s t i n g practice, such as the shipyard standard o n presentation t o the Register o f structures a n d w o r k s p e r f o r m e d o r a list o f presentation o f sections, o r the b o o k o f presentation o f spaces f o r structural integrity, watertightness, etc. Shipyard's documents shall contain t h e data indicated in the List. T h e R S B r a n c h O f f i c e h a s t h e right, b a s e d o n t h e experience o f construction o f ships a n d data o n their operation, t o introduce necessary improvements a n d additions into t h e List. T h e shipyard shall update t h e agreed documents, i f required b y the Surveyor. 5 13.3.3 S u r v e y s u n d e r t h e L i s t a r e p e r f o r m e d b y t h e Surveyor u p o n presentation b y the technical control body o f the i t e m o f technical supervision o rcompleted w o r k s together w i t h the documents issued, finally verified b y the shipyard and prepared for submission to the Register. T h e m a i n target o f s u r v e y s u n d e r the L i s t is c h e c k i n g o f the quality o f the i t e m o f technical supervision at a particular stage o f manufacture as p r o v i d e d b y t h e p r o d u c t i o n process a n d its admittance f o r further stages o f hull construction. I f deviation f r o m t h eR S require­ m e n t s , defects o r deficiencies, w h i c h shall b e e l i m i n a t e d , are f o u n d , the S u r v e y o r shall require repeated presenta­ tion o f the i t e m o f technical supervision for survey. I n case defects a r e f o u n d at s o m e stage o f construction, the S u r v e y o r shall, irrespective o f the List, r e q u i r e c h e c k i n g o f t h e p r e c e d i n g o p e r a t i o n s t o find o u t the cause o f defects a n d t op r e v e n t their re-occurrence. 13.3.3.1 T h e s h i p y a r d ' s d o c u m e n t s o n t h e a v a i l ­ ability o f the i t e m o f supervision ( w o r k scope) t o b e submitted to the Register f o r survey according t othe List (application f o r m , n o t i f i c a t i o n , b o o k o f presentation, etc.) shall contain: T h e requirements o f the present S e c t i o n a p p l y to technical s u p e r v i s i o n o v e r construction o f ships at the s h i p y a r d facilities, sub-contractors at t h e s h i p y a r d facilities, sub-contractors at their o w n facilities o r at other r e m o t e l o c a t i o n s . Hereinafter referred to as "the List". Hereinafter b y the R S B r a n c h Office i s also meant a Survey Station o f the R S B r a n c h Office at the shipyard i n accordance with the regulations for S u r v e y Station. H e r e a n d hereinafter m o d u l e a n d unit construction o f ships i s also meant. H e r e i n a f t e r b y t h e L i s t a r e a l s o m e a n t t h e s h i p y a r d ' s d o c u m e n t s r e f e r r e d t o i n 13.3.2. 2 3 4 5 48 Rules for Technical Supervision during Construction of Ships and Manufacture n u m b e r o f a ship's technical design; ship's n a m e o r order n u m b e r ; name o f the item o f supervision submitted for survey or o ft h e w o r k scope according t o t h e List; numbers o f drawings a n d other technical documentation related t ot h e i t e m o f supervision; conclusion o fthe shipyard's technical control b o d y o n the item quality a n d its availability for the Register survey; time a n d place o fthe survey. T h e above documents shall b e signed b y a representative o ft h e shipyard's technical control b o d y a n d handed over t o the Surveyor f o reach presentation t ot h e Surveyor i n accordance w i t h t h e L i s t U p o n results o f survey: the remarks, i f any, are recorded b yt h e S u r v e y o r i n the document o n survey; the document o n survey is signed a n dstamped b y the Surveyor. 13.3.4 T h e S u r v e y o r s h a l l k e e p t h e r e c o r d s o f s c o p e s o f surveys carried out under t h eL i s t including t h e results o f inspection o fwelds. Recording shall b e made i n such a w a y t o p r o v i d e traceability o fscopes o f w o r k s accepted b y t h e Register. 13.4 A l o n g w i t h t h e s u r v e y s p e r f o r m e d a c c o r d i n g t o the List, t h e S u r v e y o r carries o u t the f o l l o w i n g (patrols) n o t associated w i t h t h e official presentation b y t h e shipyard's technical control body: quality o f check operations performed b y t h e shipyard a n d production o findividual parts a n d components o f constructions, being parts o f t h e items o f technical supervision, w h i c h are presented under the List, as w e l l as t h esequence o f production processes used f o r t h e manufacture o f t h e item o f technical supervision a n d providing quality thereof. I n s o doing, special attention shall b e g i v e n t o detection o f t h e faults a n d defects, w h i c h cannot b e revealed i n t h e course o fsurveys under t h eList u p o n completion o ft h e appropriate w o r k s . Inspections (patrols) m a yrelate t ot h e certain items o f technical supervision indicated i nt h e List, t o t h e ship, as w e l l as t ot h eproduction w o r k s h o p , laboratory, production process, etc. T h e interval b e t w e e n t h e inspections (patrols) is d e c i d e d b y t h e S u r v e y o r d e p e n d i n g o n t h e n a t u r e o f t h e item o ftechnical supervision, quality o fw o r k s performed b y t h e shipyard a n d production conditions. Inspections (patrols) o f t h e particular i t e m o f technical supervision shall b e (as f a r as i ti s practicable) i n t h e sequence o f the processes used i nconstruction o f the ship a n dshall precede the appropriate inspections (patrols) under t h e L i s t 13.4.1 T h e results o f p a t r o l s a n d a shipyard's notifications o f their results a r eexecuted as established in R S o r at t h e shipyard o n agreement w i t h t h e R S Branch Office. 13.5 T h e S u r v e y o r m a y p e r f o r m s u r v e y s n o t associated w i t h t h e technical supervision during construction o f t h e particular ships, b u t emerging f r o m functions o fthe Register o ntechnical supervision atthe manufacturer o r prescribed b y t h e rules, guidelines a n d of Materials and Products for Ships other n o r m a t i v e documents o ft h e Register, as w e l l as arising f r o m t h e contract o n technical supervision w i t h the Register. 13.6 W h e r e i n s p e c t i o n s a r e a s s o c i a t e d w i t h t h e particular norms, w h i c h are n o t contained i n t h e applicable rules, t h e S u r v e y o r shall u s e t h e approved technical documentation, including standards, specifications, instructions o nt h e production processes. 13.7 T h e s h i p y a r d s h a l l i m m e d i a t e l y i n f o r m t h e S u r v e y o r o f a l l cases w h e r e fractures, d e f o r m a t i o n s , exceeding t h e permissible limits, fires resulting i n d a m a g e o f h u l l structures (deformations, fusing, b u r n o f t h e m e t a l , etc.), m a c h i n e r y , e q u i p m e n t , f l o o d i n g s a n d o t h e r ( m o s t l y e m e r g e n c y ) cases occur, w h i c h c a n cause d i m i n u tion o f quality o r danger o f such diminution,replacement o f machinery, equipment a n d outfit T h e S u r v e y o r performs t h e survey a n d requires f r o m the shipyard t o e l i m i n a t e t h e defects ( o r their causes) a n d specifies t h e scope a n d m e t h o d s o f e l i m i n a t i o n . 13.8 P r i o r t o i n s t a l l a t i o n o f m a c h i n e r y , a r r a n g e ments, equipment a n doutfit t h e Surveyor shall check that all items o f technical supervision are provided w i t h the documents confirming their production under technical supervision o ft h e Register. 13.9 T h e d o c u m e n t s o n a l l d e v i a t i o n s f r o m t h e technical design as w e l l as o n fulfilment o f remarks o f the S u r v e y o r m a d e a tt h eprevious stages o f the technical supervision shall b e submitted t othe Surveyor. 13.10 T e c h n i c a l s u p e r v i s i o n o f t h e R e g i s t e r i n t h e course o f tests o fe q u i p m e n t a n d trials o fthe ship a i m s a t checking t h econformity o f their quality a n d completeness w i t h t h eapproved technical design, t h eR S rules a n d standards as w e l l as w i t h t h e provisions o f international conventions applicable t o t h e completed ship. 13.10.1 S c o p e o f trials o f ships .1 preparation f o rtrials; .2 m o o r i n g t r i a l s ; .3 s e a t r i a l s ; .4 i n s p e c t i o n ; includes: .5 t r i a l v o y a g e , c h e c k t e s t s ; .6 o p e r a t i o n a l t r i a l s ( f o r a p r o t o t y p e s h i p ) . T h e R S Branch Office i n charge o f technical supervision during construction directly participates i n the trials o f t h e ships a t a l lstages, other t h a n those referred t o i n 13.10.1.1 a n d 13.10.1.6. Technical superv i s i o n a t stages indicated i n 13.10.1.1 a n d 13.10.1.6 consists i n checking a n d r e v i e w o f t h e technical documentation. 13.10.2 P r e p a r a t i o n f o r t r i a l s i s c a r r i e d o u t b y t h e shipyard engaged i ntheparticular ship construction. T h e results o fthe w o r k , n a m e l y : entries i n t h e f o r m s , dealing w i t h deslushing o ft h e equipment, m e a s u r e m e n t tables concerning adjustment a n d alignment w o r k s shall b e submitted t o the Surveyor t othe Register i n advance o f c o m m e n c e m e n t o f m o o r i n g trials o f t h e particular equipment. Part I . General Regulations for Technical Supervision 13.10.3 T e c h n i c a l s u p e r v i s i o n i n t h e c o u r s e o f m o o r i n g a n d sea trials o f ships, machinery, arrangements, equipment a n doutfit provided i ntheR S Nomenclature is performed b ythe Surveyors o fthe R S Branch Officei n charge o ftechnical supervision during construction o f the ship o r another R S Branch Office authorized by R H O . 13.10.4 T h e p r o g r a m m e o f m o o r i n g a n d s e a t r i a l s i s elaborated, agreed u p o n a n d approved i n compliance w i t h t h erequirements i nforce o f the applicable rules a n d approved technical documentation. 13.10.5 M o o r i n g a n d s e a t r i a l s a r e c a r r i e d o u t i n accordance w i t h t h e programme o f m o o r i n g a n d sea trials, approved b y t h e Register. Testing p r o g r a m m e s f o r non-conventional ships i n terms o ftheir purpose o r type and f o r ships being built i n t h e countries w h e r e there is no R S Branch Office are reviewed b yR H O . I n all other cases, test p r o g r a m m e s a r er e v i e w e d b y t h e R S B r a n c h Office performing technical supervision during construction o f ships. T h e p r o g r a m m e o f m o o r i n g a n d s e a trials shall include t h e stages listed i n 13.10.1.1 t o 13.10.1.5. 13.10.6 T o b e s p e c i f i e d i n t h e test p r o g r a m m e f o r every type o f machinery, arrangements, systems a n d equipment are technical requirements, t o b e indicated also are necessary explanations, descriptions a n d procedures, n a m e l y : .1 conditions, performed; .2 .3 .4 .5 .6 .7 .8 .9 mance under w h i c h t h e tests shall b e s c o p e o f tests; duration o fmodes o f operation; list o fparameters t o b e measured; frequency o f measurements; s e q u e n c e o f tests; instruments a n d equipment t o b e used; loading devices; other auxiliary equipment necessary f o r perforo f t h e tests. 13.10.7 P r o v i s i o n s h a l l b e m a d e i n t h e p r o g r a m m e o f m o o r i n g a n d sea trials f o r technological instructions o n c o m b i n e d tests o f m a c h i n e r y , arrangements, systems, equipment, o n application o f simulation a n d instrument methods o f checks, o n u s e o f outside sources o f power, etc. U s e o f simulation methods o f testing a n doutside sources o f p o w e r is subject t o special consideration b y t h e Register. W h e n testing t h eship equipment, w h i c h consists o f a number o f items o fmachinery, arrangements, systems and apparatus (e.g. ship m a i n propulsion plants) , t h e programme shall provide simultaneous testing under specified conditions o f all items o f machinery, systems, arrangements a n d apparatus, w h i c h a r e parts o f t h e system. 1 13.10.8 A c c o u n t s h a l l b e t a k e n i n t h e p r o g r a m m e o f 49 m o o r i n g a n d seatrials o f t h e requirements o f standards and technical documentation o n delivery as w e l l as t h e r e q u i r e m e n t s o f suppliers' p r o g r a m m e s f o r tests o f t h e equipment they supply. W h e r e testing procedures agreed u p o n w i t h t h e Register are used, reference shall b e m a d e thereto i nt h e p r o g r a m m e o fm o o r i n g a n d sea trials. T h e shipyard documents issued after m o o r i n g a n d sea trials shall i n c l u d e t h e m e a s u r e m e n t s indicated i n t h e sections o fthis Part. 13.10.9 T h e p r o g r a m m e o f m o o r i n g a n d s e a t r i a l s shall provide f o r the inspection w i t h subsequent check tests o f m a c h i n e r y , arrangements, e q u i p m e n t o r t h e i r assemblies after c o m p l e t i o n o fs e a trials. T h e scope o f the inspection as w e l l as d u r a t i o n a n d scope o fthe check tests a r es e tu p o n a g r e e m e n t w i t h t h e S u r v e y o r . 13.10.10 O p e r a t i o n a l tests o f t h e p r o t o t y p e s h i p a r e carried out b y t h ecustomer (shipowner) i naccordance w i t h the special p r o g r a m m e after rommissioning t h e ship. T e s t reports f o r seaworthiness a n d i c e tests o f ships as w e l l a s f o r v i b r a t i o n tests ( i f t h e y a r e transferred t o t h e p e r i o d o f operational tests) s h a l l b e s u b m i t t e d t o t h e R S B r a n c h O f f i c e i n d u e time u p o n t h e c o m p l e t i o n o f t h e t r i a l s . 13.10.11 U n l e s s o t h e r t e r m s o f d e l i v e r y a r e specified, t h eshipyard i n charge o f t h e ship construction is responsible f o r safely i n t h e course o ftrials a n d safely o f the ship. T h e shipyard building t h e ship organizes performance o f trials a n d conditions preventing a n y influence o n test results as w e l l as provides f o r the requirements f o r safe n a v i g a t i o n . 13.10.12 T h e s h i p y a r d b u i l d i n g t h e s h i p creates a l l the conditions f o rtechnical supervision b y t h e S u r v e y o r in t h e course o fm o o r i n g a n d sea trials o ft h e ship i n compliance w i t h t h e requirements o f t h e rules a n d provides with: .1 shipborne a n d shipyard c o m m u n i c a t i o n facilities; .2 t r a n s p o r t m e a n s . The equipment provided b y t h e shipyard f o r use d u r i n g t h e tests shall b e operated i n c o n f o r m i t y w i t h t h e regulations f o rtheir operation a n d maintenance instructions. The Surveyor t o t h eRegister is n o tauthorized t o operate t h eequipment w i t h h i s o w nhands o r interfere w i t h t h e actions o f attending personnel. I ncase actions o f the personnel m i g h t cause a n accident o r damage t ot h e equipment, the Surveyor t othe Register has the right t o require, v i a representatives o fthe technical control b o d y or a person w h o is i n charge o f delivery o ft h e ship, e l i m i n a t i o n o f b r e a c h e s ( i n c l u d i n g r e f u s a l from f u r t h e r participation i n t h e trials conducted). 13.10.13 W h e n t e s t i n g t h e e q u i p m e n t , a l l w o r k s , w h i c h interfere w i t h p r o p e r p e r f o r m a n c e o f t h e tests o r ' R e f e r r e d to t h e m a r e m a i n e n g i n e s , s h a f t i n g s a n d p r o p e l l e r s w i t h t r a n s m i s s i o n s , b e a r i n g s a n d c o u p l i n g s a s w e l l a s t h e i r a u x i l i a r y m a c h i n e r y , systems, arrangements, boilers, pressure vessels a n d similar equipment. 50 Rules for Technical Supervision during Construction of Ships and Manufacture e n d a n g e r p e o p l e i n v o l v e d i nt h e tests, s h a l l b e stopped. T h e e q u i p m e n t tested a n d t h e space a r o u n d shall b e clean, free f r o m f o r e i g n objects; p r o v i s i o n shall b e m a d e o f proper i l l u m i n a t i o n a n d v e n t i l a t i o n o f t h e spaces. Simultaneously w i t h presentation o f t h e i t e m o f supervision, technical documentation required for survey shall b e submitted. 13.10.14 M o o r i n g a n d s e a t r i a l s a r e p e r f o r m e d u n d e r the approved p r o g r a m m e according t o t h e schedule agreed u p o n w i t h t h e Surveyor. Justified deviations f r o m the schedule likely t o occur shall n o t interfere w i t h t h e test process. 13.10.15 T h e i t e m s o f t e c h n i c a l s u p e r v i s i o n , w h i c h test results d o n o tm e e t t h e r e q u i r e m e n t s o f the applicable rules o r the approved documentation, shall b e re-tested u p o n e l i m i n a t i o n o f causes o f unsatisfactory test results. 13.10.16 E l i m i n a t i o n o f d e f i c i e n c i e s a n d r e - t e s t i n g shall b e agreed u p o n w i t h t h e Surveyor. Re-testing shall n o t affect further tests o r interfere w i t h their safely. 13.10.17 M e a s u r e m e n t s , w h i c h a r e t a k e n b y t h e technical control b o d y a n d ascertain that t h e i t e m o f technical supervision i s i ng o o d w o r k i n g order, shall b e processed b y t h e b o d y u p o n c o m p l e t i o n o f the tests o f the item o f technical supervision a n d submitted t o t h e Surveyor. I n case o f satisfactory results t h e S u r v e y o r signs t h e s h i p y a r d d o c u m e n t o n c o m p l e t i o n o ftests o fthe i t e m s o f technical supervision, t o w h i c h t h e tables o f measurements are appended, w h e r e necessary. 13.10.18 A b r e a k i n t e s t i n g i t e m s o f t e c h n i c a l supervision under continuous operating conditions shall be indicated i n t h e test report, a n d a n issue o f c o n t i n u a t i o n o f t h e tests a n d t h e conditions o f their performance (extension o f time period a n d scope) shall be agreed u p o n w i t h t h e Surveyor, having regard t ot h e causes o f i n t e r r u p t i o n o f t h e tests. 13.10.19 I n c a s e o ft h e s e c o n d f o r c e d i n t e r r u p t i o n o f the s a m e c o n t i n u o u s m o d e o f testing, t h etests s h a l l b e stopped a n d t h e causes eliminated. T h e n re-testing shall be carried o u ti nfull o r extended scope, w h e r e necessary. T h e t i m e f o r test p e r f o r m a n c e s h a l l b e agreed u p o n w i t h the Surveyor. 13.10.20 T h e tests o f i t e m s o f t e c h n i c a l s u p e r v i s i o n shall b e stopped i n t h e f o l l o w i n g cases: .1 w h e r e faults o r defects a r ef o u n d , t h e e l i m i n a t i o n o f w h i c h requires a longer break than is specified b y t h e p r o g r a m m e (refer t o 13.10.14); .2 w h e r e t h e i t e m o f t e c h n i c a l s u p e r v i s i o n i s i n a n emergency condition; 3 i n case t h e w e a t h e r gets w o r s e a n d i t interferes w i t h f u r t h e r p e r f o r m a n c e o f t h e tests, distorts t h e test results, affects safety o f test p e r f o r m a n c e a n d safely o f t h e ship. D e p e n d i n g o n t h e causes, t h e decision t o stop t h e tests i s m a d e b y t h e S u r v e y o r , s h i p y a r d o r c u s t o m e r (on agreement w i t h the Surveyor). of Materials and Products for Ships W h o e v e r t o o k t h e d e c i s i o n t o stop t h e tests, t h e i t e m o f technical s u p e r v i s i o n s h a l l b e re-tested, t h e d u r a t i o n a n d scope o f the tests shall b e agreed u p o n w i t h t h e Register. 13.10.21 I n case tests o f t h e i t e m o f t e c h n i c a l supervision are stopped o n demand o f the Surveyor o r b y the shipyard o nagreement w i t h t h e Surveyor, a report is prepared, i n w h i c h reasons w h y t h e tests h a v e b e e n stopped, requirements f o r e l i m i n a t i o n o fthose reasons before repeated tests w i l l c o m m e n c e a n dconditions o f p e r f o r m a n c e o f repeated tests a r e indicated. 13.10.22 T h e i t e m s o f t e c h n i c a l s u p e r v i s i o n m a yb e installed o n board t h e ship, w h i c h have n o t been totally tested b y t h e shipyard engaged i n t h e particular ship construction, p r o v i d e d t h e tests h a v e b e e n carried o u t under a special p r o g r a m m e agreed u p o n w i t h t h e Register w i t h subsequent tests according t o t h e p r o g r a m m e o fm o o r i n g a n d seatrials. T h i s r e q u i r e m e n t applies t o p r o t o t y p e ships o f a series. 13.10.23 T h e S u r v e y o r t o t h e R e g i s t e r d o e s n o t participate i n t h e w o r k o f t h e customer's acceptance commission. 13.11 T h e m o o r i n g t r i a l s a r e c o n d u c t e d t o c h e c k : .1 arrangement, completeness, quality o finstallation, adjustment a n d serviceability o f m a i n a n d auxiliary machinery, arrangements, systems, equipment a n d outfit as w e l l a s c o n f o r m i t y o f t h e p a r a m e t e r s w i t h t h e requirements o f t h e R S rules, these Rules a n d approved technical documentation; .2 r e a d i n e s s o f t h e s h i p , i t s m a i n a n d a u x i l i a r y machinery, arrangements, systems a n d equipment for sea trials. 13.12 P r i o r t o m o o r i n g t r i a l s t h e s h i p y a r d s h a l l submit the following documentation t othe Surveyor: .1 documents o f the technical control b o d y certifying the completion o finstallation works; .2 p r o g r a m m e o f m o o r i n g t r i a l s a p p r o v e d b y t h e Register; .3 s c h e d u l e o f m o o r i n g t r i a l s ( t o b e a g r e e d u p o n w i t h the Surveyor); .4 c o n t r a c t s p e c i f i c a t i o n ; .5 l i s t o f d e v i a t i o n s f r o m t h e R S r u l e s a n d a p p r o v e d technical documentation w i t h justification o f t h e necessity t o d o so; .6 l i s t s o f s h i p o u t f i t a n d s p a r e p a r t s ; .7 c e r t i f i c a t e s f o r t h e i t e m s o f t e c h n i c a l s u p e r v i s i o n ; .8 p a s s p o r t s f o r t h e i t e m s o f t e c h n i c a l s u p e r v i s i o n w i t h data o n installation w o r k s ; .9 d o c u m e n t s o n t h e i n s t r u m e n t s , s h o w i n g t h e i r fitness f o r a p p l i c a t i o n i n tests; .10 d e s c r i p t i o n s o ft h e i t e m s o f t e c h n i c a l s u p e r v i s i o n and instructions o ntheir maintenance; .11 t e s t i n g p r o c e d u r e ( i n c l u d i n g s i m u l a t i o n tests w i t h layouts o f simulating devices); .12 a d d i t i o n a l t e c h n i c a l d o c u m e n t a t i o n n e c e s s a r y f o r c a r r y i n g o u t surveys, tests a n dpreparation o f the Register d o c u m e n t s (specifications, standards, etc.). Part I . General Regulations for Technical Supervision 13.13 T h e c o m m e n c e m e n t o f t h e m o o r i n g t r i a l s i s decided b yt h e shipyard m a n a g e m e n t o nagreement w i t h the Surveyor, provided t h e requirements referred to i n 13.12 are met. 51 checking o f serviceability o fnavigational, radio a n d electrical equipment under conditions close t o those i n actual operation; 13.13.1 T h e i t e m s o f t e c h n i c a l s u p e r v i s i o n s h a l l b e presented f o r m o o r i n g trials u p o n c o m p l e t i o n o f a l l installation w o r k s a n d completion o f m a i n construction w o r k s , w h i c h a r e likely t o affect t h e testing o ft h e i t e m , and this shall b e confirmed b y t h eappropriate documents o f the technical control body. measurements o f torsional vibration o f t h e m a i n engine-shafting-propeller system, vibration measurements; confirmation o fa possibility t o assign t h e Register class p r o v i d e d i nt h e design t o t h e ship according t o i t s intended purpose a n d o f a possibility t o issue t h e Register documents. 13.13.2 T h e t e c h n i c a l c o n t r o l b o d y , i r r e s p e c t i v e o f the p r o g r a m m e a n d schedule available, shall t i m e l y i n f o r m t h e S u r v e y o r o f t h e readiness o f t h e items o f technical s u p e r v i s i o n f o r tests a n do ft h e t i m e o f their performance. 13.14.1 I n case t h e R S c o n f i r m a t i o n o f t h e s h i p readiness f o r seatrials is required b y port authorities t o issue a sea trial permit, t h e Register m a y issue a n appropriate c o n f i r m a t i o n , o n t h e shipyard's request, i n w h i c h preparation t h e following shall b e considered: 13.13.3 S u r v e y s a n d tests o f t h e i t e m o f t e c h n i c a l supervision are carried o u t b y t h e Surveyor u p o n acceptance o ft h e i t e m b y t h e technical control body. .1 c o n f i r m a t i o n shall b e d r a w n u p i n a n arbitrary f o r m o n t h e R S official letter f o r m (using F o r m 6.3.10 o r 3.1.11, o r o n t h e letter f o r m u p o n agreement w i t h t h e shipyard); 13.13.4 W h e r e p o o r q u a l i t y i n s t a l l a t i o n o r a d j u s t m e n t as w e l l as other deficiencies o rdeviations f r o m t h e approved documentation a n d applicable rules a r e r e v e a l e d i n t h e course o fs u r v e y o r tests, a d o c u m e n t o n poor quality products is prepared according t o the f o r m adopted att h e shipyard. T h erepeated presentation o ft h e i t e m o ftechnical s u p e r v i s i o n f o r t h e s u r v e y o r test i s m a d e u p o n a request o ft h e managers o ft h e technical control b o d y a n d engineering service o ft h e shipyard. 13.13.5 F u l f i l m e n t o f t h e r e q u i r e m e n t s f o r c e r t a i n items o f technical supervision o n agreement w i t h t h e Register ( i n exceptional cases) m a yb e transferred t o t h e period o f the sea trials o r some other time, provided these requirements d o n o t interfere w i t h t h e sea trials o r affect the safety o f ship navigation a n d people o n board. 13.13.6 I n case t h e s h i p i s n o t r e a d y f o r s e a t r i a l s according t o t h e R S Branch Office, t h e R S Branch Office, prior t o sea trials, shall send a n application addressed t o t h eshipyard w h i c h contains t h eimpartial justifications f o rsuch a n opinion. 13.14 T h e s e a t r i a l s a i m a t t h e f o l l o w i n g : checking o f t h e m a i n parameters o f t h e m a i n propulsion plant a n d o f their conformity with t h e specification characteristics; checking o f operation o f the m a i n propulsion plant in m a n o e u v r i n g under ahead a n d astern m o v e m e n t o f the ship; checking o f reversing qualities o f t h e m a i n propulsion plant; checking o f serviceability o f the m a i n propulsion plant under conditions close t othose o factual operation; checking o f serviceability machinery a n d arrangements; checking o fautomation any, under conditions close t final tests o f t h e i t e m s except f o rthose, w h i c h shall t o s u b s e q u e n t c h e c k tests; o f deck a n d other equipment o ft h e ships, i f o those o f actual operation; o f technical supervision, b e inspected a n d subjected .2 c o n f i r m a t i o n s h a l l i n c l u d e t h e s t a t e m e n t t h a t i n accordance w i t h a specific contract o n technical supervision, R S h a sp e r f o r m e d a l lt h e d u esurveys o fa ship under construction and, according t o t h e Register, t h e ship m a yb e considered ready f o rsea trials i n compliance w i t h the R S requirements. 13.14.2 P r i o r t o s e a t r i a l s t h e s h i p y a r d s h a l l s u b m i t the following documentation t o the Surveyor: .1 documents o f t h e technical control body, w h i c h c o n f i r m t h e completion o ft h e m o o r i n g trials; .2 p r o g r a m m e o f s e a t r i a l s a p p r o v e d b y t h e R e g i s t e r ; .3 s c h e d u l e o f s e a t r i a l s ( t o b e a g r e e d u p o n w i t h t h e Surveyor); .4 t e s t i n g p r o c e d u r e ; .5 t e c h n i c a l d o c u m e n t a t i o n n e c e s s a r y f o r s u r v e y s a n d tests; .6 f o r s i s t e r s h i p , t h e I n f o r m a t i o n o n D a m a g e T r i m and Stability, Information o n t h e Effect o f Flooding updated according t ot h eresults o fthe previous i n c l i n i n g test, w h e r e n e c e s s a r y ; .7 f o r p r o t o t y p e s h i p , p r e l i m i n a r y I n f o r m a t i o n o n D a m a g e T r i m a n d Stability, I n f o r m a t i o n o n the Effect o f Flooding, Inclining Test R e p o r t a n d stability calculations; .8 w h e r e n e c e s s a r y , d o c u m e n t a t i o n referred toi n 13.12.4, 13.12.5, 13.12.7 t o 13.12.10 shall b e presented in addition t othe above. 13.14.3 A p o s s i b i l i t y t o g o t o s e a t r i a l s i s d e c i d e d b y the shipyard, o nagreement w i t h the Surveyor, provided the requirements o f13.14.2 a n d 13.14.6 a r e m e t . 13.14.4 T h e a r e a f o r s e a t r i a l s s h a l l b e a g r e e d u p o n w i t h t h e Surveyor i n terms o fits conformity w i t h t h e conditions specified b y t h e requirements o ft h e R S rules, these Rules a n d approved technical documentation. T h e suggested area f o rseatrials shall provide: safety o fperformance o ft h e seatrials; n o influence o nt h e test results; a possibility t o carry o u t a l lt h e required surveys. 52 Rules for Technical Supervision during Construction of Ships and Manufacture 13.14.5 U p o n c o m p l e t i o n o f t h e s e a t r i a l s o r tests under operating conditions w i t h o u t ship movement, using simulation methods, t h eSurveyor communicates his remarks t o t h eshipyard, w h i c h shall b e eliminated before t h e Register issues t h e ship's d o c u m e n t s , as w e l l as a l i s t o f t h e i t e m s o f t e c h n i c a l s u p e r v i s i o n t o b e opened u p a n d the scope o f inspection. 13.14.6 I n t h e c o u r s e o f t h e i n s p e c t i o n i n d i v i d u a l assemblies are disassembled t o identify their condition a n d a necessity i ncheck tests after t h e inspection. 13.14.7 T h e l i s t o f t h e i t e m s o f t e c h n i c a l s u p e r v i s i o n to b e inspected a n d t h e scope o f t h e inspection are decided o n t h ebasis o fm o o r i n g a n dsea trials h a v i n g regard t o t h e experience o f technical supervision o ft h e similar items. of Materials and Products for Ships trial voyage ( i fperformed) shall b e t h e basis f o r issuing the R S documents t o t h e constructed ship. 13.15 I n t e c h n i c a l s u p e r v i s i o n o f t h e p r o t o t y p e s h i p tests account s h a l l b e t a k e n o f t h e f o l l o w i n g . 13.15.1 T h e p r o t o t y p e s h i p tests a r e c a r r i e d o u t under a comprehensive programme, including checking o f t h e ship characteristics a n d d e t e r m i n a t i o n o f t h e parameters, w h i c h c a n b e used f o r series ships w i t h o u t this checking. 13.15.2 T h e c o m p r e h e n s i v e p r o g r a m m e f o r p r o t o t y p e ship tests shall include t h e f o l l o w i n g : .1 torsional v i b r a t i o n measurements o f t h e m a i n engine — intermediate l i n k (shafting, r e d u c t i o n gear, couplings) — propeller system; 13.14.8 I n s p e c t i o n r e s u l t s a r estated i n t h e t e c h n i c a l control body's report w h i c h shall contain: .2 v i b r a t i o n m e a s u r e m e n t s o f individual o f m a c h i n e r y a n d h u l l structures; .3 i n c l i n i n g t e s t ; .1 list o ft h e items o ftechnical supervision t o b e inspected; .4 s e a t r i a l s u n d e r c o n d i t i o n s o f actual operation as possible; .2 d e s c r i p t i o n o f t h e d e f e c t s f o u n d ; .3 c a u s e o f d e f e c t ; .4 m e a s u r e s t o e l i m i n a t e t h e d e f e c t s . T h e Report shall b e signed b y t h e Surveyor as applied o n l y t o t h e items o f t h e Register technical supervision. .5 b r o a d e n e d s c o p e o f i n s p e c t i o n ; .6 l o n g e r t e s t i n g m o d e s ; .7 t r i a l v o y a g e ( i f n e c e s s a r y , c o n s i d e r i n g t h e p r o v i sions o f 13.14.10). 13.14.9 B e f o r e t h e t r i a l v o y a g e a l l t h e defects f o u n d in t h e course o f m o o r i n g a n d sea trials a n dt h e inspection shall b e eliminated, all theremarks made b y the Surveyor shall b e taken into account. 13.14.10 A n e c e s s i t y i n t h e t r i a l v o y a g e s h a l l b e agreed u p o n w i t h t h e S u r v e y o r a n d isgenerally governed b y the following conditions: .1 w h e r e t h e i t e m o f technical supervision needs t o b e inspected a n d t h e check tests t h e r e o f cannot b e carried out w i t h o u t the trial voyage; .2 w h e r e p a r a m e t e r s c h a r a c t e r i z i n g p r o p e r o p e r a t i o n o f the i t e m o ftechnical supervision c a n b e obtained o n l y in t h e trial voyage; .3 w h e r e , b a s e d o n t h e r e s u l t s o f m o o r i n g a n d s e a trials and/or inspection, a need appeared i n total replacement o ft h e i t e m o ftechnical supervision o r i n replacement o fvital assemblies, w h i c h serviceability c a n be confirmed o n l y i n t h e course o ft h e trial voyage; .4 w h e r e s i m u l a t i o n m e a n s d o n o t a l l o w t o o b t a i n t h e required conditions o r such means are n o t available. 13.14.11 S a t i s f a c t o r y results o f t h e s u r v e y s p e r f o r m e d u n d e r t h e list, n o v i o l a t i o n o f t h e R S rules u p o n results o f the patrols, m o o r i n g a n dsea trials as w e l l as t h e as close items t o those 13.5.3 I n c a s e a l i s t o f a r r a n g e m e n t s t o b e m a d e o r r e c o m m e n d e d f o r u s e i n t h e f o l l o w i n g ships o ft h e series is elaborated u p o n c o m p l e t i o n o f t h e p r o t o t y p e ship tests, such list shall b e agreed u p o n w i t h t h e Register. 13.15.4 U p o n c o m p l e t i o n and sea trials, inspection R S Branch Office i n charge during construction o fthe ship for R H O , w h e r e necessary. o fconstruction, m o o r i n g a n d trial voyage t h e o f technical supervision prepares t h e information 13.15.5 W h e r e d e e m e d n e c e s s a r y , h a v i n g r e g a r d t o the purpose o f the ship a n d i n case o f u s i n g prototypes o f materials, machinery a n d equipment, t h e Register d o c u m e n t s shall specify operational tests t h e r e o f according t o t h e p r o g r a m m e approved b y t h e Register. 13.16 T h e t e c h n i c a l s u p e r v i s i o n p e r f o r m e d i n t h e course o f construction finishes w i t h preparation o f reports o n survey, o n w h i c h basis t h edocuments t o b e issued b y t h e Register t o t h e ship are prepared. 13.17 B e f o r e c o m p l e t i o n o f s h i p c o n s t r u c t i o n , i n order t o ensure traceability, t h eshipyard shall provide t h e Register w i t h copies o f R S certificates ( w i t h a n i n v e n t o r y ) issued t o t h e ships' items o f technical supervision, o r a list thereof, w h i c h shall include t h e name o fthe item, manufacturer, type a n d number o fthe certificate issued b y R S . Part I . General Regulations for Technical Supervision 53 14 T E C H N I C A L S U P E R V I S I O N O N B E H A L F O F T H E R E G I S T E R 14.1 T h e R e g i s t e r c a n a u t h o r i z e a n o t h e r c l a s s i f i c a tion or competent body to carry out technical supervision o n its behalf. 14.2 T e c h n i c a l s u p e r v i s i o n o n b e h a l f o f t h e R e g i s t e r is p e r f o r m e d o n t h eb a s i s o f t h e a g r e e m e n t o n m u t u a l substitution a n dunder a particular authorization o f the Register or an agreement made between the Register and the organization. 143 W h e r e a n authorization i s g i v e n b y the Register, items and scope o f technical supervision, the procedure o f the technical documentation approval, documents t o b e issued shall b e specified. Besides, the procedure o f p a y m e n t for technical supervision services can also b e indicated. 14.4 U n l e s s p r o v i d e d o t h e r w i s e , c e r t i f i c a t e s a n d other documents issued b y the organization i n charge o f technical supervision o n behalf o f the Register shall have the following notice: "Under authorization o ft h e Register, N o . o f 20 ". 14.5 U n l e s s e x p r e s s l y p r o v i d e d o t h e r w i s e , t e c h n i c a l supervision is performed according t o t h e procedures used b y the authorized organization. 14.6 T h e a u t h o r i z a t i o n s f o r t e c h n i c a l s u p e r v i s i o n a r e issued b y R H O . 14.7 T h e R e g i s t e r r e s e r v e s t h e r i g h t t o c a n c e l t h e authorization f o r technical supervision issued. 54 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for 15 T E C H N I C A L S U P E R V I S I O N O N B E H A L F O F A N O T H E R SOCIETY 15.1 T e c h n i c a l s u p e r v i s i o n o n b e h a l f o f a n o t h e r classification society isperformed b ythe Register o n the basis o f the agreement o nm u t u a l substitution and under a particular authorization o f another classification society or a nagreement made between the Register and another classification society. 15.2 W h e n t h e R e g i s t e r i s a u t h o r i z e d b y a n o t h e r classification society, items a n d scope o f technical supervision, procedure o fthe technical documentation approval, documents t o b e issued shall b e specified. Besides, t h e procedure o f payment f o r supervision services can also b e indicated. 15.3 U n l e s s e x p r e s s l y p r o v i d e d o t h e r w i s e , c e r t i f i cates o r other d o c u m e n t s issued b y the Register o n b e h a l f Ships CLASSIFICATION o f another classification society shall have the following notice: "Under authorization o f (name o f another classification society)". 15.4 U n l e s s e x p r e s s l y p r o v i d e d o t h e r w i s e , t e c h n i c a l supervision is performed according t o t h e Register practice. 15.5 A u t h o r i z a t i o n f o r t e c h n i c a l s u p e r v i s i o n f r o m another classification society shall b e forwarded to R H O . T h e R S B r a n c h Offices m a y render services o n b e h a l f o f another classification society o n l y u p o n written confirmation by R H O . 15.6 A n o t h e r c l a s s i f i c a t i o n s o c i e t y h a s t h e r i g h t t o cancel authorization for technical supervision issued. See circular 911c Part I . General Regulations for Technical Supervision 55 APPENDIX 1 NOMENCLATURE OF ITEMS OF T H E REGISTER TECHNICAL SUPERVISION 1. N o m e n c l a t u r e o fItems o f the Register Technical S u p e r v i s i o n is a list o f materials, products, p r o d u c t i o n processes a n dsoftware regulated b y the R S rules. C o l u m n 3 " o ft h e prototype" — necessity o f supervision o f the prototype performed directly b yt h e Surveyor (P) is indicated. 2. D e f i n i t i o n s a n d a b b r e v i a t i o n s g i v e n i n S e c t i o n 1 o f Part I "General Regulations for Technical Supervision" o f these Rules areused i n the R SNomenclature, as w e l l as: C o l u m n 4 "type approval/recognition o f manufac­ turer" — obligation o f type approval o f t h e i t e m o f technical supervision is indicated t o b e confirmed b y T y p e A p p r o v a l C e r t i f i c a t e (СТО), T y p e A p p r o v a l C e r t i f i c a t e f o r F i r e - P r o o f D i v i s i o n (СТПК), C e r t i f i c a t e of Approval for Welding Consumables ( C O C M ) , Type A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП), W e l d i n g P r o c e d u r e A p p r o v a l T e s t C e r t i f i c a t e (СОТПС) as w e l l a s n e c e s s i t y o f r e c o g n i t i o n o f m a n u f a c t u r e r t o b e confirmed b y Recognition Certificate for Manufacturer (СПИ). I n s e p a r a t e cases, a t t h e d i s c r e t i o n o f t h e Register, w h e r e a single approval is given f o rt h e material o r product, t h e Certificate ( C ) m a y b e issued w i t h o u t issuing t h edocument o n type approval, as w e l l o n recognition o f the manufacturer. P — technical supervision performed directly b y the Surveyor; СТО* ( T y p e A p p r o v a l C e r t i f i c a t e ) , C * ( C e r t i f i c a t e filled-in a n dsigned b y the Register) o r C 3 * (Certificate filled-in and signed b y a n official o f a manufacturer and drawn u p (affirmed) b y the Register) - o n l y upon R H O authorization; К — branding o fitems o f technical supervision; K * — branding o f each rolled product; M K — i t e m subject t o technical supervision i n compliance with t h e requirements o f international conventions. 3. T h e R S N o m e n c l a t u r e i s p r e s e n t e d i n t h e f o r m o f the table comprising nine columns. C o l u m n 1 : "Code o f i t e m o f technical supervision" — identification code o f t h e material, product, production process o r software i s indicated, w h i c h consists o f eight characters grouped i n t h e f o l l o w i n g groups, each group consisting o f t w o characters: 1st g r o u p — p a r t o f t h e R S rules, serial n u m b e r ; 2nd group — groups o f machinery, systems, constructions, materials, production processes, software; 3rd group — types o f machinery, systems, tions, materials; construc­ 4 t h group — parts, assemblies; 5 t h group ("letter group") items o ftechnical super­ vision covered b y the international conventions. C o l u m n 2 "Item o f technical supervision" — name o f the material, product, production process o r software according t o the R S rules is indicated. C o l u m n 5 "document issued" — the R S document is indicated, w h i c h i s issued i n case o f the particular type o f supervision providing t h em i n i m u m permissible control for the particular material o rproduct over fulfillment o f the R S requirements. I n separate cases, a t t h e R S discretion, types o f supervision m a y be changed b y R S . C o l u m n 6 "branding" — obligation o fbranding o f items o f technical supervision i n compliance w i t h t h e Instructions o n Branding o f Items o f t h e Register Technical Supervision (refer t oA p p e n d i x 2 )is indicated. C o l u m n s 7, 8, 9 "installation, application", "mooring trials", "sea trials" — necessity o f technical supervision during construction o f ships p e r f o r m e d directly b yt h e S u r v e y o r is indicated. s u p e r v i s i o n p e r f o r m e d b y t h e firm ( m a n u f a c t u r e r ) technical personnel a n d R S i n accordance w i t h t h e A g r e e m e n t o n S u r v e y ( C O ) (refer t o 4 . 5 o fthe present Part), t h eCertificate ( C 3 ) is issued; 4. R S N o m e n c l a t u r e c o n t a i n s t h e f o l l o w i n g s e c t i o n s : 01000000 Hull 0 2 0 0 0 0 0 0 M K Life-saving appliances 03000000 Arrangements, equipment, outfit 0 3 0 0 0 0 0 0 M K Signal means 0 4 0 0 0 0 0 0 M K Radio equipment 0 5 0 0 0 0 0 0 M K Navigational equipment 06000000 Fire protection 07000000 M a c h i n e r y installations 08000000 Systems and piping 09000000 Machinery supervision performed through type approval o f the item o f technical supervision, T y p e A p p r o v a l Certificate (СТО), T y p e A p p r o v a l C e r t i f i c a t e f o r F i r e - P r o o f D i v i ­ s i o n (СТПК), C e r t i f i c a t e o f A p p r o v a l f o r W e l d i n g Consumables ( C O C M ) , T y p e A p p r o v a l Certificate f o r C o m p u t e r P r o g r a m (СТОП), W e l d i n g P r o c e d u r e A p ­ p r o v a l T e s t C e r t i f i c a t e (СОТПС) a r e issued. 10000000 Boilers, heat exchangers and pressure vessels 11000000 Electrical equipment 12000000 Refrigerating plants 13000000 Materials 14000000 Welding consumables 1 4 0 0 0 0 0 0 M K Cargo-handling gear 15000000 Automation Columns 3 t o 9 "Technical supervision o f the Register" — types o f technical s u p e r v i s i o n are indicated: supervision performed b y t h e Surveyor (P), t h e Certificate ( C ) i s issued; 56 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 16000000 Glass-reinforced plastic ships a n d boats A p p r o v a l C e r t i f i c a t e (СТО), C e r t i f i c a t e o f A p p r o v a l f o r 17000000 liquified Welding (LG Ships carrying gases i n bulk carriers) Consumables 18000000 Nuclear ships a n d nuclear support vessels Approval 19000000MK Type Equipment vention o fpollution from a n d appliances f o r pre­ 20000000 Computer software (computer Certificate Approval calculation supply materials o r pro­ d u c t s w i t h t h e o r i g i n a l s o f t h e c e r t i f i c a t e s (С, C 3 ) o r T y p e Shipboard Item o f technical supplied N O x with Technical E I A P P 01000000 01010000 01020000 01030000 02000000MK 02010000MK 02010002MK HULL H u l l structures Structures o f superstructures a n d deckhouses Seatings o f machinery a n d arrangements LIFE-SAVING APPLIANCES Lifeboats a n dlaunching appliances: release m e c h a n i s m s a n d free-fall launching appliances for lifeboats L a u n c h i n g appliances f o rlifeboats, rescue boats, fast rescue boats a n d liferafts: launching appliances u s i n g falls a n d w i n c h e s for lifeboats free-fall launching appliances f o r lifeboats launching appliances for rescue boats launching appliances for fast rescue boats launching appliances f o r liferafts Lifeboats: partially enclosed lifeboats totally enclosed lifeboats totally enclosed lifeboats with a self-contained air support s y s t e m fire-protected totally enclosed lifeboats free-fall lifeboats free-fall lifeboats with a self-contained a i r support system fire-protected free-fall lifeboats Liferafts, rescue boats, fast rescue boats: Containers f o r inflatable liferafts Arrangements f o rlaunching a n d raising f o r liferafts, lifeboats a n d rescue/fast rescue boats Hydrostatic release units W e a k link o f life raft Automatic g a sinflation s y s t e m f o r inflatable liferafts, m a r i n e evacuation s y s t e m s , m e a n s o f rescue, inflatable lifejackets Liferafts: inflatable liferafts rigid liferafts self-righting liferafts canopied reversible liferafts (with t w o canopies) Rescue boats: rigid rescue boats inflated rescue boats combined rescue boats 02010204MK 02010305MK 02010306MK 02010307MK 02020000MK 02020100MK 02020200MK 02020300MK 02020400MK 02020500MK 02020600MK 02020601MK 02020602MK 02020603MK 02020604MK 02020700MK 02020701MK 02020702MK 02020703MK (СТОП), Division engines covered b y Certificate 73/78 shall b e a n d approved File. SUPERVISION of type a t t h e firm prototype approval/ (manufacturer) recogni­ tion o f document branding manufac­ issued turer 2 02010102MK 02010103MK 02010104MK 02010105MK 02010200MK 02010201MK 02010202MK 02010203MK Program Technical supervision o f the Register supervision 1 02010101MK o f type f o r Fire-Proof internal combustion NOMENCLATURE O FITEMS O FT H E REGISTER TECHNICAL 02010100MK f o rComputer Certificate regulation 13 o f A n n e x V I t o M A R P O L Firms (manufacturers) Code o f item o f technical supervision certificates (СТПК) a s i n d i c a t e d i n c o l u m n 5 . ships programs) 5. (COCM), a p p r o v a l ( C O T O ) , certificates o ft y p e test (СОТИ), T y p e during construction o f ship installa­ tion, a p ­ plication mooring trials sea trials 3 4 5 6 7 8 9 P P P — — — С С С — — — P P P — — — — — — P СТО* с К P — — P сто* с к P P — P P P P сто* сто* сто* сто* с с с с к к к к P P P P P P P P — — — — P P P сто* сто* сто* с с с к к к P P P P P P — — — P P P сто* сто* сто* с с с к к к P P P P P P — — — P сто* с к P P — P P сто* сто* СЗ с — к P P — P — — P P P сто* сто* сто* СЗ СЗ СЗ — — к P P P — — — — — — P P P P сто* сто* сто* сто* к к к к P P P P — — — — — — — — P P P сто* сто* сто* к к к P P P P P P — — С, С, С, С, СЗ СЗ СЗ СЗ с с с 7 7 7 7 — Part I . General 1 02020800MK 02020801MK 02020802MK 02020803MK 02030000MK 02040000MK 02050000MK 02050100MK 02050200MK 02050300MK 02060000MK 02060100MK 02060101MK 02060102MK 02060200MK 02060201MK 02060202MK 02060300MK 02060400MK 02070000MK 02080000MK 02090000MK 02090001MK 02090002MK 02090003MK 02090004MK 02090005MK 02090006MK 02090007MK 02090008MK 02090009MK 02090010MK 02090011MK 02090012MK 02090013MK 02090014MK 02090015MK 02090016MK 02090017MK 02090018MK 02090019MK 02090020MK 02110000MK 02120000MK 02130000MK 02140000MK 02150000MK 03000000 03010000 03010100 03010101 03010102 03010103 03010200 03010201 Regulations for Technical Supervision 2 Fast rescue boats: rigid fast rescue boats inflated fast rescue boats combined fast rescue boats M e a n s f o r b r i n g i n g lifeboats a n d liferafts against ship's side a n d holding t h e m alongside, skates E m b a r k a t i o n ladders, lifelines Lifebuoys Self-igniting lights Self-activating s m o k e signals B u o y a n t lifelines Lifejackets, immersion suits, anti-exposure suits a n d thermal protective aids Lifejackets: non-inflatable lifejackets inflatable lifejackets I m m e r s i o n suits: i m m e r s i o n suits w i t h thermal insulation i m m e r s i o n suits without thermal insulation Anti-exposure suits T h e r m a l protective aids Lifejacket lights Line-throwing appliances E q u i p m e n t o f survival craft, rescue boats/fast rescue boats: lifeboat steering gears masts with sails a n d stays oars, thole pins o r crutches, b u o y a n t oars cap o r plag o fdrain valves o f lifeboats lifelines, handrails boarding ladder o flifeboat a n dboarding r a m p o f liferaft b u o y a n t rescue quoit o f liferafts w i t h b u o y a n t line lifeboat m a n u a l draining p u m p s protective covers searchlights o flifeboats a n d rescue boats life-saving signals table signal whistles boat compasses internal a n d external lights o f liferafts a n d lifeboats, lights o frescue/fast rescue boats repair outfit (with instructions) f o r inflatable liferafts w a t e r p r o o f electric torch food ration fresh w a t e r v a l v e s for inflatable liferafts a n d inflated rescue/ last rescue boats first-aid outfit Sea activated p o w e r sources f o r lifejacket a n d liferaft lights a n d lifebuoy self-igniting lights Marine evacuation systems Symbols foru s e i n accordance with S O L A S - 7 4 as amended M e a n s o f rescue Type production processes ARRANGEMENTS, EQUIPMENT, OUTFIT R u d d e r a n d steering gear: rudder stocks including their flanges rudder stock bearings parts o froller laying o f steering gears chains o fsteering ropes rudder axles including their flanges parts o f connections o f rudder axles with sternframe 57 3 4 5 6 P P P СТО* СТО* с с с — СЗ — сто* — 7 8 9 к к к — р р р р р р р р — — — — р р р р р — — — — — — — — — — — сто* сто* сто* сто* сто* сто — к — — — P P сто* сто* СЗ СЗ к к р р — — — — P P P P P P сто* сто* сто* сто* сто* сто* СЗ СЗ СЗ СЗ СЗ с к к к — — — р р р р р р — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р — — — — — — — — — — — — P — СЗ — р — — P P P СЗ P P P — — сто* — сто* сто* сто* СЗ СЗ СЗ — — — — — — — р р р р р р р — — — — — — — — — — — — — — — — — — р — — P P P P — сто* сто* сто* СЗ СЗ СЗ СЗ — — — — р р р р — — — — — — — — P P сто* сто* с СЗ — — р р — — — — P P сто* сто* СЗ к — р р — — — — P сто* — С, С З к — р — р — — — — — — — — — — — с — к — — — к — р р р р р р р р — — — — — — р — — — — — — P P P P — — — P P P P P P с СЗ СЗ — СЗ — с 7 — СЗ сто сто с СЗ 58 Rules for Technical Supervision during Construction of Ships and Manufacture 1 03010300 03010301 03010302 03010303 03010304 03010400 03010401 03010402 03010403 03010404 03010500 03010501 03010600 03010601 03010700 03010701 03010702 03020000 03020005 03020100 03020300 03020400 03030000 03030001 03040000 03040001 03040002 03040003 03040004 03040100MK 03040101 03040102 03040103 03050000 03050001 03050002 03060000 03060100 03060101 03060200 03060300 03060400 03060500 03060700 03060800 03060801 03070000 03070001 03070005 03070200 03070300 03070400 03070600 2 Nozzle rudder i n assembly: pintles pintle bushes parts for coupling rudder stock with nozzle rudder limiters o f putting nozzle rudder over either side rudder blade pintles pintle bushes couplings limiters o f putting rudder blade over either side tillers parts o f c o u p l i n g tiller w i t h r u d d e r s t o c k rudder quadrants parts for coupling quadrant with rudder stock Hull a n d foundation o fm a i n steerable podded electrical propulsion units: parts o fhull a n d propulsion b l o c k hull parts o fmounting block Anchor arrangement: anchor hawses anchors anchor stoppers device f o r securing and releasing t h e inboard e n d o f the chain cable o r rope Mooring arrangement: bollards, cleats, fairleaders, h a w s e s , rollers a n d stoppers Towing arrangements: bitts, bollards, fairleaders, rollers a n d stoppers tow hooks, t o w line releasing devices snatch-blocks towing rails Emergency towing arrangement: chain devices tow lines tow securing arrangements Signal masts: metal, w o o d e n a n d glass-reinforced plastic r i g g i n g fixed g e a r o f m a s t s a n d t h e i r s t a n d i n g rigging loose gear o f standing rigging O p e n i n g s i n h u l l , 1 s t a n d2 n d tiers o f superstructures a n d deckhouses a n d their closing appliances: s i d e a n d flush d e c k s c u t t l e s round a n d s q u a r e , w h e e l h o u s e w i n d o w s (see a l s o c o d e 0601006 M K ) g l a s s e s f o r s i d e a n d flush d e c k s c u t t l e s , r o u n d and square, wheelhouse windows in bottom side shell plating doors outside doors i nsuperstructures a n d deckhouses covers o f companion hatches, skylights a n d ventilation trunks ventilation pipes doors i nwatertight bulkheads h a t c h c o v e r s o f d r y c a r g o h o l d s , h o l d s fitted f o r alternate carriage o f b u l k liquid a n d d r y cargoes, tweendecks, cargo tanks tank manhole covers E q u i p m e n t o f spaces: plating, hold battens, linings i n cargo holds cellular guide m e m b e r s i n holds o f container carriers doors i n ship's spaces o n escape routes stairways and vertical ladders g u a r d rails, b u l w a r k a n d catwalk bridges devices for securing movable decks, platforms, r a m p s a n d similar structures 3 4 P P — — — — — — — — — — — — — — — 6 7 8 9 с СЗ СЗ СЗ — с СЗ СЗ СЗ — СЗ СЗ СЗ СЗ — к к — — — к к — — — — — — — — р р р р р р р р р р р р р р р р — — — — — — — — — — — — — р р — — — — — — — — — — — — — р P P P — — — — СПИ — — с с — СЗ СЗ СЗ СЗ к к — — к — — — — р р р р р — — р — — р р — — р — — — — — — — — — СЗ — — р р р р — — — — — — — — — — — — — — — — СЗ СЗ СЗ — с СЗ СЗ СЗ СЗ СЗ — — — — — — — — — — — р р р р р р р р р р р р — — — — р — — — — — р — — — — — — — — — — — — — СЗ — — — р р — р — — — сто сто — — — — сто сто P P P — сто сто СЗ СЗ СЗ — — — р р р р р р — — — P P P — сто — СЗ СЗ СЗ — — — р р р р р р — — — P — сто — р р — — — — — — — — — р р — — — — — — — — — — — СЗ — — СЗ — — — — р р р р — — — р — — — р — P P P P P — — P — P — — P P — — P — — P P P P P P P P 5 and Products for Ships of Materials Part I . General 1 03070700 03080000 03080001 03080003 03080004 03090000 03100000 03110000 03110001 03110002 03110003 03120000 03120001 03120002 03120003 03120004 03120005 03120006 03120007 03120008 03120009 03120010 03130000 03130001 03130002 03130003 03140000 03140001 03140002 03140003 03150000 03160000 03160100 03160200 03160300 03160400 03160500 03160600 03160700 03160800 03170000MK 03170001MK 03170002MK 03180000MK 03180001MK 03200000 03000000MK 03010000MK 03020000MK 03030000MK 03040000MK 03050000MK 03100000MK 04000000MK 04020000 04020900 04021100 04021200MK 04030500 Regulations for Technical Supervision 59 2 3 4 5 6 7 8 9 low-location lighting systems (photolmniniscent, electrically p o w e r e d ) Grain fittings: removable metal bulkheads shroud wire ropes gears o f shrouds Arrangement for attachement o ftimber deck cargo Items m a d e o f ropes f o r all applications E m e r g e n c y outfit: t h r u m m e d mats, a r m o u r e d m a t s w i t h outfit tools materials M O D U jacking f r a m e o f self-elevating system: sliders a n d their guides catches a n dtheir bearers y o k e s a n d their latches securing plates o fhydraulic cylinders support screws with nuts jack frames rack-and-pinion shafts pinions a n d wheels shafts fastenings M O D U a r r a n g e m e n t s f o r lifting a n d lowering columns o fsubmersible sea water pumps: columns a n d guides column support stoppers M O D U fixing a r r a n g e m e n t s : plates sliders screws a n d nuts Parts o f lifting appliances f o r shipborne barges (lugs, e y e plates, eyes, shackles, grips) Securing devices o f general cargo o n b o a r d t h e ships: lashings (rope, chain, bar, belt, wire) tension devices (turnbuckles, b r i d g e fittings) buttresses a n d shores locks (automatic a n d semi-automatic stoppers, stacking cones with locking pin) stacking cones (single, double, etc.) penguin hooks joint rings, lashing plates pedestal a n d flush sockets, dove-tail type sockets Pilot transfer arrangements: pilot ladders mechanical pilot hoists Means ofembarkation a n d disembarkation: accommodation ladders a n d gangways Type production processes SIGNAL MEANS Navigation lights Flashing lights Sound signal means Pyrotechnic signal means Signal shapes Type production processes RADIO EQUIPMENT R a d i o t e l e p h o n e c o m m u n i c a t i o n facilities: V H F radiotelephone station U H F radiotelephone station two-way V H F radiotelephone apparatus f o r c o m m u n i c a t i o n s w i t h aircraft portable two-way radiotelephone station P — СЗ — р — — — — — — — — — — — — — — — — — — — — — — — — — — — СЗ СЗ СЗ СЗ СЗ — — — — — — — — — — к к к — к — — к к — — — — — — — — — — — — — — — — — — — — — — — — — СЗ СЗ СЗ — — — — — — — — — P P P P СТО сто сто сто СЗ СЗ СЗ СЗ P P P P сто сто сто сто — — P P — — — — — P P P P P P P P P P — P P P — — СЗ — — — с с с с с с с с с р р р р р р р р р р р р р р р р р р р р — — — — р р — — — — — — — — — — р — — — — — — — — — — — р р р р р р р р — — — — — — к к к к СЗ СЗ СЗ СЗ — — СЗ — — р р — — — р — — — — р р р р — — — — — — — — к — — — р р р р — — — — — — — — СЗ СЗ — — р р — — — — — — с — к — р р — — — — СЗ СЗ СЗ СЗ к к к — — — р р р р р р р р р р р — — — сто сто сто сто сто — — — — — — P P P сто* сто* сто* сто сто — — — р р р р р р р р р P сто* сто р р р P P P — — P P P P СЗ СЗ СЗ сто — СЗ* р 60 Rules for Technical Supervision during Construction of Ships and Manufacture and Products for Ships of Materials 1 2 3 4 5 6 7 8 9 04040000MK C o m m a n d broadcast facilities ( c o m m a n d broadcast apparatus o f public address system, microphone posts) Aerial Marine clocks for radio rooms Satellite radio c o m m u n i c a t i o n equipment G M D S S radio equipment: digital selective calling ( D S C ) encoder facsimile device terminal printing device telephony a n d N B D P receiver telephony, D S C and N B D P transmitter V H F radiotelephone station M F radiotelephone station M F / H F radiotelephone station direct-printing apparatus o fi m p r o v e d fidelity radio equipment p o w e r supply device, auto­ matic battery charger G M D S S workstations V H F radio installation (set) M F radio installation (set) M F / H F radio installation (set) I N M A R S A T ship earth station I N M A R S A T ship earth station w i t h E G C receiver ship security alert s y s t e m ( S S A S ) C O S P A S - S A R S A T satellite E P I R B V H F E P I R B u s i n g D S C o n c h a n n e l 70 N A V T E X service receiver enhanced group calling ( E G C ) receiver D S C watch receiver H F direct-printing radiotelegraph receiver radar transponder ship's a n d survival craft A I S search a n d rescue transmitter ( A I S - S A R T ) two-way V H F radiotelephone apparatus diagnosis a n dchecking systems f o r G M D S S equipment integrated G M D S S radio communication s y s t e m radio equipment n o t mentioned above Ship security surveillance T V system NAVIGATIONAL EQUIPMENT M a g n e t i c c o m p a s s e s (standard, spare, lifeboat) transmitting heading devices ( T H D ) Gyrocompasses L o g s (speed a n d distance measuring devices) Deck logs E c h o sounders Heading control systems/track control systems Integrated navigation systems C o m b i n e d ship's workstation Horizontal sonar navigational systems Gyro-magnetic compasses a n d gyro-azimuths Unified timing systems Rate-of-turn indicators Electronic chart display a n d information s y s t e m ( E C D I S ) Radionavigation equipment: radar equipment intended f o r ships below 500 g r o s s t o n n a g e radar equipment intended f o r ships below 10000 g r o s s t o n n a g e radar equipment intended f o r ships o f 10000 g r o s s t o n n a g e a n d u p w a r d s radar equipment intended f o r ships below 300 g r o s s t o n n a g e radionavigation system receivers Ship's radar reflectors (shipborne a n d f o r lifesaving appliances) P СТО* СЗ — р р р P P P СТО* сто сто — — — р р р р р р р р р P P P P P P P P P P сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* — — — — — — — — — р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р P P P P P P P P P P P P P P P сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* сто* — — — — — — — — — — — — — — — р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р P P сто* сто* — — р р р — — — P P P сто* сто* сто* р P P P P P P P P P P P P P P сто* сто* сто* сто* сто* сто* сто* сто* — сто* сто* сто* сто* сто* P сто* P 04070000 04080000 04090000 04110000MK 04110100MK 04110200 04110300MK 04110400MK 04110500MK 04110600MK 04110700MK 04110800MK 04110900MK 04111100MK 04111200 04120000MK 04130000MK 04140000MK 04150000MK 04150100MK 04150200MK 04160000MK 04170000MK 04180000MK 04190000MK 04200000MK 04210000MK 04220000MK 04220100MK 04230000MK 04240000 04250000MK 04400000 04410000 05000000MK 05010000MK 05010100MK 05020000MK 05030000MK 05040000MK 05050000MK 05060000MK 05070000MK 05080000 05090000 05100000MK 05110000 05120000MK 05130000MK 05140000MK 05140210MK 05140220MK 05140230MK 05140250 05140300MK 05140400MK сто* сто* СЗ СЗ сто СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ сто СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ сто — — — — р р р — р р — — — — — — — — — — — — — — р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р р СЗ р р р сто* СЗ р р р P сто* СЗ р р р P сто* СЗ — р р р P P сто* сто* СЗ СЗ — р р р р р р СЗ 1 сто СЗ СЗ СЗ СЗ сто СЗ СЗ СЗ с сто СЗ сто СЗ СЗ 1 1 Part I . General Regulations for Technical Supervision 61 1 2 3 4 5 6 7 8 9 05150000MK E q u i p m e n t o f the universal automatic identification s y s t e m (UAIS), class " A " E q u i p m e n t o f the automatic identification s y s t e m (AIS), class " B " V o y a g e data recorders ( V D R ) Simplified v o y a g e data recorders ( S - V D R ) S o u n d reception systems A l a r m a n d communication systems (for O M B O ships) Bridge navigational watch alarm systems (BNWAS) E q u i p m e n t f o r long-range identification a n d tracking o f ships (LRIT) Remote camera systems Hydrometeorological complexes H S C night vision equipment Night vision equipment Navigational equipment not mentioned above FIRE PROTECTION S t r u c t u r a l fire protection: fire-proof b u l k h e a d s , d e c k s a n d c e i l i n g s b u l k h e a d s : A-60 class A-30 class A-15 class B-15 class B-0 class decks: A-60 class A-30 class A-15 class ceilings: B-15 class B-0 class fire-proof doors: A-60 class A-30 class A-15 class A-0 class B-15 class B-0 class С class bulkheads, doors H class structures: H-120 H-60 H-0 C a b l e transit, p i p e a n d duct penetrations W i n d o w s a n d s i d e s c u t d e s ( s e e R e g u l a t i o n s П-2/4.5.2.3 a n d П-2/9.4.1.3 o f S O L A S - 7 4 ) A r r a n g e m e n t s f o r a u t o m a t i c c l o s i n g o f fire d o o r s Materials, deck coverings, paints, varnishes Materials: insulation (plates, p a n e l s , m a t s , cords, etc.) facing furniture, curtains, etc. bedclothes D e c k coverings (linoleum, carpets, mastics) Paints, varnishes for exposed surfaces inside spaces Primary deck coating Fire extinguishing systems: w a t e r fire m a i n s y s t e m sprinkler system pressure water-spraying system water-screen system water fog system f o a m fire e x t i n g u i s h i n g s y s t e m fixed l o c a l a p p l i c a t i o n fire e x t i n g u i s h i n g system for use i n machinery spaces P СТО* СЗ — р р р P СТО* СЗ — р р р P P P P сто* сто* сто* сто* СЗ СЗ СЗ СЗ — — — — р р р р р р р р р р р р P сто* СЗ р р р P сто* СЗ р р р P P P P P сто* сто* сто сто сто* сто — — — — — р р р р р р р р р р р 1 1 P P P P P СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК — — — — — р р р р р — — — — — — — — — — P P P СТПК СТПК СТПК СТПК СТПК СТПК — — — р р р — — — — — — P P СТПК СТПК СТПК СТПК — — р р — — — — P P P P P P P СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК — — — — — — — р р р р р р р — — — — — — — — — — — — — — P P P P P СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СТПК СЗ — — — — — р р р р р — — — р р — — — — — P сто сто — р р — P P P P P P P сто сто сто сто сто сто сто сто сто сто сто сто сто сто — — — — — — — р р р р р р р — — — — — — — — — — — — — — P P P P P P P — сто — — сто сто сто — сто — — сто сто — — — — — — р р р р р р р р р р р р р р — — — — — — 05150000 05160100MK 05160200MK 05170000MK 05180000 05190000MK 05200000MK 05210000 05220000 05220100MK 05220100 05300000 06000000 06010000MK 06010100MK 06010101MK 06010102MK 06010103MK 06010105MK 06010106MK 06010107MK 06010108MK 06010109MK 06010111MK 06010112MK 06010200MK 06010201MK 06010202MK 06010203MK 06010204MK 06010205MK 06010206MK 06010300MK 06010400 06010401 06010402 06010403 06010005MK 06010006MK 06010207MK 06020000MK 06020100MK 06020101MK 06020102MK 06020103MK 06020104MK 06020200MK 06020300MK 06020400MK 06030000MK 06030100MK 06030200MK 06030300MK 06030400 06030500MK 06030600MK 06030700MK СЗ СЗ СЗ 1 СЗ — — 62 Rules for Technical Supervision during Construction of Ships and Manufacture and Products for Ships of Materials 1 2 3 4 5 6 7 8 9 06030800MK Carbon dioxide system a s well a s systems containing fire e x t i n g u i s h i n g g a s i n cylinders Powder system Aerosol system I t e m s o f fire extinguishing systems: sprinkler heads a n dcontrol detection devices spray nozzles, monitors high-expansion foam generators mixers o f f o a m systems, tanks for the storage o f foam-generating liquid Fire-fighting outfit: fire h o s e s c o m p l e t e w i t h c o u p l i n g s fire h o s e s w i t h o u t c o u p l i n g s fire h o s e s n o z z l e s air-foam nozzles portable f o a m generators portable f o a m sets water f o g applicators p o r t a b l e fire e x t i n g u i s h e r s 45 1 a n d 1 3 6 1 f o a m fire e x t i n g u i s h e r s 16 k g a n d 4 5 k g C 0 o r p o w d e r f i r e e x t i n g u i ­ shers s a n d receptacles, fire h o s e cabinets blanket fireman's outfit (clothing, boats, gloves, helmet) portable safety lamp self-contained breathing apparatus, emergency escape breathing device flexible fireproof lifeline protective clothing f o r w o r k with dangerous goods p o r t a b l e fire m o t o r p u m p s international shore connection f o a m concentrate, powder, special g a s a n d other fire-extinguishing substances gas analyser for vapours o f flammable liquids, gases a n do x y g e n content Water intake system from seawater storage tanks o f self-elevating M O D U M O D U g a s detection a n d alarm s y s t e m S m o k e detection s y s t e m operating o n the principle o f air s a m p l i n g f r o m spaces Type production processes MACHINERY INSTALLATIONS Shafting: shafting connecting bolts propeller shaft cone sealings CPP-shaft flange connection sealings thrust shafts intermediate shafts propeller a n dsterntube shafts propeller shaft liners thrust bearings journal bearings shaft couplings Stern tubes: tubes stern bearings, including strut bearings seals sealing c o m p o n e n t s (collars, rings) packing gland pneumatic stop Propellers: fixed-pitch propellers: bosses blades blade securing items controllable pitch propellers: P СТО СЗ — р р — P P сто сто СЗ СЗ — — р р р р — — P P P P сто сто сто сто СЗ сто с сто — — — — — — — — — — — — — — — — P сто сто сто сто сто сто — сто сто сто — — — — — — — — — — р р р р р р р р р р — — — — — — — — — — — — — — — — — — — — — — — — р р р р р — — — — — — — — — — — — р р — — — — р 06031100MK 06031200MK 06050000MK 06050200MK 06050300MK 06050600MK 06050800 06060000 06060100MK 06060101MK 06060200MK 06060300MK 06060400MK 06060500MK 06060800MK 06060900MK 06061000 06061100 06061200 06061300 06061400MK 06061500MK 06061600MK 06061700MK 06061800MK 06061900 06062000MK 06062100MK 06062300MK 06070000 06080000 06090000MK 06150000 07000000 07010000 07010007 07010008 07010009 07010100 07010200 07010300 07010301 07010400 07010500 07010600 07020000 07020100 07020200 07020300 07020301 07020302 07020303 07030000 07030100 07030101 07030102 07030103 07030200 2 — P P P P — P — — — — — P — — — сто сто сто СЗ сто сто сто сто сто — сто СЗ СЗ — — СЗ сто СЗ р сто сто сто СЗ P сто — сто — сто к — — р р р — — — — — — сто СЗ — р — — — — — — р р — P P сто сто сто СЗ — — р р р р — — — — — — — — — — — — — — P P P P P P — — — — — — — — — — — — — — — — сто — — — — — к к к — — — — — к — — — — — р р р р р р р р р р р р р р р р р — — — — — — — — — P P P P P — — — — — к к к к к р р р р р р р — — — — — — р р P — P — P P P P P P P — СЗ СЗ — — с с с с СЗ СЗ СЗ — СЗ СЗ СЗ СЗ сто СЗ с СЗ СЗ СЗ с р р — — — — — — — — — — — — — — р р р р р р р р — — — — Part I . General 1 07030201 07030202 07030203 07030204 07030205 07030206 07030207 07030208 07030210 07030212 07030220 07030221 07030222 07030223 07030224 07030225 07030300 07030301 07030302 07030303 07030304 07030305 07030306 07030307 07030308 07030400 07030401 07030402 07030403 07030404 07030406 07030407 07030408 07030409 07030410 07030411 07030412 07030413 07030414 07030415 07030500 07030600 07030601 07030602 07030603 07030604 07030605 07030606 07030607 07030608 07030609 07030610 07030611 07030612 07030613 07030614 07030615 07030616 07030617 07030618 Regulations for Technical Supervision 2 boss blades blade securing items crankpin rings crosshead slide b l o c k hydraulic cylinder C P P blade sealing power hydraulic system C P P control system pitch changing mechanism: pitch c h a n g i n g m e c h a n i s m shaft, oil transfer block shaft hydraulic cylinder piston and securig items push-pull rods pitch changing m e c h a n i s m control equip­ m e n t (actuating) voith-schneider propellers: propeller housing rotor casing rotor shaft blade central support control lever gears and pinions driving shaft Steerable propellers: propeller shafts pinions housings couplings propeller shaft seals steerable propeller h o u s i n g sealing thrust bearings journal bearings control system steering gear w h e e l a n d pinion steering gear bearing motors and p u m p s o fhydraulic systems o f steering gear flexible hoses o f hydraulic and lubricating systems Thrusters M a i n steerable p o d d e d electrical p r o p u l s i o n units: propulsion unit propeller shaft thrust bearing journal bearing propeller shaft seals hull sealing o fpropulsion unit hydraulic steering systems machinery o fhydraulic steering s y s t e m hydraulic systems o f steering brake gear machinery o f hydraulic systems o f steering brake gear hydraulic systems o f shaft brake gear machinery o fhydraulic systems o f shaft brake gear cooling air unit m a c h i n e r y o f cooling air unit lubricating oil treatment (cleaning a n d control) unit machinery o f lubricating oil treatment (cleaning a n d control) unit steering gear w h e e l 63 3 4 P P P P P P P P P P P — — — — — — — — — — — — P P P P P — — — P P P P P P P P P P P P P P P P P P P P 5 6 СЗ СЗ СЗ СЗ СЗ СЗ к к к к к — к — — — к к — — — — СЗ СЗ СЗ СЗ к к к — — — — — с — — СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ к — — к к к к к к к к к к — — — — — — — к к к СЗ СЗ СЗ СЗ СЗ — СЗ СЗ СЗ СЗ СЗ СЗ — — — — СТО 2 — — — — — — — 2 сто2 сто — — — сто с с СЗ СЗ СЗ — 7 8 9 р р р — — — — — — — — — — — — — — — — — — р р р р — — — — — — — — — — — — р р р — — — — — р р р р р р — — — — — — — — — — — — — — — — — — — — — — — — р р р р — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р р P сто СЗ — — — — P P — сто СЗ к к р р р р р р P P P P P P P сто — — сто сто сто сто — сто — сто СЗ к к к — — — — — к — к р р р р р р — — — — — — — — — — — — — — — р р р р р р р р р р р р р р р р р р — P — P — с с с сто сто СЗ СЗ — СЗ — СЗ — сто — СЗ СЗ P сто сто — сто СЗ к к — к P — с к P P P — СЗ — — к р р р — — — р р р — — — — — — 64 Rules for Technical Supervision during Construction of Ships and Manufacture 1 07030619 07030620 07030621 07030622 07030623 07030624 07030700 07040000 07050000 07150000 08000000 08010000 08010100 08010200 08010300 08010400 08010500 08010600 08010610 08010620 08010700 08010800 08010850 08010900 08011000 08011100 08011150 08011200 08011300 08011310 08011400MK 08011410MK 08011420MK 08011430MK 08011440MK 08011450MK 08011460MK 08011470MK 08020000 08020100 08020110 08020200 08020300 08020400 08020500 08020600 08020700 08020800 08030000 08030100 08030200 08030210 08030220 08030230 08030240 and Products for Ships of Materials 2 3 4 5 6 7 8 9 steering gear bearing swivel o flubricating a n d drainage systems flexible h o s e s o f hydraulic a n d lubricating s y s t e m connecting bolts o f hull, shafts a n d steering gear wheel technical condition monitoring system for thrust and journal bearings hydraulic emergency control system Water jets Shock absorbers Glands i nbulkheads o r decks o f cargo p u m p rooms for p u m p a n df a n drive shafts Type production processes P P P — — с с СТО — сто СЗ СЗ к к — — — — — — — — — — — — — — P сто сто — р р р P P P P сто 2 сто* — — СЗ р р р р р р р р СЗ СЗ — к — — — р — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р р р р р р р — — — — — — — — — — — — — — р р р р — — — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р р р р р р — — — — — — — — — — — — — — р р р р — — — — сто — — — р р р р — — — сто — сто сто — P P P P СЗ СЗ СЗ СЗ — — — — — р р р р р р р р р р — — — — — P P P сто — — СЗ СЗ СЗ — — — р р р р р р — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р р р р р р р р р р р р р р р р р — P — СЗ — — — — P P P P — — — — СЗ — — — — — — — — — — — — — — SYSTEMS A N D PIPING Ship's systems: bilge system ballast system heel a n dtrim systems sewage water system scupper pipe system heating systems o f fuel a n d lubrication o i l tanks, ballast water tanks, cargo heating systems for oil tankers, side fittings a b o v e t h e waterline on icebreakers a n dships with ice strengthening chemical carrier cargo temperature control gas carrier cargo pressure a n d temperature control ventilation system air, o v e r f l o w a n d s o u n d i n g p i p e s venting a n dcargo vapour emission hydraulic drives o fmachinery a n d equipment voice pipes cargo s y s t e m s o f chemical carriers, g a s carriers and oil tankers oil s k i m m i n g s y s t e m o n o i ls k i m m i n g ships c o m p r e s s e d air for tyfon, b o t t o m a n d side fitting blowing, instruments a n d fittings o f air-con­ trolled automation systems fuel o i ls y s t e m for domestic purposes: equipment o f t h e fuel o i l system f o r domestic purposes inert g a s system: inert g a s generator water seal o f the inert g a s s y s t e m scrubber o f the inert g a s s y s t e m instruments a n d alarms o f t h e inert g a s system nitrogen generator o f the inert g a s s y s t e m air c o m p r e s s o r f o r t h e nitrogen generator nitrogen receiver Systems o f machinery installations: oil fuel s y s t e m fuel treatment lubricating o i l system cooling water system compressed air system exhaust system steam piping a n d blow-off system condensate a n dfeed water system thermal oil system Valves: Class I a n dClass П pipes valves Class Ш pipes valves: c l a s s Ш p i p e s v a l v e s , D > 100 m m c l a s s Ш p i p e s v a l v e s , D ^ 100 m m bottom a n d side valves remote-controlled valves y y P — P с СЗ СЗ сто СЗ СЗ р — — р — — — Part I . General Regulations 1 08030300 08030400MK 08030410 08030420 08030500MK 08030510MK 08030600 08030700 08030710 08030720 08030800MK 08030900 08031000 08031100 08031110 08031200 08031240 08031250 08031260 08031270 08031300 08040000 08050000 08060000 08070000 08080000 08090000 08100000 08110000 08120000MK 08150000 09000000 09010000 09010001 09010002 09010003 09010004 09010005 09010006 09010007 09010008 09010009 09010011 09010012 09010013 09010014 09010015 09010016 09010018 09010019 09010020 09010021 for Technical Supervision 2 formed components o f pipes a n d pipelines t y p e A v e n t i l a t i o n fire d a m p e r s ventilation fire d a m p e r s type H ventilation fire d a m p e r s tank venting a n d cargo vapour emission systems automatic closing devices f o r air pipes Flexible joints Expansions pieces a n d mechanical connections o f pipes: mechanical connections o f pipes expansion pieces C a r g o hoses o f chemical a n d g a s carriers Cargo hoses o f oil tankers Oil fuel a n d lubricating oil receiving/transfer hoses Appliances a n d systems f o r oil product transfer afloat a n df r o m a point berth Cargo vapour transfer hoses Gauges: thermometers manometers level gauges discharge gages a n d flowmeters S l e e v e s f o r h o s e s a c c o r d i n g t o c o d e s 08030800, 08030900, 08031000 a n d 08031100 S p a r k arresters (spark extinguishers), d a m p e r s o f exhaust g a s systems, boiler a n d incinerator uptakes S e a water s y s t e m o f self-elevating M O D U P u r g i n g a n d water filling s y s t e m o f M O D U l e g tanks M O D U marine riser tightening a n d rolling compensation system Hydraulic drive system o f jacking arrangements o f self-elevating M O D U Hydraulic drive s y s t e m o farrangement for lifting and lowering columns o f submersible sea water pumps o f M O D U M O D U ventilation system o f enclosed spaces maintained i n overpressure M O D U drilling m u demergency discharge s y s t e m Flange gasket material Type production processes MACHINERY Internal combustion engines o f power output 55 k W a n d o v e r ( m a i n , a u x i l i a r y a n d e m e r g e n c y ) : b e d plates crankcases bed plate/framebox/cylinder frame/column cylinder blocks cylinder liners/jackets cylinder covers outlet v a l v e h o u s i n g s tie r o d s pistons (heads a n d trunks) piston rods connecting rods crossheads crankshafts crankshaft detachable couplings crankcase safety valves camshaft air receivers safety v a l v e s Outlet header safety valves Hydraulic p o w e r drive f o r outlet valves a s s e m ­ bly Hydraulic accumulators A i r a n d o i lcylinders f o r outlet v a l v e s Engine-driven hydraulic p u m p s 8 8 8 65 3 4 5 6 7 8 9 P P — СТО сто сто сто сто — — — — — — р р р — — р р р — — — — — — — — р — р — — — р р р р — р — — — — — р — — — — — — — P P — сто сто P P сто сто сто P P P P P P сто — сто сто сто — сто сто СЗ СЗ СЗ СЗ — — — — — — P сто СЗ — р — — P P P P — — — — сто сто — сто сто сто — — — — — р р р р — р р р р — — — — — — P — СЗ — р р р — — — — — — — — р р р р р р — — — — р р р — — — — р р р — — — — р р р — — — — р р — — — — — сто — сто — — — — р р — р — — — — — P сто* с к р р р P P P P P P P P P P P P P P P P P P P — — — — — — — — — — — — — — сто* — сто* сто* — СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ к к к к к к к к к к к к к — — — — — к — — — — — — — — — — — — — — — — р — — — — — — — — — — — — — — — р р р — — — — — — — — — — — — — — — — р р р — — — P P P сто — сто — к — — — — — — — — — — — P СЗ СЗ 3 сто СЗ 2 сто2 сто СЗ 8 09010022 09011023 09010024 8 8 8 СЗ СЗ сто 66 Rules for Technical Supervision during Construction of Ships and Manufacture 1 09010025 09010026 2 3 4 Electrically-driven hydraulic p u m p s Hydraulic pipes a n d high pressure flexible joints Control system air receivers M a i n starting valve a s s e m b l y Starting air valves o f different d i m e n s i o n s Starting air valve h o u s i n g s Oil fuel a n dlubricating o i l filters Air coolers Auxiliary blowers Thrust shaft Turning gear bearings: main bearings bottom-end bearings crosshead bearings thrust securing items: bolts a n dstuds o fm a i n bearings bolts a n dstuds o f bottom-end bearings bolts a n dstuds o f cylinder covers bolts a n dstuds o f crossheads gears: gearing chain gear other types Oil fuel equipment: casings a n dcovers o f high pressure o i l fuel injection p u m p s fuel valves high pressure o i lfuel injection pipes p u m p elements sprayers C o m m o n rail s y s t e m : high pressure o i l fuel injection p u m p , fuel valves, high pressure oil fuel injection pipes for the accumulator fuel o i l s y s t e m switchgear for h i g h pressure o i l fuel injection pumps gas fuel piping gas fuel preparation stations Speed governors Torsional vibration dampers a n dcrankshaft impulse neutralizers Rescue boat engines Lifeboat engines Diesel-generators Diesel-engine geared set D i e s e l e n g i n e s c o m p l y i n g w i t h R e g u l a t i o n 13 o f A n n e x V I t o M A R P O L 73/78 a n d t h e r e q u i r e m e n t s o f Technical C o d e o n control o f emissions o f n i t r o g e n o x i d e s from m a r i n e d i e s e l e n g i n e s D i e s e l e n g i n e s c o m p l y i n g w i t h R e g u l a t i o n 13 o f A n n e x V I t o M A R P O L 73/78 a n d t h e r e q u i r e m e n t s o f Technical C o d e o n control o f emissions o f nitrogen oxides f r o m m a r i n e diesel engines fitted with S C R system t o reduce N O emissions i n S c h e m e A ( I M O r e s o l u t i o n M E P C . 198(62)) P P P P P P P P P P P сто — сто — сто сто сто — — СЗ СЗ P P P P спи спи спи — — — — P P P P 8 and Products for Ships of Materials 5 6 7 8 9 — СЗ СТО сто — — — — — — — — к к — — — — — к к — — — — — — — — — — — — — — — — — — — — — — — — — — — СЗ — — — — — — — — — — — — — — — — — — — — СЗ СЗ СЗ СЗ к к к к р р р р — — — — — — — — P P P — — — СЗ СЗ СЗ — — — — — — — — — — — — P — СЗ — — р р СЗ сто — — — — — — — — — — р р р р р р р р р р 8 09010027 09010028 09010029 09010030 09010031 09010032 09010033 09010034 09010035 09011600 09011601 09011602 09011604 09011606 09011700 09011701 09011702 09011703 09011704 09011800 09011801 09011802 09011803 09011900 09011901 09011902 09011903MK 09011904 09011905 09011906 09011907 8 8 8 8 8 8 8 8 8 8 8 8 сто СЗ СЗ СЗ — СЗ СЗ 2 P P P P P сто сто сто2 сто сто* P — СЗ к — р р P P P P — сто* спи2 сто СЗ СЗ СЗ — к к к — — — — р р р р р р р р P P P P P сто* сто*2 сто2 сто — СЗ СЗ СЗ СЗ EIAPP к к к к — — р р р р р р р р — р р р р — P — EIAPP — р — — D i e s e l e n g i n e s c o m p l y i n g w i t h R e g u l a t i o n 13 o f A n n e x V I t o M A R P O L 73/78 a n d t h e r e q u i r e m e n t s o f Technical C o d e o n control o f emissions o f n i t r o g e n o x i d e s from m a r i n e d i e s e l e n g i n e s f i t t e d with S C R system t o reduce N O emissions i n S c h e m e В ( I M O r e s o l u t i o n M E P C . 198(62)) P — EIAPP — р р р S C R system t o reduce N O emissions ( I M O resolution MEPC.198(62)) P — СЗ — — — — 8 8 8 8 сто сто СЗ 8 09011908 09011909 09012200 09012400 09013000MK 09014000MK 09015000 09016000 09017000MK 09017001MK 8 8 8 4 4 — x 09017002MK x 09017003MK x Part I . General Regulations for Technical 1 09018000 Supervision 2 C o m m o n foundation frame f o r c o m b i n e d sets w i t h d r i v e p o w e r 55 k W a n d o v e r Internal combustion engines o f power output b e ­ l o w 55 k W ( d r i v e s o f g e n e r a t o r s , f i r e p u m p s , c o m ­ pressors, engines o flifeboats a n d rescue boats): auxiliary engines lifeboat engines speed governors, overspeed devices rescue boat engines Diesel-generators Diesel-engine geared set M a i n s t e a m t u r b i n e s a n d electric g e n e r a t o r turbines: turbine casings nozzle boxes manoeuvring gear casings nozzles diaphragms discs blades gland seals rotors a n d shafts bearings couplings shrouds a n dlashing wire bolts f o r split casing joints Steam auxiliary turbines: turbine casings nozzle boxes nozzles discs blades rotors a n d shafts bearings M a i n g a s t u r b i n e s a n d electric g e n e r a t o r g a s t u r b i n e s : turbine casings compressor housings combustion chamber casings diaphragms turbine rotors turbine discs compressor rotors compressor discs turbine blades compressor blades shrouds, lashing wire flame tube o f combustion chambers regenerators gland seals bearings couplings bolts f o r turbine split casing joints bolts f o r compressors split casing joints M a i n machinery reduction gear: reduction gear casing wheels and pinions reduction gear shafts detachable half-couplings o f shafts bolts sliding bearings Disengaging, flexible couplings a n d other: coupling casing coupling shafts driving parts o f couplings driven parts o f couplings components o f flexible couplings sliding bearings 67 3 4 5 P — СЗ 6 7 8 9 р — — 5 09020000 09020100 09020200MK 09020008 09023000MK 09024000 09025000 09030000 09030001 09030002 09030003 09030004 09030005 09030006 09030007 09030008 09030009 09030010 09030011 09030012 09030013 09040000 09040001 09040002 09040003 09040004 09040005 09040006 09040007 09050000 09050001 09050002 09050003 09050004 09050005 09050006 09050007 09050008 09050009 09050010 09050011 09050012 09050013 09050014 09050015 09050016 09050017 09050018 09060000 09060001 09060002 09060003 09060004 09060005 09060006 09060100 09060101 09060102 09060103 09060104 09060105 09060106 4 4 P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P — P СТО сто*2 сто сто*2 сто2 сто сто — — — — — — — — — — — — — сто — — — — — — — сто — — — — — — — — — — — — — — — — — — 2 сто — — — — — — сто — — — — — СЗ к р р р СЗ СЗ СЗ СЗ СЗ СЗ к к — к к к к р р — — р р р р р р р р р р р р р р р р р к к к — к к — — к — — — — — — — — — — — — к к к к — к — к — — — — — — — — — — — к к к к — — — к к к — — — — — — — — — — — — — — — — р — — — — — — — р — — — — — — — — — — — — — — — — — — р — — — — — — р — — — — — — — — — — — — — — — — — — р — — — — — — — р — — — — — — — — — — — — — — — — — — р — — — — — — р — — — — — — — — — — — — — — — — — — р — — — — — — — р — — — — — — — — — — — — — — — — — — р — — — — — — р — — — — — с СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ 68 Rules for Technical Supervision 1 09070000 09070001 09070002 09070003 09080000 09080100 09080200 09080300 09080400 09080500 09080600 09080700 09080800 09080900 09081000 09081100 09081200 09081300 09081400 09081500 09081600 09081700 09081800 09081900 09090000 09090100 09090101 09090102 09090103 09090104 09090105 09090106 09090200 09090201 09090202 09090203 09090300 09090301 09090302 09090303 09090304 09090400 09090401 09090402 09090403 09090500 09090501 09090502 09090503 09090504 09090505 09100000 09100100MK 09100101 09100102 09100103 09100104 09100105 09100106 09100200 09100201 09100202 09100203 09100204 09100205 during Construction 2 of Ships and Manufacture 3 5 4 2 Auxiliary machinery reduction gear: casings o f reduction gear a n d couplings wheels and pinions shafts o f reduction gears a n d couplings Auxiliary machinery: starting air compressors turbochargers main and auxiliary boiler blowers cooling water p u m p s o fm a i n engines and auxiliary machinery circulating p u m p s o f m a i n condensers lubricating o i l p u m p s o f m a i n engines a n d turbines boiler feed water p u m p s condensate p u m p s boiler burner p u m p s fuel oil transfer p u m p s a n d fuel-feed p u m p s o f main engines bilge p u m p s fire p u m p s fire m o t o r - p u m p s ballast p u m p s cargo p u m p s steam-jet ejectors o f condensers circulating p u m p s o f waste-heat boilers oil fuel a n d lubricating oil separators bilge ejectors P a r t s o f m a c h i n e r y l i s t e d u n d e r 09080000: piston p u m p s and compressors: cylinder blocks cilynder liners pistons piston rods connecting rods crankshafts centrifugal and rotary p u m p s and compressors: shafts impellers, rotors casings screw and gear p u m p s and compressors: shafts, screws casings screw p u m p housing pinions oil fuel a n d lubricating oil separators: b o w l bodies, shafts b o w l discs pinions gas turbochargers and blowers: shafts a n d rotors gland seals casings bearings supercharging air coolers Deck machinery: steering gear (engines): rudder stock yoke cylinders driven shafts pinions, wheels, tooth rims pistons with rods safety valves windlass a n d anchor capstans: intermediate a n d output shafts a n d spindles chain sprockets pinions, gears o f p o w e r drives disengaging and safety clutches b a n d and automatic brakes and Products for Ships of Materials 6 7 8 9 р — — — р — — — р — — — р р р р р р р р P P P P СТО — — — СЗ СЗ СЗ СЗ — P P P P СТО сто* 2 сто сто СЗ СЗ СЗ СЗ — — — — р р р р P P сто сто СЗ СЗ — — р р р р р р P P P P сто сто сто сто СЗ СЗ СЗ СЗ — — — — р р р р р р р р р р р — P P P P P P P P P сто сто сто сто сто сто сто сто сто СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — — — р р р р р р р р р р р р р — р р р р — — — — — р р р — — — — — — — — — — — — — — — — СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — СЗ СЗ СЗ — — — — — — — — — — — — P P P P — — — — СЗ СЗ СЗ СЗ — — — — — — — — р р р р р р р р P P P — — — СЗ СЗ СЗ — — — — — — р р р р р р — — — — P — — — — 2 сто СЗ СЗ СЗ СЗ СЗ — — — — — — — — — р — — — — р — — — — р P P P P — P P P P — — — сто — — — — — — сто — — — — СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ к — — — — — — к — — — — р — — — — — — р — — — — р — — — — — р р — — — — р — — — — — р р — — — — — — — — — Part I . General 1 09100300 09100301 09100302 09100303 09100304 09100400 09100401 09100402 09100403 09100404 09100500MK 09100501 09100502 09100503 09100504 09110000 09120000 09120010 09120020 09120030 09120040 09130000 09130001 09130002 09130003 09130004 09130005 09140000 09150000 09160000 09160100 09160101 09160102 09160103 09160104 09170000 09170001 09170002 09170003 09200000 10000000 10000100 10010000 10010003 10010004 10010006 10010007 10010008 10010009 10010011 10010012 10010100 10010200 10010500 10011000 10011300 10011400 Regulations for Technical Supervision 69 2 3 4 mooring capstans and winches: spindles, output shafts pinions, gears o fp o w e r drives safety clutches automatic brakes towing winches: output a n d intermediate shafts pinions, gears o fp o w e r drives rope tightening control devices, rope layers brakes boat winches: output a n d intermediate shafts pinions, gears o fp o w e r drives automatic and h a n d brakes stoppers Mechanical telegraphs Fans: m a c h i n e r y spaces, f o a m a n d s m o t h e r i n g fire extinction stations, refrigerated spaces cargo p u m p rooms, holds f o rcarriage o f dangerous goods and motor vehicles, helicop­ ters shelds portable gas freeing fans for enclosed spaces o n oil a n d chemical tankers dangerous spaces and spaces with overpressure of M O D U , o i land chemical tankers Motors and p u m p s o fhydraulic systems: shafts, rotors, pinions rods pistons, plungers casings hydraulic cylinders Thruster machinery Sea water submersible pumps Drives o fM O D U jacking arrangements: hydraulic cylinders i n assembly cylinders and covers pistons with rods yokes for securing hydraulic cylinders securing items W i n c h e s o f M O D U lifting a n d lowering c o l u m n s of submersible sea water p u m p s : output a n d intermediate shafts wheels and pinions brakes Type production processes BOILERS, HEAT EXCHANGERS AND PRESSURE VESSELS S t e a m generating units Boilers, including waste-heat a n d water heating boilers: shells end plates water chambers combustion chambers furnaces boiler stays economizers steam accumulators (steam separators) shells drums headers oil burning equipment steam superheaters air heaters P P P P P P СТО — — — — сто — — — 6 7 8 9 СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — — — р — — — — р — — — р р р р р р — — — — р р р р р — — — P — сто — — — — сто СЗ СЗ СЗ СЗ СЗ СЗ СЗ — к — — — — — — р — — — — р — р — — — — р — р — — — — р — — сто — р р — P сто СЗ р р P сто СЗ — р р — P сто СЗ — р р — P сто — — — — — сто сто — — — — — — — СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ к — — — — — к к к к к к к — к р — — — — — р р р — — — — р р р — — — — — р р р — — — — — р р — — — — — р — р — — — — — — — — — — СЗ СЗ СЗ — — — — — — — — — — — — — — — — — — сто/ спи — — — — — — — — — — — — — СЗ СЗ к к р р р р р р СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — к — — — — — — — — — — — — р — — — р — — — — — — — — р — — — р — — — — — — — — р — — — р — — — — — P — — — — — — — — — P P P P P P P — P P P P — P P P P P P P P P P P P P P P 5 70 Rules for Technical Supervision during Construction of Ships and Manufacture 1 10020000 10020100 10020101 10020200 10020201 10020300 10020400 10020500 10020501 10020502 10020503 10020600 10020601 10020602 10020603 10020604 10020700 10020701 10020702 10020703 10020800 10020900 10021000 10021100 10021200 10030000 10030100 10030200 2 H e a t exchangers a n d pressure vessels: boiler feed water heaters deaerators condensers o fm a i n turbines condensers o f electric generator turbines condensers o f auxiliary steam turbines distillers heaters: oil fuel heaters lubricating oil heaters water heaters coolers: lubricating o i lcoolers o fm a i n machinery water coolers o fm a i n machinery lubricating oil coolers o f auxiliary machinery water coolers o f auxiliary machinery filters: oil fuel filters l u b r i c a t i n g o i l filters water filters air bottles hydraulic accumulators hydrophores pressure vessels and apparatus o f fire-fighting systems pressure vessels a n d apparatus o f domestic, production, research a n d other applications Valves: v a l v e s f o r b o i l e r s e q u a l t o o r o v e r 0,07 M P a valves for pressure vessels and heat exchangers e q u a l t o o r o v e r 0,07 M P a , D ^ 5 0 m m safety valves pressure gauges Pressure vessels for M O D U marine riser tightening and rolling compensation system G a s fuel tanks: liquefied gas fuel tanks compressed gas fuel tanks g a s fuel treatment installation L N G fuel forcing vaporizer Type production processes ELECTRICAL EQUIPMENT Electrical propulsion plant: propulsion generators o r m a i n power plant generators, i f combined p r o p u l s i o n e l e c t r i c a l m o t o r s (РЕМ) p o d d e d a z i m u t h drive's p r o p u l s i o n electrical motors propulsion switchboards standard unit/card o f switchboard propulsion transformers, reactors propulsion semiconductor converters electrical m a c h i n e converters control systems, monitoring a n d protection systems slip rings devices for p o d d e d azimuth propul­ and Products for Ships of Materials 3 4 5 6 7 8 9 P P P P P P — — — — — — СЗ СЗ СЗ СЗ СЗ — — — — — — р р р р р р р р р р р р р р р — — р P P P — — — СЗ СЗ СЗ — — — р р р р р р — — — P P P P — — — — СЗ СЗ СЗ СЗ — — — — р р р р р р р р р р р р P P P P P СЗ СЗ СЗ СЗ СЗ СЗ — — — к — — к р р р р р P — — — — — — — р р р р р р р р — — — — — — — — — СЗ — р — — P P — — СЗ СЗ — — — — — — — — — — к р р р р р р — — р р р р р р р р р р р — с — — y 10030300 10030400 10040000 10050000 10050100 10050200 10050300 10050400 10100000 11000000 11010000 11010100 11010200 11010300 11010400 11010410 11010500 11010600 11010700 11010800 11010900 11011000 11020000 11020100 11020101 11020102 11020200 11020300 11020301 11020302 11020400 sion a z i m u t h drives f o r p o d d e d p r o p u l s i o n electrical motors M a i n a n d e m e r g e n c y sources o f electrical p o w e r : generators: p o w e r o f 100 k V A a n d o v e r p o w e r l e s s t h a n 100 k V A accumulators a n d accumulator batteries uninterrupted power supply: p o w e r o f 25 k V A a n d o v e r p o w e r less t h a n 25 k V A other sources o f electrical p o w e r P СТО СЗ — — — — — P P P P P сто сто — сто сто с с сто к к к к — — — — — с* — к р р р P — — — P P — — с* с* к к — — — — — — P P P P P P — сто* — — — сто* с* — с* с* с* с — — — — — — — — — — — — — — — — — — — — — — — — P — с* — — — — P — с* — — — — — — — — р р р P P P сто* сто* сто* — сто сто сто* с к — — — — — — — — — — — — — — — — — — — — — — — — — — — — P P P СЗ СЗ СЗ СЗ сто — с СЗ СЗ — р — — — Part I . General 1 11030000 11030100 11030101 11030200 11030300 11030301 11030302 11030400 11030401 11030402 11030500 11030501 11030502 11040000 11040100 11040101 11040110 11040200 11040300 11040400 11040401 11040402 11040403 11040500 11040502 11040503 11040504 11040505 11040506 11040600 11040601 11040602 11040603 11040604 11040605 11040606 11040607 11040608 11040700 11040701 11040702 11040703 11040704 11040800 11040900 11050000 11050100 11050101 11050102 11050103 11050200 11050201 11050202 11050204 11050205 11050206 11050207 11050300 11050400 Regulations for Technical Supervision 2 Transformers a n d converters: power transformers lighting transformers measuring a n d other transformers rotary converters: p o w e r o f 100 k V A a n d o v e r p o w e r l e s s t h a n 100 k V A rotary amplifiers: p o w e r o f 100 k V A a n d o v e r p o w e r l e s s t h a n 100 k V A s t a t i c a n d s e m i - c o n d u c t o r c o n v e r t e r s (rectifiers, inverters, f r e q u e n c y converters) w i t h rated current: r a t e d c u r r e n t o v e r 25 A rated current 25 A a n d less Switchboards a n d conrtol a n d monitoring desks: main switchboards emergency switchboards standard unit/card o f switchboard distribution a n dother switchboards navigation light switchboards desks: control desks monitoring desks signalling desks switehgear a n d control gear: switches contactors, relays tripping devices switches, limit switches resistors a n d rheoststs protective devices: relays I > 25 A relays I ^ 25 A f u s e s I > 25 A f u s e s I ^ 25 A complex protective devices protective barriers o f intrinsically safe circuits o fE x i type circuit breakers 1^25 A c i r c u i t b r e a k e r s К 25 A controllers: r e g u l a t o r s I > 25 A regulators 1^25 A reactors p o w e r coefficient increase capacitors stationary electrical m e a s u r i n g instruments busbars Electric drives f o r machinery referred t o i n 0 7 0 0 0 0 0 0 , 0 9 0 0 0 0 0 0 , 12000000, 1 4 0 0 0 0 0 0 M K , 18050000 1 9 0 0 0 0 0 0 M K a s w e l l a s fishing v e s s e l m a c h i n e r y a n d ships engaged i n processing o f living recources o ft h e sea a n d n o t engaged i n catching: electric m o t o r s : e l e c t r i c m o t o r s w i t h p o w e r o u t p u t 100 k W and over electric m o t o r s w i t h p o w e r output m o r e t h a n 2 0 k W a n d l e s s 100 k W e l e c t r i c m o t o r s w i t h p o w e r o u t p u t u p to 2 0 k W starting devices: starters suppressors o f breaking power, resistances and rheostats controllers soft starters rated a t 20 k W a n d m o r e control s y s t e m s f o r electric drives soft starters rated u p t o 20 k W electromagnetic brakes electromagnetic clutches 71 3 4 5 6 7 — — р р СТО* — — — — — — — — — — — р P P P — с с сто — с — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — с с с — — — — — — — — — — — — р р р — — — — — — — — — сто сто сто сто сто — — — — — — — — — — — — — — — — — — — — СЗ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — P P — P P — сто* сто* — сто* сто — сто сто — СЗ — с СЗ — 9 P P P сто* сто — — — сто* сто сто — сто сто сто P P P P P сто сто* сто сто сто P P P P P P сто* сто сто сто сто* сто* P P сто* сто* сто P P P P P сто сто сто сто — — — — — — — — — — — — — — — — — — — — — — — сто* сто сто* сто сто — р р р P сто* с к — — — P сто СЗ — — — — P сто — P P сто — сто сто — — — — — — — — — — — — — — — — P P P P P P сто сто* сто сто* сто сто СЗ СЗ СЗ — — — — — к — — — — — — P P — P P P P P — — с 8 СЗ — с с — СЗ СЗ сто СЗ сто СЗ сто СЗ СЗ СЗ сто сто сто сто р р р — — — — — — — — — — — — — — — р р р — — — — — — — — — 72 Rules for Technical Supervision during Construction of Ships and Manufacture 1 11060000 11060001 11060002 11070000 11070100 11070200 11070300 11070400 11070500 11080000 11080100 11090000 11090001 11100000 11100100 11100102 11100103 11100200 11100201 11100202 11100300 11100301 11100302 11100400 11100401 11100402 11100500 11100501 11100502 11100600 11100601 11100602 11100700 11100701 11100702 11100703 11100704 11100800 11100801 11100802 11100900 11100901 11100902 11110000 11110001 11110100 11110101 11110102 11120000 11120001 11130000 11130100 11130101 11130102 11130103 2 M a i n and emergency lighting: s t a t i o n a r y l i g h t i n g fixtures, flood-light p r o j e c t o r s l i g h t i n g fitting a n d a c c e s s o r i e s Control and monitoring devices: electrical engine telegraphs rudder angle indicators C P P position indicator tachometers other m o n i t o r i n g d e v i c e s (static electricity insulation, intrinsically-safe circuits, etc) Telephone service communication: c o m m u t a t o r s a n d telephone c o m m u n i c a t i o n sets General alarm system: visual and sound devices and switches F i r e detection s y s t e m a n d w a r n i n g a l a r m o n fire smothering s y s t e m release: i n d i c a t i n g u n i t s o f fire d e t e c t i o n s y s t e m m a n u a l fire a l a r m b u t t o n s a n d detectors o f fire detection s y s t e m s y s t e m c o m p o n e n t s o f w a r n i n g a l a r m o n fire smothering s y s t e m release W a r n i n g s y s t e m s o f l o c a l fire e x t i n g u i s h i n g s y s t e m release for machinery space machinery: switchboards, control and alarm panels detectors a n d other components A l a r m system o fhigh-level o fbilge water: switchboards, control and alarm panels detectors a n d other components Engineer's alarm: switchboards, control and alarm panels detectors a n d other components Alarm system o f people presence inside refrigerated holds: switchboards, control and alarm panels detectors a n d other components A l a r m s y s t e m o f side port closures condition: switchboards, control and alarm panels detectors a n d other components Exterior/inner video monitoring system: video cameras video terminals switchboards, control and alarm panels detectors a n d other components A l a r m system o f explosive g a s concentration increase i n spaces a n d areas: switchboards, control and alarm panels detectors a n d other components Cargo holds a n d d r y cargo ships water ingress detection system: switchboards, control and alarm panels detectors a n d other components Fire and watertight door signalling system: c o m p o n e n t s o f fire a n d w a t e r t i g h t d o o r s i g n a l ­ ling system W a r n i n g a l a r m s y s t e m f o r a u t o m a t i c s p r i n k l e r fireextinguishing system Central alarm panel Detectors and other components Machinery personnel alarm system Components o fmachinery personnel alarm system Cabling: cables and wires: cables o f s u p p l y circuits f o r voltage o v e r 1000 V cables o f s u p p l y circuits for voltage u p t o 1000 V cables o f control circuits a n d information transfer circuits and Products for Ships of Materials 4 5 6 7 — — — — — р р СТО — сто сто р P P — — — — — — P P P P P сто* сто сто сто сто СЗ — — — — — р р р р р р р р р р р р р р р — P P — сто — сто сто* P P сто* сто* сто P сто* P сто* P P P P P P P P P сто* сто* сто — сто сто — сто сто P P P P P P P P P P P — сто сто*2 сто сто* сто* сто* сто*2 сто сто* сто* P P P сто сто* сто* 3 P — сто сто сто сто СЗ — сто — сто — — — — — 8 9 р р р — — — р р р — — — р р р — — — — — — — — сто — — — — СЗ — р р р СЗ — — — — — — — — — — — — — — — СЗ СЗ сто СЗ СЗ сто СЗ СЗ сто СЗ СЗ сто СЗ СЗ* сто р р р — — — — — — р р р — — — — — — р р р — — — — — — — — — — — — — — — — — р р р — — — — — — р р р — — — — — — — — — — — — р р р — — — — — — — — — р р р — — — — — — р р р сто — — — — — — — с — р р р СЗ — — — — — — р р р СЗ СЗ — — — — — — — — — — — — — СЗ сто сто СЗ* сто СЗ 2 СЗ* сто СЗ 2 P P P P сто сто* сто* сто* P сто* P P P P сто* сто* — сто — сто* сто* P сто* СЗ — — — — P сто* СЗ — — — — — P — СЗ* сто СЗ сто СЗ сто — р р р — — — Part I. General 1 11130104 11130105 11130200 11140000 11150000 11150001 11150002 11150003 11150004 11150005 11160000 11170000 11170100 11170101 11170102 11170200 11170201 11170202 11180000 11180001 11180002 11190000 11210000 11220000 12000000 12010000 12010005 12010100 12010110 12010120 12010130 12010200 12010300 12010400 12010500 12010600 12020000 12020100 12020200 12020300 12020400 12020500 12020600 12020700 12020800 12050000 12050004 12050100 12050200 12050300 12050400 12050500 12060000 12070000 12070100 12070200 12070300 12080000 12090000 12100000 12110000 Regulations for Technical 13 Supervision 2 3 coaxial cables optical-fiber cables items a n d devices for installation, splicing a n d connection o f cables and wires Lightening a n d earthing conductors, impressed current protection Heating a n d cooking appliances, stationary appliances: oil f u e l a n d lubricating oil h e a t i n g appliances heating radiators for air-conditioning s y s t e m w a t e r h e a t e r s o f 0,025 m i n c a p a c i t y a n d p r e s s u r e e q u a l t o o r m o r e t h a n 0,07 M P a other stationary heating appliances heating cables E l e c t r i c a l filters o f d i f f e r e n t p u r p o s e Special s y s t e m s o f oil tankers a n d g a s carriers: A l a r m system o f temperature increase o f bulkhead bearings o f cargo a n d ballast p u m p s : switchboards, control and alarm panels detectors a n d other components A l a r m system o f cargo h i g h and limiting level: switchboards, control and alarm panels detectors a n d other components Signalling o nfailures i n M O D U j a c k i n g system: switchboards, control and alarm panels detectors a n d other components H o u s i n g s for electrical items Other electrical e q u i p m e n t Type production processes REFRIGERATING PLANTS Refrigerating units and machinery: P a r t s o f p r o d u c t s s p e c i f i e d i n 12010000 Compressors: screw type piston type centrifugal and axial-flow type Refrigerant p u m p s Secondary refrigerant p u m p s Compressing and condensating units Ice generators Freezing units Refrigerant pressure vessels: Refrigerant condensators Direct evaporation air coolers Brine air coolers Refrigerant evaporators R e f r i g e r a n t filters Oil separators Refrigerant receiver Refrigerant separator Piping a n d valves: V a l v e s d e s i g n e d f o r p r e s s u r e 1,0 M P a a n d m o r e Pipes o f refrigerant, liquid secondary refrigerant and cooling water Air pipes o fcooling system Safety devices and valves Solenoid valves Manually operated valves Safety devices Automatic control devices Thermostatic expansion valves Thermostats Bellows-actuated pressure switches A t m o s p h e r e control devices Materials for insulation o frefrigerated spaces and pipes Refrigerant Refrigerant leak detectors 3 4 5 6 7 8 9 — — — — — — P P P СТО* СТО* сто* СЗ СЗ сто — — — — — — P сто сто — р — — — — — р р P P P сто сто сто СЗ сто СЗ — — — — — — — — — — — — P P P сто сто* сто сто сто сто — — — — р р — р р — р р P сто* СЗ — р р р P P P P P — P P P P — сто* сто* сто* 2 сто сто* сто* 2 сто сто* сто сто — СЗ сто СЗ СЗ* сто СЗ СЗ* сто сто сто — — — — — — — — — — — — — — р — — р — — — — — — — р — — р — — — — — — — р — — р — — — — — P — СЗ к — — — P P P P P P P P — — — — — — — — СЗ СЗ СЗ СЗ сто СЗ СЗ СЗ к к к к — к к к р р р р р р р р р р р р р р р р — — — — — — — — P P P P P P P P — — — — — — — — СЗ СЗ сто СЗ СЗ СЗ СЗ СЗ — — — — — — — — р р р р р р р р р р р р р р р р — — — — — — — — сто — — р р р р — — — — — — — — — — — р р р р р р р р р р р — — — — — — — — — — — р р р р р р р р р р р — — р р р р — — — P — — — — P P P P P P P P P P — — — — — — — — — — — — СЗ сто сто сто сто сто сто сто сто сто P P — — сто сто — р — — 74 Rules for Technical Supervision during Construction of Ships and Manufacture 1 13000000 13100000 13110000 13110100 13110101 13110102 13110103 13110104 13110105 13110200 13110300 13110400 13110500 13120000 13120100 13120101 13120102 13120200 13120201 13120202 13120300 13120301 13120302 13120400 13120401 13120402 13130000 13130100 13130101 13130102 13130200 13130300 13130400 13130500 13130501 13130502 13130503 13130504 13130505 13130506 13130507 13130508 13130600 13140000 13140100 13140101 2 MATERIALS Steel a n d Iron Rolled products: rolled products f o r ship a n d M O D U structures as well a s ship arrangements: plates a n d sheets strips sections bars welded sections rolled steel f o r boilers, heat exchangers a n d pressure vessels rolled stock for nuclear steam supply s y s t e m (NSSS) rolled stock for M O D U gears and machinery clad steel Tubes a n d pipes: tubes a n d pipes for D a s s I a n d Class П machinery, boilers, heat exchangers and pressure vessels: seamless welded tubes a n dpipes f o rClass I a n d П piping a n d M O D U special systems: seamless welded tubes and pipes for N S S S : seamless welded constructional tubes and pipes o fM O D U gears and machinery: seamless welded Forgings: forgings f o r ship hull a n d M O D U structures a s well as ship arrangements: stems, b a r keels, shafting struts rudder stocks and rudder nozzles forgings f o r boilers, heat exchangers, pressure vessels a n d for pipes o fpipeline systems forgings for N S S S forgings forM O D U gears and machinery forgings f o rship machinery a n d machinery installations: forgings f o r propellers a n d C P P (bosses and blades) forgings f o r crankshafts o f internal c o m ­ b u s t i o n e n g i n e s o f p o w e r o u t p u t 55 k W and over forgings f o r propeller, intermediate a n d thrust shafts forgings forconnecting rods, rods, pistons, crossheads o f internal combustion engines o f p o w e r o u t p u t 55 k W a n d o v e r forgings f o r casings, disks, rotors a n d shafts o fm a i n turbines a n d compressors forgings f o r gears, pinions a n d shafts of main machinery transmissions f o r g i n g s f o r tillers, quadrants, p a r t o f r u d d e r s and rudder nozzles forgings for propulsion motors shafts, generators a n d slip couplings built into t h e shafting forgings foranchors and accessories Castings: castings f o r ship hull a n d M O D U structures a s well as ship arrangements: castings for stems, b a r keels, shafting struts and Products for Ships of Materials 3 4 5 6 7 8 9 P P P P P P СПИ СПИ СПИ СПИ СПИ СПИ СЗ СЗ СЗ СЗ СЗ СЗ к* к* к к к к — — — — — — — — — — — — — — — — — — P P P спи спи — СЗ СЗ к к к — — — — — — — — — P P спи спи СЗ СЗ — — — — — — — — P P спи спи СЗ СЗ — — — — — — — — P P спи спи СЗ СЗ к к — — — — — — P P спи спи с с к к — — — — — — P P P спи спи спи СЗ СЗ СЗ к к к — — — — — — — — — P P спи спи СЗ СЗ к к — — — — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — спи+сз Part I . General 1 13140102 13140200 13140300 13140400 13140500 13140501 13140502 13140503 13140504 13140505 13140506 13140507 13140600 13150000 13160000 13160100 13160200 13160300 13160400 13200000 13210000 13220000 13230000 13240000 13240100 13300000 13310000 13310100 13310200 13320000 13330000 13340000 13350000 13360000 13361000MK 13362000MK 13370000MK 13380000 13400000 13500000 13510000 13520000 13600000 13600100 13800000 13810000 13820000 13830000 13840000 13850000 14000000 14100000 14100100 Regulations for Technical Supervision 2 castings f o rrudder stocks a n d rudder nozzles castings for boilers, heat exchangers, pressure vessels a n d forpipes o fpipeline systems castings for N S S S castings for M O D U gears a n d machinery castings o f machinery a n d machinery installa­ tions: castings f o r propellers a n d C P P (bosses and blades) castings f o r crankshafts o f internal c o m ­ b u s t i o n e n g i n e s o f p o w e r o u t p u t 55 k W a n d castings f o r propeller, intermediate a n d thrust shafts castings for connecting rods, rods, pistons, crossheads o f internal combustion engines o f p o w e r o u t p u t 55 k W a n d o v e r castings f o rcasings a n d shafts o f m a i n turbines a n d compressors castings f o r gears, pinions a n d shafts o f main machinery transmissions castings f o r tillers, quadrants, parts o f rudders a n d rudder nozzles castings f o r anchors a n d accessories steel f o r chains Semi-finished products: ingot blum slab billet A l u m i n i u m , titanium a n d cooper alloys: rolled products f o r ship hull a n d M O D U structures a n d ship arrangements pipes a n d tubes forgings castings castings forpropellers a n d C P P Non-metal materials: materials f o r reinforced plastic structures: reinforcing materials binders laminated textiles retro-reflective materials f o a m plastics polymeric compositions anticorrosive coating o fhull structures protective coating f o r dedicated s e a water ballast tanks ( I M O resolution MSC.215(82)) protective coatings for cargo oil tanks o f crude oil tankers (TMO resolution MSC.288(87)) antifouling coatings o f ship's hulls ice-resistant coatings A n c h o r a n d mooring chain cables a n d accessories Ropes: wire ropes ropes o f n a t u r a l a n d s y n t h e t i c f i b r e Plastic pipes a n d accessories Pipes a n d shape pieces o f class H I Stainless steel: rolled p l a t e s a n d b a r s pipes forgings castings semi-finished products WELDING CONSUMABLES Electrodes: electrodes for ships hull a n d M O D U structures 75 3 4 5 6 7 8 9 — — P СПИ СЗ к — P СПИ с к — — — P P СПИ СПИ СЗ СЗ к к — — — — — — P СПИ СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P спи СЗ к — — — P P спи спи СЗ СЗ к — — — — — — — к к к к — — — — — — — — — — — — P P P P — — — — спи+сз спи+сз спи+сз спи+сз P спи СЗ к — — — P P P P спи спи спи спи СЗ СЗ СЗ СЗ — к к к — — — — — — — — — — — — P P P P P P P P сто сто сто сто сто сто* сто* сто* сто сто сто сто сто сто сто сто — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р P сто* сто — р р р P P P сто* сто* спи сто сто — — к р р р — — — — р р P P P спи спи спи — СЗ СЗ СЗ сто к — — — — — — — — — — — — — — — — — — — — спи+сз спи+сз спи+сз спи+сз спи+сз к к к к — — — — — — — — — — — — — — — — — — — — — P P P P — P СЗ сосм сосм р р 76 Rules for Technical Supervision during Construction of Ships and Manufacture 1 14100200 14100300 14100400 14100500 14200000 14200100 14200200 14200300 14200400 14200500 14300000 14300100 14300200 14300300 14300400 14300500 14400000 14500000 14000000MK 14010000MK 14010100MK 14010200MK 14010300MK 14010301 14010302 14010303 14010304 14010305 14010400MK 14030000MK 14030100MK 14030200MK 14030300MK 14030301 14030302 14030303 14030304 14030305 14030306MK 14030307 14030308 14030309 14030400MK 14030500MK 14030600MK 2 electrodes f o r boilers, heat exchangers a n d pressure vessels electrodes f o r Class I , Class П a n d Class I I I piping electrodes for nuclear steam supply systems electrodes f o r machinery, devices, equipment and welded parts o finternal combustion engines Wire/flux: wire/flux f o r ship hull M O D U structures wire/flux f o r boilers, heat exchangers a n d pressure vessels wire/flux f o r Class I , Class П a n dClass H I piping wire/flux fornuclear steam supply systems wire/flux f o r machinery, equipment a n d weldded parts o finternal combustion engines Wire/gas: wire/gas for hull structures o f ships a n d M O D U wire/gas f o rboilers, heat exchangers a n d pressure vessels wire/gas for Class \ П a n dClass I I I piping wire/gas fornuclear steam supply systems wire/gas formachinery, equipment a n d welded parts o finternal combustion engines Protective primers allowing t o w e l d without their removal Type production processes CARGO HANDLING G E A R Ship derricks: structures with fixed g e a r (masts, columns, gantries, etc.) derrick b o o m s cargo winches, span winches a n d slewing g u y w i n c h e s ; s p a n rope r e e l s a n d p r e v e n t e r g u y reels w i t h drive: m a i n shafts couplings frames a n d casings brakes ratchets s p a n rope r e e l s a n d p r e v e n t e r g u y r e e l s w i t h o u t independent drive C r a n e s a n d hoists, u p p e r structures: structures o f cranes a n d h o i s t s w i t h p e r m a n e n t l y at­ t a c h e d fixed g e a r ( m a s t s , p o s t s , b e l l - s h a p e d s t r u c t u ­ r e s , b r i d g e s , g a n t r i e s , u n d e r s t r u c t u r e s , rocking a r m s a n d p u l l rods o f a d j u s t a b l e c o u n t e r w e i g h t s , etc.) jibs cargo lifting, luffing, slewing, travelling m o t i o n or counterbalance machinery: m a i n shafts couplings frames a n d casings brakes wheels, rollers adjustable counterbalances hydraulic cylinders power hydraulic cylinders flexible joints safety devices ( S W L indicators, limit-load switches, hi-jacking devices, limit switches, jibradius indicators, safety switches, signal devices) m e t a l u p p e r structurers: posts, frames, suppor-ting a s s e m b l i e s ( j i b a n d a x l e s , etc.), t r o l l e y s , j i b s , counterbalance attachements a n d other structures fastenings a n d supports o fderrick w h e n stowed for sea 3 4 5 and Products for Ships of Materials 6 7 8 9 — — — P COCM сосм — P COCM сосм — — — — P P COCM COCM сосм сосм — — — — — — — — P P COCM COCM сосм сосм — — — — — — — — P COCM сосм — — — — P P COCM COCM сосм сосм — — — — — — — — P P COCM COCM сосм сосм — — — — — — — — P P P COCM COCM COCM сосм сосм сосм — — — — — — — — — — — — P сто сто — — — — P СОТПС СОТПС — — — — — — — — р р — P P — — с с к к р р р р — — P P P P P P — — — — — — СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — — — — — — — — — — — — — — — — — — сто — с — к — р р р р — — — — с с к — р р р р — — СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — — — — — — — — — — — — — — р — — — — — — — — — р — — — — — — — — — — P — P P P P P P P P P P P P — — — — — — — — — сто — — — — р р — P — — — р р — Part I . General 1 14030700MK 14040000MK 14040100MK 14040200MK 14040201 14040202 14040203 14040204 14040300MK 14050000MK 14050100MK 14050101MK 14050102MK 14050200MK 14050201MK 14050202MK 14050203MK 14050204MK 14050205MK 14050206MK 14050208MK 14050300MK 14050400MK 14060000MK 14060100MK 14060200MK 14060300MK 14060400MK 14100000MK 15000000 15010000 15020000 15030000 15030100 15030200 15030300 15030400 15030500 15030510 15030520 15030530 15030600 Regulations for Technical 11 Supervision 2 devices d a m p i n g d y n a m i c loads, stability o f derrick against jack-knifing with the ship rolling or load drop P a s s e n g e r a n d c a r g o lifts w i t h lifting c a p a c i t y 250 k g a n d o v e r : metal structures with all loose gear lift w i n c h e s : m a i n shafts couplings frames a n d casings brakes lift e q u i p m e n t (trunk d o o r s , c o u n t e r b a l a n c e s , buffers, safety devices, etc.) Parts a n dropes o f cargo handling gear: interchangeable components: blocks, pulleys, hooks, chains, swivels, shackles, turnbuckles, triangle plates, b o o m a n d suspensions, etc. thimbles, ropes sockets a n d pressed clips fixed g e a r : cargo runner and span eye plantes, g u y eye plates o nb o o m ends deck e y e plates o n ship hull structures derrick h e l fork lugs span e y e plates with shoes heel goosenecks with shoes built i n sheaves with strops journals, bearing axles loose gear being part o f t h e ship (slings, spreaders, hoisting crossbars, frames, etc.) ropes ( s h r o u d s , s t a y s , c a r g o r u n n e r s , s p a n ropes, tackles a n d slewing g u y pendants, preventer g u y s a n d b o o m h e a d g u y s i n u n i o n p u r c h a s e , etc.) Ship elevating platforms: platforms equipment o f platforms (guides, shoes, blocking devices, buffers, fencing a n d locking mechan­ isms, mechanical o rhydraulic drives) load-carriyng m e a n s (ropes a n d chains w i t h guides a n d attachments, leverpool system, hydraulic drives, gear racks, spindles) safety devices Type production processes AUTOMATION Integrated automation systems o f machinery installations Centralized alarm a n d monitoring systems, including computer-based systems M a i n machinery automated remote control systems: remote control systems o f m a i n internal c o m ­ bustion engines remote control systems o f m a i n machinery w i t h C P P remote control systems o f m a i n steam turbine installations remote control systems o fazimuth propulsion thrusters control systems o f ship a n d M O D U dynamic positioning systems computer-based systems, associated software and interfaces used f o r automated control systems o f t h e thrusters with t h e u s e o f t h e single control device (joystick) o r several control devices operator panel s y s t e m with controls a n d data displays position reference systems control s y s t e m s o f a z i m u t h p o d d e d electrical propulsion plant 3 4 5 6 7 8 9 P — с — р р — P СТО с к р р р — P P P P P P — сто — — — — — — с СЗ СЗ СЗ СЗ СЗ — к — — — — — р р — — — — р — р — — — — р — р — — — — — P сто СЗ к р р — P сто СЗ — — р — P сто СЗ — р р — P P P P P P P сто сто сто сто сто сто — СЗ СЗ СЗ СЗ СЗ СЗ СЗ — — — — — — к р р р р р — р р р р р р р р — — — — — — — P — СЗ — р р — P P P сто — — с СЗ СЗ к — — р р р р р р — — — P — СЗ — р р — P — — СЗ — — — — р — р — — — P сто* с — р р р P сто* с — р р р P — с — р р р P P — — с с — — р р р р р р P — с — р р р P — с — р р р P сто* с — р р р P сто* с — р р р P P сто* сто* сто с — — р р р р р р 78 Rules for Technical Supervision during Construction of Ships and Manufacture 1 15030700 15030800 15030900 15031000 15040000 15040100 15040200 15040300 15040400 15050000 15050100 15050200 15050300 15050400 15060000 15060100 15060200 15060300 15060400 15060500 15070000 15070100 15070200 15070300 15070400 15070500 15080000 15090000 15090100 15090200 15090300 15090400 15090500 15090600 15090700 15100000 15100101 15100102 15100103 2 automated control systems o f self-elevating M O D U jacking mechanisms remote control and monitoring systems o f semisubmersible M O D U ballast systems remote control systems o f azimuth and tunnel thrusters stabilization a n d hull-position control systems o f h i g h - s p e e d craft P o w e r plant control systems: remote automated starting a n d stopping s y s t e m s o f diesel generators remote automated starting a n d stopping s y s t e m s o f turbo-generators remote automated starting a n d stopping s y s t e m s o f shaft generators (where coupling control system is provided) a u t o m a t e d electric p o w e r p l a n t s y s t e m s Boiler installation control systems: automated control systems o f m a i n boiler installations automated control systems o f auxiliary steam boiler installations automated control systems o f exhaust boiler installations automated control systems o fhot-water boiler installations Control systems o fauxiliary machinery: automated control systems o f compressors automated control systems o f separators a u t o m a t e d control s y s t e m s o f filters automated control systems o f p u m p s (oil, fuel, cooling, etc.) automated control systems o ffuel preparation (temperature, viscosity) R e m o t e control o f ship systems a n d r e m o t e level gauges: remote control systems o f p u m p s a n d valves o f ballast a n d bilge systems a n d remote level gauges remote control systems o f heel and trim systems remote control systems o f o i l tankers cargo systems remote control s y s t e m s o f g a s carriers cargo s y s t e m remote control systems o f chemical tankers cargo system Control systems o f deck machinery Devices: regulating devices a sparts o fcontrol systems l i s t e d i n 15010000 t o 15080000 alarm a n d monitoring devices a s parts o f integrated a n d centralized control a n d monitor­ i n g s y s t e m s l i s t e d i n 15010000 t o 15080000 safety devices a sparts o f the systems listed i n 15010000 t o 15080000 recording devices a s parts o f the systems listed i n 15010000 t o 15080000 oil mist detectors i n crankcases o f internal combustion engines (aswell a s internal c o m ­ bustion engines bearing temperature monitors or equivalent devices f o r t h eprevention o f explosion i n the crankcase) computers a n d p r o g r a m m a b l e logic controllers electronic fuel injection a n d exhaust gas expul­ sion processes control devices f o r internal combustion engines Regulators of: level pressure temperature and Products for Ships of Materials 3 4 5 6 7 8 9 P СТО* с — р р р P СТО* с — р р р P — с — р р р P сто* с — р р р — — — — — — СЗ — — — P р р р P сто* СЗ — р р р P — СЗ — р р р СЗ р р р — — — СЗ — — — р р р P — P сто — — — P — СЗ — р р р P — СЗ — р р р P — СЗ — р р р — — — — — — — — — СЗ СЗ СЗ СЗ — — — — — — P P P P р р р р р р р р р р р р P — СЗ — р р р — — — — — — — P сто с — р р — P P сто сто* с с — — р р р р — — P P сто* сто* с с — — р р р р — — P СЗ — — — р р р — сто — — — P — — сто р р р P сто сто — р р р P сто сто — р р р P сто сто — р р р P сто* СЗ — р р р P P сто* сто* сто сто — — р р р р — — — сто сто сто — сто сто сто — — — — — — р р р р р р — — — — — P P P р Part I . General Regulations for Technical 1 15100104 15100105 15110000 15110101 15110102 15110103 15110104 15110105 15110106 15110107 15110108 15110110 15119999 15120000 15120100 15120200 15120300 15130000 15130100 15200000 16000000 16010000 16020000 16100000 17000000 17010000 17011000 17011100 17011110 17011111 17011112 17011113 17011114 17011200 17011210 17011220 17011221 17011222 17011223 17011230 17011231 17011232 17011240 17011241 17011242 17011243 17011244 17011250 17011251 17011260 17011261 17011262 Supervision 2 3 viscosity speed Sensors a n d indicators of: level pressure temperature flow salinity vibration position external force sensors gas concentration others Panels, cabinets a n d other enclosures for: control systems monitoring (alarm and indication) systems recording system Remote instrumentation E q u i p m e n t diagnostic facilities Type production processes SHIPS AND BOATS O F GLASS-REINFORCED PLASTIC Glass-reinforced plastic for hull a n d lifeboats Hull Type production processes SHIPS CARRYING LIQUIFIED GASES I N B U L K (LG CARRIERS) Materials M e m b r a n e C a r g o C o n t a i n m e n t S y s t e m - M a r k Ш: metal for m e m b r a n e s stainless steel plates (thickness < 3 m m ) (thickness > 3 m m ) stainless steel studs, nuts a n d w a s h e r s inner hull studs, nuts and washers stainless steel /angles anchor strips non-metallic materials plywood laminate fibrous materials glass w o o l glass-fiber materials polymeric materials reinforced polyurethane f o a m ( R - P U F ) low density foam (LDF) adhesive materials load bearing mastic adhesive, i sused for the insulation panel assembly adhesive for secondary barrier adhesive, i sused for bonding the secondary barrier to the p u m p t o w e r b a s e support ( P T B S ) protective a n d interlayer materials paint for inner hull protection heat insulation blocks thermal protection6 secondary barrier, rigid secondary barrier material ( R S B ) a n d flexible secondary barrier material ( F S B ) top bridge p a d s flat w a l l p a n e l s corner panels Membrane Cargo Containment System - N096: metal for m e m b r a n e s Fe-36%Ni alloy strips staples collar studs (forged) 6 6 6 6 6 79 4 5 6 СТО СТО* сто — — P P P P P P P P P P СТО сто сто сто сто сто сто сто* сто* сто — сто сто сто сто сто сто — сто сто сто сто сто сто сто сто сто сто — сто сто сто сто сто сто — — — — — — — — — — — — — — — — — — — — 8 9 р р — р р р р р р р р р р — р р р р — р р р — р р р р р р р р р р — р р р р — р — — — — — — — — — — р — — — — — — — — — — сто — — сто с — — — — — р — — — — — — — P спи с к р — — — — спи спи — — СЗ СЗ — — к к р р р р — — — — — — — — P P P P P P сто* сто* — — — сто* сто* сто* сто* сто* сто* сто сто — — — сто сто сто сто сто сто — — — — — — — — — — — р р — р р р р р р р р — — — — — — — — — — — — — — — — — — — — — — P P сто* сто* сто сто — — р р — — — — P P P — сто* сто* сто* — сто сто сто — — — — — р р р р р — — — — — — — — — — — — — — — — — — — — р р р — — — — — — P спи — — с — — к — — р р р — — — — — — P P — P P P P P P P P P P P P — — — СЗ 7 6 17011263 17011264 17011265 17012000 17012100 17012110 17012111 17012112 6 6 6 6 6 — 80 Rules for Technical Supervision during Construction of Ships and Manufacture 1 17012113 17012114 17012200 17012210 17012220 17012230 17012231 17012232 17012240 17012241 17012242 17012250 17012251 17012260 17012261 17012262 17012263 17012270 17020000 17020110MK 17020120 17020130MK 17020140MK 17020210MK 17020310MK 17030000 17030100 17030200MK 17030210MK 17030300MK 17030400MK 17030500MK 17040000 17040100 17040200 17050000 17050100 17050200 18000000 18010000 18010100 18010200 18010300 18010400 18010500 18020000 18020100 18020200 18020300 18030000 18030100 18030200 18030300 18030400 18030401 18030402 18030403 2 6 self-locked nuts spring washers non-metallic materials p l y w o o d (N096) wood screws fibrous materials glass wool glass-fibre materials adhesive materials load bearing mastic glue protective a n dinterlayer materials anti-sticking film heat insulation blocks thermal protection insulating boxes insulating material perlite Valves: cargo system valves (working temperature b e l o w - 5 5 °C) pressure relief valves o f cargo pipelines pressure relief valves o f cargo tank vent system ( w o r k i n g t e m p e r a t u r e b e l o w — 5 5 °C) v a c u u m relief valves o f cargo tanks (working t e m p e r a t u r e b e l o w —55 °C) expansion bellows f o r cargo systems (working t e m p e r a t u r e b e l o w —55 °C) cargo vapour hoses (working temperature b e l o w - 5 5 °C) Auxiliary machinery o fcargo systems: cargo transfer p u m p s (working temperature b e l o w - 5 5 °C) m a i n cargo p u m p s (working temperature below - 5 5 °C) cargo stripping p u m p s (working temperature b e l o w - 5 5 °C) portable emergency cargo pumps (working t e m p e r a t u r e b e l o w —55 °C) high duty compressors low duty compressors C a r g o v a p o u r utilization system: gas combustion unit (GCU) steam dumping arrangement cargo pressure a n dtemperature control system cargo refrigeration plant cargo reliquefaction plant N U C L E A R SHIPS A N DN U C L E A R SUPPORT VESSELS S h i p hull (additionally t o non-nuclear ships): collision structural protection stranding structural protection supporting structures a n d foundations i n t h e reactor compartment containment structures safety enclosure Nuclear reactors: hulls roofs with their securing items removable a n dnon-removable internals Cores: fuel elements fuel assembly protective covers rods: emergency shutdown rods burnable poison rods shim rods 6 6 6 6 6 6 6 6 6 6 6 and Products for Ships of Materials 3 4 5 6 7 8 9 — — — — — — — — р р — — — — P P P P P СТО* — — — — сто* — — сто* сто* сто* — — — — сто — — — — сто — — сто сто сто — — — — — — — — — — — — — — — — — — — р р — р р р — — р р р р р р р P сто СЗ к р — — — — — — — — — — — — — — — — р — — — — — — — — — — — — — — — — р P P сто сто СЗ СЗ к к р р р р — р P сто СЗ к р р — P сто СЗ к р р р P сто СЗ к р р — — P — — — СЗ — к — р — р — р P сто с к р р р P сто с к р р р P сто СЗ к р р р P P P P — — — — — — — — с с — СЗ СЗ — с с — к к — к к р р — р р — р р р р — р р — р р — — — р р — р р P P P P — — — — — — — — — — — — р р р р р — — — р — — — P P P P P P P P P P P P P P — — — — — — — — — — — — — — — — с с с с с с с с с с с с — — к к к к — — — — — — — — р р р р р р р р р р р р р р р р р — — — р — — — — — — — — — р — — — р — — — — — — — — — P P P — — P P P — P P — Part I . General 1 18030500 18040100 18040200 18040300 18040400 18040401 18040402 18040403 18040404 18040405 18040406 18050000 18050100 18050200 18050300 18050500 18050600 18050700 18050800 18050900 18051000 18051100 18051200 18051300 18051400 18051500 18060000 18060100 18060101 18060102 18060106 18060200 18060300 18060400 18060500 18060600 18060700 18060800 18060900 18061000 18061100 18061200 18070000 18070100 18070200 18070300 18070400 18070500 18070600 18070700 18070800 18070900 18071000 18071100 18071200 Regulations for Technical Supervision 81 2 3 4 5 6 7 8 9 working neutron sources automatic a n d remote control a n d protective systems o f nuclear reactors automatic monitoring a n d alarm systems o f nuclear reactors automatic a n d remote control, protection, m o n ­ itoring a n d alarm systems o f N S S S control, protection, monitoring a n dalarm d e ­ vices o f N S S S drives and actuating mechanisms o f automatic and remote controls drives a n d actuating m e c h a n i s m s o f emergency protection o f automatic and remote control measuring equipment o fnuclear reactor p o w e r level gauges thermocouples and resistance thermometers N S S S parameter transducers N S S S machinery: primary coolant circulating p u m p s fresh w a t e r p u m p s f o r e q u i p m e n t c o o l i n g a n d protection sea water p u m p s for equipment cooling p u m p s a n d ejectors o f N S S S space drainage system p u m p s o fprimary coolant m a k e - u p system p u m p s o f emergency core cooling s y s t e m p u m p s o f automation hydraulic system p u m p s o fresidual heat removal system sorbent transfer p u m p s high-pressure gas compressors controlled area fans high pressure air compressors m e d i u m pressure air compressors vacuum compressors H e a t exchangers a n d pressure vessels: steam generators: housings tube systems fittings pressure compensators filters: p r i m a r y c i r c u i t , p r i m a r y c o o l a n t filling a n d m a k e - u p s y s t e m , fresh w a t e r c o o l i n g s y s t e m , r a d i o ­ active drainage a n d process water treatment s y s t e m s h e a t e x c h a n g e r s o f fresh w a t e r c o o l i n g a n d protection circuit air coolers sludge collecting tanks o f p r i m a r y circuit a n d fresh w a t e r c o o l i n g a n d p r o t e c t i o n s y s t e m filters c o o l e r s o f p r i m a r y c i r c u i t filters drainage and collecting tanks gas a n d air bottles pneumatic and hydraulic receivers steel-water protection tanks first c i r c u i t r e c u p e r a t i v e h e a t e x c h a n g e r s N S S S systems: primary coolant circulation system primary coolant purification system primary coolant make-up system residual heat removal system core e m e r g e n c y cooling s y s t e m primary coolant sampling system deaeration system primary coolant drainage system pressure compensation system secondary circuit fresh w a t e r s y s t e m f o r e q u i p m e n t a n d p r o t e c t i o n drives cooling sea water cooling system P P — — С С — — р р — — — — P — С — р р р P — с — р р р P — — — р р р P — с к р р р P — с к р р р P P P P — — — — с с с с к к к к р р р р р р р р р р р р P P — — с с к к р р р р р р P P — — с с — — р р р р р р P P P P P P P P P P — — — — — — — — — — с с с с с с с с с с к к к к — к — к к к р р р р р р р р р р р р р р р р р р р р — — P P P P P P — — — — — — с с с с с с к к к к к к р р р р р р P — с — р р P P — — с с — — р р р р — — P P P P P P — — — — — — с с с с с с к к к — к к р р р р р р р р р р р р — — — — P P P P P P P P P P P — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р р р р р р р р р р р р р р р р р P — — — р р р р — р р — — р р р — — — — — р р р р р р р р р р р р — р — — р — р р 82 Rules for Technical Supervision during Construction of Ships and Manufacture 1 18071300 18071400 18071500 18071600 18071700 18071800 18071900 18072000 18080000 18090000 18100000 18110000 18110100 18110200 18110300 18120000 19000000MK 19020200MK 19030100MK 19030202MK 19040000MK 19050000MK 19060000MK 19060100MK 19060200MK 19060300MK 19060400MK 19070000MK 19070100MK 19070200MK 19080000MK 19080100MK 19080200MK 19080300MK 19090000MK 19090001MK 19100000MK 19110000MK 19120000MK 19130000MK 19140000MK 19150000MK 19160000MK 19170000MK 19170100MK 19170300MK 19180000MK 19210000MK 19220000MK 2 v e n t i l a t i o n a n d a i r filtering s y s t e m radioactive liquid a n d solid collection, storage and handling system N S S S space drainage system sorbent handling system explosive mixture removal system fitting a u t o m a t i o n a n d c o n t r o l h y d r a u l i c s y s t e m radioactive drainage a n dprocess water purifica­ tion system pressure reduction i n containment NSSS fittings Radiation monitoring system a n d means Protection means against radioactive radiation a n d radioactive substance spreading L i q u i d radioactive waste treatment equipment Shielding F u e l a s s e m b l y storage facilities Core handling equipment C o m p l e x o f engineering a n dtechnical m e a n s o f physical protection EQUIPMENT A N D ARRANGEMENTS FOR T H E PREVENTION O F POLLUTION F R O M SHIPS 15 p p m b i l g e s e p a r a t o r s ( r e s o l u t i o n M E P C . 1 0 7 ( 4 9 ) ) Oil discharge monitoring a n d control systems f o r o i l t a n k e r s ( r e s o l u t i o n M E P C . 108(49) a s a m e n d e d ) 15 p p m b i l g e a l a r m s ( r e s o l u t i o n M E P C . 1 0 7 ( 4 9 ) ) Oil/water interface detectors i n slop tanks Pumping, piping a n ddischarge arrangements f o r oily water Tanks: segregated ballast tanks slop tanks cargo tanks holding tanks Washing systems: washing machines washing machine drive units Incinerators Spark-arresters i n exhaust-gas systems a n d uptakes o f incinerators S u p p l y a n d exhaust ventilation facilities Oil residues processing s y s t e m (tank f o r m i x i n g o i l residues with fuel o i l , o i l residues preheating system, homogenization system) S e w a g e treatment plants (resolution MEPC.227(64)) S e w a g e t r e a t m e n t p l a n t s ( r e s o l u t i o n M E P C . 159(55)) Sewage comminution a n ddisinfection systems Sewage holding tanks S e w a g e p u m p s (ejectors) Sewage disposal a n d discharge systems Garbage treatment plants Garbage containers Equipment a n d arrangements f o r prevention o f pollution b y noxious liquid substances Equipment a n darrangements forprevention o f air pollution Diesel engine exhaust g a s cleaning systems i n accordance with the requirements o f I M O resolution MEPC.184(59), the survey under Scheme A . Sampling equipment Substances a n dmeans formuster and liquidation o f spillings o f oil a n d oil-products Oily waters deep purification plants including 5 p p m bilge separator, 5 p p mbilge alarm a n d automatic stopping device Ballast water management systems (resolu­ t i o n M E P C . 174(58)) and Products for Ships of Materials 3 4 5 6 P P — — — — P P P P P — — — — — P P P P 7 8 9 — — р р р р р р — — — — — — — — — — р р р р р р р р р р — — р р — — — — — — с с с — к — — р р р р р р р р — р р р P P P P P — — — — — с — с с с к — к к — р р р р р р р р р р — р — — р P P COTO COTO СЗ СЗ — — р р р р р р P P COTO СОТИ — — — — — р р р р р р р р — — — — — — — — — — — — — — — — — — — — — — — — р р р р р р р р р — — — — р р р р р — — — — — — — р р — — р р р р р — СЗ — — — — — — — — — р р р р р р р р р р р р — р р р — р р р — — — — — — — СЗ, сото сз,соти — — — — — — СЗ СЗ СЗ, сото P COTO — — СЗ P — — СЗ — P P P — — — P — P COTO COTO — — — — — — — — сз,сото СЗ, сото СЗ — СЗ — СЗ — P сто сто — р — — P P сто сто СЗ сто — — р — р — — — — сто — — — — — р р р P P сото СЗ, сото Part I . General 20000000 20100000 20200000 20300000 Regulations for Technical Supervision COMPUTER SOFTWARE (PROGRAMMES FOR COMPUTER-AIDED CALCULATIONS) S h i p theory a n dstrength p r o g r a m m e s f o r computer-aided calculations Mashinery programmes f o r computer-aided calculations Electrical equipment and automation programmes for computer-aided calculations 83 СТОП СТОП СТОП СТОП СТОП СТОП ' T y p e o f technical supervision i s subject to special review b y the Register. F o r type items only. " C 3 " i s acceptable for internal c o m b u s t i o n e n g i n e s w i t h a c y l i n d e r d i a m e t e r o f 300 m m a n d under, "in case t h e set i s delivered i n assembly. I n c a s e o f d e l i v e r y a p a r t f r o m the set. d e l i v e r y o f materials w i t h t h e manufacturer's certificates. T e c h n i c a l s u p e r v i s i o n s h a l l b e carried out i n c o m p l i a n c e w i t h t h e technical documentation approved b y the Register. W h e n a d o c u m e n t e d quality s y s t e m covering the process o f manufacture, testing, a n d quality control o f the items o f technical supervision a p p r o v e d b y the R e g i s t e r o r recognised competent organization i s available a t the manufacturer. F o r i n t e r n a l c o m b u s t i o n e n g i n e s w i t h p o w e r o u t p u t o v e r 1000 k W . 2 3 5 7 8 84 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for APPENDIX Ships 2 INSTRUCTIONS ON BRANDING OF ITEMS OF T H E REGISTER TECHNICAL SUPERVISION 1 GENERAL 1.1 T h e s e I n s t r u c t i o n s s u p p l e m e n t a n d e x p l a i n t h e R S N o m e n c l a t u r e (refer t o A p p e n d i x 1). under the Register standards or to r e n e w the products parts o n ships i n service. 1.2 I n t h e c o u r s e o f m a n u f a c t u r e o f c e r t a i n m a t e r i a l s , products a n d their parts under technical supervision o f t h e S u r v e y o r t o t h e R e g i s t e r a n d t h e firm ( m a n u f a c t u r e r ) technical personnel i n accordance w i t h the Agreement o n S u r v e y ( C O ) (refer t o 4 . 5 o f t h e present Part), these materials, products and parts as w e l l as samples taken t h e r e f r o m shall b e branded a t certain stages o f their manufacture w i t h appropriate brands o f the Register. 1.6 I n c a s e i t i s f o u n d i n t h e c o u r s e o f f u r t h e r processing, assembly o r installation at the shipyard that the material, product o r part is defective o r does n o t c o m p l y w i t h t h e R S rules o r other R S normative documents, as w e l l as w i t h the technical documentation approved b y the Register, it m a y b e rejected, irrespective o f the presence o fthe R e g i s t e r brand. I n this case, t h e Register brand shall b e cancelled. 1.3 M a t e r i a l s , p r o d u c t s a n d p a r t s s u b j e c t t o b r a n d i n g b y the Register are identified i n the R S N o m e n c l a t u r e . The cancellation o f the brands shall b e done i n the presence o f t h e Surveyor t o t h e Register, t h e f i r m (manufacturer) technical personnel authorized under the Agreement o nSurvey ( C O ) t o d o branding. 1.4 T h e p u r p o s e o f b r a n d i n g m a t e r i a l s , p r o d u c t s a n d parts shall m a k e sure i n the course o f subsequent surveys that they w e r e properly checked b y the Register. 1.5 A l l t h e p r o v i s i o n s o f t h e s e I n s t r u c t i o n s e q u a l l y refer t o all spare parts, irrespective o f the fact w h e t h e r they have been produced for a newbuilding constructed and 1.7 A l l t h e p r o v i s i o n s o f t h e s e I n s t r u c t i o n s e q u a l l y r e f e r t o S u r v e y o r s t o t h e R e g i s t e r a n d t h e firm ( m a n u f a c turer) technical personnel i n accordance w i t h t h e Agreem e n t o n S u r v e y ( C O ) (refer t o 4.5 o f the present Part), as w e l l a s t o o f f i c i a l s o f t h e firms ( m a n u f a c t u r e s ) . 2 T Y P E S O F T H ER E G I S T E R BRANDS 2.1 T h e R e g i s t e r b r a n d s a r e s u b d i v i d e d i n t o t h e brands o f Surveyor t othe Register and those o f the f i r m (manufacturer) technical personnel i n accordance w i t h the A g r e e m e n t o n S u r v e y ( C O ) (refer t o 4 . 5 o f t h e present Part). T h e appearance o f the brands is the same w i t h a difference that brands o f the f i r m (manufacturer) technical personnel i n accordance w i t h the Agreement o n S u r v e y ( C O ) (refer to 4.5 o f the present Part) have a line under the brand. o f t h e present Part) — b y t h e f i r m ( m a n u f a c t u r e r ) technical personnel i n accordance w i t h t h e Agreem e n t o n Survey ( C O ) (refer t o 4 . 5 o f t h e present Part). Brands o f the Surveyor to the Register shall b e used for branding b y the S u r v e y o r s t o the Register, brands o f the f i r m (manufacturer) technical personnel i n accordance w i t h the A g r e e m e n t o nS u r v e y ( C O ) (refer t o 4 . 5 2.4 T h e b r a n d s m a y b e o f p r e l i m i n a r y o r f i n a l n a t u r e . T h e i m p r i n t s o f b r a n d s are s h o w n i n F i g s . 2.4-1 a n d 2.4-2. 2.5 T h e p r e l i m i n a r y b r a n d s o f t h e S u r v e y o r t o t h e Register and the firm (manufacturer) technical personnel 2.2 F o r b r a n d i n g m a t e r i a l s , p r o d u c t s a n d p a r t s , u s e i s made o f brands, stamps and punches. 2.3 B r a n d s a r e u s e d f o r b r a n d i n g m a t e r i a l s , p r o d u c t s and parts m a d e o fm e t a l o r material enabling t o p u t a durable brand imprint. a) F i g . 2.4-1 I m p r i n t s p e c i m e n s o f p r e l i m i n a r y b r a n d s : a) — S u r v e y o r t o t h e R e g i s t e r ; b) — t h e f i r m ( m a n u f a c t u r e r ) t e c h n i c a l p e r s o n n e l i n a c c o r d a n c e w i t h t h e A g r e e m e n t o n S u r v e y ( C O ) ( r e f e r t o 4.5 o f t h e p r e s e n t P a r t ) F i g . 2.4-2 I m p r i n t s p e c i m e n s o f f i n a l b r a n d s a n d p u n c h e s : a) — S u r v e y o r t o t h e R e g i s t e r ; b) — t h e f i r m ( m a n u f a c t u r e r ) t e c h n i c a l p e r s o n n e l i n a c c o r d a n c e w i t h t h e A g r e e m e n t o n S u r v e y ( C O ) ( r e f e r t o 4.5 o f t h e p r e s e n t P a r t ) Part I . General Regulations for Technical Supervision 85 i n accordance w i t h the A g r e e m e n t o n S u r v e y ( C O ) (refer to 4.5 o f the present Part) are p u t o n : . 1 test specimens a n dproducts, f r o m w h i c h these specimens a r e t a k e n f o r m e c h a n i c a l tests a n d e x a m i n a tions; .2 products a n d parts, w h i c h p r o d u c t i o n process h a s not been completed, subject t o further treatment. 2 . 6 T h e final b r a n d o f t h e S u r v e y o r t o t h e R e g i s t e r a n d t h e firm ( m a n u f a c t u r e r ) t e c h n i c a l p e r s o n n e l i n a c c o r d a n c e w i t h t h e A g r e e m e n t o n S u r v e y ( C O ) (refer t o 4 . 5 o f the p r e s e n t P a r t ) i s p u t o n finished m a t e r i a l s , p r o d u c t s o r p a r t s , manufactured, surveyed a n d tested i n compliance w i t h the R S rules and other R S normative documents and technical documentation approved b y the Register. 2.7 I n case materials, products o r parts bearing brands are rejected, the b r a n d i m p r i n t shall b e destroyed. 2.8 T h e Surveyor's stamp is used for branding w i t h indelible paint o f non-metal products made o f materials where t h ebrand impression cannot b e preserved for a l o n g t i m e , b u t the area available i se n o u g h to p u t a stamp (lifebuoys, lifejackets, inflatable liferafts, etc.). F i g . 2.9 Imprint specimen o f Surveyor's stamp 2.9 T h e Register stamp i m p r i n t is s h o w n i n F i g . 2.9. 2.10 I n case the product i srejected after a stamp h a s been put thereon, the w h o l e imprint shall b e filled w i t h the indelible paint. 2.11 T h e Register seals a r e intended f o r such products and parts w h e r e a brand o r stamp cannot b e directly placed as w e l l as for sealing safety devices. 2.12 B r a n d a n d p u n c h i m p r i n t s are s h o w n i n F i g . 2.4-2. 2.13 I n case a p r o d u c t after sealing i s rejected, t h e seal shall b e r e m o v e d . 3 G E N E R A L INSTRUCTIONS ON BRANDS AND BRANDING 3.1 Presence o f brands o f t h e Surveyor t o t h e Register o r the f i r m (manufacturer) technical personnel i n accordance w i t h the A g r e e m e n t o n S u r v e y ( C O ) (refer to 4.5 o f the present Part) o nthe materials and products does n o trelieve t h e supplier f r o m presentation o f the documents required b y the Register. 3.2 T h e Register does n o t p u t its b r a n d o nthe parts after repair. 3.3 B r a n d s , stamps a n d sealer p u n c h e s shall b e k e p t b y t h e S u r v e y o r s t o t h e R e g i s t e r a n d t h e firm ( m a n u f a c t u r e r ) technical personnel i naccordance w i t h the Agreement o n S u r v e y ( C O ) (refer t o 4 . 5 o f t h e present Part) under coinditions preventing t h e m f r o m a n authorized use. 3.4 B r a n d s , stamps a n d sealer p u n c h e s shall b e handed i n to the Surveyors to the Register b y the H e a d o f the R S B r a n c h O f f i c e or his D e p u t y against receipt. I n s o doing, a n i m p r i n t o fthe handed i n stamp o r p u n c h is made i n t h e statement f o r their handing. T h e f i r m (manufacturer) technical personnel i n accordance w i t h the A g r e e m e n t o n S u r v e y ( C O ) (refer t o 4 . 5 o f t h e present Part) receive brands, stamps a n d sealer p u n c h e s from R H O o r t h eR S Branch Office according t o t h e concluded Agreements o nSurvey (CO). 3.5 T h e decision o n ordering n e w brands, stamps a n d sealer p u n c h e s i s t a k e n b y R H O . 3.6 B r a n d i n g o f materials, products a n d parts shall b e done i n the presence and u p o n instructions o f the Surveyor to t h e Register, t h e f i r m (manufacturer) technical personnel i naccordance w i t h the Agreement o n Survey ( C O ) (refer t o 4.5 o f the present Part). 3.7 I ncase a technical c o n t r o l b o d y i s available a t the f i r m (manufacturer), finished materials, products and parts shall b e checked a n d t h e n branded b ythis technical control body before submission t o t h e Surveyor t o t h e Register. 3.8 T h e n u m b e r o f cast, o r d i n a l n u m b e r o f t h e specimen, brand o f t h e technical control body a n d preliminary brand o f the Surveyor t othe Register o r the firm (manufacturer) technical personnel i n accordance w i t h the A g r e e m e n t o n S u r v e y ( C O ) (refer t o 4.5 o f the present Part) shall b e p u n c h e d o n t h e test specimens produced for testing mechanical properties o f materials and samples. 3.9 Brands shall b e generally p u t o n materials, products a n d parts i n readily accessible places i nsuch a w a y that t h e y c a nb e easily f o u n d after installation o n board the ship. 3.10 A l l finished products shall b e provided w i t h manufacturer's m a r k i n g , w h i c h shall consist o f a serial number and the year o f manufacture. T h e details o f manufacturer's m a r k i n g o f s o m e products a r eg i v e n i n S e c t i o n 5 . M a r k i n g m a y b e applied o n identification plates o r directly o nthe products. T h e final brand o f the Register shall b e located underneath t h e m a r k i n g o n t h e righth a n d side. W h e r e i t is difficult to f i n d the places o f m a r k i n g a n d b r a n d s (plates, r o l l e d products, forgings, castings, etc.), the brand shall b e put i n the frame m a d e w i t h a contrast paint. 86 Rules for Technical Supervision during Construction of Ships and Manufacture 3.11 I n b r a n d i n g t h e p r o d u c t s t o u n d e r g o f u r t h e r m a c h i n i n g the b r a n d shall b e p u t i n spots, w h i c h w i l l n o t b e m a c h i n e d later. I f i t i s i m p r a c t i c a b l e , t h e b r a n d s h a l l be transferred i n t h e course o fm a c h i n i n g as stated i n Section 4 . 3.12 F i n i s h e d p r o d u c t s a n d p r o d u c t s , w h i c h m a n u facturing process has n o t been completed and w h i c h shall undergo further machining at other firms (manufac- of Materials and Products for Ships turers), i n case the products bear the Register brand, shall be provided w i t h a certificate o r another appropriate document. Such documents shall bear a n imprint o f the brand (stamp), w h i c h has been put o n the product. I fthere is n o place specially p r o v i d e d f o r the imprint, t h elatter shall be p u t i n t h e b o t t o m part o f t h e f o r m above t h e Surveyor's signature. 4 TRANSFER OF BRANDS 4.1 T h e R e g i s t e r b r a n d s s h a l l b e p r e s e r v e d i n a n y treatment o r assembly o f the parts. W h e r e brands shall b e cut because o f the processing conditions, they shall b e transferred t o another place. F o r this purpose m a n u f a c turer's m a r k i n g shall b e transferred t o a n e w place, a n d then the part shall b e presented t o t h eSurveyor t o t h e Register for transference o f the brand. 4.2 I n c a s e t h e b r a n d s h a l l b e t r a n s f e r r e d i n t h e process o f treatment o f the part i nn o n - w o r k i n g t i m e o f the Surveyor, the manufacturer shall i n f o r m the Surveyor in advance, indicating t h e part a n d manufacturer's marking. 4.3 I n p a r t i c u l a r c a s e s , t h e S u r v e y o r m a y a l l o w t o c u t the brand and t o transfer manufacturer's m a r k i n g o f the part t o a n e w place under supervision o f a f i r m ( m a n u f a c t u r e r ) supervisor. I ns u c h cases, the supervisor shall m a k e a n entry i nthe workshop's log, draw u p a report and p u t his brand o nthe part. Based o n l o g entry o r report a n d t h e firm (manufacturer) supervisor brand, t h e Surveyor t ot h e Register puts a n e w Register brand o nthe part. 5 BRANDING AND MARKING 5.1 MATERIALS 5.1.1 M a r k i n g o f t h e m a t e r i a l s s h a l l b e d o n e i n accordance w i t h the firm (manufacturer) current regulations w i t h a m a n d a t o r y account o fthe requirements o f the R S rules. 5.1.2 S t e e l p l a t e s , e v e r y o n e o f w h i c h r e q u i r e s t o b e tested according to the R S rules, are subject t o m a n d a t o r y branding. B r a n d i n g o fo t h e r steels i s d o n e i n cases specially p r o v i d e d b y the Register o r o ncustomer's request. 5.2 CASTINGS 5.2.1 G a t e d s a m p l e s o r c a s t i n g s i n p l a c e s w h e r e specimens aretaken shall b e marked w i t h t h e Register preliminary brand. 5.2.2 I n c a s e o f s e p a r a t e l y c a s t s a m p l e s , p o u r e d together w i t h the specimens a r esteel tags, o nw h i c h the n u m b e r s o f the cast a n d p o u r i n g w h e r e f r o m specimens are taken, shall b e p u n c h e d b y the technical c o n t r o l b o d y o f t h e f i r m (manufacturer). U p o n extraction o ft h e samples out o f the m o u l d the Register preliminary brand shall b e put thereupon. 5.2.3 U p o n s a t i s f a c t o r y r e s u l t s o f t h e s p e c i m e n t e s t s and survey a preliminary brand o f the Register isput o n o n e o f t h e c a s t i n g ends, n e x t t o t h e n u m b e r o f t h e cast. PLACES 5.3 S T E E L FORGINGS 5.3.1 U p o n s a t i s f a c t o r y r e s u l t s o f t h e s p e c i m e n t e s t s and survey, a preliminary brand o f the Register isput o n o n e o f t h e f o r g i n g ends, n e x t t o t h e n u m b e r o f t h e cast. 5.4 S H I P ' S ARRANGEMENTS 5.4.1 S t e e r i n g g e a r . 5.4.1.1 U p o n c o m p l e t i o n o f b e n c h tests o f t h e g e a r (engine) atthe firm (manufacturer) the final brand o f the Register is put o n the manufacturer's plate o f the steering gear. T h e rudder stock m o m e n t value shall b e mandatorily indicated o nthe manufacturer's plate. 5.4.1.2 T h e f i n a l b r a n d o f t h e R e g i s t e r i s p u t o n t h e f o l l o w i n g places o f finally processed rudder stocks, rudder spindles o f " S i m p l e x " type and pintles: upper butt surface o f rudder stocks, flange surface o f rudder spindles o f " S i m p l e x " type and upper butt surface o f the pintles. 5.4.2 A n c h o r a r r a n g e m e n t U p o n c o m p l e t i o n o f b e n c h tests o f w i n d l a s s e s a n d anchor capstans at t h e f i r m (manufacturer), t h e final b r a n d o f the R e g i s t e r is p u t o n the manufacturer's plate o f windlasses and anchor capstans. T h e chain cable diameter shall b e mandatorily indicated o nthe manufacturer's plate. Part I . General Regulations for Technical Supervision 5.4.3 A n c h o r s . 5.4.3.1 T h e f o l l o w i n g d a t a s h a l l b e p u n c h e d o r cast o n every anchor i nplaces specially provided for m a r k i n g ( o f circular o r square shape): t h e f i r m (manufacturer) trademark, mass o ft h e anchor i n assembly, manufac­ turer's n u m b e r , final b r a n d o f t h e Register — i n circle; y e a r o f t e s t a n d final b r a n d o f t h e R e g i s t e r — i n s q u a r e . 5.4.3.2 O n H a l l ' s a n c h o r s , t h e c i r c l e f o r m a r k i n g shall b e p r o v i d e d o no n e o ft h e anchor flukes, t h e square — o n t h e other fluke a n d i nt h eupper part o fthe anchor shank. T h e mass o f t h e assembled anchor shall b e additionally cast o rp u n c h e d o nt h e shank. 5.4.3.3 O n a d m i r a l t y a n c h o r s , a l l t h e m a r k i n g s h a l l be punched i n place w h e r e t h e shank is attached t o t h e flukes; o n welded anchors — o n t h e fluke b e l o w t h e w e l d i n g line. T h e mass o f the anchor shall b epunched o n the stock. 5.4.4 A n c h o r c h a i n c a b l e s . T h e m a r k i n g o fchain cable shall b e done o n e n d links o f every length a n d shall include t h e certificate number, chain cable grade a n d t h e Register brand. T h e location o fm a r k i n g shall b e as s h o w n i n F i g . 5.4.4. 87 5.5.1.2 U p o n c o m p l e t i o n o f a l l t h e r e q u i r e d t e s t s a n d surveys a l llife-saving appliances shall b e m a r k e d i n order as setforth under 5.5.2 t o 5.5.6. 5.5.2 L i f e b o a t s . 5.5.2.1 O n e a c h s i d e o f t h e l i f e b o a t ' s b o w t h e following information shall b e marked: the n u m b e r o f persons, f o rw h i c h t h e lifeboat is approved ( i n clear permanent characters w i t h t h e indelible paint); the n a m e a n dport o f registry o fthe ship, t ow h i c h t h e lifeboat belongs ( i n b l o c k capitals o f t h e R o m a n alphabet). M a r k i n g permitting t oidentify t h eship, t o w h i c h t h e lifeboat belongs, a n d t h e lifeboat n u m b e r shall b e made in such a w a y that i tis visible f r o m above. 5.5.2.2 O n e x t e r i o r o f e v e r y l i f e b o a t i n accessible p l a c e above t h e waterline a m e t a l plate m a d e o f anti-corrosive m a t e r i a l s h a l l b e secured c o n t a i n i n g t h e f o l l o w i n g data: manufacturer's name o r trademark; n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " letters a n d n u m b e r o f t h e certificate issued b y t h e Register t ot h e lifeboat; serial number; n u m b e r o fpersons permitted t ob e accommodated; date o f survey; final brand o fthe Register. 5.5.3 R i g i d a n d i n f l a t a b l e l i f e r a f t s . 5.5.3.1 O n t h e e x t e r i o r o f e v e r y l i f e r a f t t h e f o l l o w i n g information shall b e permanently marked with t h e indelible paint: Certificate N o . n a m e a n d port o f registry o f t h e ship, t o w h i c h t h e liferaft belongs (for inflatable liferafts, n a m e a n d port o f registry o f t h e ship shall b e m a r k e d i nsuch a f o r m that the ship identification c a n b e changed anytime w i t h o u t opening the container); C h a i n cable grade B r a n d of the Register F i g . 5.4.4 E v e r y part o f t h e chain cable shall b e m a r k e d , t h e m a r k i n g shall include t h e certificate number, chain cable grade a n d t h e Register brand. 5.5 L I F E - S A V I N G APPLIANCES 5.5.1 L a u n c h i n g a p p l i a n c e s . 5.5.1.1 U p o n t e s t i n g a n d s u r v e y o f d a v i t s o r o t h e r launching appliances t h e f o l l o w i n g shall b e m a r k e d thereupon: permissible w o r k i n g load; date o f test; final b r a n d o f t h e R e g i s t e r . n u m b e r o fpersons permitted t o b e a c c o m m o d a t e d o v e r each entrance i n characters n o tless t h a n 1 0 0m m i n height o f a c o l o u r contrasting w i t h that o ft h e liferaft; word " S O L A S " a n d type enclosed (for rigid liferafts); o f emergency pack launching instructions ( f o r rigid liferafts); length o fpainter ( f o r rigid liferafts); m a x i m u m permitted height o fstowage above waterline ( f o r rigid liferafts). 5.5.3.2 O n t h e i n n e r s i d e o f e v e r y l i f e r a f t t h e p l a t e made o f t h e material, w h i c h does n o tbecome unfit f o r use t h r o u g h o u t t h e service life o ft h e liferaft, shall b e secured, containing t h e f o l l o w i n g i n f o r m a t i o n m a r k e d w i t h t h e indelible paint o r i n some other suitable w a y : manufacturer's name o r trademark; serial number; n u m b e r o ft h e certificate issued b y t h eRegister t o the liferaft w i t h " R S " letters; date o fmanufacture ( m o n t h a n d year); final brand o rstamp o fthe Register; n a m e a n d place o f serving station w h e r e i tw a s last surveyed ( f o r inflatable liferafts). 88 Rules for Technical Supervision during Construction of Ships and Manufacture 5.5.4 C o n t a i n e r s f o r i n f l a t a b l e l i f e r a f t s . I n t h earea o fa pocket o fa soft container o r n e x t t o a lock o fa rigid container the following information shall be m a r k e d w i t h the indelible black o r other contrasting colour paint: manufacturer's name o r trademark; serial number; " R S " letters a n d n u m b e r o f T y p e A p p r o v a l Certifi­ c a t e (СТО); n u m b e r o fpersons permitted t ob e accommodated; word "SOLAS"; type o f emergency pack enclosed; date a n d place o ft h e latest servicing; length o f painter; m a x i m u m permitted height o fstowage above waterline; stamp o fthe Register. 5.5.5 L i f e b u o y s . O n t h e flat part o f lifebuoys t h e manufacturer's n a m e o r its t r a d e m a r k , t h e date o f m a n u f a c t u r e , n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " l e t t e r s a n d t h e Register stamp shall b e marked w i t h t h e indelible paint 5.5.6 L i f e j a c k e t s , i m m e r s i o n s u i t s , suits a n d t h e r m a l protective aids. antiexposure I n conspicuous places o f lifejackets, i m m e r s i o n suits, antiexposure suits a n d t h e r m a l protective aids manufacturer's n a m e o r its trademark t h e date o fmanufacture, n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " l e t t e r s a n d t h e Register stamp shall b e m a r k e d w i t h t h e indelible paint. 5.5.7 R e s c u e / f a s t r e s c u e b o a t s ( r i g i d , i n f l a t e d a n d combined). M a r k i n g a n d b r a n d i n g o f rescue/fast rescue boats shall c o m p l y w i t h t h e requirements o f5.5.2, except that the m e t a l plate mentioned i n 5.5.2.2 shall b e secured o n the inner side o ft h e upper part o ft h e boat transom. 5.5.8 H y d r o s t a t i c r e l e a s e u n i t s . Hydrostatic release u n i t shall b ep e r m a n e n t l y o n its exterior o rhave identification plate made corrosive material, w h i c h does n o tbecome unfit throughout t h e service life o ft h e unit, securely to t h e unit, w i t h t h e f o l l o w i n g data: marked o f antifor use attached manufacturer's name o r trademark; type o fthe unit; serial number; n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " letters; date o f manufacture: w h e t h e r t h e u n i t i s suitable f o r u s e w i t h a liferaft w i t h a capacity o fm o r e than 2 5 persons; i f disposable, exact e x p i r y date shall b e marked. 5.5.9 A u t o m a t i c g a s i n f l a t i o n s y s t e m f o r i n f l a t a b l e liferafts, m a r i n e evacuation systems, m e a n s o f rescue. 5.5.9.1 A u t o m a t i c g a s i n f l a t i o n s y s t e m s h a l l b e permanently m a r k e d o n a securely attached identification plate made o f anti-corrosive material, w h i c h does n o t b e c o m e unfit f o r u s e t h r o u g h o u t t h e service life o ft h e s y s t e m , w i t h t h e f o l l o w i n g data: of Materials and Products for Ships manufacturer's name o r trademark; type o fthe system; serial number; n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " letters; date o f manufacture. 5.5.9.2 O n t h e u p p e r s p h e r i c a l o r c y l i n d r i c a l p a r t o f t h e pressure vessels u p o n c o m p l e t i o n o f h y d r a u l i c tests the following information shall b e clearly marked: firm (manufacturer) trademark; manufacturer's number; capacity o rw o r k i n g pressure; date o f last testing; final brand o fthe Register. 5.5.10 M e a n s o f r e s c u e . 5.5.10.1 A n i n f l a t a b l e m e a n s o f r e s c u e s h a l l b e m a r k e d as s e t f o r t h u n d e r 5 . 5 . 3 . 2 . T h e m a r k i n g s h a l l c o n t a i n a l s o the n u m b e r o f persons permitted t o b e accommodated. Provision shall b e made for m a r k i n g t h e inflatable means o f rescue w i t h t h e n a m e a n d port o f registry o f t h e ship, t o w h i c h i t belongs, s o that t h e ship identification c a n b e changed a n y t i m e w i t h o u t opening t h e container. 5.5.10.2 A r i g i d m e a n s o f r e s c u e s h a l l b e m a r k e d w i t h t h e f o l l o w i n g data: manufacturer's name o r trademark; serial number; n u m b e r o ft h e certificate issued b y t h eRegister t o the raft w i t h " R S " letters; word "SOLAS"; number o maximum launching 5.5.11 M a fpersons permitted t ob e accommodated; permitted height o fstowage above waterline; instructions. rine evacuation system. 5.5.11.1 I n a d d i t i o n t o t h e d a t a s e t f o r t h u n d e r 5.5.3.2, t h ecapacity o f m a r i n e evacuation s y s t e m shall be marked. 5.5.11.2 T h e c o n t a i n e r f o r m a r i n e e v a c u a t i o n s y s t e m shall b e indelibly m a r k e d w i t h t h e data set forth under 5.5.4, except that i n lieu o f t h e n u m b e r o f persons permitted t o carry, t h e capacity o ft h e m a r i n e evacuation s y s t e m a n d t h e date o fmanufacture a r em a r k e d , w h i l e the type o f emergency pack enclosed a n d t h e length o f painter are n o t marked. 5.5.12 L i f e b u o y s e l f - i g n i t i n g l i g h t s a n d s e l f activating s m o k e signals, lifejacket lights, external a n d internal lights o f lifeboats a n dliferafts, lights of rescue/fast rescue boats, sea-water-activated sources o fenergy, food ration, water i n receptacles, s e a r c h l i g h t s o f life- a n d r e s c u e b o a t s , b o a t ' s c o m ­ passes, line-throwing appliances. The following information shall b e marked o n t h e above products o rpacking thereof: manufacturer's name o r trademark; type o f product; n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " letters; Part I . General Regulations for Technical Supervision date o f manufacture; i f disposable, exact expiry date shall b e m a r k e d o r date w h e n i tshall b e renewed. 5.6 M A I N D I E S E L E N G I N E S , A U X I L I A R Y D I E S E L E N G I N E S W I T H P O W E R O U T P U T 55 k W A N D O V E R 5.6.1 U p o n c o m p l e t i o n o f b e n c h tests o f t h e e n g i n e s a t t h e firm ( m a n u f a c t u r e r ) , e l i m i n a t i o n o f a l l f a u l t s f o u n d a n d c h e c k tests, t h e f i n a l b r a n d o f t h e R e g i s t e r i s p u t o n the manufacturer's plate. 5.6.2 C r a n k s h a f t s . 5.6.2.1 F o r g i n g s i n t e n d e d f o r m a n u f a c t u r e o f crankshafts shall b e delivered f o r m a c h i n i n g w i t h t h e preliminary brand o f t h e Register a n d a certificate ( i f forgings are produced b y another f i r m (manufacturer)); 5.6.2.2 W h e r e t h e c r a n k s h a f t i s a d e q u a t e l y b i g , manufacturer's m a r k i n g a n d final brand o f the Register on t h e machined crankshafts shall b e p u t o n t h e cylindrical surface o ft h e crankshaft coupling flange. W h e r e t h e surface area i s n o t enough, t h e m a r k i n g shall b e m a d e o n t h eouter side o ft h e c r a n k w e b first after t h e c o u p l i n g flange. E a c h section o f built-up crankshafts shall b e branded using t h e same principle f r o m t h e side nearest t o t h e coupling flange. 5.6.2.3 E a c h p i n o r j o u r n a l i n b u i l t - u p c r a n k s h a f t s shall b e checked a n d marked w i t h t h e Register p r e l i m i n a r y brand o nt h e butt; t h e w e b s — o nt h e outer side i n t h e area o fb o r i n g f o r t h e j o u r n a l . 5.6.2.4 O n e v e r y j u n c t i o n o f b u i l t - u p c r a n k s h a f t s , o n webs a n d journals o r pins, along w i t h c o m m o n manufacturer's marking, numbers o fjunctions shall b e marked. 5.6.3 C o n n e c t i n g r o d s . The manufacturer's m a r k i n g a n dfinal Register brand on adequately b i g connecting rods shall b e p u to n t h e front p a r t o f c o n n e c t i n g r o d f o o t , i n c a s e t h e a r e a i s n o t e n o u g h — o nt h e side o ft h e foot. 5.6.4 P i s t o n 89 5.6.8 C y l i n d e r b l o c k s . T h e R e g i s t e r final b r a n d s h a l l b e p u t o n t h e s i d e surfaces o fblocks o n t h e areas specially allocated f o r t h e manufacturer's m a r k i n g , a n di n case n o special area i s provided, o n t h e m a c h i n e d side surface o f t h e cylinder b l o c k , n e a r e s t t o t h e c o u p l i n g flange ( c o u p l i n g ) o f t h e crankshaft. 5.6.9 C y l i n d e r c o v e r s . W h e r e t h etotal surface o ft h e cover is machined, t h e manufacturer's m a r k i n g a n dt h e Register final brand shall be p u t o nthat surface. 5.6.10 B e d p l a t e s , c r a n k c a s e s , c o l u m n s . The Register final brand shall b e p u to n specially allocated areas, a n di ncase n o p r o v i s i o n i s m a d e f o r such areas, o n a readily v i s i b l e place n e x t t o t h e m a n u f a c turer's m a r k i n g . 5.7 M A I N S T E A M T U R B I N E S A N D E L E C T R I C G E N E R A T O R TURBINES 5.7.1 U p o n c o m p l e t i o n o f b e n c h tests a t t h e f i r m (manufacturer), e l i m i n a t i o n o f a l l faults found, t h e Register final brand is p u to n t h emanufacturer's plate o f t h e geared turbine installation o r a turbine. 5.7.2 R o t o r s a n d s h a f t s . 5.7.2.1 F o r g i n g s i n t e n d e d f o r m a n u f a c t u r e o f r o t o r s a n d shafts shall b e delivered f o rm a c h i n i n g w i t h t h e preliminary brand o f t h e Register a n d a certificate ( i f forgings are produced b y another firm (manufacturer)); 5.7.2.2 A f t e r f i n a l a s s e m b l y o f a l l b l a d i n g s t a g e s a n d b a l a n c i n g t h e R e g i s t e r final b r a n d s h a l l b e p u t o n t h e rotor flange generatrix. 5.7.3 T u r b i n e c a s i n g s . The Register final brand shall b e p u t o n t h e generatrix o ft h e h o r i z o n t a l j o i n t flange after assembly o f t h e casing w i t h t h e rotor. 5.7.4 M a n o e u v r i n g g e a r c a s i n g s , n o z z l e b o x e s . The Register final brand shall b e p u t o n t h e generatrix o fthe horizontal joint flange. rods. T h e R e g i s t e r final b r a n d s h a l l b e p u t o n t h e f l a n g e o r b e l o w t h etaper part o ft h e piston r o d i nt h earea w h e r e i t is a t t a c h e d t o t h e p i s t o n . 5.6.5 C r o s s h e a d s . T h e R e g i s t e r final b r a n d s h a l l b e p u t n e x t t o t h e manufacturer's marking. 5.6.6 P i s t o n s . T h e R e g i s t e r final b r a n d s h a l l b e p u t n e x t t o t h e manufacturer's m a r k i n g . 5.6.7 C y l i n d e r l i n e r s . T h e R e g i s t e r final b r a n d s h a l l b e p u t o n t h e t o p b u t t part o ft h e cylinder shoulder. O n b i g engine liners w h e r e t h e shoulder isn o t s u n k e n i nt h e block, t h e brand m a yb e p u t o n t h e side surface o ft h e shoulder. 5.8 M A I N G A S T U R B I N E P L A N T S A N D G A S T U R B I N E S OF ELECTRIC GENERATORS 5.8.1 U p o n c o m p l e t i o n o f b e n c h tests a t t h e f i r m (manufacturer), e l i m i n a t i o n o f a l l faults found, t h e Register final brand is p u to n t h emanufacturer's plate o f the gasturbine installation(turbine). 5.8.2 I n t h e c o u r s e o f p r o d u c t i o n o f t h e g a s t u r b i n e installation, after final assembly a n d checking casings o f turbines, compressors a n d combustion chambers, rotors, shafts, discs shall b e branded b y t h e Register. The brand shall b e p u tnext t o t h e manufacturer's branding. 90 Rules for Technical Supervision during Construction of Ships and Manufacture 5.9 G E A R S A N D D I S E N G A G I N G C O U P L I N G S OF MAIN MACHINERY of Materials and Products for Ships year o f manufacture; manufacturer's number; boiler index; 5.9.1 U p o n c o m p l e t i o n o f t h e b e n c h tests a t t h e f i r m (manufacturer) a n d satisfactory results thereof, t h e R e g i s t e r final b r a n d i s p u t o n t h e m a n u f a c t u r e r ' s p l a t e o f t h e gear. w o r k i n g steam pressure i n t h e boiler; superheated steam temperature; steaming capacity, f o r fire-tube boilers — surface area; 5.9.2 P i n i o n s a n d w h e e l s . T h e R e g i s t e r final b r a n d i s p u t o n t h e g e n e r a t r i x o f t h e p i n i o n a n d w h e e l flange, a n d i f t h e r e i s n o flange — o n t h eshaft butt. S u c h branding isdone u p o n c o m p l e t i o n o f assembly o ft h e w h o l e gear a n d checking t h eteeth b y blueing. T h e p r e l i m i n a r y brand i s p u t i n case o f intermediate checkings. final b r a n d o f t h e R e g i s t e r . 5 . 1 1 . 2 T h e R e g i s t e r final b r a n d i s p u t a f t e r h y d r a u l i c t e s t s a t t h e firm ( m a n u f a c t u r e r ) . 5.11.3 M a i n p a r t s o f t h e b o i l e r , n a m e l y : s h e l l s , headers ( c h a m b e r s ) after c o m p l e t i o n o fh y d r a u l i c tests as w e l l as c o m b u s t i o n chambers, furnaces, stays before assembly shall b e s u r v e y e d a n dm a r k e d w i t h t h e Register preliminary brand. 5.9.3 S h a f t s o f r e d u c t i o n g e a r s a n d c o u p l i n g s . T h e R e g i s t e r final b r a n d i s p u t o n t h e c y l i n d r i c a l surface o ft h e coupling flange. 5.9.4 C a s i n g s o f r e d u c t i o n g e a r s a n d c o u p l i n g s . T h e R e g i s t e r final b r a n d i s p u t o n t h e h o r i z o n t a l flange o f t h e casing couplings. joints o f reduction gears a n d heating I n case t h eboiler components a r eproduced at t h e same f i r m (manufacturer) where a boiler is assembled, branding o fthe above components is n o t mandatory. 5.11.4 S a f e l y v a l v e s o f t h e b o i l e r s s h a l l b e f i n a l l y tested o n board, o n e o f t h e m shall b e sealed b yt h e Register. 5.10 S H A F T I N G A N D P R O P E L L E R S 5.12 A H t R E C E I V E R S 5.10.1 F o r g i n g s i n t e n d e d f o r m a n u f a c t u r e o f thrust, intermediate a n d propeller shafts shall b e branded w i t h the Register preliminary brand. 5.12.1 O n t h e u p p e r spherical o r c y l i n d r i c a l (depending o n t h ebottle size) part o ft h e a i r receiver casing t h e f o l l o w i n g data shall b e clearly m a r k e d : 5.10.2 F i n a l l y m a c h i n e d t h r u s t , i n t e r m e d i a t e a n d propeller shafts ( i n c l u d i n g C P P shafts) shall b e m a r k e d w i t h t h e R e g i s t e r final b r a n d o n t h e c y l i n d r i c a l s u r f a c e o f t h e flanges. W h e r e t h e r e a r e n o flanges, t h e b r a n d s h a l l be p u t o nt h e shaft butt. 5.10.3 T h e R e g i s t e r f i n a l b r a n d o n s o l i d p r o p e l l e r s shall b e p u t o n t h e side surface o ft h e h u bunder t h e m a n u f a c t u r e r ' s m a r k i n g , w h i c h i n c l u d e s t h e firm ( m a n u facturer) trademark, pitch a n d diameter o ft h e propeller, direction o frotation. 5 . 1 0 . 4 T h e R e g i s t e r final b r a n d o n b u i l t - u p p r o p e l lers shall b e p u t o nt h e h u b a n d outside surface o f each b l a d e flange o r o n t h e h u b r o o t i n t h e a r e a o f t h e s h a n k (for C P P ) . T h e manufacturer's m a r k i n g o f t h e h u bis similar t o that referred t o i n5.10.3. T h ew h o l e C P P shall be branded w i t h t h e Register final brand o n t h e m a n u f a c t u r e r ' s p l a t e o f t h e m a c h i n e r y p i t c h c o n t r o l gear. firm ( m a n u f a c t u r e r ) t r a d e m a r k ; year o f manufacture; manufacturer's number; air receiver index; w o r k i n g pressure; capacity; final b r a n d o f t h e R e g i s t e r . 5.12.2 T h e R e g i s t e r f i n a l b r a n d i s p u t o n t h e a i r receiver u p o n c o m p l e t i o n o f h y d r a u l i c tests a t t h e f i r m (manufacturer). 5.12.3 I n c a s e e n d p l a t e s o r c y l i n d r i c a l p a r t s o f a i r receivers a r e produced at another manufacturer, they shall b e branded w i t h t h e Register preliminary brand. 5.12.4 S a f e l y v a l v e s i n s t a l l e d o n a i r r e c e i v e r s s h a l l be tested a n d sealed b y t h e Register. 5.13 M A C H I N E R Y , P R E S S U R E V E S S E L S A N D A P P A R A T U S OF REFRIGERATING PLANTS 5.11 B O I L E R S 5.11.1 O n t h e n o n - r e m o v a b l e p a r t s o f t h e b o i l e r front, i n a conspicuous place readily accessible f o r inspections t h e manufacturer's plate shall b e secured c o n t a i n i n g t h e f o l l o w i n g data: firm (manufacturer) trademark; 5.13.1 T h e R e g i s t e r f i n a l b r a n d i s p u t o n t h e manufacturer's plate o f compressors a n d refrigerant p u m p s u p o n c o m p l e t i o n o f b e n c h tests a t t h e f i r m (manufacturer). 5.13.2 T h e R e g i s t e r f i n a l b r a n d i s p u t o n t h e manufacturer's plate o fpressure vessels a n d apparatus w o r k i n g under a refrigerant pressure u p o n completion o f Part I . General Regulations for Technical Supervision h y d r a u l i c a n d a i rtests w i t h satisfactory results a tt h e f i r m (manufacturer). 5.13.3 S a f e l y v a l v e s i n s t a l l e d o n t h e p r e s s u r e v e s s e l s and apparatus w o r k i n g under a refrigerant pressure shall be tested a n d sealed b y t h e Register. 5.14 E L E C T R I C A L EQUIPMENT 5.14.1 T h e R e g i s t e r f i n a l b r a n d i s p u to n t h e plates o f generators, motors, electromagnetic couplings u p o n c o m p l e t i o n o f t h e r e q u i r e d s u r v e y s a n d tests a t t h e f i r m (manufacturer). 5.15 S I G N A L MEANS 91 5.15.2 D i r e c t l y o n e v e r y s o u n d s i g n a l m e a n s , s u c h a s whistle, typhon, horn, hong, bell the following shall b e marked: firm (manufacturer) trademark; sequence number; year o f manufacture; final brand o fthe Register. 5.15.3 P y r o t e c h n i c s i g n a l m e a n s ( r o c k e t chute flares, signal rockets, h a n d flares). para­ Every pyrotechnic signal means shall b e marked w i t h t h e f o l l o w i n g data i n R u s s i a n a n d E n g l i s h : manufacturer's name o r trademark; name o ft h e product; brief instructions o r diagrams clearly illustrating h o w it shall b e operated; n u m b e r o f T y p e A p p r o v a l C e r t i f i c a t e (СТО) w i t h " R S " letters; date o f manufacture; date o fits e x p i r y o r date w h e n i tshall b e renewed. 5.15.1 I n a c o n s p i c u o u s p l a c e o n e a c h n a v i g a t i o n and flashing lantern the Register final brand is p u ta n d manufacturer's plate shall b e secured containing t h e f o l l o w i n g data: firm (manufacturer) trademark; lantern designation; lantern index; sequence number; year o f manufacture. 5.16 C A R G O H A N D L I N G G E A R 5.16.1 C a r g o h a n d l i n g g e a r s h a l l b e m a r k e d i n compliance w i t h t h e provisions o f Sections 7 a n d11 o f the Rules f o r t h e Cargo Handling Gear o f Sea-Going Ships. 92 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships APPENDIX 3 H U L L SURVEY F O RN E W CONSTRUCTION 1 SCOPE 1 T h e scope o f these requirements includes t h e following m a i n activities: 1.1 E x a m i n a t i o n o f t h e p a r t s o f t h e s h i p c o v e r e d b y classification rules a n db y applicable statutory regula­ tions for hull construction, t oobtain appropriate evidence that they have been built i n compliance w i t h t h e rules and regulations, taking account o fthe relevant approved drawings. 1.2 A p p r a i s a l o f t h e m a n u f a c t u r i n g , c o n s t r u c t i o n , control a n dqualification procedures, including w e l d i n g consumables, w e l d procedures, w e l d connections a n d assemblies, w i t h i n d i c a t i o n o f r e l e v a n t a p p r o v a l tests. 1.3 W i t n e s s i n g i n s p e c t i o n s a n d t e s t s a s r e q u i r e d i n the classification rules used f o r ship construction including materials, welding a n d assembling, specifying the items t ob e e x a m i n e d and/or tested a n d h o w (e.g. b y hydrostatic, hose o r leak testing, non-destructive e x a m ­ ination (testing), verification o fgeometry) a n db y w h o m . 1.4 A p p r a i s a l o f m a t e r i a l a n d e q u i p m e n t u s e d f o r ship construction a n d their inspection at t h e firm (manufacturer) is n o t included i n these requirements. Details o f requirements f o r h u l l a n d m a c h i n e r y steel forgings a n d castings a n d f o r n o r m a l a n d higher strength h u l l structural steel a r e g i v e n i n 3 . 7 , 3 . 8 a n d 3 . 2 , P a r t Х1П " M a t e r i a l s " o f t h e R u l e s f o r t h e C l a s s i f i c a t i o n and Construction o f Sea-Going Ships respectively. Acceptance o fthese items is verified through t h e survey p r o c e s s c a r r i e d o u t a t t h e firm ( m a n u f a c t u r e r ) a n d t h e issuing o f t h e appropriate certificates. .3 w e l d e d f o u n d a t i o n s , e . g . m a i n e n g i n e s e a r i n g s ; .4 h a t c h c o a m i n g s , b u l w a r k s ; . 5 a l l p e n e t r a t i o n s fitted a n d w e l d e d i n t o b u l k h e a d s , decks a n d shell; . 6 t h e fittings o f a l l c o n n e c t i o n s t o d e c k s , b u l k h e a d s and shell, such as a i r pipes a n d ship side valves — a l l items covered b y the International Convention o n L o a d Lines, 1 9 6 6as a m e n d e d ( I L L C 1966); .7 w e l d e d attachments t o shell, decks a n d p r i m a r y members, e.g. crane pedestals, bitts a n d bollards, b u t o n l y as regards their interaction o nt h e h u l l structure. 2.2 R e f e r e n c e t o d o c u m e n t s a l s o i n c l u d e s e l e c t r o n i c transmission o r storage. 2.3 D e f i n i t i o n o f s u r v e y m e t h o d s w h i c h t h e surveyor is directly involved i n :patrol, review, witness. 2.3.1 P a t r o l i s t h e a c t o f c h e c k i n g o n a n independent a n dunscheduled basis that t h e applicable processes, activities a n d associated d o c u m e n t a t i o n o f the shipbuilding functions identified i n t h e Table "Survey R e q u i r e m e n t s " (hereinafter, t h eTable) continue t o con­ f o r m t o the R S a n d statutory requirements. 2.3.2 R e v i e w , i s t h e a c t o f e x a m i n i n g d o c u m e n t s in order t o determine traceability, identification a n d t o confirm that processes continue t o c o n f o r m t o t h eR S a n d statutory requirements. 2.3.3 W i t n e s s i s t h e a t t e n d a n c e a t s c h e d u l e d inspections i n accordance w i t h t h e agreed Inspection a n d Test Plans o requivalent t othe extent necessary t o check compliance w i t h the survey requirements. 2 1.5 I n addition t o above, f o r o i l tankers a n d b u l k c a r r i e r s s u b j e c t t o S O L A S C h a p t e r П-l P a r t A - l R e g u l a ­ tion 3 - 1 0 (Goal-based ship construction standards f o r b u l k carriers a n d o i l tankers), refer also t o A p p e n d i x 5 . 2 DEFINITIONS 3 2.1 T h e h u l l s t r u c t u r e i s d e f i n e d a s f o l l o w s : .1 h u l l envelope including a l l internal a n d external structures; .2 s u p e r s t r u c t u r e s , d e c k h o u s e s a n d casings; 3 APPLICATIONS 3.1 T h e s e r e q u i r e m e n t s c o v e r t h e s u r v e y o f a l l n e w construction o fsteel ships intended f o rclassification a n d for international voyages except for: . 1 t h o s e d e f i n e d i n r e g u l a t i o n 1/3 o f S O L A S - 7 4 C o n v e n t i o n (i.e. ships o fw a r a n d troopships; cargo ships o f less t h a n 5 0 0 gross t o n n a g e ; ships n o t p r o p e l l e d b y mechanical means; w o o d e n ships o f p r i m i t i v e build; pleasure yachts n o t engaged i n trade, a n d fishing vessels); ' T h e s e r e q u i r e m e n t s , u n l e s s e x p r e s s l y p r o v i d e d o t h e r w i s e , s h a l l b e i m p l e m e n t e d o n s h i p s c o n t r a c t e d f o r c o n s t r u c t i o n o n o r a f t e r 1 J a n u a r y 2008. " T h e contracted for construction date" m e a n s the date o n w h i c h the contract t o b u i l d the ship i s s i g n e d b e t w e e n the prospective o w n e r a n d t h e s h i p y a r d . F o r f u r t h e r d e t a i l s r e g a r d i n g " t h e d a t e o f c o n t r a c t f o r c o n s t r u c t i o n " , r e f e r t o 1.1.2, P a r t I " C l a s s i f i c a t i o n " o f t h e R u l e s f o r t h e Classification a n d Construction o f Sea-Going Ships. T h e s e r e q u i r e m e n t s s h a l l b e i m p l e m e n t e d o n s h i p s c o n t r a c t e d f o r c o n s t r u c t i o n o n o r a f t e r 1 J u l y 2016. T e r m s a n d definitions for hull a n d hull survey are g i v e n i n the R S rules. 2 3 Part I . General Regulations for Technical Supervision .2 h i g h speed craft as d e f i n e d i n 1.3.1 o f C h a p t e r 1 o f the International Code for the Safety o f High-Speed Craft (2000 H S C Code); .3 m o b i l e o f f s h o r e d r i l l i n g u n i t s a s d e f i n e d i n 1 . 2 . 1 o f Chapter 1 o f t h e Code f o rt h e Construction a n d Equipment o f Mobile Offshore Drilling Units, 2009 (2009 M O D U Code). 3.2 T h e s e r e q u i r e m e n t s c o v e r a l l s t a t u t o r y i t e m s relevant t o the h u l l structure a n d coating, i.e. L o a d L i n e and S O L A S Safely Construction. 3.3 T h e s e s r e q u i r e m e n t s d o n o t c o v e r t h e m a n u f a c ture o f equipment, fittings a n d appendages regardless w h e t h e r t h e y are m a d e inside o r outside o f the shipyard, examples being as follows: .1 hatch covers; .2 doors a n d r a m p s bulkheads; integral w i t h t h e shell a n d .3 r u d d e r s a n d r u d d e r s t o c k ; .4 a l l f o r g i n g s a n d c a s t i n g s i n t e g r a l t o t h e h u l l . Evidence o f acceptance shall b e provided b y accompanying documentation f r o m surveyor at the firm (manufacturer) and verified at the shipyard 3.4 T h e s e r e q u i r e m e n t s a p p l y t o t h e i n s t a l l a t i o n i n t o the ship, w e l d i n g and testing o f the following: 93 5 S U R V E Y O F T H EH U L L STRUCTURE 5.1 T h e T a b l e p r o v i d e s a l i s t o f s u r v e y a b l e i t e m s f o r the hull structure and coating covered b y these requirements, including: .1 description o f the shipbuilding functions; .2 c l a s s i f i c a t i o n a n d s t a t u t o r y s u r v e y r e q u i r e m e n t s ; .3 s u r v e y m e t h o d r e q u i r e d f o r c l a s s i f i c a t i o n ; .4 r e l e v a n t R S a n d s t a t u t o r y r e q u i r e m e n t r e f e r e n c e s ; .5 d o c u m e n t a t i o n t o b e a v a i l a b l e f o r t h e c l a s s i f i c a tion surveyor during construction. .5.1 t h e s h i p y a r d s h a l l p r o v i d e t h e c l a s s i f i c a t i o n surveyors access t o d o c u m e n t a t i o n required b y classification, this includes documentation retained b y t h e shipyard o r other third parties; .5.2 t h e l i s t o f d o c u m e n t s a p p r o v e d o r r e v i e w e d b y the classification society for the specific n e w construction are as follows: plans and supporting documents; examination and testing plans; N D E plans; w e l d i n g consumable details; w e l d i n g procedure specifications; w e l d i n g p l a n o r details; .1 i t e m s listed i n3.3 above; .2 e q u i p m e n t f o r m i n g part o f t h e watertight a n d weather tight integrity o f the ship. 3.5 T h e s e r e q u i r e m e n t s a p p l y t o t h e h u l l s t r u c t u r e s and coating constructed at any o f the following: welder's qualification records; N D E operator's qualification records; .6 d o c u m e n t s t o b e i n s e r t e d i n t o t h e s h i p t i o n file. R e f e r t o p a r a g r a p h 1 0 f o r d e t a i l s ; .1 .2 .3 remote .7 a list o f specific activities w h i c h are relevant to the shipbuilding functions. T h i s list i s n o texhaustive a n d m a y b e m o d i f i e d t o reflect the construction facilities o r specific ship type. shipyard facilities; sub-contractors at the shipyard facilities; sub-contractors a t their o w n facilities o r at other locations. 4 QUALIFICATION AND MONITORING O F PERSONNEL 4.1 R S e x c l u s i v e s u r v e y o r s s h a l l c o n f i r m t h r o u g h patrol, r e v i e w a n dwitness as defined i n 2.3, that t h e ships are built using approved plans i naccordance w i t h the relevant rules a n d statutory requirements. T h e surveyors shall b e qualified t o b e able t o carry out the tasks and procedures shall b e i n place to ensure that their activities are m o n i t o r e d . D e t a i l s a r e specified i n Instruction for Activity Monitoring o f R S Surveyors and R H O Experts a n d Procedure f o rTraining a n dQualification Maintenance o f R S Engineering-Technical Personnel. ' T h e f o r m " S h i p y a r d R e v i e w R e c o r d " i s g i v e n i n A p p e n d i x 4. construc- 5.2 E v i d e n c e i s a l s o t o b e m a d e a v a i l a b l e , a s required, b y t h e shipyard, t o t h e surveyor whilst t h e construction process proceeds t oprove that the material and equipment supplied t o t h e ship h a s been built o r manufactured under survey relevant t o the R S rules and statutory requirements. 6 R E V I E W O F T H EC O N S T R U C T I O N FACILITY 1 6.1 T h e R e g i s t e r s h a l l f a m i l i a r i z e w i t h t h e y a r d ' s production facilities, management processes, and Safety for r e v i e w i n compliance w i t h t h erequirements o f the Table prior to any steelwork o rconstruction taking place in the following circumstances: 94 Rules for Technical Supervision during Construction of Ships and Manufacture .1 w h e r e t h e society h a s n o n e o r n o recent experience o f t h e construction facilities — typically after a o n e year lapse — o r w h e n significant n e w infrastructure has been added; of Materials and Products for Ships and agreed during t h e kick-off meeting. Structural fabrication shall b e carried out i n accordance w i t h I A C S Recommendation 47, "Shipbuilding and Repair Quality Standard" , o r a recognized fabrication standard w h i c h has been accepted b y t h e Register p r i o r t o t h e .2 w h e r e t h e r e h a s b e e n a s i g n i f i c a n t m a n a g e m e n t o r commencement o f fabrication/construction. Provisions personnel re-structuring having a n impact o n t h e ship o f the particular fabrication standard submitted t o t h e construction process; o r Register f o r r e v i e w a n d acceptance shall b e a t least .3 w h e r e t h e s h i p y a r d c o n t r a c t s t o c o n s t r u c t a v e s s e l equivalent t o that o f I A C S R e c o m m e n d a t i o n N o . 4 7o r o f a different type o r substantially different i n design. shall establish m o r e stringent performance criteria. W h e n a contradiction between shipyard fabrication standard and I A C S Recommendation N o . 4 7 is identified during 7 NEWBUILDING SURVEY PLANNING r e v i e w o f t h e standard, m o r e stringent performance criteria for t h e hull construction shall b e applied. T h e w o r k shall b e carried out i n accordance w i t h the R S rules 7.1 P r i o r t o c o m m e n c e m e n t o f s u r v e y s f o r a n y a n d under survey (technical supervision) o f the Register. n e w b u i l d i n g project, the Register shall discuss w i t h the shipyard at a kick o f f meeting t h e items listed i n t h e 7.5 T h e k i c k - o f f meeting m a y b e attended b y other Table. T h e purpose o f the meeting ist or e v i e w and agree parties as defined i n t h e Procedure f o r S u p p l y o f h o w the list o f specific R S activities relating t o the ship I n f o r m a t i o n t o C u s t o m e r s ( o w n e r , A d m i n i s t r a t i o n s , etc.) construction process a n d s h o w n i n t h e Table shall b e subject t o agreement b y the shipyard. addressed. T h e meeting shall take into account t h e 7.6 I n t h e event o f series ship p r o d u c t i o n , t h e shipyard construction facilities a n dship type including requirement for a kick o f f meeting i n paragraph 7.1 m a y the list o f proposed subcontractors. A record ( t h e be w a i v e d for the second and subsequent ships p r o v i d e d minutes) o f the meeting shall b e made, based upon the that n o changes t o t h e specific activities agreed i n t h e contents o f the Table (the Table m a y b e used ast h e k i c k o f f m e e t i n g f o r t h e first s h i p a r e i n t r o d u c e d . I f a n y record w i t h comments made into t h e appropriate changes a r eintroduced, these are t o b e agreed i na n e w column). I f the Register has n o m i n a t e d a surveyor for a dedicated meeting a n d documented i na record o f such specific n e w b u i l d i n g project then t h e surveyor shall meeting. attend the kick o f f meeting. 1 2 T h e shipyard shall agree t o undertake a d h o c investigations during construction as m a y b e requested b y t h e Register w h e r e areas o f concern arise a n d t h e shipyard shall agree t o keep the Register advised o f the progress o f any investigation. W h e n e v e r a n investigation is u n d e r t a k e n , t h e s h i p y a r d s h a l l b e requested, i n principle, t o agree t o suspend relevant construction activities i f warranted b y the severity o f the problem. 7.2 T h e r e c o r d s s h a l l t a k e n o t e o f s p e c i f i c p u b l i s h e d Administration requirements a n d interpretations o f statutory requirements. 7.3 T h e s h i p y a r d s h a l l b e r e q u e s t e d t o a d v i s e o f a n y changes t o the activities agreed at the kick o f f meeting and these shall b e documented i n the survey plan. E.g. i f the shipyard chooses t ouse o r change sub-contractors, o r to incorporate a n y modifications necessitated b y changes in production o r inspection methods, rules a n d regulations, structural modifications, o r i n t h e event where increased inspection requirements a r ed e e m e d necessary as a r e s u l t o f a s u b s t a n t i a l n o n - c o n f o r m a n c e o r o t h e r w i s e . 7.4 S h i p b u i l d i n g q u a l i t y s t a n d a r d s f o r t h e h u l l structure during n e w construction shall b e r e v i e w e d 8 EXAMINATION AND TEST PLAN F O R NEWBUILDING ACTIVITIES 8.1 T h e s h i p y a r d s h a l l p r o v i d e p l a n s o f t h e i t e m s w h i c h are intended t o b e e x a m i n e d a n d tested. T h e s e plans n e e d not b e submitted for approval and examination at the time o f the kick o f f meeting. T h e y shall include: .1 proposals f o r the e x a m i n a t i o n o fcompleted steelw o r k — generally referred t o as the block p l a n and shall include details o f j o i n i n g blocks together a tthe pre-erection a n d erection stages o r a t other relevant stages; .2 p r o p o s a l s f o r fit u p e x a m i n a t i o n s w h e r e n e c e s s a r y ; .3 p r o p o s a l s f o r t e s t i n g o f t h e s t r u c t u r e ( l e a k a n d hydrostatic) as w e l l as for all watertight and weathertight closing appliances; .4 proposals f o r non-destructive e x a m i n a t i o n (testing); .5 a n y other proposals specific t othe ship t y p e o r t o the statutory requirements. 8.2 T h e p l a n s a n d a n y m o d i f i c a t i o n s t o t h e m s h a l l b e submitted t o t h e surveyors i n sufficient time t o allow review before the relevant survey activity commences. ' I A C S R e c o m m e n d a t i o n N o . 47 "Shipbuilding a n d R e p a i r Quality Standard" shall b e f o u n d i n the S u p p l e m e n t to R u l e s o f R u s s i a n M a r i t i m e Register o f Shipping " I A C S Unified Interpretations" (published i n electronic f o r m as a separate edition). S e r i e s s h i p p r o d u c t i o n : s h i p s i n t h e s e r i e s s u b s e q u e n t t o t h e first o n e ( p r o t o t y p e ) , i . e . s i s t e r s h i p s b u i l t i n t h e s a m e s h i p y a r d . 2 Part I . General Regulations for Technical Supervision 1 8.3 I naddition t o above, for o i l tankers and b u l k carriers subject t o S O L A S Chapter I I - l Part A - l Regulation 3-10 refer also t o A p p e n d i x 5 . 9 P R O O F O F T H EC O N S I S T E N C Y O F S U R V E Y S 95 .1 as-built structural drawings including scantling details, material details, a n d , as applicable, wastage allowances, location o fbutts a n d seams, cross section details a n d locations o f a l l partial a n dfull penetration welds, areas identified f o r close attention a n d rudders (refer to Part H I " A d d i t i o n a l Surveys o f Ships D e p e n d i n g on Their Purpose and H u l l Material" o f the Rules for the Classification Surveys o f Ships i n Service); 9.1 T h e R e g i s t e r s h a l l b e a b l e t o p r o v i d e e v i d e n c e , e.g. t h r o u g h r e c o r d s , c h e c k lists, i n s p e c t i o n a n d test records, etc. t h a t i t s s u r v e y o r s h a v e c o m p l i e d w i t h t h e requirements o f the newbuilding survey planning a n d d u l y participated i nthe relevant activities s h o w n i n the s h i p y a r d e x a m i n a t i o n a n d test plans. .2 m a n u a l s r e q u i r e d f o r c l a s s i f i c a t i o n a n d s t a t u t o r y r e q u i r e m e n t s , e.g. l o a d i n g a n d s t a b i l i t y , b o w d o o r s a n d i n n e r doors a n d side shell doors a n d s t e m doors — operations a n d m a i n t e n a n c e m a n u a l s ( r e f e r t o 7 . 4 a n d 7 . 1 5 , P a r t 1П "Equipment, Arrangements and Outfit" o f the Rules for the Classification and Construction o f Sea-Going Ships); 9.2 I n a d d i t i o n , t h e R e g i s t e r s h a l l m a i n t a i n r e c o r d s o f deficiencies found during t h e patrolling activities required i n the Table and described i n 2.3.1. .3 S h i p S t r u c t u r e A c c e s s M a n u a l , a s applicable; .4 copies o f t h e R S certificates o n forgings a n d castings w e l d e d into t h e h u l l (refer t o 3 . 7 a n d 3 . 8 , P a r t Х1П " M a t e r i a l s " o f t h e R u l e s f o r t h e C l a s s i f i c a t i o n and Construction o f Sea-Going Ships); Records shall include the date w h e n deficiency w a s found, description o f the deficiency and the date w h e n the deficiency was cleared. 10 S H I P C O N S T R U C T I O N FILE T h e requirements o f this S e c t i o n are applicable t o a l l ships except f o r o i l tankers and b u l k carriers subject t o S O L A S C h a p t e r П-l P a r t A - l R e g u l a t i o n 3 - 1 0 f o r w h i c h the requirements o f Section 3 i n Appendix 5 shall b e applied . 2 10.1 T h e s h i p y a r d s h a l l d e l i v e r d o c u m e n t s f o r t h e Ship Construction File. I n the event that items have been provided b y another party such as t h e shipowner a n d w h e r e separate arrangements have been m a d e f o r document delivery w h i c h excludes t h e shipyard, that party has the responsibility. T h e Ship Construction File shall b e reviewed f o r content i n accordance w i t h the requirements o f 10.2. 10.2 I t i s r e c o g n i s e d t h a t t h e p u r p o s e o f d o c u m e n t s held i n t h e Ship Construction File o n board t h e ship, shall facilitate inspection (survey) a n d repair a n d maintenance, and, therefore, shall include i naddition t o documents listed i n the Table, but not b e limited to: .5 details o f e q u i p m e n t f o r m i n g part o f the w a t e r t i g h t and weathertight integrity o f the ship; .6 t a n k testing p l a n i n c l u d i n g details o f t h e test requirements (refer to A p p e n d i x 1 to Part П " H u l l " o f the Rules f o r t h e Classification a n d Construction o f Sea-Going Ships); .7 c o r r o s i o n p r o t e c t i o n specifications (refer t o 1.2.5.1 and 3.3.5.1, Part I I "Hull" o f t h e Rules f o r t h e Classification a n d Construction o f Sea-Going Ships; 5.2.2.3.2 o f Part Ш " A d d i t i o n a l Surveys o f Ships Depending o n Their Purpose and H u l l Material" o f the Rules for the Classification Surveys o f Ships i n Service); .8 details f o r t h e i n - w a t e r survey, i f applicable, information for divers, clearances measurements instruc­ tions, etc. t a n k a n d c o m p a r t m e n t b o u n d a r i e s ; .9 d o c k i n g p l a n a n d d e t a i l s o f a l l p e n e t r a t i o n s normally examined at drydocking; .10 C o a t i n g T e c h n i c a l F i l e , f o r s h i p s s u b j e c t t o compliance w i t h t h e I M O Performance Standard f o r Protective Coatings ( P S P C ) ( M S C . 2 1 5 ( 8 2 ) ) as t h e R S requirement under the Part XVTTT " C o m m o n Structural Rules f o r Double H u l l O i l Tankers" a n d Part X I X " C o m m o n Structural Rules f o rB u l k Carriers" o f t h e Rules f o r t h e Classification a n d Construction o f Sea-Going Ships. ' T h e s e requirements shall b e i m p l e m e n t e d o n ships contracted f o r construction o n or after 1 J u l y T h e s e requirements shall b e i m p l e m e n t e d o n ships contracted f o r construction o n or after 1 J u l y 2 2016. 2016. 96 Rules for Technical Supervision during Construction of Ships and Manufacture а • 2 J2 о 7 3 ^ .Т5 и .2 Он Ц ft о ai с ^ ft - s -° ? ее о л 1. <8 U of Materials and Products for <u о ее Л в еа е во ее ^ > 8 ft О -о тз +•* о J3 о т5 43 о 'С > 2 В -о в -о -.В -.В •с 8 « а е 3 .9 а з § в о -а е о ё ft & ft 3 . 8 2 S 3 и > •с в -о 8 | "в с 5 'й С о > Й >>_я & й -а - о- » 8 *| а 73 гг &та - ft g в j-s в « 3 ft g - J j g > 3 s ев Он 1 В °" С ев Л о Он о тЗ -£з и ebr о 2 1 - 2 о ft * -.В & •р ^"3 'С о 8 & о ЁSв 8 во О ев " - «Я и О ° ~ - S "а « Я -2! о « ь Я ^ б " о о ш _ з ез р, „ в « ° £ § •о г- О « U И ft : $ Е 03 •а ВО 8 g в в и е X во g ' | _ Й о •2 О О - и Я й б - £ U £ s в .2 2 I-II11i и о во onf О! CTsS •S P I 1 § 'Я 1 3 09 ев & оэ И И Z U > § ^ в " * « в g •а * а - ,§ _ и в а» 3 и Ш И £ в i- S o . w о. ь Ships Part I . General Regulations for Technical Supervision 97 ь "3 8^ .. 8 о & 8 Он ь, 42 8 ё to 2 В и .. •й о ез я ! е •*= •с "В г* | •с в, > s? > еI и в 2 Он •а В -а В - . В 8 & & О •11 QI •с - . В 8 o f аз *<Ц 0 42 -= Я ее « В -а - .В -а 8 > 9 & g-a 1 § .|1 я И ."2& ° 2 — 4«J Я Л2 Nw — „ « г о 2 '3 •я I S Z В" с «I в» я У о. о тз я _ .О S S « ° « 5я ее в « •а г- ВО 73 о .2 я ! О * "bp S § • S "a — Г Я й a t 2 B ea о 03 $ E a, r £ 6 2 и тз e я о• s ! И i ! Ли i И Д ее ' £ •a t я •* az и - Я к i ее ТЗ X = i. > 03 f> в , 03 l l 111 •2 a <4Ч ТЗ Я > > • " « "в я 8 'Л ев о. Я я^ во-. й 8 S •1 в 5- es > « 2 ее О a, r ^ 6 2 и •а '£ I§ |l „о ос « о 98 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships "3 8^ .. 8 & Он ь, я S ар я § 75 •8 8 •8 1 ст .2 « 8 -о я> Й §1 Ь ° | > I o f 8 о,л 1 г> а В я О оэ 42 Он I*£ 8 В i?.S * I ° | 8 > > -S 9 > о,л 8 & ^. Н Н 03 С S u n ~ •£! и u " Z H F Н & g 2 . N /а ев 03 43 СЗ 43 Он § s « в'а • g fe .д -в о 8 О, и е в тэ " П с r u S ^ я ^ _ о с _ a a z 1з ев аз й °.2|di.5-g , 3 я" 8 " Я " J " о ~ о, ад „ ^ 1 1 ез 5 ~ "2£ 59 '8 1§ 8 ВО о о « ? s 3 § в о •« тз 8-1 1 3 S £ 1 в >..§ я я тз 2 о ' ад оз . д «1 ^ ; =а.^н*• & U ТЗ ш I§ 1'* вртз л я « +- о й 9 £?J J . 3 9 8 и а о .§ 8 3 « С ад ё « в Ё. о о" О 8 & &f I 3 ос' . 2 в тз - | 1 u aI ее о 1С 03 03 •В О О - 5 о во 22 о S Z 8 ^-g I 0.-S " 8 3 » а . 9 "2 -а •а "S •с -в с •с 8 -о «•§ _ в о е СУ - . В а с о 2 " B S Я ^ -а я> Й *0 о 11 "& а Я 1 ст .2 81 а т «а _ е - S J 3 .а > о ^ 1 В я > - s Part I . General e Regulations for Technical Supervision 99 о «g 3 8 Б. .ТЗ u Он u w о e f J3 w оэ С ^ .2 Он и О <8 3 * а * 8 «, о о, о ев во S §• *1 Ш •с 3.а •с -с я о, •с 8 •c 8 £ s > ев "Н > чЗ Л В -о В -о В -о В -о - . В - - . В 8 & 8 & 8 S3 % 2 - . В 8 & .В 09 & о S 03 ее .2 - и •3 Л .3, -2 -3 ез g § ее § и S Он Ё t o S 3 -о л 8 •о ?° «9 ft О 3 о — В « •о г- $ Е Z 3 8 3 8 $ Е &1 S I§ о- ас _ в и S ар «« „.В t в в s .9 s «* а 2 8 Ss я >>а: я •а в "С II-в «2 d K g , о 23 я - 100 Rules for Technical Supervision during Construction of Ships and Manufacture а о «g 3 8 Б. и 43 О оа С of Materials and Products for ^ B i <8 t 01 ВО S с i * а 7 3 Б. о во g в о •а •с • 2 о, 7 3 СЗ > С g н. в о -a S 8 •§ е я ?? « Он ° » « о, J ° -а „ £ ь и о, S -а Я ТЗ ^ Я 3 •з" о 5 о, & § аэ )н ~ СЗ СЗ аэ « » ё Он И О И к » h о о & в « s»— 5 Ч a s - §1 С •а 42 *" 4J " .« s i -si I I 4 S •* СЗ аэ Он аэ 1н ТЗ — 8 ез •а •а ги с Ч 5 о 3 9 Z 9 Z 3 09 <U U 09 "и 9 В тз l-sf ез а Он Св 5 I§ u в !S § " : а в о. « Oi и - Я в е *в" ?— 8a в = 13 в S а в С Я s о 4 § 2 8 о О н в в s 2 о Я ВС - Я д н ш . и ш « V £ <?£ и « ей ш л S я ш со •3-й e g - о . & 8 "2 О о — 8 ез С S . 9 ^2 § s 45 5 »— 3 ^3 и h Я 3 я — ^ .Он о я Он Ships Part I. General for Technical Supervision 101 о e «g 3 ю Regulations 8 Б. аа С ^ <8 О J * 1 § ° a j ? • в •3 sв I8 <8 opв оо •§> Он 43 « 8/1 *%% а 1/3 09 U e 4 4 я •» О, 2 " Is . & 42 О 8 J g ё В В а •§ _ « а чз е • о liA B O 7 3 e .S «09 2 " 5 S со Я ТЗ & 1.2 -е "В ft U 09 ft 09 еЗ -+-> I СО о во 8 м я § (U СО в а •о t с •* ТЗ- И В 3 8 Z IS < во 42 « е 'Во 'ос « б с в о о а о — йн «о «S -В щ Я U л ом во м оО 1 " IS е ва > !> 09 09 2 % ^.о > из 5 з в я > 09 ? в «и я 5 В 8-18 М 3 чз и во a w aa ТЗ •Я « в я if -я '-5 я 1'8 |l •в S « s — Di« 11»s •Si в щ ш = ? " в Я •2Р 2 в > , в н .8 л л £ •В § <и ТЗ 3§ Ё.О" о а-3 оэ - Я ^ 43 I И т) 3 ft & ° ^ 1 & ° ^ 1 -+-> оэ - Я S ТЗ (U ^ Is О оэ <- ft 09 -С > У* S гчеЗ — S Я & ft > О « _^ 5 S со и > а а 3 -в !ж 2Р И ™ £ •§ 5 8 з а ТЗ« Я Л а и > а а 6 > - a "o, «а ТЗ в(U Л в 5 1J g еЗ •§ ' °> e« 2 ' л S Я во e .S 7 3 6a а §5 | 1 "I 43 a -S 5 8 T3 3 S H ТЗ оЯ 42 ооa 8|f в в l i f ta p i 1 fc> <Ц 09 ~.Я.з о a ' S S s > 3 ft с •*i •I- e ад Й s §& о О и з И, a °з <3 4 3 •с . я 8 ? СЗ в во 42 « е 'Яо ос « б с в о о а о « <Я U о м Refe­ rence Survey requirements for classification salt water ballast tanks with boundaries formed by the hull envelope, and also bulk carrier hold internal surfaces, coamings and hatch covers shall have an efficient protective coating. Safety aspects of cathodic systems to be dealt with separately Shipbuilding function Corrosion protec­ tion systems, e.g. coatings, cathodic protection, impressed current, except for coating systems subject to PSPC review and report on builder's and the firm (manufacturer) documentation Survey method required for classification Statutory requirements and relevant reference Documentation available to classification Surveyor during construction const­ ruction file Docu­ menta­ tion for Specific activities 1 . 2 . 5 . 1 and reg. П-1/3-2 the firm (manu­ corro- verify that applied coatings are approved 3.3.5.1, Partn of SOLAS-74, facturer) and buil­ s i о n and review records of application "Hull" of the as amended der's specification protec¬ Rules for the t i о n verify that adequate records have been Classification specifi­ maintained and copied to the ship and Construc­ cations construction file tion of SeaGoing Ships; 5.2.2.3.2, Part Ш "Addi­ tional Surveys of Ships Depending on their Purpose and Hull Material" of the Rules for the Classifica­ tion Surveys of Ships in Service; 2.15.1.4, Part V " Tech­ nical Supervi­ sion during Construction of Ships" of the Rules for Technical Supervision during Const­ r u c t i o n of S h i p s and Manufacture of Materials and Products for S h i p s ; 2 . 4 . 1 5 , Part VI "Fire Protection" of the Rules for the Classifica­ tion and Cons¬ truction of Sea-Going Ships Reference* Classification society proposals for the project 102 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships Part I. General Regulations "3 for Technical Supervision 103 £ о ё'-ё g jj- 2 •9 > В 1 ao . J . ' с S — -S '5 я с ™ о ез о и g a u 4 — 1 Я1 ( u 8 Б> an в 'в в в о аас о - 5 s •<§ »> оэ е с ез ТЗ <u ТЗ > ез te -4-> Он О 1) 1'в ft оэ еЗ -*-> оэ - Я тЗ J m •- m э 8 - ев с- тз стз Я »н ас -Г о s о ft < £. — со О = аэ г тз ч-н оотз i _? ы)М " а э ч - н к - к г ч ч ы ео ео -° «ад8 rg j о — в ^ Я" SЧ - еi зl еl в 2е . "„ во ^ т Э с о . <= .а л й £. н. Д Щ (J о о Н в I Они < й о « в о 1 и и а J J о, &я i -a S Ё8 Ё ТЗ = I§ S 1 ' * | | со «2 «8 -й < « S " 1 3 ас ? Л e •Я «* а тз 2 8 « 1 =3 • ас « .. ¥ '-В ас и в 1 • S ТЗ ft 5 в. й g e "5 в ™ 45 -9 3=в£ s s t~: = • < S T S T S - Н Э Я М Й 104 Rules for Technical Supervision during Construction of Ships and Manufacture а of Materials and Products for Ships о «g 3 g Б . wи О ai cсf j^3 43 О ft h <8 <U - i <U ta ^ . ftм — .9 " £ ц- <a ~ I ТЗ О та 4J и 2 s .9 •а - > в _М о * '£ s О .2 О та g > tH boтаО "В о О Я В и" ТЗ ТЗ Я 8 ТЗ тз 9 «i- я ft'Я О 43 о о в ftT3 u о IT Й а ТЗ Н Н И •*-» ТЗ »> оэ 2 " ы ВОТЗ и ^ '3-о S г « g. з 5 s ft-o Я о, 8 u 7 3 g| 1 ^ 8 - f t l l S a g ТЗ °-2' Н S )н ft <U ft " ft аз i f 1-1 &f I 3 ft оэ ft тз и •2 g 9 JВ Бg •3 В « •§ _ « S ) :'|||. С ТЗ 1 тз § и й Ы) 12 в » 2 3 о J S 4J е ° - - Т С О .в та 3 3 1 | |= .6 CN tl? > на „ •с с о В § > и тз в f g К в л: - w та „ _ „ о стз Я ТЗ Н в > -Г О э so'a I •§ -I °i ft s g. ТЗ 3 О оэ и О „ Н 3 Щ 1 ftо оа 3 tв | s ° 1 ill S •С ft а ТЗ Э "О _ s а g - , и -я wсо 7 3 ft оэ еЗ -*-> g ft оэ - Я 3 s - s s ^ v g 2 и о л ВО S О СО в К N н во™ в во 42 « е о с CO ft в О , 43 H C O •5 U t~ ар е •§ ft сЗ t H о 45 "3 о о < Pi О 41 и а •Я О тз- is < ft* Я о « б с в о о а U о со 0 0 нн "К во е g ° U !Я та ,н a e ft S Н Н О м СО СО « - а й и а 0 3 ^ 09 <U U 09 tH 9-в ^•1 g во' [ _ X 73 4 J S тз Й ° 9 'С Ч 43 S •2 О а е О" о в'а ° =8 и 1 9 В "Я l« - Сs fо ft ев о 8-1 .ё 8 3 « ST '53 >>73 В н с I 1 •аас»тз е<я I g | | со 8 4 а - а 2 £ « J -9 о s | •д "Е — тз гз — * в а я д » >• ' а i f f £-г в ас „ её В. J S € 15 2 -Р - 2 i t 'С о тз о, Part I . General e Regulations for Technical Supervision 105 о «g 3 g Б. .тд ц о, о «а о c f J 3 ю ю С ^ 43 О ft ь =8 ft 4г ft I •1 * В •я •п а 3 g.ТЗ &f I 3 В в J е i.g в 2 в «s vo 3 g. са о ая ч 3 м -О О U Д 5 § ^ ^ - S g со ft 8 ез ^> 6 « 8 и t« h J i , 43 О ft-3 S тз g •§ •2*8 § « " S (О C O 8 £ " > о "3 ' S ri J О О — В «з СО •о t с •* $ Е Z 8 Я 1 I§ S сз | | я я 8 •1 « .2 О. ТЗ & i 60 а» тз со о «в € о В 44 О с/3 -о 60 !! 60 0< Р4 Р4 106 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for APPENDIX FORM. SHIPYARD REVIEW RECORD РОССИЙСКИЙ МОРСКОЙ РЕГИСТР СУДОХОДСТВА RUSSIAN MARITIME REGISTER OF SHIPPING ОТЧЕТ ОБ ОЦЕНКЕ ВЕРФИ SHIPYARD REVIW RECORDS № Н а з в а н и е и адрес в е р ф и Дата N a m e a n d address o fshipyard Date 1. Сведения о любых системах менеджмента Details o f a n y m a n a g e m e n t s y s t e m s Полученное одобрение Сертифицирована Дата истечения З а м е ч а н и я ( о б ъ е м , и др.) Obtained Approval Certified b y срока действия R e m a r k s (scope, etc.) Expiry Date ИСО-9001 ISO-9001 ИCO 1 4 0 0 1 ISO 1 4 0 0 1 ИCO 1 8 0 0 1 ISO 1 8 0 0 1 Другое: Other: Ships 4 P a r t I. G e n e r a l Regulations for T e c h n i c a l Supervision 107 2. Т е х н и ч е с к о е о с н а щ е н и е : (вместо з а п о л н е н и я д а н н о г о раздела м о г у т быть п р и л о ж е н ы д о к у м е н т ы , т а к и е как б р о ш ю р а верфи) C o n s t r u c t i o n facilities: ( D o c u m e n t s such as a brochure o fshipyard can b e attached in lieu o fcompleting this section.) 2 . 1 С т а п е л ь (С) или д о к (Д) / B u i l d i n g B e r t h (В) o r D o c k ( D ) Название Name с/д B/D Д л и н а (м) Length (m) Ш и р и н а (м) Width (m) В ы с о т а * (м) Depth* (m) Построечные мощности (грузоподъемность, Тонн) К р а н (тонна x количество) Crane (Ton x No.) B u i l d i n g C a p a c i t y (lifting capacity, Ton) * В случае стапеля высота не п р и м е н я е т с я . I n c a s e o f b e r t h , D e p t h is n o t a p p l i c a b l e . 2.2 Д о с т р о е ч н ы е п р и ч а л ы / O u t f i t t i n g Q u a y s Название Name Д л и н а (м) Ш и р и н а (м) Г л у б и н а (м) Пропускная способность К р а н (тонна х Length(m) Width (m) Depth(m) причалов(в единицах количество) валовой в м е с т и м о с т и ) Crane (Ton х Berthing Capacity (Gross tonnage) No.) 108 Rules for T e c h n i c a l Supervision d u r i n g Construction o f Ships and M a n u f a c t u r e o f M a t e r i a l s and Products for 2.3 О с н о в н о е п р о и з в о д с т в е н н о е и м о н т а ж н о е о б о р у д о в а н и е M a i n Fabrication a n d erection facilities (1) М а р к и р о в к а и резка л и с т о в о й стали ( в к л ю ч а я в н у т р е н н и е э л е м е н т ы ) M a r k i n g a n d cutting o fs t e e l p l a t e s (including internal m e m b e r s ) Способ маркировки Marking method Вручную Да/Yes Нет/No Manual Фото Photo Электрическим способом ЕРМ ЧПУ NC Другое Others Да/Yes Нет/No X Да/Yes Нет/No X Да/Yes Нет/No X Да/Yes Нет/No X Да/Yes Нет/No X Да/Yes Нет/No X шт./pcs шт./pcs шт./pcs шт./pcs - Указать То be specified Станок с Ч П У д л я резки стали NC cutting machine Газовый Gas Плазменный Plasma Лазерный Да/Yes Laser Нет/No X шт./pcs шт./pcs шт./pcs - Способ управления станком с ЧПУ Control procedure o f N C Оперативно On-line Другое Others Да/Yes Нет/No Да/Yes Нет/No Указать То be specified О б о р у д о в а н и е д л я резки Cutting equipment К р о м к о о б р а б а т ы в а ю щ и й станок Edge planer Н о ж н и ц ы д л я резки стали Roll-shear Да/Yes Нет/No X Да/Yes Нет/No X шт./pcs шт./pcs - Ships P a r t I. G e n e r a l Regulations for T e c h n i c a l Supervision 109 (2) М а р к и р о в к а и резка с о р т о в о г о п р о ф и л я M a r k i n g a n d cutting o fsection bar Способ м а р к и р о в к и Marking method Вручную Manual Да/Yes Нет/No Станок с ЧПУ NC Да/Yes Нет/No М а р к и р о в к а контрольной к р и в о й M a r k i n g o freference curved line Вручную Manual Да/Yes Нет/No Станок с ЧПУ NC Да/Yes Нет/No Способ резки Cutting method Вручную Manual Да/Yes Нет/No Станок с ЧПУ NC Да/Yes Нет/No И с п о л ь з о в а н и е станка с ЧПУ In case o f N C Газовый Gas Да/Yes Нет/No X Плазменный Plasma Да/Yes Нет/No X (3) С в а р о ч н ы й а в т о м а т д л я о д н о с т о р о н н е й с в а р к и One-side automatic welding machine шт./pcs шт./pcs Да/Yes Нет/No Тип сварочной машины Type of welding machine На ф л ю с о в о й подушке Flux Backing Да/Yes Нет/No X Сварка под ф л ю с о м на м е д н о й подкладке Flux and Copper Backing Да/Yes Нет/No X Другое Other Yes Да/Yes шт./pcs шт./pcs - Указать To be specified Н а л и ч и е с п е ц и а л ь н о й р а з м е т о ч н о й плиты д л я сварки л и с т о в Existence o fspecial surface plate for plate w e l d i n g Да/Yes Нет/No (4) М а ш и н а д л я с в а р к и у г л о в ы х ш в о в Fillet w e l d i n g m a c h i n e Да/Yes Нет/No Гравитационная Gravity Да/Yes Нет/No Автоматическая Automatic Да/Yes Нет/No П р о ц е н т н о е о т н о ш е н и е а в т о м а т и з а ц и и , за и с к л ю ч е н и е м г р а в и т а ц и о н н ы х машин: около about % 110 Rules for T e c h n i c a l Supervision d u r i n g Construction o f Ships and M a n u f a c t u r e o f M a t e r i a l s and Products for Percentage of automatization except gravity: С п е ц и а л и з и р о в а н н ы й стенд Line w e l d e r Да/Yes Нет/No Наплавка под слоем ф л ю с а Submerged arc Да/Yes головок heads X - Нет/No C02 C02 Да/Yes Нет/No Сварочный автомат небольшого размера для сварки угловых швов Small a u t o m a t i c fillet w e l d i n g m a c h i n e Да/Yes Название Name Нет/No головок heads X _ шт./pcs X Сварочный робот Welding robot Yes No Портальный Portal Да/Yes Нет/No X Р а б о т а ю щ и й в прямоугольной системе координат Rectangular Да/Yes Нет/No X Шарнирно-сочлененный Articulated Да/Yes Нет/No X шт./pcs шт./pcs шт./pcs - (5) О б о р у д о в а н и е д л я нанесения покрытия Painting e q u i p m e n t М а ш и н а д л я д р о б о м е т н о й очистки л и с т а / нанесения грунтового покрытия Plate shot blasting/ primer coating machine Макс, ширина Max. width Указать To be specified M Длина Length Указать To be specified M Да/Yes Нет/No m m М а ш и н а д л я д р о б о м е т н о й очистки сортового п р о ф и л я / нанесения грунтового по крытия Section bar shot blasting/ primer coating machine Макс, д л и н а Max. length Указать To be specified Да/Yes Нет/No M m Участок для нанесения с п е ц и а л ь н ы х покрытий Special coating factory Указать To be м m x Указать To be specified Да/Yes Нет/No 1 м m x Указать To be specified n p эфили se : t i o n s (6) С в а р о ч н ы й автомат д л я вертикальной сварки Vertical a u t o m a t i cwelding m a c h i n e Да/Yes Нет/No Электрогазовая Electrogas Да/Yes Нет/No У п р о щ е н н а я электрогазовая Simplified Electrogas Да/Yes Нет/No Электрошлаковая Electroslag Да/Yes Нет/No (7) Д р у г о е о с н о в н о е производственное о б о р у д о в а н и е Other m a i n fabrication facilities Указать To be specified X X X шт./pcs шт./pcs шт./pcs - Ships P a r t I . G e n e r a l Regulations for T e c h n i c a l Supervision 111 3. К о н т р о л ь к в а л и ф и ц и р о в а н н ы х с в а р щ и к о в , о с у щ е с т в л я е м ы й в е р ф ь ю Shipyard control o fqualified welders ( 1 ) Сталь н о р м а л ь н о й п р о ч н о с т и N o r m a l steel Рабочие верфи Подтвердить наличие системы Shipyard workers Confirm system in place Субподрядные рабочие Подтвердить наличие системы Subcontracted Confirm system in place workers Сертификация П росл ежи ва емость Наблюдение Поддержание квалификации Certification Traceability Supervision Maintenance of qualification Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No Да/Yes Нет/No 4. Х а р а к т е р и с т и к и п р о ц е с с а п о с т р о й к и Feature o fConstruction Procedure ( 1 ) С у б п о д р я д на к о р п у с н ы е б л о к и Да/Yes Нет/No Subcontract o fhull blocks Подэлементы: С о о т н о ш е н и е с у б п о д р я д н ы х работ Sub Ratio o fsubcontracted members: % works С о о т н о ш е н и е с у б п о д р я д н ы х работ Блоки Blocks Ratio o fsubcontracted % works Bee Weight Кол-во с у б п о д р я д ч и к о в No., o f subcontractors Кол-во с у б п о д р я д ч и к о в No., o f subcontractors шт. шт. ( 2 ) С п о с о б с б о р к и б л о к а из л и с т о в M e t h o d o fplate block assembly Способ установки и сварки продольных и поперечных рамных балок на соединенных панелях M e t h o d fitting and welding longitudinals and transverse webs on jointed panels Да/Yes Нет/No Способ сварки продольных связей на соединенных панелях до установки и сварки поперечных рамных балок M e t h o d welding longitudinals o n jointed panels prior t o fitting and welding transverse webs Да/Yes Нет/No Способ установки и сварки шпангоута включает продольные и поперечные рамные балки на соединенных панелях M e t h o d fitting and welding a f r a m e consists o f longitudinals and transverse w e b s o n j o i n t e d panels Да/Yes Нет/No Способ соединения панелей при помощи предварительно собранных продольных связей путем сварки до установки и сварки поперечных рамных балок Да/Yes M e t h o d jointing panels w i t h pre-assembled longitudinals b ywelding prior t o fitting and welding transverse webs Нет/No Другое (указывать ниже в пункте ( 5 ) ) O t h e r (please specify in (5) b e l o w ) Да/Yes Нет/No (3) Выполнен предварительный монтаж оборудования Pre-erection outfitting carried o u t П р и н я т ы е в расчетах б о л ь ш и е и с в е р х к р у п н ы е б л о к и Grand block/mega block Да/Yes Нет/No adopted С п о с о б м о н т а ж а на с т а п е л е / в д о к е M e t h o d o ferection a t building berth/dock М а к с и м а л ь н ы й вес п о д н и м а е м о г о б л о к а : Max. weight o floading block: С п о с о б п о с т р о й к и в д о к е / на с т а п е л е / на берегу и т.д. Construction m e t h o d i n building dock/berth/land construction etc. 1 судно Да/Yes Нет/No 1 ship -1,5 судна Да/Yes Нет/No полутандем semi-tandem Да/Yes Нет/No двухостровной способ dual entrance Да/Yes Нет/No 112 Rules for T e c h n i c a l Supervision d u r i n g Construction of Ships and M a n u f a c t u r e of M a t e r i a l s and Products for П р о ц е с с погрузки б л о к о в Block loading process единичный закладной блок Да/Yes Нет/No single starting block з а к л а д н ы е блоки Да/Yes Нет/No m u l t i starting blocks з а б о й н а я секция Да/Yes Нет/No inserting block ( 4 ) О к о н ч а н и е работ в д о к е Да/Yes Нет/No Final dock в компании Да/Yes Нет/No in h o u s e в д р у г о м месте этой же к о м п а н и и o t h e r place o f t h e s a m e Да/Yes Нет/No company выбрана другая компания Да/Yes Нет/No use o t h e r c o m p a n y ( 5 ) Другие характеристики процесса постройки Other feature of construction procedure Указать To be specified 5. С и с т е м а к о н т р о л я к а ч е с т в а : (см. Р у к о в о д с т в о по качеству, если и м е е т с я ) Quality C o n t r o l S y s t e m : (Refer t o Quality M a n u a l , if available) Вопрос и описание Результат Замечания Item and description Result Remarks ( 1 ) Наличие организационной структуры, включая отделы, занимающиеся проектированием, закупками, производством и Да/Yes о б е с п е ч е н и е м качества Existence of t h e organization chart including t h e d e p a r t m e n t s o f design, purchasing, m a n u f a c t u r i n g and quality assurance Нет/No -Понятны ли функции, ответственность и компетенция организации? Да/Yes - Are the function, responsibility and competence of the organization clear? Нет/No ( 2 ) О т д е л к о н т р о л я качества Quality control organization - Н а л и ч и е о т д е л а к о н т р о л я качества - Existence o fquality control organization - К о л и ч е с т в о с о т р у д н и к о в д а н н о г о отдела (включая руководителя) - N u m b e r o fe m p l o y e e s inthis organization (including t h e cheif) - Н а л и ч и е п р о ц е д у р или планов, о т н о с я щ и х с я к п р о в е д е н и ю испытаний и проверок - Existence o fprocedures o rplans related t o tests and inspections Да/Yes Нет/No человек persons Да/Yes Нет/No Ships P a r t I. G e n e r a l Regulations for T e c h n i c a l Supervision 113 ( 3 ) С и с т е м а п р е д в а р и т е л ь н о й п р о в е р к и верфи Pre-inspection system o f shipyard - П р о в о д и т с я ли п р е д в а р и т е л ь н а я п р о в е р к а д о освидетельствований P C ? - Is p r e - i n s p e c t i o n c a r r i e d o u t p r i o r t o t h e R S i n s p e c t i o n ? Да/Yes Нет/No в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No -Назначаются ли и н с п е к т о р ы , п р о в о д я щ и е п р е д в а р и т е л ь н ы е п р о в е р к и ? ( П р о в е р и т ь список) - A r e p r e - i n s p e c t o r s a s s i g n e d ? ( C h e c k t h e list.) Да/Yes Нет/No в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No N/A N/A - Количество и н с п е к т о р о в , п р о в о д я щ и х п р е д в а р и т е л ь н ы е проверки (только п р и м е н и т е л ь н о к корпусу) - N u m b e r o fpre-inspectors (related t ohull only) в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items человек persons человек persons - Наносятся ли результаты п р о в е р о к на о б ъ е к т и / и л и заносятся ли в чек-лист? - Are inspection results m a r k e d o nt h e object and/or recorded in the checklist? Нет/No в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No Да/Yes N/A ( 4 ) О т ч е т н ы е д о к у м е н т ы по п р о в е р к а м и и с п ы т а н и я м Records o finspections and tests - Составляются и хранятся л и отчетные д о к у м е н т ы д о л ж н ы м образом? - Are records made and kept properly? в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No Да/Yes Нет/No N/A - Проверяет ли ответственное л и ц о о т ч е т н ы е д о к у м е н т ы ? - Does the responsible person verify the records? в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No Да/Yes Нет/No N/A - М о ж е т ли быть проверено принятие н е о б х о д и м ы х к о р р е к т и р у ю щ и х д е й с т в и й по в ы я в л е н н о м у несоответствию? Да/Yes - Can t h e a d o p t i o n o fnecessary corrective actions against n o n ­ conformity happened be checked? Нет/No в т о м числе п р и м е н и т е л ь н о к с у б п о д р я д н ы м о б ъ е к т а м including subcontracted items Да/Yes Нет/No N/A 114 Rules for T e c h n i c a l Supervision d u r i n g Construction of Ships and M a n u f a c t u r e of M a t e r i a l s and Products for ( 5 ) У с л о в и я во в р е м я о с в и д е т е л ь с т в о в а н и й , п р о в о д и м ы х в присутствии и н с п е к т о р о в P C Condition a tt h e t i m e o f t h e surveys i nt h e presence o fRS surveyors - Часто л и м е н я ю т с я сроки о с в и д е т е л ь с т в о в а н и й ? - Is t h e s c h e d u l e o f t h e s u r v e y s c h a n g e d o f t e n ? - Завершаются ли досрочно предварительная проверка, п р о в е р к а верфи и р е м о н т ? - Are pre-inspection, shipyard inspection and repairs completed beforehand? Да/Yes Нет/No Да/Yes Нет/No - Проведена ли достаточная подготовка к о с в и д е т е л ь с т в о в а н и я м , как, н а п р и м е р , у с т а н о в к а л е с о в , освещения, уборка? Да/Yes - Are t h e sufficient preparations for surveys such as scaffoldings, lighting, cleaning m a d e ? Нет/No 6. М е р о п р и я т и я по о б е с п е ч е н и ю о х р а н ы т р у д а и з д о р о в ь я Measures for Safety and Health Вопрос и описание Результат Замечания Item and description Result Remarks ( 1 ) В у д о в л е т в о р и т е л ь н о м л и с о с т о я н и и находятся л е с а , с т р а х о в к а , п р е д о х р а н и т е л ь н ы е пояса, о с в е щ е н и е и в е н т и л я ц и я ? Are conditions o fscaffolding, nets, safety belt, lighting and ventilation good? ( 2 ) Уделяется ли должное внимание радиографическому контролю и работе а в т о п о д ъ е м н и к а с л ю л ь к о й ? Does sufficient a t t e n t i o n paid f o r radiographic e x a m i n a t i o n and o p e r a t i o n o fcherry picker? Да/Yes Нет/No Да/Yes Нет/No Примечание: Note: 7. С и с т е м а и с п ы т а н и й м е т о д а м и н е р а з р у ш а ю щ е г о к о н т р о л я Control System o fNon-Destructive Examination (NDE) Вопрос и описание Результат Замечания Item and description Result Remarks ( 1 ) К о л и ч е с т в о с п е ц и а л и с т о в по м е т о д а м н е р а з р у ш а ю щ е г о контроля на в е р ф и (включая л и ц , о т в е т с т в е н н ы х за о ц е н к у результатов) N u m b e r o fNDE supervisors inshipyard (including persons responsible f o r j u d g i n g results) человек persons ( 2 ) З а в и с и м о с т ь от с у б п о д р я д н ы х работ по м е т о д а м н е р а з р у ш а ю щ е г о к о н т р о л я Dependence o nsubcontracted NDE work - Количество работников верфи человек - N u m b e r o fshipyard e m p l o y e e s persons - Количество субподрядчиков человек - Number o f sub-contractors persons ( 3 ) Название субподрядной организации, занимающейся методами неразрушающего контроля, и официальные квалификационные сертификаты технических специалистов NDE sub-contractor company's n a m e and official technical qualifications Ships P a r t I . G e n e r a l Regulations for T e c h n i c a l Supervision 115 ( 4 ) К а т е г о р и я и к о л и ч е с т в о т е х н и ч е с к и х с п е ц и а л и с т о в на в е р ф и , з а н и м а ю щ и х с я м е т о д а м и н е р а з р у ш а ю щ е г о контроля, которые имеют официальные квалификационные сертификаты Grade and n u m b e r o fNDE e m p l o y e e s w i t h official technical qualifications i n shipyard - С п е ц и а л и з и р у ю щ и е с я в области р а д и о г р а ф и ч е с к о г о контроля - Specialized in radiography - С п е ц и а л и з и р у ю щ и е с я в области у л ь т р а з в у к о в о г о контроля - Specialized in ultrasonic - С п е ц и а л и з и р у ю щ и е с я в области п о в е р х н о с т н ы х м е т о д о в контроля - Specialised insurface detection Кат. grade Чел. persons Кат. grade Чел. persons Кат. grade Чел. persons ( 5 ) Если и с п ы т а н и я м е т о д а м и н е р а з р у ш а ю щ е г о к о н т р о л я п р о в о д я т с я с у б п о д р я д ч и к а м и , категория и к о л и ч е с т в о технических специалистов, имеющих официальные квалифицированные сертификаты If n o n - d e s t r u c t i v e e x a m i n a t i o n s a r e s u b c o n t r a c t e d , t h e g r a d e a n d n u m b e r o f o f f i c i a l l y q u a l i f i e d - С п е ц и а л и з и р у ю щ и е с я в области р а д и о г р а ф и ч е с к о г о контроля persons Кат. grade Чел. persons Кат. grade Чел. persons Кат. grade Чел. persons - Specialized in radiography - С п е ц и а л и з и р у ю щ и е с я в области у л ь т р а з в у к о в о г о контроля - Specialized in ultrasonic - С п е ц и а л и з и р у ю щ и е с я в области п о в е р х н о с т н ы х м е т о д о в контроля - Specialised insurface detection ( 6 ) О б о р у д о в а н и е д л я о с у щ е с т в л е н и я н е р а з р у ш а ю щ е г о к о н т р о л я (на верфи) Non-destructive examination equipment (in-house) - Количество радиографического оборудования - N u m b e r o fradiographic ШТ. equipment pieces - Количество ультразвукового оборудования шт. - N u m b e r o fultrasonic equipment pieces П р и м е ч а н и е : Д а ж е если р а б о т ы в ы п о л н я ю т с я с у б п о д р я д ч и к а м и , р е к о м е н д у е т с я привлечь к в а л и ф и ц и р о в а н н о е ( ы е ) л и ц о ( а ) , к о т о р о е ( ы е ) с м о ж е т ( г у т ) п р о в е р и т ь работу. N o t e : E v e n i f all w o r k s a r e s u b c o n t r a c t e d , i t is r e c o m m e n d a b l e t o a t t a c h t h e q u a l i f i e d p e r s o n ( s ) w h o c a n v e r i f y t h e w o r k s . 8. К о н т р о л ь качества на п р о и з в о д с т в е н н о й л и н и и Quality Control o n Production Line Вопрос и описание Item and description Результат Замечания Result Remarks 8 . 1 П р е д у п р е ж д а ю щ и е д е й с т в и я по п р е д о т в р а щ е н и ю н е п р а в и л ь н о г о п р и м е н е н и я м а т е р и а л о в Preventive measures for misuse o f materials ( 1 ) Д о л ж н о с т и и н с п е к т о р а и л и ц а , о т в е т с т в е н н о г о за с в е р к у з а к а з а н н о й и п о л у ч е н н о й стали и за п р о в е р к у с е р т и ф и к а т о в качества п р е д п р и я т и я (изготовителя) Job title o fsupervisor and person i ncharge o fcollating o r d e r e d steel and received steel, and checking o fmill sheet Должность инспектора: Title o f supervisor: Должность ответственного лица: Title o fperson in charge: 116 Rules for T e c h n i c a l Supervision d u r i n g Construction of Ships and M a n u f a c t u r e of M a t e r i a l s and Products ( 2 ) У с т а н о в л е н ы л и средства контроля и м е ю щ е г о с я м а т е р и а л а д л я сталей в ы с о к о й категории? Are means for checking the material grade in hand prescribed for highgrade steels? ( 3 ) Р а з р а б о т а н ы л и п р а в и л а п р о в е р к и категории м а т е р и а л а д л я стали п о в ы ш е н н о й п р о ч н о с т и и стали, п р е д н а з н а ч е н н о й д л я Да/Yes Нет/No Да/Yes применения в условиях низких температур? Are regulations prescribed for checking the material grade for hightensile steel and steel for l o w - t e m p e r a t u r e applications? Нет/No И м е ю т с я л и п р а в и л а по н а н е с е н и ю н а д п и с и «сталь п о в ы ш е н н о й п р о ч н о с т и » на п о в е р х н о с т и стали п о в ы ш е н н о й прочности и с п е ц и а л ь н о м у о б о з н а ч е н и ю стали, Да/Yes п р е д н а з н а ч е н н о й д л я п р и м е н е н и я в у с л о в и я х низких температур? Are t h e r e regulations for inscribing high tensile steel o n t h e surface o f t h e high tensile steel and special indication f o r steel Нет/No for low temperature applications? ( 4 ) И м е ю т с я л и п р о ц е д у р ы по п о в т о р н о м у и с п о л ь з о в а н и ю остатков Да/Yes н и з к о у г л е р о д и с т о й стали, п о л у ч е н н ы х после резки? Are there procedures for re-using o fremaining cut-off mild steel? ( 5 ) И м е ю т с я л и п р о ц е д у р ы по п о в т о р н о м у и с п о л ь з о в а н и ю остатков стали п о в ы ш е н н о й п р о ч н о с т и , п о л у ч е н н ы х после резки? Are there procedures for re-using o fremaining cut-off high-tensile steel? Нет/No Да/Yes Нет/No ( 6 ) В отношении вышеупомянутых пунктов ( 4 ) и ( 5 ) можно ли п р о в о д и т ь сверку с с е р т и ф и к а т а м и качества п р е д п р и я т и я (изготовителя)? Да/Yes In t h e case o f (4) a n d (5) a b o v e , can a c o l l a t i o n b e m a d e w i t h t h e mill sheet? Нет/No ( 7 ) О т д е л по к о н т р о л ю в е д о м о с т и остатков стали, п о л у ч е н н ы х после резки (указать н а и м е н о в а н и е отдела) S e c t i o n o fc o n t r o l l i n g t h e lists o f r e m a i n i n g c u t - o f f s t e e l (specify t h e n a m e of the Section) П р и м е ч а н и е : в о т н о ш е н и и стали п о в ы ш е н н о й п р о ч н о с т и , с у щ е с т в у ю т л и средства р а з л и ч е н и я к а т е г о р и й ? N o t e : in case o fhigh tensile steel, are m e a n s identifying d i f f e r e n t grades П р и м е ч а н и е : в о т н о ш е н и и в ы ш е у п о м я н у т ы х пунктов ( 3 ) и ( 4 ) , контролируются ли материалы, одобренные другим классификационным обществом, подобным образом? N o t e : i n t h e case o f (3) a n d (4) a b o v e , a r e t h e m a t e r i a l s a p p r o v e d b y o t h e r classes c o n t r o l l e d similarly? Да/Yes Нет/No Да/Yes Нет/No for Ships P a r t I. G e n e r a l Regulations for T e c h n i c a l Supervision 117 8.2 Д р о б е м е т н а я о ч и с т к а / н а н е с е н и е грунтового п о к р ы т и я Shot blastine/Primer coatine ( 1 ) Н а л и ч и е т е х н и ч е с к и х т р е б о в а н и й по подготовке п о в е р х н о с т и Existence o fsurface p r e p a r a t i o n standards ( 2 ) Н а л и ч и е т е х н и ч е с к и х т р е б о в а н и й по к о н т р о л ю т о л щ и н п о к р ы т и я Existence o fcoating thickness c o n t r o l standards - Н а л и ч и е о т ч е т н ы х д о к у м е н т о в по з а м е р а м т о л щ и н - Existence of thickness m e a s u r e m e n t records П р и м е ч а н и е : Т е х н и ч е с к о е т р е б о в а н и е д о л ж н о с о д е р ж а т ь п о л н ы е д а н н ы е о п р о с л е ж и в а е м о с т и м а т е р и а л а после д р о б е с т р у й н о й очистки и нанесения грунтового п о к р ы т и я . N o t e : T h e s t a n d a r d is t o i n c l u d e t h e d e s c r i p t i o n r e l a t e d t r a c e a b i l i t y a f t e r s h o t b l a s t i n g a n d p r i m e r c o a t i n g . 8.3 М а р к и р о в к а и резка (сборка) Marking and cutting (Assembly work) ( 1 ) Н а л и ч и е т е х н и ч е с к и х т р е б о в а н и й по о б е с п е ч е н и ю т о ч н о с т и и п р о в е д е н и ю п е р и о д и ч е с к и х п р о в е р о к рулеток, лент, т р а ф а р е т о в и т.д. Existence o fstandards f o r accuracy and periodical inspection o f tape measures, tapes, stencils, etc. ( 2 ) Н а л и ч и е т е х н и ч е с к и х т р е б о в а н и й по о б е с п е ч е н и ю т о ч н о с т и р а з м е р о в среза и разделки к р о м о к : Existence o fstandards f o r accuracy o fcut d i m e n s i o n s a n d edge preparation: п р о в е р к а д о л ж н а в к л ю ч а т ь п о д т в е р ж д е н и е т о г о , что разделка к р о м о к не с о д е р ж и т с к в о з н ы х о т в е р с т и й , check i t e m s are t o include c o n f i r m a t i o n o fedge preparations free f r o m piercing hole. то же д л я станков с Ч П У д л я с о р т о в о г о п р о ф и л я t h e s a m e is f o r N C f o r s e c t i o n b a r s Да/Yes Нет/No Да/Yes Нет/No ( 3 ) Н а л и ч и е т е х н и ч е с к и х т р е б о в а н и й по зачистке о б р а б а т ы в а е м о г о торца Existence o fstandards f o r finish o fcutting face п р о в е р к а д о л ж н а в к л ю ч а т ь п о д т в е р ж д е н и е т о г о , что разделка к р о м о к не с о д е р ж и т с к в о з н ы х о т в е р с т и й , check i t e m s are t o include c o n f i r m a t i o n o fedge preparations free f r o m piercing hole. то же д л я станков с Ч П У д л я с о р т о в о г о п р о ф и л я t h e s a m e is f o r N C f o r s e c t i o n b a r s Да/Yes Нет/No Да/Yes Нет/No ( 4 ) Каковы периодичность и объем техобслуживания и проверок, в ы п о л н я е м ы х д л я о б е с п е ч е н и я т о ч н о с т и станка с Ч П У д л я резки и/или станка д л я к и с л о р о д н о й с т р о ж к и ? W h a t is t h e f r e q u e n c y a n d e x t e n t o f m a i n t e n a n c e a n d i n s p e c t i o n carried o u t for ensuring accuracy o fN C cutter and/or flame planer? ( 5 ) В о т н о ш е н и и станка с Ч П У с о д е р ж а т с я л и д и с к и , л е н т ы и т.д. в хорошем состоянии? In case o f NC, a r e t h e disks, t a p e s etc. m a i n t a i n e d i n g o o d c o n d i t i o n ? ( 6 ) Какие п р и н я т ы м е р ы и д а н ы указания по п о д р о б н о м у о з н а к о м л е н и ю р а б о ч и х с т е х н и ч е с к и м и т р е б о в а н и я м и по в ы п о л н е н и ю резки д л я о б е с п е ч е н и я т о ч н о с т и ? Да/Yes Нет/No 118 Rules for T e c h n i c a l Supervision d u r i n g Construction o f Ships and M a n u f a c t u r e o f M a t e r i a l s and Products W h a t are the measures adopted and guidance given t o m a k e the worker fully conversant with cutting w o r k standards for maintaining accuracy? 8.4 Гибка и у с т р а н е н и е д е ф о р м а ц и й Bending and strain free ( 1 ) Наличие технических требований в отношении максимальных з н а ч е н и й т е м п е р а т у р ы нагрева в процессе о х л а ж д е н и я в о д о й и в процессе гибки и у с т р а н е н и я д е ф о р м а ц и й стали путем б ы с т р о г о нагрева и о х л а ж д е н и я Existence o fstandards f o r m a x i m u m heating t e m p e r a t u r e s during w a t e r cooling and a tt h e t i m e o fbending and distortion r e m o v a l o f steel by quick heating and cooling ( 2 ) Наличие технических норм в отношении толщины листа и радиуса погиба в процессе о б р а б о т к и ф л а н ц а Existence o fregulations for plate thickness and bending radius for flange processing ( 3 ) Какие п р и н я т ы м е р ы и д а н ы указания по п о д р о б н о м у о з н а к о м л е н и ю р а б о ч и х с т е х н и ч е с к и м и т р е б о в а н и я м и по о б е с п е ч е н и ю качества и т о ч н о с т и в п р о ц е с с е гибки? W h a t are t h e measures a d o p t e d and guidance given t om a k e t h e worker fully conversant with maintaining quality and accuracy during the bending process? Примечание: Note: 8.5 К о н т р о л ь т е х н о л о г и ч е с к о г о п р о ц е с с а с в а р к и Control of Welding Procedure ( 1 ) О д о б р я ю т с я л и все п р и м е н я е м ы е к с у д а м т е х н о л о г и ч е с к и е п р о ц е с с ы сварки P C или д р у г и м и о б щ е с т в а м и - ч л е н а м и М А К О ? A r e all w e l d i n g p r o c e d u r e s a p p l i e d t o t h e ships a p p r o v e d b y t h e RS or o t h e r IACS m e m b e r s ? Да/Yes Нет/No Примечание: Note: 8.6 У с т р а н е н и е з н а ч и т е л ь н ы х н е с о о т в е т с т в и й T r e a t m e n t o fs e r i o u s n o n - c o n f o r m i t i e s ( 1 ) П р е д о с т а в л я ю т с я л и P C п л а н ы р е м о н т а при в ы я в л е н и и значительных несоответствий? Да/Yes Are repair plans s u b m i t t e d t o t h e RS w h e n serious n o n - c o n f o r m i t i e s happened? Нет/No ( 2 ) Б ы л и л и п р е д о с т а в л е н ы планы о с у щ е с т в л е н и я н е р а з р у ш а ю щ е г о контроля ( р а д и о г р а ф и ч е с к о г о и у л ь т р а з в у к о в о г о контроля) в н а д л е ж а щ е е время? W e r e t h e NDE(RT/UT) plans s u b m i t t e d a tappropriate t i m i n g ? ( 3 ) Был л и у в е л и ч е н о б ъ е м и с п ы т а н и й с у ч е т о м их р е з у л ь т а т о в ? W a s t h e extent of tests extended considering t h e results of t h e test? Примечание: Note: Да/Yes Нет/No Да/Yes Нет/No for Ships P a r t I. G e n e r a l Regulations for T e c h n i c a l Supervision 119 8.7 Г и д р о с т а т и ч е с к и е и с п ы т а н и я и и с п ы т а н и я на в о д о н е п р о н и ц а е м о с т ь Hydrostatic and Watertight Tests ( 1 ) П р е д с т а в л е н л и план и с п ы т а н и й P C ? Да/Yes Нет/No Is t h e t e s t p l a n s u b m i t t e d t o t h e R S ? ( 2 ) Применяются ли вакуумные испытания? Are v a c u u m tests applied t o ? Одобрены ли процедуры испытаний P C ? Are the test procedures approved bythe RS? ( 3 ) Применяются ли испытания местным надувом воздуха в Да/Yes Нет/No Да/Yes Нет/No Да/Yes процессе м о н т а ж н о - с б о р о ч н ы х работ? A r e local air i n j e c t i o n tests d u r i n g s u b - a s s e m b l y w o r k s applied t o ? Одобрены ли процедуры испытаний P C ? Are the test procedures approved bythe RS? Нет/No Да/Yes Нет/No Примечание: Note: Инженер(ы)-инспектор(ы) Surveyor(s) подпись(и) signature(s) М.П. LS. фамилия(и), инициалы name(s) 120 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships APPENDIX R E Q U I R E M E N T S F O R O I LT A N K E R S A N D B U L K C A R R I E R S S U B J E C T T O S O L A S C H A P T E R I I - l P A R T A - l R E G U L A T I O N 3-10 5 1 GOAL-BASED SHIP CONSTRUCTION STANDARDS FOR BULK CARRIERS AND OIL TANKERS 1 EXAMINATION AND TEST PLAN F O R NEWBUILDING ACTIVITIES 1.1 T h e shipbuilder shall p r o v i d e plans o f the i t e m s w h i c h a r e intended t o b e e x a m i n e d a n d tested i n accordance w i t h the R S rules i na document k n o w n as the Survey Plan, taking into account the ship type a n d design. T h i s S u r v e y P l a n shall b e reviewed atthe t i m e o f the kick-off meeting, and shall include: .1 a set o frequirements, including specifying t h e extent a n d scope o f t h e construction survey(s) a n d identifying areas that need special attention d u r i n g t h e survey(s), t o ensure compliance o f construction w i t h mandatory ship construction standards including: .1.1 types o f surveys (visual, non-destructive examination, etc.)depending o n location, materials, w e l d i n g , casting, coatings, etc.; .1.2 establishment o f a construction survey schedule for a l l assembly stages f r o m t h e k i c k - o f f m e e t i n g , through all m a j o r construction phases, u p t o delivery; .1.3 inspection/survey p l a n , i n c l u d i n g p r o v i s i o n s f o r critical areas identified d u r i n g design approval; .1.4 inspection criteria for acceptance; .1.5 interaction w i t h shipyard, including notification and d o c u m e n t a t i o n o f survey results; .1.6 correction procedures t o r e m e d y construction defects; .1.7 list o fitems that w o u l d require scheduling o r formal surveys; .1.8 d e t e r m i n a t i o n a n d d o c u m e n t a t i o n o fareas that need special attention throughout ship's life, including criteria used i n m a k i n g the determination; .2 a description o f the requirements f o r a l l types o f testing d u r i n g survey, i n c l u d i n g test criteria. 2 DESIGN TRANSPARENCY 2.1 F o r ships subject t o compliance I M O resolutions MSC.287(87), MSC.290( M S C . 2 9 6 ( 8 7 ) and I M O circular M S C . l / C i r c . 1 3 4 3 , ily available documentation shall include the m a i n with 87), readgoal- based parameters and all relevant design parameters m a y limit the operation o f the ship. that 3 SHIP C O N S T R U C T I O N F I L E (SCF) 3.1 A Ship Construction File ( S C F ) w i t h specific information o n h o w t h efunctional requirements o f the Goal-Based Ship Construction Standards f o r B u l k Carriers a n d O i l Tankers have been applied i nthe ship design and construction shall b e provided upon delivery o f a n e w ship, a n d kept o nb o a r d the ship and/or ashore and updated as appropriate throughout the ship's service. T h e contents o f the Ship Construction File shall c o n f o r m to the requirements below. 3.1.1 T h e f o l l o w i n g design specific i n f o r m a t i o n shall be included i n the Ship Construction File (SCF): .1 areas r e q u i r i n g special attention t h r o u g h o u t t h e ship's life ( i n c l u d i n g critical structural areas); .2 a l l design parameters l i m i t i n g t h e operation o f a ship; .3 a n y a l t e r n a t i v e s t o t h e r u l e s , i n c l u d i n g s t r u c t u r a l details and equivalency calculations; .4 "as built" drawings a n d i n f o r m a t i o n w h i c h a r e verified t o incorporate a l lalterations approved b y t h e Register o r Administration during t h e construction process i n c l u d i n g scantling details, material details, location o fbutts a n d seams, cross section details a n d locations o f all partial and full penetration welds; .5 n e t ( r e n e w a l ) scantlings f o r a l l t h e structural constituent parts, as b u i l t scantlings a n d v o l u n t a r y addition thicknesses; .6 m i n i m u m h u l l girder section m o d u l u s along t h e length o f the ship w h i c h shall b e maintained throughout the ship's life, including cross section details such as the value o f the area o f the deck zone and b o t t o m zone, the renewal value for the neutral axis zone; .7 a listing o f materials used for the construction o f the hull structure, a n d provisions f o r documenting changes t oa n y o f the above d u r i n g the ship's service life; .8 copies o f t h e R S certificates o n forgings a n d castings w e l d e d into t h e h u l l (refer t o 3 . 7 a n d 3 . 8 , ' T h e s e r e q u i r e m e n t s s h a l l b e i m p l e m e n t e d o n s h i p s c o n t r a c t e d f o r c o n s t r u c t i o n o n o r o f a f t e r 1 J u l y 2016. " T h e c o n t r a c t e d f o r c o n s t r u c t i o n date" m e a n s the date, o n w h i c h the contract to b u i l d the ship i s s i g n e d b e t w e e n the p r o s p e c t i v e o w n e r a n d the shipbuilder. F o r further details r e g a r d i n g " t h e d a t e o f c o n t r a c t e d f o r c o n s t r u c t i o n " , r e f e r t o 1.1.2, P a r t i " C l a s s i f i c a t i o n " o f t h e R u l e s f o r t h e C l a s s i f i c a t i o n a n d C o n s t r u c t i o n o f S e a Going Ships. Part I . General Regulations for Technical P a r t Х1П " M a t e r i a l s " o f t h e R u l e s f o r t h e C l a s s i f i c a t i o n and Construction o f Sea-Going Ships); .9 details o f equipment f o r m i n g part o f the watertight and weathertight integrity o f the ship; . 1 0 t a n k testing p l a n i n c l u d i n g details o f the test requirements (refer to A p p e n d i x 1 to Part П " H u l l " o f the Rules f o rt h e Classification a n d Construction o f SeaGoing Ships); .11 details for the in-water survey, w h e n applicable, information for divers, clearances measurements instruc­ tions, etc. t a n k a n d c o m p a r t m e n t b o u n d a r i e s ; .12 d o c k i n g p l a n a n d details normally examined at drydocking; 121 Supervision o f a l l penetrations .13 C o a t i n g Technical F i l e ( C T F ) , for ships subject to compliance w i t h the I M O Performance Standard for Protective Coatings (PSPC ). 1 3.1.2 R e f e r t o t h eTable "List o f I n f o r m a t i o n t o b e Included i nt h eShip Construction File (SCF)" (herein­ after — the Table) f o r details o f i n f o r m a t i o n to b e further included. This information shall b e kept o n board t h e ship and/or ashore and updated as appropriate throughout the ship's life i n order t o facilitate safe operation, maintenance, survey, repair and emergency measures. 3.1.3 I t shall b e noted that parts o f the content o f the S C F m a y b e subject t o various degrees o f restricted access a n d that such d o c u m e n t a t i o n m a y b e appropriately kept ashore. 3.1.4 T h e S C F shall include t h e list o f documents constituting t h e S C F a n d all information listed i n t h e T a b l e , w h i c h i s r e q u i r e d f o r a ship's safe operation, maintenance, survey, repair and i n emergency situations. Details o f specific i n f o r m a t i o n that i s n o t considered t o be critical t o safely m i g h t b e included directly o r b y reference t o other documents. 3.1.5 W h e n developing a nS C F , all o f the columns i n the Table shall b e reviewed t o ensure that all necessary i n f o r m a t i o n has been provided. 3.1.6 It m a y b epossible to provide information listed in I M O resolution M S C . 2 8 7 ( 8 7 ) under more than o n e Tier I I functional requirement as a single i t e m w i t h i n the SCF, for example, the Coating Technical File required b y the P S P C is relevant for both "Coating life" and "Survey during construction". 2 1 3.1.7 T h e S C F shall r e m a i n w i t h t h e ship and, i n addition, b e available t othe Register and Administration throughout t h e ship's life. W h e r e i n f o r m a t i o n n o t considered necessary t o b e o n board i s stored ashore, procedures t o access this i n f o r m a t i o n shall b e specified in the onboard SCF. T h e intellectual property provisions within the S C F shall b e duly complied with. 3.1.8 T h e S C F shall b eupdated throughout the ship's life a t a n ym a j o r event, including, b u t n o tlimited t o , substantial repair and conversion, o rany modificationt o the ship structure. 4 DETERMINATION OF NUMBER O F SURVEYOR(S) R S shall assign adequate n u m b e r o f suitable qualified s u r v e y o r s ) for n e w b u i l d i n g projects according to t h e construction progress o f each ship t o meet appropriate coverage o f t h e examination a n d testing activities as agreed i n the S u r v e y Plan. 'Performance Standard for Protective Coatings for Dedicated Seawater Ballast Tanks i n all Types o f Ships a n d Double-Side Skin Spaces o f B u l k Carriers, adoptedb y I M O resolution MSC.215(82), as a m e n d e d a n d Performance Standard for Protective Coatings for C a r g o Oil T a n k s o f Crude Oil Tankers, adoptedb y I M O resolution MSC.288(87), as amended. "Tier П items" m e a n s the functional requirements included i n the International G o a l - B a s e d Ship Construction Standards for B u l k Carriers and Oil Tankers ( G B S ) , adopted b y I M O resolution MSC.287(87). 2 122 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships List of Information t obe Included in the Ship Construction File (SCF) Table Nos. Tier П items Information to b e included Further explanation o f the content E x a m p l e documents N o r m a l storage location DESIGN 1 D e s i g n life SCF-specific on board ship midship section plan on board ship statement referencing data source or R S rules (specific rule a n d data) or, i n a c c o r d a n c e w i t h the R S rules (date a n d revision) SCF-specific on board ship ( d a t e a n d applied design m e t h o d alternative t o the R S rules and subject structure^) SCF-specific on board ship a s s u m e d d e s i g n life i n y e a r s Environmental con­ assumed environmental conditions ditions statement or note on midship section Structural strength 3.1 General design applied R S rules revision) applied alternative to the R S rules 3.2 D e f o r m a t i o n a n d calculating conditions a n d results; failure m o d e s assumed loading conditions 3.3 Ultimate strength operational restrictions structural strength 3.4 Safety margins strength calculation results allowable loading pattern capacity plan on board ship loading manual on board ship m a x i m u m allowable hull girder bending trim a n d stability on board ship m o m e n t and shear force booklet d u e t om a x i m u m allowable storage factor cargo density o r loading instrument on board ship instruction m a n u a l operation and main­ on board ship tenance manuals strength calculation o n shore archive b u l k y output o f strength calculation p l a n s h o w i n g h i g h l y s t r e s s e d a r e a s (e.g. critical structural areas) p r o n e to yielding and/or buckling areas prone t o yiel­ ding and/or buckling on board ship gross hull girder section modulus m i n i m u m hull girder section m o d u l u s along the length o f the ship to b e maintained throughout the ship's life, including cross section details s u c h a s the value o f the area o fthe deck zone and bottom zone, the renewal value for the neutral axis zone general plan gross scantlings constituent parts k e y construction plans o f s t r u c t u r a l structural drawings net scantlings o fstructural consti­ rudder a n d stern frame tuent parts, as built scantlings and voluntary addition thicknesses structural details o f typical m e m b e r s hull form arrangement on board ship rudder and stock plans rudder on board ship structural details on board ship yard plans o n shore archive dangerous area p l a n on board ship hull f o r m information indicated i n k e y lines plan construction plans hull f o r m data stored within a n onboard computer necessary for trim a n d stability on board ship o n shore archive Part I . General Regulations for Technical Supervision 123 Table Nos. Tier П items Information to b e included Further explanation o f the content continued E x a m p l e documents N o r m a l storage location a n d longitudinal strength calculations 4 F a t i g u e life equivalent on board ship a p p l i e d R S rules (date a n d r e v i ­ sion) applied alternative to the R S rules applied design m e t h o d alternative t o the R S rules a n d subject structures SCF-specific on board ship calculating conditions a n d results a s s u m e d loading conditions a n d rates structural details on board ship b u l k y output o f fatigue life calculation f a t i g u e l i f e c a l c u l a t i o n o n shore archive assumed loading conditions fatigue life calculation results p l a n s h o w i n g a r e a s (e.g. c r i t i c a l s t r u c t u r a l a r e a s p r o n e to fatigue areas) p r o n e to fatigue 5 Residual strength 6 Protection against corrosion 6.1 C o a t i n g life 6.2 Corrosion addition a p p l i e d R S rules (date a n d revision) c o a t e d areas a n d target coating life p l a n s s h o w i n g a r e a s ( e . g . c r i t i c a l a n d other measures for corrosion structural areas) p r o n e t o e x c e s s i v e protection i n holds, cargo a n d corrosion ballast tanks, other structureintegrated deep tanks and void spaces on board ship SCF-specific on board ship SCF-specific on board ship C o a t i n g T e c h n i c a l on board ship File required b y PSPC specification for coating and other measures for corrosion protection in holds, cargo and ballast tanks, other structure-integrated deep tanks and void spaces areas prone t o exce­ ssive corrosion on board ship gross scantlings constituent parts k e y construction plans on board ship SCF-specific on board ship o f structural net scantlings o fstructural consti­ tuent parts, as built scantlings and voluntary addition thicknesses 7 Structural dancy r e d u n ­ a p p l i e d R S rules (date a n d revision) 8 on board ship W a t e r t i g h t a n d a p p l i e d R S rules (date a n d revision) SCF-specific weathertight inte­ grity k e y factors f o r w a t e r t i g h t a n d details o f e q u i p m e n t f o r m i n g part o f the structural details o f o n b o a r d ship weathertight integrity watertight and weathertight integrity hatch covers, doors and other closings integral with t h e shell and bulkheads 9 Human e l e m e n t list o f ergonomic d e s i g n principles considerations a p p l i e d t o ship structure d e s i g n t o enhance safety during operations, inspections a n d maintenance o f ship SCF-specific 10 Design rency intellectual provisions t r a n s p a ­ a p p l i e d R S rules (date a n d revision) on board ship property on board ship applicable industry standards f o r design transparency a n d I P protection reference t o part o f S C F infor­ mation kept ashore s u m m a r y , location on board ship and access proce­ dure for part o f S C F information on shore 124 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Table Nos. Tier П items Information to b e included Further explanation o f the content recognized national o r international construction quality standard Ships continued E x a m p l e documents N o r m a l storage location CONSTRUCTION 11 Construction qua­ lity procedures applied construction quality stan­ dard 12 Survey during con­ struction s u r v e y r e g i m e a p p l i e d d u r i n g a p p l i e d R S rules (date a n d revision) SCF-specific construction (to include all o w n e r a n d class s c h e d u l e d inspections copies o f certificates o f f o r g i n g s a n d t a n k testing p l a n during construction) castings w e l d e d into the hull information examination o n non-destructive on board ship SCF-specific non-destructive ting plan on board ship on board ship tes­ on board ship C o a t i n g Technical on board ship F i l e required b y P S P C IN-SERVICE CONSIDERATIONS 13 Survey and tenance on board ship m a i n ­ m a i n t e n a n c e p l a n s specific t o the p l a n s h o w i n g h i g h l y stressed areas (e.g. S C F - s p e c i f i c s t r u c t u r e o f t h e s h i p w h e r e h i g h e r critical structural areas) p r o n e t o yielding, attention is called for buckling, fatigue and/or excessive corrosion operation a n d mainte­ o n b o a r d s h i p n a n c e m a n u a l s (e.g. hatch covers a n d doors) preparations for survey arrangement (docking plan) a n d details o f d o c k i n g p l a n all penetrations n o r m a l l y e x a m i n e d a t dry docking on board ship gross hull girder section modulus details for d r y - d o c k i n g dangerous area plan on board ship Ship Structure A c ­ cess M a n u a l on board ship m i n i m u m h u l l g i r d e r s e c t i o n details for in-water s u r v e y m o d u l u s along the length o f the ship t o b e maintained throughout the ship's life, including cross section details s u c h a s the value o f the area o fthe deck zone and b o t t o m zone, the renewal value for the neutral axis z o n e M e a n s o f access t o o n board ship other structure-inte­ grated deep tanks C o a t i n g Technical on board ship F i l e required b y P S P C gross scantlings o f structural con­ stituent parts k e y construction plans net scantlings o f structural cons­ tituent parts, a s built scantlings and voluntary addition thicknesses rudder stock and rudder on board ship structural details yard plans hull form information indicated i n k e y construction plans lines plan hull form or equivalent on board ship on board ship o n shore archive o n shore archive on board ship Part I . General Regulations for Technical Supervision 125 Table Nos. 14 Tier П items Structural bility Information to b e included Further explanation o f the content continued E x a m p l e documents N o r m a l storage location a c c e s s i ­ m e a n s o f a c c e s s to h o l d s , cargo a n d p l a n s s h o w i n g a r r a n g e m e n t a n d details o f S h i p Structure A c c e s s o n b o a r d s h i p ballast tanks a n d other structure- m e a n s o f access Manual integrated deep tanks means o f access t o on board ship other structure-inte­ grated deep tanks RECYCLING CONSIDERATIONS 15 Recycling identification o f all materials that list o f materials u s e d for the construction were u s e d i n construction a n d m a y o f the hull structure need special handling d u e to environmental and safety concerns SCF-specific on board ship N o t e s : 1. " S C F - s p e c i f i c " m e a n s d o c u m e n t s t o b e d e v e l o p e d especially t o m e e t t h e requirements o f these G B S guidelines (MSC.l/Circ.1343). 2. " K e y c o n s t r u c t i o n p l a n s " m e a n s p l a n s s u c h a s m i d s h i p s e c t i o n , m a i n o i l t i g h t a n d w a t e r t i g h t t r a n s v e r s e b u l k h e a d s , c o n s t r u c t i o n p r o f i l e s / p l a n s , s h e l l e x p a n s i o n s , f o r w a r d a n d aft s e c t i o n s i n c a r g o t a n k (or h o l d ) r e g i o n , e n g i n e - r o o m c o n s t r u c t i o n , f o r w a r d c o n s t r u c t i o n a n d s t e r n construction drawings. 3. " Y a r d p l a n s " m e a n s a f u l l s e t o f s t r u c t u r a l d r a w i n g s , w h i c h i n c l u d e s c a n t l i n g i n f o r m a t i o n o f a l l s t r u c t u r a l m e m b e r s . 4. " H u l l f o r m " m e a n s a g r a p h i c a l o r n u m e r i c a l r e p r e s e n t a t i o n o f t h e g e o m e t r y o f t h e h u l l . E x a m p l e s s h a l l i n c l u d e t h e g r a p h i c a l d e s c r i p t i o n provided b y a lines plan a n d the numerical description provided b y the hull f o r m data stored within a n onboard computer. 5. " L i n e s p l a n " m e a n s a s p e c i a l d r a w i n g w h i c h i s d e d i c a t e d t o s h o w t h e e n t i r e h u l l f o r m o f a s h i p . 6. " E q u i v a l e n t (to L i n e s p l a n ) " m e a n s a s e t o f i n f o r m a t i o n o f h u l l f o r m t o b e i n d i c a t e d i n k e y c o n s t r u c t i o n p l a n s f o r S C F p u r p o s e s . S u f f i c i e n t i n f o r m a t i o n shall b e i n c l u d e d i n the d r a w i n g s to p r o v i d e the g e o m e t r i c definition to facilitate the repair o f a n y part o f the h u l l structure. 7. " N o r m a l s t o r a g e l o c a t i o n " m e a n s a s t a n d a r d l o c a t i o n w h e r e e a c h S C F i n f o r m a t i o n i t e m s h a l l b e s t o r e d . H o w e v e r , t h o s e i t e m s l i s t e d a s b e i n g o n b o a r d i n the T a b l e a b o v e shall b e o n b o a r d as a m i n i m u m to ensure that t h e y are transferred w i t h the ship o n a c h a n g e o f owner. 8. " S h o r e a r c h i v e " s h a l l b e o p e r a t e d i n a c c o r d a n c e w i t h a p p l i c a b l e i n t e r n a t i o n a l s t a n d a r d s . PART II. T E C H N I C A L DOCUMENTATION 1 APPLICATION 1.1 T h e p r o v i s i o n s o f t h e p r e s e n t P a r t a r e a p p l i e d i n review o f the technical documentation o n construction o f ships and manufacture o f materials and products for ships subject to the Register technical supervision i n compliance w i t h the General Regulations for the Classification and Other Activity. 1.2 T h e s e p r o v i s i o n s a r e a l s o a p p l i e d i n r e v i e w o f the technical documentation o n conversion, modernization, restoration and repair o f the items o f technical s u p e r v i s i o n as f a r as i t is p r a c t i c a b l e a n d r e a s o n a b l e . 2 DEFINITIONS AND EXPLANATIONS 2.1 D e f i n i t i o n s a n d e x p l a n a t i o n s r e l a t e d t o t h e general t e r m i n o l o g y o f the R S rules are g i v e n i n 1.1, Part I "Classification" o f the Rules for the Classification and Construction o f Sea-Going Ships. Terms and definitions used i n the present Part and related t o the technical d o c u m e n t a t i o n are g i v e n i n Section 1, Part I "General Regulations for Technical Supervision" o f the present Rules. 3 GENERAL 3.1 C o n s t r u c t i o n o f ships a n d m a n u f a c t u r e o f materials and products for ships shall be i n compliance w i t h the technical documentation approved (agreed) b y the Register. 3.2 R e v i e w ( e x p e r t i s e ) o f t h e t e c h n i c a l d o c u m e n t a t i o n a i m s at v e r i f i c a t i o n o f the c o m p l i a n c e o f the i t e m s o f technical supervision w i t h the R S requirements. 3.3 T e c h n i c a l d o c u m e n t a t i o n o n i t e m s o f t e c h n i c a l supervision shall be submitted to the Register for review and approval (agreement) prior to the commencement o f construction (manufacture) o f the items. Documents shall be English languages. compiled i n the Russian or Documents shall be submitted: .1 i n h a r d c o p y ( i n the f o r m o f originals, duplicates or copies); or .2 i n e l e c t r o n i c f o r m i n P D F f o r m a t ( o n C D , b y e-mail, v i a FTP-server or i n a different w a y agreed w i t h the Register). It is n o t a l l o w e d t o s u b m i t d o c u m e n t a t i o n partially i n electronic f o r m and partially i n hard copy. 3 . 4 T e c h n i c a l d o c u m e n t a t i o n s u b m i t t e d to t h e R e g i s t e r for r e v i e w shall be prepared i n such a w a y or supplied w i t h such additional information that enables to m a k e sure that the appropriate provisions o f the R S rules and international conventions a n d agreements are fulfilled. 3.5 F o r c l a s s a s s i g n m e n t t o a s h i p u n d e r c o n s t r u c t i o n t h e p l a n a p p r o v a l d o c u m e n t a t i o n , as s t a t e d i n 3 . 2 , P a r t I "Classification" o f the Rules for the Classification and Construction o f Sea-Going Ships, and i n 3.2, Part I "Survey Regulations" o f the Rules for the Equipment o f Sea-Going Ships ( i fapplicable), and i n other rules for the classification and construction o f specialized types o f s h i p s a n d f i x e d o f f s h o r e p l a t f o r m s ( r e f e r t o 1.3 o f General Regulations for the Classification and Other Activity) shall be submitted to the Register for approval. T h e scope o f technical documentation for ships and products o f special design a n d p u r p o s e is subject t o agreement w i t h the Register i n e a c h particular case. Standards o n individual materials and products agreed w i t h the Register m a y substitute the relevant part o f t h e d o c u m e n t a t i o n o r d o c u m e n t a t i o n as a w h o l e . 3.6 U p o n r e q u e s t o f t h e c u s t o m e r (shipyard, designer, shipowner or another project originator), the technical documentation review and approval m a y be performed b y the Register i n the scope o f technical design. I n this case the scope o f d o c u m e n t a t i o n subject t o approval shall be agreed w i t h the Register i n each particular case. 3.7 W h e r e n o v e l e n g i n e e r i n g s o l u t i o n s a r e u s e d , a n d for the purpose o f feasibility studies, tendering process, etc., t h e p e r f o r m a n c e s p e c i f i c a t i o n , draft p r o p o s a l , t e n d e r documentation, conceptual design, engineering analysis p r o c e d u r e as w e l l as e x p e r i m e n t a l d e s i g n a n d r e s e a r c h d e v e l o p m e n t s ( F r o n t E n d E n g i n e e r i n g D e s i g n , etc.) a n d other documentation o f h i g h degree o f novelty m a y be s u b m i t t e d t o the Register f o r r e v i e w . S u c h d o c u m e n t s are not subject to approval, and o n the results o f their r e v i e w a w r i t t e n c o n c l u s i o n (expert o p i n i o n ) o f the R e g i s t e r is compiled (refer to 8.5). O n the customer's request, the Register m a y r e v i e w t h e a b o v e t e c h n i c a l d o c u m e n t a t i o n as p a r t o f " A p p r o v a l Part II. Technical Documentation in Principle" ( A I P ) service. W i t h regard t o this service, the written conclusion (expert opinion) contains t h e additional information including, b u tn o t limited to, t h e following: list o f actions w i t h respect t o t h e project a i m e d a t obtaining the R S approval; information o nn e w R Srequirements t o b e implem e n t e d a t subsequent stage o f the documentation r e v i e w ; 127 The m a i n provisions concerning approval o f computer-aided calculation programs a n d agreement o f calculation procedures a r estated i nSection 1 2 . 3.10 A m e n d m e n t s made i n the technical documentation approved (agreed) b ythe Register and dealt w i t h the fulfillment o f the R Srequirements shall b e submitted t o the Register f o rreview prior t o their implementation (refer t o Section 10). list o f restrictions a n d conditions o f u s e f o r t h e 3.11 I proposed n e w engineering solutions based o n their shows full engineering evaluation and research results. compliance quirements, D u e t o t h e novelty o f t h e proposed engineering solutions, t h e scope o f technical documentation submitted t o t h e Register, a n d t h e actions required f o r rendering A I P service aresubject t o agreement b e t w e e n t h e c u s t o m e r a n d t h e R e g i s t e r i n e a c h particular case. Technical documentation shall contain general information o n t h e item, drawings, specifications, engineering analysis results, test reports, etc., w h e r e applicable. 3.8 T h eRegister r e v i e w s a n dagrees t h e R u s s i a n standards (national standards and standards o f organizations) as w e l l as standards o f other countries a n d international standards containing n o r m s a n d requirements for items o f the Register technical supervision. Standards o f another country areagreed u p o n w h e n t h e y are officially s u b m i t t e d b y a state o r g a n i z a t i o n o f the country for agreement. I n case standards o f another c o u n t r y a r e submitted together w i t h the technical documentation o n items o f the Register technical supervision, t h e y are r e v i e w e d as part o f that documentation, a n d a possibility o f their application i n each case i s c o n f i r m e d b y t h e approval o f the technical documentation without agreement o f the standards themselves. The m a i n provisions concerning agreement o f standards a n d other n o r m a t i v e documents a r estated i n Section 7. 3.9 Calculations necessary f o r determination o f parameters a n d values regulated b y t h e R S rules shall be m a d e i n compliance w i t h the provisions o f these rules or according t o t h e standards, methods a n d other normative documents agreed b ythe Register. The procedures a n dmethods o fcalculations used shall provide a n adequate accuracy o f t h e problem solution. Computer-aided calculations shall b e made i n accordance w i t h t h eprograms having type approval o f the Register. The Register does n o t check t h e correctness o f computing operations i n calculations, including those made according t othe programs having type approval o f the Register b u t examines o n l y t h e final results o f the calculations. I n separate cases, the R e g i s t e r m a y conduct additional expertise o f the accuracy o f the final results. n case t h e submitted technical d o c u m e n t a t i o n ( o r recognized b y t h eRegister as adequate) o ft h e items o fsupervision w i t h t h e R S r e this d o c u m e n t a t i o n i s approved (agreed). The documentation, w h i c h does n o t meet t h e R S requirements, is returned t o t h e design office f o r further w o r k and/or updating. 3.12 T h efact that t h ed o c u m e n t a t i o n i s approved (agreed) i s a c k n o w l e d g e d b yp u t t i n g o n it the appropriate stamps o f the Register (refer t o 8.3). A p p r o v a l (agreement) relates o n l y t o t h e technical documentation covered b ythe R S requirements. 3.13 W h e r e technical documentation contains technical solutions that differ f r o m those regulated b y t h e R S rules (deviations), t h edesign office shall s u b m i t the list o fthese solutions w i t h description o ftheir essence and technical grounds. T h eRegister informs o f its decisions t a k e n o nthe list i n its conclusion o n the results o f r e v i e w . D e v i a t i o n s n o t included i n t h e list a r e n o t considered as approved, a n d t h e Register m a y require their elimination a t a n y subsequent stage o f design, construction o rmanufacture o f the item. 3.14 A p p r o v a l o ft h e technical documentation b y any Register Branch Office is valid f o r a l l other R S B r a n c h Offices. S u c h approval m a y b e ( i n case o f proper reasons) cancelled o r altered o n l y b y t h e R S Branch Offices, w h i c h approved the documentation, as w e l l a s a h i g h e r R S B r a n c h O f f i c e u p t o R H O . The technical documentation approved b yone o f the Register B r a n c h Offices i s accepted b y other Register Branch Offices f o r carrying o u t technical supervision without additional approval o fthe documentation concerned, provided n o updating i s required b y t h e production conditions o f the particular f i r m (manufacturer). 3.15 T h e differences o fprinciple o n t h e technical documentation shall b e finally resolved by: .1 R H Oi n relation o f technical designs, p l a n approval documentation, specifications a n d n o r m a t i v e documents; .2 t h e R S B r a n c h O f f i c e s i n r e l a t i o n t o detailed design documentation. 3.16 T h eRegister charges fees f o r r e v i e w o f t h e technical documentation i naccordance w i t h its current tariffs (irrespective o f the results o f review). 3.17 A l l t h edocumentation submitted t othe Register for r e v i e w is c o n f i d e n t i a l a n d m a y b e h a n d e d o v e r t o a t h i r d party o n l y u p o n the w r i t t e n consent o f its legal o w n e r . 128 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 4 TECHNICAL DOCUMENTATION ON SHIPS 4.1 P l a n a p p r o v a l d o c u m e n t a t i o n , p r o j e c t s i n v o l v i n g m a j o r conversions o f ships, passage o f ships, as w e l l as the d o c u m e n t a t i o n stated i n 3 . 6 a n d3 . 7 a r e subject t o review and approval b y R H O or b y the R S Branch Office w h e n duly authorized b y R H O . T h e projects involving m i n o r conversion (outfitting, modernization) as w e l l as technical documentation o n ships o f less t h a n 1 0 0 gross t o n n a g e ( e x c l u d i n g h i g h speed craft, passenger ships, tankers, tugs, ships designed for carriage o f dangerous goods, pleasure craft w i t h passenger capacity m o r e than 12) shall b e reviewed b y the R S Branch Offices w i t h o u t the R H O authorization. 4.2 R e q u e s t s f o r r e v i e w o f p l a n a p p r o v a l d o c u m e n t a t i o n s h a l l b e s e n t to t h e r e l e v a n t R S B r a n c h O f f i c e d e p e n d i n g o n t h e t y p e o f t h e d o c u m e n t a t i o n a c c o r d i n g to 4 . 1 . A request shall contain the following information: project number; ship type; ship purpose; ship m a i n particulars; date o f contract f o r c o n s t r u c t i o n o f the ship o r series o f sister ships, as w e l l as h u l l n u m b e r s ( i . e. o r d e r n u m b e r s ) o f all ships included i n t h e contract, w i t h indication o f optional ships; confirmation that t h e organization h a s been familiarized w i t h t h e General Conditions f o r Rendering Services b y Russian M a r i t i m e Register o f Shipping; guarantee o f p a y m e n t f o r the R S services. 4.3 P l a n a p p r o v a l d o c u m e n t a t i o n , a s w e l l a s t h e documentation stated i n 3 . 6 submitted for the Register approval shall b e reviewed b y t h e Register f o r c o m pliance w i t h t h eR S requirements i n effect o n t h e date o f s i g n i n g the contract f o r construction o f a ship (series o f ships). I n t h e absence o fthe contract for construction t h e documentation shall b ereviewed for compliance w i t h the R S requirements i n effect o no n e o f the f o l l o w i n g dates, as a p p l i c a b l e : .1 k e e l l a y i n g date o r the date o n w h i c h the ship w a s at a s i m i l a r stage o f construction; .2 the date o f the customer's request f o r d o c u m e n t a tion review b ythe Register ( i fthe terms o f construction o f the ship (series o f ships) are n o t k n o w n y e t ) . I n case o f 4.3.2, a n d i f n e w R Srequirements came into force o n t h edate o fsigning t h econtract for construction o f the ship (series o f ships), o r o n t h e k e e l l a y i n g date, o r o n t h e date o n w h i c h t h e ship w a s at a s i m i l a r stage o f c o n s t r u c t i o n ( i n the absence o f the contract f o rconstruction), t h e documentation shall b e amended i n compliance w i t h these n e w requirements. 4.4 P l a n a p p r o v a l d o c u m e n t a t i o n , p r o j e c t s i n v o l v i n g m a j o r conversions o f ships, passage o f ships, as w e l l as the d o c u m e n t a t i o n stated i n 3.6 shall b e submitted t o the Register as a set either i nhard copy i ntriplicate o r i n electronic f o r m according t o 3.3.2. T h e d o c u m e n t a t i o n stated i n3 . 7 shall b e submitted to t h eRegister as a set either i n o n ehard copy o r i n electronic f o r m according t o 3.3.2. Documentation shall b e submitted with a covering letter w i t h a list o f documents t ob e s u b m i t t e d f o r r e v i e w attached. O n t h eRegister request, t h e designer shall s u b m i t additional documents t o support a n dexplain t h e solutions adopted i n the design. S u b m i s s i o n o f the documentation b y separate parts ( o n h u l l , m a c h i n e r y , systems, electrical e q u i p m e n t , etc.) m a y b e a l l o w e d o n agreement w i t h the Register. I n s o doing, specification and general arrangement plans shall be submitted together w i t h t h e first p o r t i o n o f t h e documentation, as w e l l as the complete list o f documents to b e submitted for review. 4.5 I n g e n e r a l , t h e R e g i s t e r r e v i e w o f t h e d o c u m e n tation setstated i n 4.1 takes 3 0 w o r k i n g days. I n case the d o c u m e n t a t i o n i s s u b m i t t e d b y parts, i t s r e v i e w takes 3 0w o r k i n g days f r o m the date o f receiving the last p o r t i o n . Duration o f the documentation review m a ybe reduced u p o n agreement w i t h t h e Register i n each particular case. Part II. Technical Documentation 129 5 TECHNICAL DOCUMENTATION ON PRODUCTS 5.1 R H O o r t h e R S B r a n c h O f f i c e s , i f d u l y authorized b y R H O , review a n d approve t h e technical documentation o n the products against w h i c h description s y m b o l s "С", "СТО" o r " C 3 " a r e i n d i c a t e d i n c o l u m n s 4 and 5 o ft h e R S N o m e n c l a t u r e (refer t o A p p e n d i x 1 , Part I "General Regulations for Technical Supervision", as w e l l a s o n n e w p r o d u c t s , w h i c h a r e n o t r e g u l a t e d b y the R S rules a n d have n o t been used before i n shipbuilding a n d ship machine building. The technical documentation o n t h eitems s h o w n u n d e r other letters i n t h e R S N o m e n c l a t u r e m a y b e reviewed a n d approved b y t h e R S Branch Offices without the R H O authorization. 5.2 T h e d e s i g n d o c u m e n t a t i o n s h a l l b e s u b m i t t e d t o the Register i ntriplicate, detailed design documentation — i n duplicate. It is allowed t o submit documentation i n electronic f o r m according t o 3.3.2. 5.3 I n c a s e p r o d u c t s o r t h e i r p a r t s o r a s s e m b l i e s indicated i n t h e R S Nomenclature are produced i n compliance w i t h standards, the standards shall b e agreed u p o n w i t h the Register i naccordance w i t h Section 7 . 5.4 T h e t e c h n i c a l d o c u m e n t a t i o n o n t h e p r o d u c t s o f a s s e m b l y u n i t t y p e s o r o n sets o f p r o d u c t s , etc., w h i c h include t h e component parts indicated i n t h eR S N o ­ menclature a n d supplied b y subcontractors (generators, reduction gears, p r i m e m o v e r s o f generators, compres­ sors, p u m p s , d e c k m a c h i n e r y , a u t o m a t i o n systems, etc.) is a p p r o v e d a f t e r a p p r o v a l b y t h e R e g i s t e r o f t h e technical d o c u m e n t a t i o n o n the c o m p o n e n t parts. I n particular cases, t h e Register m a y approve t h e technical documentation o nassembly units, the technical documentation o f w h i c h component parts does n o t have the Register approval, p r o v i d e d satisfactory results o f testing component parts together w i t h assembly units s h o w their suitability for o n board operation (mechanical a n d c l i m a t i c tests) a n d their electromagnetic compa­ tibility (for electrical a n d electronic equipment). 5.5 W h e r e t h e p r o d u c t s a r e d e s i g n e d n o t a s t y p e products b u t f o r a particular ship, t h e technical documentation o n such products is generally reviewed b y the Register within the ship technical documentation. 5.6 W h e r e u s e i s m a d e o f t y p e p r o d u c t s m a n u f a c ­ tured i n accordance w i t h t h etechnical documentation approved b ythe Register, the latter reserves the right for additional review o f their possible u s e within t h e particular ship project. 5.7 I n c a s e t h e t e c h n i c a l d o c u m e n t a t i o n f o r t h e products is presented for r e v i e w a n dapproval complete w i t h t h eship design (upon the agreement w i t h the f i r m (manufacturer)), t h eresults o f i t s r e v i e w a r e c o m m u ­ nicated t o t h edesigner b y a separate letter. 5.8 T h e p r o d u c t s r e f e r r e d t o i n t h e R S N o m e n c l a t u r e and intended for repairs a n d supply o f the ships w i t h spare parts shall b e manufactured according t o t h e technical documentation approved b ythe Register. 5.9 I n c a s e t h e t e c h n i c a l d o c u m e n t a t i o n o n s p a r e parts f o r products i n service is developed anew, t h e developer o fthe documentation shall present i t t o t h e R S B r a n c h Office, i n w h i c h area t h e documentation developer i s located, f o r r e v i e w a n d approval together w i t h the i n f o r m a t i o n , w h i c h c o n f i r m s t h ecompliance o f the design a n d materials o fspare parts t o t h e specifica­ tions o f these products. Technical documentation submitted t o t h e Register for approval shall b e reviewed for compliance w i t h t h e requirements o f the R S rules being i n force o n the date o f contract for manufacture o f the products. 5.10 A d d i t i o n a l r e q u i r e m e n t s f o r s u b m i t t i n g t h e I C E documentation t o t h eRegister for review a n d approval are g i v e n i n Appendices 2 a n d 3 t o S e c t i o n 5 "Machinery" o fPart T V "Technical Supervision during Manufacture o f Products". 130 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 6 TECHNICAL DOCUMENTATION ON MATERIALS 6.1 T e c h n i c a l d o c u m e n t a t i o n o n m a t e r i a l s s h a l l b e submitted f o r review a n d approval t o R H O or, i fso i n s t r u c t e d b y R H O , to t h e R S B r a n c h O f f i c e s i n d u p l i c a t e . It is a l l o w e d t o submit documentation i n electronic f o r m according t o 3.3.2. 6.2 D o c u m e n t a t i o n s h a l l b e s u b m i t t e d a s s t a n d a r d s , specifications a n dsimilar documents containing necessary information o nthe production procedure, chemical composition, mechanical a n d technological properties, 7 NORMATIVE 7.1 N a t i o n a l s t a n d a r d s a n d g u i d e l i n e s , a s w e l l a s international standards (refer t o 3.8) shall b e submitted for r e v i e w t oR H O ; standards o f organizations and other normative documents — t o t h eappropriate R S B r a n c h Offices situated w i t h i n the area o f their operation. Standards o f another c o u n t r y are considered b y R H O or the R S Branch Office, i f duly authorized b y R H O . 7.2 A l l w o r d i n g s o f t h e n o r m a t i v e d o c u m e n t s s h a l l be submitted for review but only the final w o r d i n g o f the document shall b e agreed upon. 7.3 T h e R e g i s t e r c o m p i l e s a w r i t t e n c o n c l u s i o n ( o p i n i o n ) o n the first a n d intermediate w o r d i n g s o f the n o r m a t i v e documents, w h i c h is sent t o t h e d o c u m e n t developer, and the documents arekept for the Register files. 7.4 W h e r e d r a w i n g s h a v e b e e n p r o d u c e d , c a l c u l a tions m a d e a n d other documents compiled as w e l l as v a r i o u s tests carried o u t f o r t h e p u r p o s e o f d e v e l o p m e n t or revision o f the normative document, the Register m a y scope o f tests a n d testing procedures, d r a w i n g - u p o f the test results a n d m a r k i n g procedure. 6.3 W h e r e m a t e r i a l s a r e m a n u f a c t u r e d i n a c c o r d a n c e w i t h t h e standards, t h e latter shall b e r e v i e w e d a n d agreed u p o n i ncompliance w i t h Section 7 . 6.4 P r o v i s i o n s o f 5.5 t o 5.9 c o n c e r n i n g t h e p r o d u c t s are also applicable t o materials as far as i ti s practicable and reasonable. DOCUMENTS require these documentation submitted for review. a n d test results to be 7.5 W h e r e i t i s f o u n d i n t h e c o u r s e o f t h e n o r m a t i v e document review that the content o f the documentation is not i n full compliance w i t h t h e R S requirements, t h e Register m a y require the additional documentation t o b e s u b m i t t e d f o r r e v i e w o ra d d i t i o n a l tests t o b e carried out. 7.6 W h e n t h e n o r m a t i v e d o c u m e n t s a r e r e v i e w e d and agreed upon, one shall b e guided b y the following: .1 n e w l y d e v e l o p e d d o c u m e n t s f o r the i t e m s subject t o the Register technical supervision during manufacture are agreed u p o n b y the Register, p r o v i d e d their requirements are a t least as stringent as those o f the R S requirements; .2 w h e r e t h e r e q u i r e m e n t s o f t h e p r e v i o u s l y published documents d o not meet the R S requirements, their applica-tion is subject t o special consideration o f the Register. I n the subsequent revision o f these documents, their requirements shall b e brought i ncompliance w i t h the R S requirements. P a r t II. T e c h n i c a l Documentation 131 8 PREPARATION OF RESULTS OF TECHNICAL DOCUMENTATION REVIEW 8.1 U p o n results o f t h e technical documentation review, t h eRegister puts t h e appropriate stamps o n t h e d o c u m e n t s and/or c o m p i l e s a c o n c l u s i o n letter. W h e n reviewing t h e technical documentation i n electronic form, stamping iscarried out b ysoftware tools and is certified b y digital signature o f t h e Register authorized specialist. 8.2 T h e Register applies t h ef o l l o w i n g stamps (refer to Figs. 8.2-1 t o 8.2-6). 8.3 T h es t a m p t o b e a p p l i e d i s d e t e r m i n e d b yt h e Register depending o n a d o c u m e n t type a n d result o f its review. U p o n approval (agreement) o f t h e technical doc­ umentation, t h e Register puts t h e appropriate stamps, namely: PC .ГЛАВНОЕ У П Р А В Л Е Н И Е . HEAD OFFICE ОДОБРЕНО .1 stamps s h o w n i nFigs. 8.2-1 a n d8.2-2 a r ep u t o n the structural drawings, (basic a n d functional) circuits, test p r o g r a m s , other s i m i l a r d o c u m e n t s ; .2 s t a m p s s h o w n i nF i g s . 8.2-3 a n d 8.2-4 a r ep u t o n the list o fequivalent structures, materials a n d products, various calculations, descriptions, technical back­ grounds, ship specifications a n dgeneral v i e w drawings w i t h o u t indication o f structural dimensions, lists o f products a n d materials (applied), lists o f spare parts, research reports a n d test results, etc, as w e l l as o n t h e n o r m a t i v e documents (standards, i n c l u d i n g t h e shipyard standards, regulations, etc.); .3 s t a m p s s h o w n i n F i g . 8 . 2 - 5 a r e p u t o n t h e documents approved o nbehalf o f Administrations. 120 RS ПОДРАЗДЕЛЕНИЕ BRANCH OFFICE PC ОДОБРЕНО APPROVED Дата / D a t e _ RS APPROVED Дата / D a t e _ 312-01 001 F i g . 8.2-1 120 ГЛАВНОЕ УПРАВЛЕНИЕ HEAD OFFICE PC ОДОБРЕНО при условии выполнения замечаний письма RS A P P R O V s Eu b jDe c t ПОДРАЗДЕЛЕНИЕ BRANCH OFFICE PC ОДОБРЕНО to comments in letter при условии выполнения замечаний письма RS APPROVED t o c o ms umbej en ct ts in letter № Дата / D a t e _ Дата / D a t e _ 312-02 002 F i g . 8.2-2 .120 .ГЛАВНОЕ У П Р А В Л Е Н И Е . HEAD OFFICE СОГААСОВАНО p £ AGREED ПОДРАЗДЕЛЕНИЕ. BL > lR\ АЛ1 A N" N VC_ HI I O F FI II VC- EL СОГЛАСОВАНО Дата / D a t e _ Дата / D a t e _ 312-03 003 F i g . 8.2-3 AGREED 132 Rules for T e c h n i c a l Supervision d u r i n g Construction o f Ships .ГЛАВНОЕ У П Р А В Л Е Н И Е . HEAD OFFICE PC С ОприГ Л АСОВАНО условии выполнения замечаний письма and M a n u f a c t u r e o f M a t e r i a l s and Products 120 RS AGREED при условии выполнения замечаний письма Дата / D a t e _ Ships ПОДРАЗДЕЛЕНИЕ BRANCH OFFICE PC СОГЛАСОВАНО subject to comments in letter for RS AGREED subject to comments in letter Дата / D a t e _ 312-04 004 Fig. 8.2^ ГЛАВНОЕ УПРАВЛЕНИЕ HEAD OFFICE PC ОДОБРЕНО Российским морским регистром судоходства по поручению Морской администрации 312-05 120 ПОДРАЗДЕЛЕНИЕ BRANCH OFFICE PC ОДОБРЕНО RS APPROVED Российским морским регистром судоходства по поручению Морской администрации Approved by the Russian Maritime Register of Shipping under the authority of Maritime Administration of Дата / D a t e _ 005 RS APPROVED Approved by the Russian Maritime Register of Shipping under the authority of Maritime Administration of Дата / D a t e . F i g . 8.2-5 .ГЛАВНОЕ У П Р А В Л Е Н И Е . HEAD OFFICE PC ДЛЯ FOR ИНФОРМАЦИИ INFORMATION 1 2 0 ПОДРАЗДЕЛЕНИЕ BRANCH OFFICE PC RS ДЛЯ FOR RS ИНФОРМАЦИИ INFORMATION Дата / D a t e _ Дата / D a t e 006 312-06 F i g . 8.2-6 T h e various i n f o r m a t i o n documents n o t subject t o review f o r compliance w i t h t h e R S requirements are stamped as s h o w n i nF i g . 8.2-6. 8.4 E a c h sheet o f t h e structural d r a w i n g shall b e stamped. Paper-bound documents comprising several sheets w i t h t h e same registration number, such as specifications, descriptions, calculations, instructions, lists, test p r o g r a m s , etc., s h a l l b e s t a m p e d o n l y o n t h e d o c u m e n t title page. Stamp o n t h e title page o f electronic document certified b y digital signature m a y apply to all pages o f the document. 8.5 B a s e d o n t h e results o fr e v i e w o fthe technical documentation referred t o i n 3.6 a n d 3.7, t h e Register compiles a conclusion letter w i t h o u t stamping o r signing the documents. 8.6 I n case o f negative results o f r e v i e w , t h e R S requirements are communicated i n t h e conclusion letter. N o R e g i s t e r s t a m p s a r e p u t o n the d o c u m e n t s . 8.7 I n case o f a single approval o f t h e technical documentation o n materials a n d products (refer t o Section 1 , Part I "General Regulations f o r Technical Supervision"), a n entry o n limitation o fthe material o r p r o d u c t a p p l i c a t i o n (e.g., " f o r P r o j e c t 1 5 0 1 0 " , etc.) s h a l l be made i nt h e approval stamp o r under t h e stamp a n d this s h a l l b e also i n d i c a t e d i nt h e c o n c l u s i o n letter. 8.8 T h e requirements laid d o w n b y t h e Register i n the course o f approval o f the design documentation o f a ship under construction shall b e taken into account b y appropriate updating o f t h e documentation bearing stamps s h o w n i n F i g s . 8.2-2 a n d 8.2-5 t o the satisfaction o f the R S B r a n c h Office i n charge o ftechnical super­ vision during construction o f a ship. Part II. Technical Documentation The R SBranch Offices shall communicate information o n cancelling t h e remarks t o t h e Register Branch Office, w h i c h has approved the design documentation o f a ship under construction as a w h o l e , not later than o n e m o n t h before the delivery. 8.9 T h e d e t a i l e d d e s i g n d o c u m e n t a t i o n s h a l l b e approved w i t h o u t a n yremarks. T h e approval is issued o n l y u p o n canceling all the remarks b ythe designer. 8.10 C o p i e s o f t h e d o c u m e n t s b e a r i n g t h e o r i g i n a l stamps o f the Register a r econtrol copies. 8.11 O n e s e t o f t h e a p p r o v e d t e c h n i c a l d o c u m e n t a tion o n ships, materials a n d products together w i t h t h e conclusion letter a r e sent t o t h e designer a n d t h e RS Branch Office, w h i c h w i l l b e i n charge o f review of t h e detailed design documentation o r technical supervision during construction (manufacture) o f t h e i t e m . T h e t h i r d set o f t h e a p p r o v e d d o c u m e n t a t i o n i s k e p t in t h e Register B r a n c h Office that h a s reviewed t h e documentation. Documentation approved i n electronic f o r m is submitted t o t h edesigner a n dt o t h eR S B r a n c h Office b y e-mail, v i a F T P - s e r v e r o r i n a different w a y m u t u a l l y agreed. U p o n approval o f the detailed design documentation, o n e set i sr e t u r n e d t o the designer, the o t h e r is k e p t b y the RS Branch Office, w h i c h h a s reviewed t h e docu- 133 mentation. I f specially agreed u p o n w i t h the R S Branch Office, another procedure for keeping approved detailed design d o c u m e n t a t i o n (e.g., a t t h e designer o r f i r m (manufacturer) where technical supervision will b e effected, o n conditions agreed u p o n w i t h the R S B r a n c h Office) m a y b e adopted. W h e r e ship's construction i s supervised b y another RS Branch Office, o n e set o f t h e detailed design documentation together w i t h t h e conclusion letter shall be sent t othis B r a n c h Office. 8.12 U p o n r e v i e w a n d a g r e e m e n t o f t h e f i n a l w o r d i n g o f t h e n o r m a t i v e document, t h e Register sends t o t h e organization, w h i c h submitted t h e document, a n appropriate written confirmation o n agreement o f the document; the document itself w i t h the Register stamp iskept i n the R e g i s t e r B r a n c h O f f i c e files a s t h e c o n t r o l c o p y . 8.13 R H O c a r r i e s o u t , w h e r e n e c e s s a r y , t h e c o n t r o l check o f the technical documentation o nships, materials and products reviewed a n dapproved b ythe R S B r a n c h Offices upon the R H O authorization. The order o f review o f the technical documentation in R H O and i n the R S B r a n c h Office i sestablished b y the appropriate R S internal normative documents (procedures, instructions). 134 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for 9 DURATION OF VALHHTY OF TECHNICAL DOCUMENTATION (AGREEMENT) 9.1 T h e p e r i o d o f v a l i d i t y o f t h e R e g i s t e r a p p r o v a l for plan approval documentation is limited b ythe period o f contract validity f o r construction o f the ship o r series o f sister ships. I n this case, i t i sm a n d a t o r y t o m e e t the r e q u i r e m e n t s o f international conventions a n d R S circulars w i t h d u e regard f o r the dates set f o r their i m p l e m e n t a t i o n d u r i n g construction o f ships according t othe Register-approved technical documentation (refer t o 9.5), a n d t h e R S B r a n c h Office i ncharge o f technical supervision during construction o f the ship checks the implementation. Ships APPROVAL as a g r e e d s t a n d a r d s a n d o t h e r n o r m a t i v e d o c u m e n t s a r e subject t o m a n d a t o r y updating w i t h regard t o adopted requirements o f international conventions a n d agreements that h a v e c o m e into force after approval (agreement) o fthe documentation. A l l approved a n d agreed documentation is also subject t oupdating, h a v i n g regard to the requirements o f the R S circular letters that require their mandatory fulfillment. 9.6 T h e r e q u i r e m e n t s o f t h e R S r u l e s a s w e l l a s o f international conventions a n d agreements that are i n i n effect o n the date o f s u b m i s s i o n o f the documents shall 9.2 T h e v a l i d i t y o f t h e R e g i s t e r a p p r o v a l o f t h e b e t a k e n i n t o c o n s i d e r a t i o n i n t h e t e c h n i c a l d o c u m e n t a tion submitted f o r re-approval (re-agreement) upon technical documentation o n materials a n dproducts i n e x p i r y o f validity o f its previous approval. case o f a single approval (refer t o Section 1 , Part I "General Regulations f o r Technical Supervision") is 9.7 T h e R e g i s t e r a p p r o v a l ( a g r e e m e n t ) o f t h e limited b y t h e time o f delivery o f t h e materials a n d technical d o c u m e n t a t i o n loses its v a l i d i t y : products o rconstruction o f ships, f o r w h i c h the materials .1 u p o n e x p i r y o f a p p r o v a l v a l i d i t y ( w h e r e t h e t e r m and products are intended. is i n d i c a t e d ) ; 9.3 T h e R e g i s t e r a p p r o v a l o f t h e t e c h n i c a l d o c u m e n t a t i o n o n materials a n d products i n case o f type approval (refer to Section 1, Part I "General Regulations for Technical Supervision"), including the specifications, is v a l i d f o r a p e r i o d o f s i x y e a r s . Approval o f t h e technical documentation f o r t h e products specified i n5.8 h a sn o d u r a t i o n o f validity. 9.4 S t a n d a r d s a n d o t h e r n o r m a t i v e d o c u m e n t s o n materials and products shall b e agreed for the period o f their validity. .2 u p o n e x p i r y o f t h e d o c u m e n t a t i o n v a l i d i t y ( w h e r e the t e r m is indicated); .3 i n c a s e a m e n d m e n t s w e r e i n t r o d u c e d w i t h o u t consent o f t h e Register into t h e approved (agreed) d o c u m e n t a t i o n dealing w i t h the issues, w h i c h are w i t h i n the Register terms o f reference. 9.8 T h e R e g i s t e r m a y c a n c e l i t s a p p r o v a l ( a g r e e ment) o f the technical documentation or change the terms o f a p p r o v a l ( a g r e e m e n t ) i n the f o l l o w i n g cases: W h e n revising t h e standards a n dnormative documents they shall b e checked t o take account o f t h e current R S rules. .1 i f t h e d o c u m e n t a t i o n has n o t b e e n t i m e l y b r o u g h t in line w i t h the provisions o finternational conventions and agreements, as w e l l as w i t h the requirements o f the R S circular letters as s e tf o r t h u n d e r 1 0 . 1 ; 9.5 I r r e s p e c t i v e o f t h e a p p r o v a l v a l i d i t y , t h e t e c h n i c a l documentation o nships, materials and products, as w e l l .2 i f t h e q u a l i t y a n d r e l i a b i l i t y o f m a t e r i a l s a n d i t e m s are r e g u l a r l y l o w a n d d o n o t m e e t the R S requirements. Part II. Technical Documentation 135 10 I N T R O D U C T I O N O F A M E N D M E N T S I N T O A P P R O V E D TECHNICAL DOCUMENTATION (AGREED) 10.1 A n y amendments t o t h etechnical documenta­ tion approved (agreed) b ythe Register that m a y relate t o the requirements regulated b y t h e R S rules o r interna­ tional conventions shall b e approved (agreed) b y t h e Register based o n the results o f r e v i e w o f the appropriate notifications o n t h e amendments o r o f t h e reissued amended documents. the development o f the detailed design documentation o r the construction o fthe ship o r t h e manufacture o f the product. T h e amendments shall b e detailed o rspecified i n the amended documents, plans. 10.5 A n y amendments t o t h e specifications for t h e materials and products approved b ythe Register shall b e reviewed a n dapproved b y t h eRegister Branch Office, w h i c h h a s approved these specifications. 10.2 R e v i e w a n dapproval o famendments t o t h e design documentation shall b e carried out b y the Register Branch Office, w h i c h has approved this documentation. 10.3 A n y amendments t o t h e detailed design documentation made during the construction o f the ship or t h e manufacture o f t h e product that m i g h t affect solutions adopted i nt h edesign documentation shall b e reviewed a n dapproved b y t h eRegister Branch Office, w h i c h hasapproved the design documentation. A m e n d m e n t s t o t h e detailed design documentation that d o n o t affect t h e solutions adopted i n t h e design documentation shall b e reviewed a n d approved b y t h e R S Branch Office i ncharge o f technical supervision o f 10.4 A n y amendments t ot h enormative documents agreed b ythe Register shall b e r e v i e w e d a n d agreed b y the Register B r a n c h Office, w h i c h h a s agreed these documents. 10.6 T h eprocedure f o r review a n d approval (agreement) o f amendments t othe technical documenta­ tion referred t oi n 10.1 t o 10.5 above m a y b e altered o r updated w h e n necessary at the discretion o f R H O i n each particular case. 10.7 T h e Register B r a n c h Office that i s i ncharge o f approval o f t h e amendments made i n t h e technical documentation approved earlier shall timely i n f o r m t o that effect t h e R S B r a n c h Office, w h i c h carries o u t technical supervision during construction o f ship o r manufacture o f materials and products, respectively. 11 F I N A L D O C U M E N T A T I O N O N A S H I P T O B E S U B M I T T E D T O T H E R E G I S T E R 11.1 U p o n c o m p l e t i o n o f construction, trials a n d commissioning o f the ship, the final documentation shall be sent f o r i n f o r m a t i o n t o t h eR S B r a n c h Office f o r in-service supervision. T h e amount o f the documentation a n d t h eorder o f its s u b m i s s i o n s h a l l b e agreed u p o n w i t h t h e R S B r a n c h Office i n charge o f technical supervision during construction o f the ship prior t o completion o f the ship construction. W h e r e necessary, a n appropriate entry shall be m a d e i nthe contract o n technical supervision signed between the R SBranch Office and the shipyard. A p p r o x i m a t e lists o f the final documentation, w h i c h m a y b e reduced o r extended i n each particular case depending o nspecific features o f the ship structure, a r e given in Appendix. I n p a r t i c u l a r , f o r o i l t a n k e r s a n d b u l k c a r r i e r s s u b j e c t to S O L A S C h a p t e r П-l P a r t A - l R e g u l a t i o n 3 - 1 0 , t h e l i s t o f final d o c u m e n t a t i o n s h a l l a l s o c o n t a i n t h e d o c u m e n t s g i v e n under items 1, 3.1 - 3.4, 4 , 6 . 1 , 8, 10, 12, 1 3a n d 1 5i n the L i s t o f I n f o r m a t i o n to B e I n c l u d e d i n t h e S h i p C o n s t r u c t i o n F i l e ( S C F ) ( r e f e r to A p p e n d i x 5 to P a r t I " G e n e r a l Regulations for Technical Supervision"). I n o r d e r t o r e d u c e t h e n u m b e r o f t h e final d o c u m e n t s to b e sent t o the R S B r a n c h Offices, c o m b i n e d drawings and layouts areallowed. 1 1 . 2 T h e final d o c u m e n t s shall correspond t o t h e constructions actually done o n board, installed machi­ nery, a r r a n g e m e n t s , e q u i p m e n t , systems, etc. 11.3 E a c h d o c u m e n t shall b e p r o v i d e d w i t h a stamp "final" o r"operating". T h e documents shall b e signed b y a developer's official responsible for their development and correct information contained therein. T h e list o f final d o c u m e n t a t i o n Register stamp (refer t oF i g . 8.2-3). shall bear t h e 1 1 . 4 T h e final d o c u m e n t a t i o n s h a l l b e s e n t to t h e R S B r a n c h O f f i c e i n o n e c o p y f o r t h e first s h i p o f a s e r i e s a n d a single ship. I f ships o f t h e s a m e series a r e i n t e n d e d f o r operation under technical supervision o f different R S B r a n c h O f f i c e s , o n e c o m p l e t e s e t o f t h e final d o c u m e n t a ­ t i o n o n t h e first s h i p o f t h e s e r i e s , o p e r a t e d u n d e r t e c h n i c a l supervision o f the particular R S B r a n c h Office shall b e sent to e a c h R S B r a n c h O f f i c e . I n f u t u r e t h e d o c u m e n t s specified i n 1.5,2.5 t o2.9, 3.12, 3.13, 6.7 o f the A p p e n d i x , t h e d o c u m e n t s to w h i c h m a j o r a m e n d m e n t s h a v e b e e n made, and n e w l y developed documents shall b e sent t o the R S B r a n c h O f f i c e s f o r t h e ships o f a series. 1 1 . 5 T h e final d o c u m e n t a t i o n o n t h e first s h i p o f a series a n d a single ship shall b e sent t o t h eR S B r a n c h Offices n o t later t h a n six m o n t h s after c o m m i s s i o n i n g o f the ship, a n d f o r ships o f a series, n o tlater t h a n three m o n t h s after c o m m i s s i o n i n g o f the first ship o f the series to a particular basin. 136 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 12 P R O G R A M M E S F O R C O M P U T E R - A I D E D C A L C U L A T I O N S 12.1 D E F I N I T I O N S grammes m a y b e presented t othe Register together w i t h the technical documentation o nt h e ship. A l g o r i t h m is a set o f a finite n u m b e r o f mathematical operations performed w i t h initial data i n a certain sequence a n d used f o rimplementation o f a calculation procedure. 12.2.3 I n o r d e r t o o b t a i n t h e T y p e A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) , the materials shall b e submitted t o the Register contain­ ing the following: C a l c u l a t i o n m e t h o d isa method for solving p r o b l e m ( s ) o f a certain class, b a s e d o nm o r e o r less full idealization o f a real physical object (construction o r system), w h i c h includes a finite n u m b e r o f input a n d output parameters characterizing t h e object, a n d assump­ tions used t o simplify the solution o f the problem. T h e calculation method shall provide u s e o f particular mathematical methods t o arrive at n u m e r i c a l results, w h i c h are t h e parameters characterizing t h e object. .1 n a m e o f t h e p r o g r a m m e ; .2 c o m p u t e r t y p e , p r o g r a m m i n g l a n g u a g e , n a m e o f the programme developer; C a l c u l a t i o n p r o c e d u r e is a seto f methods for t h e practical solution o f a particular problem, enabling t o arrive at n u m e r i c a l results. O n b o a r d c o m p u t e r a c t i v e s y s t e m is a software system that uses, as input i n f o r m a t i o n , data f r o m sensors automatically reading t h e contents o f tanks and other ship loading parameters. O n b o a r d c o m p u t e r p a s s i v e s y s t e m is a software system that requires m a n u a l entry o f input data for calculation. P r o g r a m m e is a systematized sequence o f mathematical computer-aided operations, w h i c h imple­ ments a n algorithm f o rsolving a problem. S o f t w a r e isa totality o f programmes intended for solving a certain p r o b l e m ( o r a n u m b e r o f problems), using a shipborne computer o f a certain type. 12.2 T Y P E A P P R O V A L O F P R O G R A M M E S .3 t e c h n i c a l procedure. documentation o n t h e calculation T h e procedures f o r calculations, w h i c h results a r e used i n developing t h etechnical d o c u m e n t a t i o n o n t h e ship, shall b e agreed u p o n w i t h t h e Register. The technical documentation required f o r t h e calculation procedure submitted t o t h e Register shall contain: mathematical statement o fa p r o b l e m , descrip­ tion o f a procedure (method) f o r solution o f a problem w i t h indication o frestrictions o n application, accuracy, convergence criteria as w e l l as analysis o fa proposed procedure a n d adopted assumptions f o rcompliance w i t h the R S rules, references, etc. A n appropriate reference shall b e m a d e calculation procedure already k n o w n (agreed); for the .4 detailed instructions o n u s e o f t h e p r o g r a m m e a n d preparation o fthe initial data w i t h enclosure o ftype forms; .5 test c o n d i t i o n s o f calculations w i t h listing o ft h e initial data a n d calculation results w i t h explanation o fall initial data a n d results. O n preliminary agreement w i t h t h e Register, used as a test task f o r a c o m p u t e r m a yb e : calculations o n the check task issued b y t h e Register; comparison w i t h calculation using a reference p r o ­ g r a m m e , w i t h results o f full-scale a n d m o d e l experiments. Test conditions shall cover the w h o l e range o fthe basic variable parameters. 12.2.1 P r o g r a m m e s o f c o m p u t e r - a i d e d c a l c u l a t i o n s , w h i c h results a r e part o f technical documentation t o b e submitted t o the Register f o rapproval according t o 3.8, shall b e approved b y t h e Register. The programmes are approved b y , a n d t h e Type A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6.8.5) is issued b y R H O . P r o g r a m m e s o fcomputer-aided calculations u s e d f o r automated counting, w h i c h come t o performance o f separate computations f o r determination o f auxiliary values, shall b e duly noted b y t h e Register. 12.2.2 C o m p u t e r - a i d e d c a l c u l a t i o n p r o g r a m m e s , f o r w h i c h t h e T y p e A p p r o v a l Certificate for C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) i s i s s u e d i n a c c o r d a n c e w i t h 1 2 . 2 . 1 , s h a l l b e s u b m i t t e d to t h e R e g i s t e r b e f o r e t h e i r a p p l i c a t i o n . I n separate cases, c o m p u t e r - a i d e d calculation pro­ The conditions shall contain verification calculations for t w otypes o f ships f o r w h i c h type approval is requested. W h e r e approval isrequested for o n l y o n e type o f ship, a m i n i m u m o f t w o conditions f o r different hull forms o fthat type o f ship shall b e submitted. For approval o fa programme w h i c h isbased o nthe i n p u t o f h u l l f o r m data, test c o n d i t i o n s s h a l l i n c l u d e calculations f o r three types o fships o r three different h u l l forms i f approval is requested f o ro n l y o n e type o f ship; .6 m i n i m u m configuration o f a computer system required for programme operation i ndifferent modes a n d w i t h different quantities o f initial data, i n f o r m a t i o n o n type a n d n u m b e r o f necessary input-output devices, R A M a n d mass m e m o r y as w e l l as o n t h e type o ft h e operation system, f o ruse with w h i c h the programme is oriented. Part II. Technical Documentation 137 Information o n recognition o f a particular prog r a m m e b y other classification societies o r competent organizations m a y also b e submitted t othe Register. I n separate cases, based o n t h e a b o v e r e c o g n i t i o n , the Register m a y allow t o submit t h edocumentation i n the lesser scope. The technical documentation o n t h e calculation procedure a n d computer-aided calculation programme shall b e submitted i n duplicate. T h e d o c u m e n t a t i o n shall h a v e number, title and shall be registered i na n established order. 12.2.4 W h e n the calculation procedure is considered, account shall b e taken o f the following criteria: national conventions, reference t o t h e year o f their edition. Listing shall also contain i n f o r m a t i o n o nt h e p r o g r a m m e , necessary f o r its identification; .5 t h e s o f t w a r e s h a l l h a v e a n easy s y s t e m o f inputting t h e required data a n d outputting t h e results and shall also provide t h e protection against input o f unspecified data, such as: input o fweights a n dcentre o fgravity positions o f cargoes (stores), w h i c h values exceed those specified for the particular space; positioning o c c u p i e d , etc.; o f containers i n t h e places already reliability o f physical process representation; validity o f assumptions; compliance o fthe calculation results w i t h those o f check calculations. .6 t h e s o f t w a r e s h a l l p r e v e n t a p o s s i b i l i t y o f m a k i n g a n y changes i n the initial data b y user as regards general arrangement, w e i g h t and centre o f gravity position o f the light ship; 12.2.5 T h e p r o g r a m m e s are checked f o r suitability o f the algorithm f o r calculation procedure adopted, f o r correct a l g o r i t h m logic asw e l l as correlation b e t w e e n the results o f calculations m a d e according t o the p r o g r a m m e concerned a n d test c o n d i t i o n s . .7 the Register does n o t restrict a p r o g r a m m e builder in choosing a programming language a n d software development methods; t h e developed programmes, however, shall c o m p l y w i t h the up-to-date requirements, including availability o f a fetch protection unit, a n u n a u t h o r i z e d c o p y i n g p r o t e c t i o n u n i t , etc.; The programmes shall following requirements: also comply with the .1 provision shall b e made i n the programmes using large quantity o f the initial data for checking these data before m a k i n g calculations, i n c l u d i n g , w h e r e necessary, visual checking w i t h plotted o rprinted output; .2 t h e c a l c u l a t i o n p r o g r a m m e s h a l l p r e s e n t a l l relevant parameters o f each loading condition. W h e n m a k i n g calculations, t h euser shall b e provided w i t h at least the f o l l o w i n g characteristics: d e a d w e i g h t data; lightship data; trim; draught a t the draught marks and perpendiculars; s u m m a r y o f loading condition displacement, vertical centre o f gravity, longitudinal centre o f gravity a n d transverse centre o f gravity, d o w n f l o o d i n g angle a n d corresponding downflooding opening; .8 the software shall p r o v i d e the possibility o f calling on the display o f a n easy and detailed guidance for user (HELP); .9 decoding o f basic terms a n dcharacteristics shall have English translation. 12.2.6 W h e n t h eresults o fcheck calculations a r e verified using t h esubmitted procedure a n d computeraided calculation programme, account shall b e taken both o fcompliance o fcalculation procedures a n d t h e p r o g r a m m e w i t h the above criteria and calculated values and parameters w i t h the requirements o f the R S rules. 12.2.7 T h e computational accuracy o f the calculation p r o g r a m m e results shall b e w i t h i n t h e acceptable tolerances o f the results u s i n g t h ea p p r o v e d I n f o r m a t i o n on Stability w i t h identical input o r a n independent p r o g r a m m e approved b ythe Register. P r o g r a m m e s w h i c h u s e pre-programmed data f r o m c o m p l i a n c e w i t h stability criteria: listing o f a l l the approved I n f o r m a t i o n o n Stability as t h e basis f o r criteria, t h e l i m i t values, t h e obtained values a n d t h e stability calculations, shall have zero tolerances f o r t h e p r i n t o u t s o f i n p u t data. conclusions (criteria fulfilled o rnot fulfilled). I f direct damage stability calculations are performed, the r e l e v a n t d a m a g e cases shall b e pre-defined f o r automatic check o f a given loading condition. .3 t h e s o f t w a r e s h a l l b e r e l i a b l e , i.e. t o f u n c t i o n f a i l free w i t h i n t h e w h o l e calculation range a n dt o p r o v i d e the accuracy for a specified time, agreed u p o n w i t h t h e Register; .4 p r i n t e d c a l c u l a t i o n results s h a l l c o n t a i n i n f o r m a tion o nt h einitial data (including references t o t h e data bases used), values o f t h e calculation results w i t h indication o ftheir designations as w e l l as, i ncase u s e is m a d e i n t h e p r o g r a m m e o f t h e r e q u i r e m e n t s o f t h e R S rules o r other R Snormative documents, a n dinter- O u t p u t data tolerances shall b e close t o zero, however, s m a l l differences associated w i t h calculation r o u n d i n g o r abridged i n p u t data a r eacceptable. Differences associated w i t h the use o f hydrostatic and stability data f o r trims that differ f r o m those i n t h e approved I n f o r m a t i o n o n Stability, m a y b e accepted subject t o agreement w i t h the Register. W h e n output data a r e calculated t h r o u g h prog r a m m e s w h i c h u s e h u l l f o r m m o d e l s as their basis f o r calculations, t h e tolerances shall b e obtained b y t h e formula: D e v i a t i o n i n% = {(base value — calculated value)/ b a s e v a l u e } «100, 138 Rules for Technical Supervision during Construction of Ships and Manufacture however, they shall n o texceed those specified i n Table 12.2.7. T h e base value m a yb e f r o m t h e approved I n f o r m a ­ tion o nStability o ra nindependent p r o g r a m m e approved b y t h e Register. A n e x a m p l e o f p r e - p r o g r a m m e d initial data: H y d r o s t a t i c data: displacement, abscissa a n d applicate o f t h e centre o fb u o y a n c y , abscissa o f t h e centre o f floatation, height o f metacenter a n dm o m e n t t o trim 1 c m (all are as a function o f draught). Stability data: stability cross-curves o rresidual a r m s o f f o r m stability f o r corresponding angles o fh e e l / t r i m as a function o f displacement, stability limitations. D a t a o n spaces: v o l u m e s , coordinates o f center o f v o l u m e s a n d correction f o rfree surface effect/heeling m o m e n t s d u e t o grain shifting (all are as a function o f the level o f space filling). A n example o f output: H y d r o s t a t i c data: displacement, abscissa a n d applicate o f t h e centre o fb u o y a n c y , abscissa o f t h e centre o f floatation, height o f metacenter a n dm o m e n t t o trim 1 c m (all are as a function o fdraught a n d also for ship's actual trim). Stability data: corrections f o r free surface effect, arms o f stability curve, applicate o f ship's centre o f gravity, initial transverse metacentric height, limiting curve, permissible heeling moments duet o grain shifting, stability criteria being used. of Materials and Products for D a t a o n spaces: calculated v o l u m e s , coordinates o f center o fv o l u m e s a n d corrections f o rfree surface effect/ heeling m o m e n t s d u e t o grain shifting ( a l l are as a function o ft h e level o f space filling). 12.2.8 T h e T y p e A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) i s i s s u e d f o r t h e programmes reviewed a n dverified i n accordance w i t h the provisions o f these Rules. T h e T y p e A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) shall contain t h e n a m e o f t h e p r o g r a m m e , names o ft h e developing organization a n d t h e owner o f t h e pro­ gramme, a computer type, p r o g r a m m i n g language, brief description o f t h e calculation procedure, scope o f application, grounds f o r issuing t h e T y p e A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) . 12.2.9 W h e n c o m p u t e r - a i d e d c a l c u l a t i o n s , w h i c h a r e part o fthe ship's technical d o c u m e n t a t i o n a n d w h i c h a r e performed according t o the programme having the type approval certificates a r e presented t o t h e Register, a reference t o t h e n u m b e r o f the T y p e A p p r o v a l Certificate f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) i s s u e d b y the Register shall b e made i n these calculations. 12.2.10 T h e T y p e A p p r o v a l C e r t i f i c a t e f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) i s s u e d b y t h e R e g i s t e r f o r a p r o g r a m m e loses i t sv a l i d i t y i f changes affecting t h e subject agreed u p o n have been m a d e i n t h e p r o g r a m m e . Table Parameter evaluated Tolerance Hull form dependent Displacement L o n g i t u d i n a l center o fb u o y a n c y , f r o m after perpendicular, X Vertical center o fbuoyancy, Z Transverse center o fbuoyancy, Y L o n g i t u d i n a l c e n t e r o f f l o t a t i o n , from a f t e r p e r p e n d i c u l a r , X M o m e n t to trim 1 c m Transverse metacentric height Longitudinal metacentric height Cross curves o f stability Ships c c c f Compartment dependent Volume or deadweight L o n g i t u d i n a l center o f gravity, f r o m after perpendicular, X Vertical centre o f gravity, Z Transverse center o f gravity, Y Free surface m o m e n t Shifting m o m e n t L e v e l o fcontents y v v T r i m a n d stability D r a u g h t s (forward, aft, m e a n ) Initial metacentric height (GMt) Righting curve levers (GZ values) Free surface correction Downflooding angle Equilibrium angles D i s t a n c e t o u n p r o t e c t e d o p e n i n g s o r m a r g i n l i n e from w a t e r l i n e ( i f a p p l i c a b l e ) Areas under righting a r m curve 2 % 1 % / 50 c m m a x 1 % / 5 cm max 0,5 % o f В / 5 c m m a x 1 % / 50 c m m a x 2 % 1 % / 5 cm max 1 % / 50 c m m a x 5 cm 2 % 1 % / 50 c m m a x 1 % / 5 cm max 0,5 % o f В / 5 c m m a x 2 % 5 % 2 % 1 % / 5 cm max 1 % / 5 cm max 5 % / 5 cm max 2 % 2° 1° ± 5 %/ 5 cm max 5 % o r 0,0012 m r a d 12.2.7 Part II. Technical Documentation 12.3 A P P R O V A L O F C O M P U T E R S O F T W A R E U S E D F O R S O L V I N G P R O B L E M S O NE V A L U A T I O N O F T R I M , S T A B I L I T Y A N D S T R E N G T H (FORA P A R T I C U L A R SHIP) 12.3.1 G e n e r a l . 12.3.1.1 W h e r e a s h i p b o r n e c o m p u t e r o r a s h o r e based stability a n d residual strength calculation pro­ g r a m m e i s used f o r e v a l u a t i o n o f ship's t r i m , stability o r strength, t h e appropriate software shall b e approved b y the Register for application o n board a particular ship. I n s u c h a case, t h e base s o f t w a r e m o d u l e s h a l l h a v e t h e Type A p p r o v a l Certificate f o r Computer Program (СТОП) ( F o r m 6 . 8 . 5 ) ( r e f e r t o 1 2 . 2 ) . 12.3.1.2 T h e s e r e q u i r e m e n t s a r e a p p l i c a b l e t o o n ­ board computers w h e n using passive systems a n dt h e off­ line operation m o d e o f active systems. 12.3.1.3 T h es t a b i l i t y c a l c u l a t e d u s i n g a c o m p u t e r shall b e checked w i t h regard t o a l lt h estability criteria applicable t ot h e ship. 12.3.1.4 T h e s c o p e o f c a l c u l a t i o n s s h a l l c o r r e s p o n d to t h e I n f o r m a t i o no n Stability approved b y t h e Register. T h e input a n d output data shall, as f a r as practicable, b e easily compatible i n terms o fcontents a n dformat w i t h those i n t h eI n f o r m a t i o n o n Stability s o as t o a l l o w t h e operator t o familiarize themselves p r o m p t l y w i t h t h e stability calculations. T h e calculations output data o f t h e damaged passenger ship stability a n d residual strength calculation p r o g r a m m e shall as a m i n i m u m include t h e following parameters: transverse metacentric height; righting lever curve; area under t h e righting lever curve; m a x i m u m a n d actual heeling m o m e n t s d u e t o liquid overflow i n a l l tanks a n d compartments b e l o w t h e bulkhead deck; draft f o r w a r d , amidships a n d aft; angles o f t r i m a n d heel; areas o ft h e d a m a g e d ship above-water a n d under­ w a t e r parts projections t o t h e centre plane a n d their centers t o evaluate w i n d heeling m o m e n t ; 139 not c o m p l y w i t h t h erequirements o f the R S rules, as w e l l as i n case o f a w r o n g u s e o f t h e v e r y p r o g r a m m e . 12.3.1.9 T h e p r o g r a m m e s h a l l m o n i t o r o p e r a t i o n a n d activate a n a l a r m w h e n t h e p r o g r a m m e is incorrectly o r abnormally used. 12.3.1.10 T h e l a n g u a g e i n w h i c h t h e s t a b i l i t y information is displayed a n d printed o u t shall b e t h e s a m e as used i n t h e Stability I n f o r m a t i o n . F o r ships engaged o n international voyages, i t is allowed t o u s e o n l y E n g l i s h w h e n developing onboard computer soft­ ware. 12.3.1.11 O n b o a r d c o m p u t e r s o f t w a r e a n d a n y d a t a stored i nt h esystem shall b e protected f r o m corruption b y loss o f power. 12.3.1.12 E v e r y printout shall contain programme including ship, printing-out date page o f t h e calculation result t h eidentification number o f the theversion number, name o f the a n dload condition indication. 12.3.1.13 T h e s o f t w a r e s h a l l b e i n s t a l l e d i n a shipborne c o m p u t e r o fa type approved b y t h e Register or i nt w ounapproved computers. T h erequirements f o r computers a n d computer-based systems o n board sea-going ships a r esetforth i nPart X V " A u t o m a t i o n " o f the Rules f o r t h e Classification a n dConstructiono f S e a - G o i n g Ships. I ncase w h e r e t w o computers a r e used each shall b e fitted w i t h a m o n i t o r a n d a printer, a n d b o t h c o m p u t e r s s h a l l b e subjected t o acceptance tests. 12.3.2 S o f t w a r e a p p r o v a l p r o c e d u r e . 12.3.2.1 T o m a k e u s e o f s o f t w a r e o n b o a r d a particular ship possible, t h esoftware functioning shall be checked a n dReport ( F o r m 6.3.29) based o n the check results issued. I n order t o obtain this Report, t h e following documentation shall b e submitted t oR H O : .1 M a n u a l f o rUser, w h i c h shall contain: identification number, n a m e o f ship; clear a n d definitive c o m m a n d s w i t h t h e u s e o f illustrations a n d diagrams; general description o ft h e p r o g r a m m e , i n c l u d i n g its identification, n u m b e r a n d v e r s i o n date; a copy o f t h e Type A p p r o v a l Certificate f o r C o m p u t e r P r o g r a m (СТОП) ( F o r m 6 . 8 . 5 ) ; bending m o m e n t a n d shear forces. 12.3.1.5 U n i t m e a s u r e s s h a l l b e c l e a r l y s p e c i f i e d a n d uniformly used i n a l l calculations. W h e r e different measurement systems are used i n t h esoftware, input errors shall b e ruled out. T h esoftware shall provide that all t h enecessary data are displayed as w e l l asprinted o u t in t h e measurement systems used. requirements for thehardware parameters needed f o r n o r m a l start a n d f u n c t i o n i n g o f t h e p r o g r a m m e ; instruction for installationo f programme o n onboard computer; 12.3.1.6 C o p i e s o f a l l i n i t i a l d a t a n e e d e d f o r t h e p r o g r a m m e operation shall b e stored o na separate disk or diskettes i n dublicate. light ship mass a n dcoordinates o f centre o fgravity w i t h t h e indication o ft h e source o f information; 12.3.1.7 T h e p r o g r a m m e s h a l l h a v e a s i m p l e command, w h i c h allows return t om a i n m e n u from a n y working window. 12.3.1.8 T h ep r o g r a m m e s h a l l w a r n t h e u s e r o f a n y i n p u t errors a n d i n cases w h e r e t h e c a l c u l a t i o n results d o description o f messages o n errors a n d warnings, w h i c h a r em o s t likely t o occur, w i t h t h e indicationo f s e q u e n c e o factions t ob et a k e n b y t h euser i n s u c h cases; d e a d w e i g h t c o m p o n e n t s f o r each test c o n d i t i o n ; list o f permissible still w a t e r shear force a n d bending m o m e n t values specified b y t h e Register a n d , i f necessary, torsion load; i f necessary, correction factors f o rt h e shear forces; 140 Rules for Technical Supervision during Construction of Ships and Manufacture i f necessary, limitations o nt h e cargo mass f o r each h o l d a n d f o r each pair o fadjacent holds, as a f u n c t i o no f the m e a n draft lengthwise t h e h o l d (holds); a sample o f the calculation procedure accompanied b y explanations a n d a sample o fa n output data printout; a sample o f each screen d u m p displayed w i t h explanatory text; .2 I n f o r m a t i o n o n S t a b i l i t y a n d I n f o r m a t i o n o n Damage Stability, including subdivision layout, approved b y the Register; .3 p e r m i s s i b l e b e n d i n g m o m e n t a n d s h e a r f o r c e values i n t h e checked hull sections approved b yt h e Register; .4 s o l u t i o n p r i n t o u t s o f t h e t e s t c o n d i t i o n s s e l e c t e d o n agreement w i t h t h e Register. T h e test c o n d i t i o n s s h a l l b e selected i ns u c h a w a y as to cover thew h o l e range o fload draughts (from the light ballast condition t o t h e deepest envisaged loaded condition) a n dshall include a t least o n e departure a n d one arrival condition. Calculations shall b e provided f o r at least f o u r l o a d i n g c o n d i t i o n s , t a k e n f r o m t h e ship's approved stability information. F o r ships carrying liquids i n b u l k a n d ships c a r r y i n g g r a i n i n b u l k a tleast o n e o f the conditions shall include p a r t i a l l y filled cargo spaces. I n the test conditions selected, each cargo h o l d shall b e a t least once loaded. T h e approval consists i n checking t h e software functioning i n t h epresence o ft h e Register representative. T h e Register representative shall verify that t h e f o l l o w i n g data, used b y t h e calculation p r o g r a m m e , i s consistent w i t h arrangements a n dm o s t recently approved lightship characteristics o f t h e ship according t o approved plans a n d documentation: identification o f the calculation programme including version number; of Materials and Products for T h e following procedures testing t h e software: shall b e followed Ships when retrieve a t least o n e test l o a d c o n d i t i o n a n dstart a calculation r u n ; compare t h e stability results w i t h those in the documentation; change several items o fdeadweight (tank weights and the cargo weight) sufficiently t o change the draught or displacement b y a t least 1 0 p e r cent. T h e results are t o be r e v i e w e d t o ensure that they differ i na logical w a y f r o m those o f t h e a p p r o v e d test c o n d i t i o n ; revise t h e above m o d i f i e d load condition t o restore the initial test c o n d i t i o n a n d c o m p a r e t h e results; t h e relevant i n p u t a n d o u t p u t data o f t h e a p p r o v e d test condition shall b e replicated; alternatively, o n e o r m o r e test conditions shall b e selected a n d t h etest c a l c u l a t i o n p e r f o r m e d b y e n t e r i ng a l l the necessary deadweight data m a n u a l l y ; t h eresults shall be verified as identical t ot h e results i n t h e a p p r o v e d test conditions. W h e r e satisfactory convergence o f t h e results f o r some parameters h a s n o t been achieved, appropriate clarifications shall b e presented, w h i c h then shall b e reflected i n t h e Register Report ( F o r m 6.3.29) and/or M a n u a l f o r User. T h e Report ( F o r m 6.3.29) is issued i nt h e Russian a n d E n g l i s h languages w i t h a p p r o v e d test c o n d i t i o n s . 12.3.3 A c c e p t a n c e tests o f t h e s o f t w a r e s h a l l b e conducted o n board ship i nt h e presence o fthe S u r v e y o r to t h e Register w i t h issuance o f t h e Register Report ( F o r m 6.3.10). A l o n g w i t h that: .1 a check shall b e m a d e t o ensure that t h e M a n u a l for User duly noted b y theRegister is available o n board; .2 a c h e c k s h a l l b e m a d e t o e n s u r e t h a t t h e R e p o r t ( F o r m 6.3.29) w i t h a p p r o v e d test conditions i s available on board; m a i n dimensions, hydrostatic particulars a n d , i f .3 t h e s o f t w a r e s h a l l b e i n s t a l l e d i n a c o m p u t e r o f applicable, t h e ship profile; approved type o ri n t w o computers o funapproved type; .4 t h e I n f o r m a t i o n o n S t a b i l i t y a n d S t r e n g t h , the p o s i t i o n o fthe f o r w a r d a n d after perpendiculars, Information o n D a m a g e Stability, o n w h i c h software a n d i fappropriate, t h ecalculation m e t h o d t o derive t h e operation has been tested a n d w h i c h have been indicated f o r w a r d a n d after draughts at t h e actual p o s i t i o n o ft h e in t h e R e p o r t ( F o r m 6.3.29), shall n o t b e updated since ship's draught m a r k s ; the issue o ft h e Report; ship lightweight a n d centre o f gravity derived f r o m t h e m o s t recent i n c l i n i n g test; lines plan, offset tables o rother suitable presentation o f h u l l f o r m data i f necessary t o check t h e i n p u t data; .5 s o l u t i o n results o f t h e test c o n d i t i o n s s h a l l b e t h e same as t h eresults o f the approved conditions attached t o the Report ( F o r m 6.3.29). compartment definitions, including frame spacing, a n d centres o f v o l u m e , together w i t h capacity tables, free surface corrections; cargo a n d consumables distributionf o reach loading condition. 12.3.4 W h e r e t h e s h i p , w h i l e i n s e r v i c e , e x p e r i e n c e s changes i n general arrangement, light ship mass, loading plans, t h e R e p o r t ( F o r m 6.3.29) i s cancelled. T h e software for t h e n e w parameters o fthe ship shall b e once m o r e subject t o t h e approval procedure according t o 12.3.2. Part II. Technical 141 Documentation APPENDIX LIST O F FINAL DOCUMENTATION ON A SHIP T O B E SUBMITTED TO T H E REGISTER 1 1 GENERAL 1.1 L i s t o f f i n a l d o c u m e n t a t i o n o n a s h i p . 1.2 S p e c i f i c a t i o n f o r a l l p a r t s . 1.3 G e n e r a l a r r a n g e m e n t p l a n . 1.4 L i s t o f m a c h i n e r y a n d e q u i p m e n t i n s t a l l e d o n board t h e ship, w i t h b r i e f indication o f their technical characteristics. 1.5 L i s t o f e q u i v a l e n t s a l l o w e d b y t h e R e g i s t e r . 1.6 L i s t o f s p a r e p a r t s . 1.7 D r a w i n g s h o w i n g t h e l o c a t i o n o f t h e I M O s h i p identification number. 2 STABILITY, UNSINKABILITY 2.1 L i n e s d r a w i n g . 2.2 S u m m a r y t a b l e o f d i s p l a c e m e n t s , centre o f gravity positions, trim a n d initial stability for different loading conditions. 2.3 T a b l e o f t a n k c a p a c i t i e s . 2.4 D r a f t m a r k a r r a n g e m e n p l a n a n d l o a d l i n e . 2.7 I n f o r m a t i o n o n S t a b i l i t y a n d I n s t r u c t i o n s o n Taking and Consuming L i q u i d Cargoes and Ballasting. 2.8 I n f o r m a t i o n o n D a m a g e T r i m a n d S t a b i l i t y o r Information o nthe Effect o f Flooding. 2.9 I n f o r m a t i o n o n S t a b i l i t y f o r t h e S h i p L o a d e d with Grain. 2.5 I n c l i n i n g T e s t R e p o r t o r W e i g h i n g R e p o r t , i f t h e s h i p i s e x e m p t e d f r o m t h e i n c l i n i n g test. 2.6 U p d a t e d s t a b i l i t y c a l c u l a t i o n . 2.10 L a y o u t o f w a t e r t i g h t c o m p a r t m e n t s . 2.11 D a m a g e C o n t r o l P l a n . 2.12 O p e r a t i n g m a n u a l o n w a t e r l e v e l d e t e c t i o n s y s t e m 3 HULL 3.1 3.2 3.3 3.4 3.5 i n case 3.6 3.7 3.8 1 M i d s h i p section. Constructional profile. D e c k and p l a t f o r m plans. Double (single) b o t t o m plan. S h e l l expansion (for glass reinforced ships o n l y the outer shell plating has different thickness). L o n g i t u d i n a l and transverse bulkheads. After end framing and sternframe. Fore e n d framing a n d stem. 3.9 P r o p e l l e r b r a c k e t s a n d b o s s i n g s . 3.10 M a i n m a c h i n e r y s e a r i n g s a n d b o i l e r b e a r e r s w i t h b o t t o m construction i nthat area. 3.11 H y d r o f o i l s y s t e m a n d a i r c u s h i o n s k i r t p l a n s . 3.12 L o a d i n g i n s t r u c t i o n s f o r s h i p s 6 5 m i n l e n g t h and more. 3.13 I n f o r m a t i o n ( B o o k l e t ) o n S t a b i l i t y a n d S t r e n g t h During Loading, Unloading a n dArrangement o f Bulk Cargoes Other than Grain. G i v e n i n t h e L i s t a r e a p p r o x i m a t e d e s i g n a t i o n o f p a r t i c u l a r final d o c u m e n t s a d o p t e d o n l y t o r e f l e c t t h e i r t e c h n i c a l e s s e n c e . 142 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 4 A R R A N G E M E N T S ,E Q U I P M E N T , OUTFIT, LIFE-SAVING A P P L I A N C E S AND SIGNAL MEANS 4.1 S t o c k list. 4.2 A r r a n g e m e n t p l a n o f s u r v i v a l c r a f t a n d p e r s o n a l life-saving appliances. 4.3 A r r a n g e m e n t p l a n o f s o u n d s i g n a l m e a n s a n d navigation lights. 4.4 A r r a n g e m e n t p l a n o f o p e n i n g s i n t h e h u l l , superstructures and deckhouses as w e l l as i n subdivision bulkheads w i t h indication o f coaming heights, types, designs and basic dimensions and parameters o f closing appliances. 4.8 G e n e r a l a r r a n g e m e n t p l a n o f f i t t i n g s u s e d t o prevent shifting o fcargo w i t h indication o f the design, material a n d basic dimensions (parameters) o f m a i n components o f the fittings. 4.9 A r r a n g e m e n t p l a n o f e m e r g e n c y o u t f i t . 4.10 G e n e r a l a r r a n g e m e n t p l a n o f c a r g o h a n d l i n g gear w i t h i n d i c a t i o n o f principle characteristics (safe w o r k i n g load, o p e r a t i o n areas, outreach, cargo lifting a n d lowering speed, m a x i m u m a n d m i n i m u m outreach, s l e w i n g speed, etc.). 4.5 G e n e r a l a r r a n g e m e n t p l a n o f r u d d e r a n d s t e e r i n g gear w i t h indication o f basic dimensions, design a n d material, m a i n components, type and m a i n parameters o f steering gear ( m a i n and auxiliary). 4.11 G e n e r a l v i e w d r a w i n g o f c a r g o h a n d l i n g g e a r together w i t h specification o f associated machinery, components and safely devices. 4.6 G e n e r a l a r r a n g e m e n t p l a n o f a n c h o r a r r a n g e m e n t w i t h indication o f types, principal dimensions (parameters) o f components, type a n dbasic parameters o f anchor machinery. 4.13 D r a w i n g o f a t t a c h m e n t s o f c a r g o m a s t s , c r a n e , w i n c h and reel foundations t oship structures and o f hull strengthening i n w a y o f theirinstallation. 4.14 D r a w i n g o f s e c u r i n g o f c a r g o h a n d l i n g g e a r i n the s t o w i n g f o r sea p o s i t i o n . 4.7 G e n e r a l a r r a n g e m e n t p l a n o f m o o r i n g a n d t o w i n g arrangements w i t h indication o f types, basic parameters o f t h e equipment, m a i n characteristics o f m o o r i n g and t o w i n g ropes, type and basic parameters o f mooring and towing machinery. 4.12 D r a w i n g ( s c h e m e ) o f d e r r i c k a n d c r a n e r i g g i n g . 4.15 D r a w i n g o f s e c u r i n g t i m b e r d e c k c a r g o . 5 FH*E PROTECTION 5.1 F i r e p l a n . 5.2 A r r a n g e m e n t p l a n o f f i r e - p r o o f d i v i s i o n s ( i n eluding doors) w i t h indication o fnumbers o fthe type approval certificates. 5.3 S c h e m e s o f i n s u l a t i o n o f s p a c e s w i t h i n d i c a t i o n o f type insulation constructions, 5.4 D e c k c o v e r i n g s c h e m e s , 5.5 F i r e f i g h t i n g s y s t e m d i a g r a m s . 6 MACHINERYINSTALLATION 6.1 G e n e r a l a r r a n g e m e n t p l a n s o f m a c h i n e r y , b o i l e r s 6.6 D i a g r a m a n d d e s c r i p t i o n o f r e m o t e c o n t r o l a n d e q u i p m e n t i n m a c h i n e r y a n d b o i l e r spaces a n d i n s y s t e m f o r m a i n m a c h i n e r y c o m p l e t e w i t h i n f o r m a t i o n spaces o f e m e r g e n c y sources o f electrical p o w e r . on equipment o f remote control stations w i t h control devices, indication and a l a r m signalling devices, means 6.2 G e n e r a l a r r a n g e m e n t p l a n o f s h a f t i n g . o f communication and other arrangements. 6.3 C P P s y s t e m d r a w i n g s . 6.4 G e n e r a l v i e w o f p r o p e l l e r . 6.5 S t e r n - t u b e d r a w i n g . 6.7 S h a f t i n g a l i g n m e n t c a l c u l a t i o n . T o r s i o n a l v i b r a tion calculations and torsiographing results. Part II. Technical Documentation 143 7 SYSTEMS AND PIPING 7.1 S h i p s y s t e m d i a g r a m s : .1 bilge system; .2 b a l l a s t s y s t e m ; .3 w a s t e w a t e r , s e w a g e a n d s c u p p e r s y s t e m s ; .4 f u e l l i n g a n d f u e l t r a n s f e r s y s t e m s ; .5 s o u n d i n g , a i r a n d o v e r f l o w p i p e s ; .6 c a r g o a n d s t r i p p i n g s y s t e m s ( o n o i l t a n k e r s ) ; .7 v e n t s y s t e m ( o n o i l t a n k e r s ) ; .8 v e n t i l a t i o n s y s t e m o f a c c o m m o d a t i o n , cargo, m a c h i n e r y a n d p r o d u c t i o n spaces; .9 l i q u i d c a r g o h e a t i n g s y s t e m ; .10 a r r a n g e m e n t p l a n o f b o t t o m a n d s i d e f i t t i n g s . 7.2 M a c h i n e r y i n s t a l l a t i o n p i p i n g d i a g r a m s : .1 live and exhaust steam, b l o w - o f f pipes; .2 f e e d w a t e r , c o n d e n s a t e a n d e v a p o r a t o r ; .3 f u e l ; .4 l u b r i c a t i n g o i l ; .5 c o o l i n g ; .6 c o m p r e s s e d a i r ; .7 f u e l , w a t e r a n d o i l h e a t i n g ; .8 e x h a u s t g a s p i p e s a n d u p t a k e s . 8 REFRIGERATING 8.1 R e f r i g e r a n t s y s t e m d i a g r a m . 8.2 C o o l i n g m e d i u m a n d c o o l i n g w a t e r diagram. system PLANTS 8.6 I n s u l a t i o n d r a w i n g w i t h t e c h n i c a l s p e c i f i c a t i o n s o f insulating materials. 8.7 B a s i c d i a g r a m o f t e l e t h e r m o m e t e r s t a t i o n a n d arrangement o f t h e r m o m e t e r tubes. 8.3 B a s i c d i a g r a m o f h o l d a i r c o o l i n g . 8.4 A r r a n g e m e n t p l a n o f e q u i p m e n t i n r e f r i g e r a t i n g m a c h i n e r y space w i t h indication o f escape routes. 8.8 G e n e r a l a r r a n g e m e n t p l a n o f e q u i p m e n t i n refrigerant storage spaces w i t h stationary receivers. 8.5 A r r a n g e m e n t p l a n o f e q u i p m e n t i n r e f r i g e r a t e d spaces. N o t e . O n l y d o c u m e n t a t i o n r e f e r r e d t o i n 8 . 1 , 8.4, 8.8 s h a l l b e presented for unclassed refrigerating plants. 9 ELECTRICAL 9.1 C i r c u i t d i a g r a m s o f e l e c t r i c a l p o w e r d i s t r i b u t i o n f r o m m a i n and emergency sources: p o w e r mains, lighting (to section switchboards) and navigation lights. 9.2 C i r c u i t d i a g r a m s o f m a i n a n d e m e r g e n c y switchboards, control desks a n d other switchboards o f non-standard design. 9.3 C i r c u i t d i a g r a m o f m a i n c u r r e n t , e x c i t a t i o n , control, monitoring, signalling, protection and interlocking o f the electric p r o p u l s i o n plant. 9.4 C i r c u i t d i a g r a m o f o u t e r c o n n e c t i o n s o f s h i p ' s control apparatus, telephone c o m m u n i c a t i o n , general a l a r m a n d fire d e t e c t i o n a n d a l a r m s y s t e m s . 9.5 C i r c u i t d i a g r a m o f e l e c t r i c d r i v e s f o r s t e e r i n g gear, electrical r e m o t e c o n t r o l systems o f rudder electric drive, protection a n d alarm. EQUIPMENT 9.6 G e n e r a l a r r a n g e m e n t p l a n o f e s s e n t i a l e l e c t r i c a l equipment and electric propulsion plant. 9.7 L u b r i c a t i n g o i l a n d a i r c o o l i n g d i a g r a m s o f m a i n electric machines o f the electric p r o p u l s i o n plant. 9.8 D i a g r a m s o f p r o t e c t i v e e a r t h i n g , d r a w i n g s o f lightning protection devices f o rtankers, g a s carriers, m o b i l e offshore drilling units a n dships w i t h n o n - m e t a l hulls. 9.9 L a y o u t p l a n o f c a b l e w a t e r t i g h t a n d fire b u l k h e a d s . penetrations through N o t e . Information o n cross-sectional areas o f cable conductors, types o f cables, currents a n d protection shall b e g i v e n i n t h e documentation. 144 Rules for Technical Supervision during Construction of Ships and Manufacture of Materials and Products for Ships 10 N A V I G A T I O N A L E Q U I P M E N T 10.1 C o n n e c t i o n d i a g r a m o f n a v i g a t i o n a l e q u i p m e n t ( w i t h indication o f types a n d cross-sectional areas o f cable conductors). manoeuvring, including the line o f sight under the upper edge o f the w i n d o w f r o m standing w o r k i n g position at the workstation; 10.2 D r a w i n g s ( n o t l e s s t h a n t w o v i e w s ) s h o w i n g arrangement o fnavigational equipment a n d sources o f power, as w e l l as heating, ventilation, communication, a l a r m a n dlighting facilities i n spaces intended for t h e installation o f navigational equipment. .3 w i n d o w a r r a n g e m e n t , including inclination, dimensions, framing and height o f lower and upper edge above bridge deck surface as w e l l as t h eheight o f the deckhead. 10.3 Drawings (plan a n d side v i e w ) showing arrangement o f aerials as w e l l as spaces intended f o r the installation o f navigational equipment. 10.6 B r i d g e l a y o u t d r a w i n g s showing: .1 the bridge layout, including the configuration and location o f a l l bridge workstations, including w o r k stations for additional bridge functions; 10.4 L i s t o f n a v i g a t i o n a l e q u i p m e n t f i t t e d o n b o a r d w i t h specification o f manufacturer, type, supplier a n d information o napproval o f the equipment b y the Register. .2 c o n f i g u r a t i o n a n d d i m e n s i o n s o f w o r k s t a t i o n consoles including console foundations, and location o f instruments and equipment i n all w o r k s t a t i o n consoles. 10.5 B r i d g e f i e l d s o f v i s i o n d r a w i n g s s h o w i n g : .1 t h e horizontal field o f v i s i o n f r o m t h e various workstations, including t h e arc o f individual blind sectors and the s u m o f b l i n d sectors f o r w a r d o f the beam; 10.7 I n c a s e o f s h i p s h a v i n g a d i s t i n g u i s h i n g m a r k O M B O i n their class n o t a t i o n , t h e scope o f technical documentation t o b e submitted shall b e i n accordance w i t h t h e requirements o f 1.3.7, P a r t V " N a v i g a t i o n a l Equipment" o fthe Rules for Equipment o f Sea-Going Ships. .2 t h e v e r t i c a l f i e l d o f v i s i o n o v e r t h e b o w f r o m t h e conning station and the workstation for navigation and 11 A U T O M A T I O N 11.1 F u n c t i o n a l c i r c u i t s o f c o n t r o l a n d p r o t e c t i o n elements, devices a n d systems o f m a i n machinery a n d propellers (remote automated control systems). 11.5 S t r u c t u r a l d r a w i n g s o f s e n s o r s , a l a r m s , i n s t r u ments as w e l l as control a n dm o n i t o r i n g switchboards a n d panels o f the s y s t e m s referred t o i n 11.3 t o 11.5. 11.2 F u n c t i o n a l c i r c u i t s o f c o n t r o l a n d p r o t e c t i o n elements, devices a n dsystems o fauxiliary machinery, electric-generation plants, m a i n a n d auxiliary boilers, refrigerating plants. 11.6 D e s c r i p t i o n o f p o w e r s o u r c e s o f t h e s y s t e m s referred t o i n 11.3 t o 11.5 a n d their w i r i n g schemes. 11.7 B l o c k d i a g r a m s o f m a c h i n e r y c o n t r o l a l g o rithms f o r computers a n d computer-aided systems applied i n t h eplants subject t o t h e Register technical supervision. 11.3 F u n c t i o n a l c i r c u i t s o f c o n t r o l a n d p r o t e c t i o n elements, devices a n d systems o f centralized a n d local w a r n i n g alarm, indication and recording systems. 11.4 G e n e r a l v i e w d r a w i n g s o f s e p a r a t e d e v i c e s , switchboards, panels o f control and protection systems o f m a i n machinery, propellers and auxiliary machinery, and their arrangement o n board ship. 11.8 F a i l u r e m o d e a n d e f f e c t s a n a l y s i s ( F M E A ) f o r dynamic positioning systems o n t h e ships having distinguishing marks D Y N P O S - 2 a n d D Y N P O S - 3 i n the class notation. 12 R A D I O E Q U I P M E N T 12.1 D i a g r a m o f c o n n e c t i o n s o f r a d i o e q u i p m e n t a n d c o m m u t a t i o n o f aerials ( w i t h indication o f types a n d cross-sectional areas o f cable conductors and protection means f r o m radio interference). 12.2 D r a w i n g ( p l a n a n d s i d e v i e w ) o f e q u i p m e n t arrangement i n radio equipment spaces w i t h indication o f heating, ventilation, communication, alarm and lighting systems. 12.3 D r a w i n g (plan a n d side v i e w ) o f aerial arrangement w i t h indication o fthe spaces intended for installation o f radio equipment. 12.4 D r a w i n g a n d d i a g r a m o f r a d i o e q u i p m e n t f o r m o t o r lifeboats ( i f any). Part II. Technical Documentation 145 13 A R R A N G E M E N T S A N D E Q U I P M E N T F O R P R E V E N T I O N OF POLLUTION F R O M SHIPS 13.1 F o r s h i p s o f a l l t y p e s : .1 arrangement p l a n o f equipment f o r p r e v e n t i o n o f p o l l u t i o n f r o m ships; .2 c a l c u l a t i o n o f r e q u i r e d c a p a c i t y o f h o l d i n g t a n k s , oily water a n d sewage tanks, garbage containers a n d their arrangement plans; .3 d i a g r a m o f b i l g e o i l y w a t e r p i p i n g ; .4 d i a g r a m o f o i l r e s i d u e p i p i n g ; .5 d i a g r a m o f s e w a g e p i p i n g ; .6 calculation o f the discharge rate o f untreated sewage; .7 E n e r g y Efficiency D e s i g n I n d e x Technical F i l e i n accordance w i t h the Guidelines o nSurvey and Certifica­ tion o f Energy Efficiency Design Index (EEDI) ( I M O resolution M E P C . 2 5 4 ( 6 7 ) as amended b y I M O resolution ИМО M E P C . 2 6 1 ( 6 8 ) ) , i f applicable. 13.2 F o r o i l t a n k e r s , to i n 13.1: other than those referred .1 calculation o f capacity o f slop tanks; .2 a c c i d e n t a l o i l o u t f l o w c a l c u l a t i o n s f o r o i l t a n k e r s delivered o n o r after 1 January 2 0 1 0 ( R e g u l a t i o n 2 3 of Annex I to MARPOL-73/78); .3 a r r a n g e m e n t p l a n o f a l l c a r g o a n d s l o p t a n k s o n board; .4 s u b d i v i s i o n p l a n a n d d a m a g e s t a b i l i t y c a l c u l a ­ tions; .5 d i a g r a m o f e m e r g e n c y o i ltransfer system, i f applicable; .6 diagram o f crude o i l w a s h i n g system a n d shade diagram ( i f applicable); .7 p l a n s h o w i n g arrangement o f discharge outlets; .8 d i a g r a m o ftransfer o fo i l residues (sludge) a n d t a n k washings f r o m cargo area into slop tanks; .9 d i a g r a m o f t h e ballast a n d cleaning w a t e r discharge m o n i t o r i n g a n d control system ( i f applicable); .10 o p e r a t i o n s a n d e q u i p m e n t m a n u a l f o r c r u d e o i l washing system ( i f applicable); .11 o p e r a t i o n m a n u a l f o r d i s c h a r g e m o n i t o r i n g a n d control system o fballast a n dw a s h i n g water ( i f applic­ able). 13.3 F o r t a n k e r s c a r r y i n g n o x i o u s l i q u i d s u b s t a n c e s , other than those referred t o i n13.1: .1 arrangement p l a n o f p u m p r o o m s ; .2 a r r a n g e m e n t p l a n o f c a r g o t a n k v e n t i l a t i o n s y s t e m ; .3 p l a n s h o w i n g a r r a n g e m e n t o f d i s c h a r g e o u t l e t s ; .4 p r o c e d u r e s a n d a r r a n g e m e n t s m a n u a l f o r d i s ­ charge o f n o x i o u s liquid substances. 8.3.36 Reset form LIST OF CIRCULAR LETTERS AMENDING/SUPPLEMENTING NORMATIVE DOCUMENT НД 2-020101-040 "Rules for technical supervision during construction of ships and manufacture of materials and products for ships. P.1 "General regulations for technical supervision" (номер и название нормативного документа) № п/п 1 Номер циркулярного письма, дата утверждения 381-08-911c dated 05.07.2016 Перечень измененных и дополненных пунктов Section 4, para 4.5 and 4.5.1 Text has been amended. Section 16. New section 16 has been introduced considering IACS Unified Requirement Z26 (Feb.2015) 11/05 Appendix to the Circular Letter No. 381-08-911c of 05.07.2016 RULES FOR TECHNICAL SUPERVISION DURING CONSTRUCTION OF SHIPS AND MANUFACTURE OF MATERIALS AND PRODUCTS FOR SHIPS, 2016, ND NO. 2-020101-040-E 4 REQUESTS, CONTRACTS AND AGREEMENTS ON TECHNICAL SUPERVISION Paras 4.5 and 4.5.1 shall be amended to read: “4.5 The Register may entrust the firm (manufacturer) technical personnel with performance of the check tests or part thereof, to which effect the Agreement on Survey (CO) is signed with the firm (manufacturer). For signing the Agreement on Survey (CO) use is made of the established form or the Agreement on Survey (CO) may be signed in a free form. The Agreement on Survey (CO) is made based on survey of the firm (manufacturer) carried out to the extent and according to the procedure described in Sections 10 and 16, and type approval of the material or product (refer to Section 6). Rights and responsibilities of the firm (manufacturer), responsibilities of the Register and terms of payment to the Register for technical supervision are stated in the Agreement on Survey (CO). In order to provide the adherence to the RS requirements for products, to draw up covering documentation and to fulfill the terms and conditions of the Agreement on Survey (CO), an official competent in production and quality control of the items of technical supervision shall be appointed at the firm (manufacturer). Based on the Agreement on Survey (CO) concluded, the items of technical supervision shall be delivered with: the Certificate (C3) (Alternative Certification Scheme – ACS) to be filled in and signed by the firm (manufacturer) official and drawn up (affirmed) by the Register (refer to 5.2); the Type Approval Certificate (СТО) copy and the firm (manufacturer) document (refer to 4.1.1) which shall contain: name, type and serial number of the item; name and address of the manufacturer; address of the manufacturing location; name of technical documentation for the item and date of its approval by the Register; name of the document containing data on item surveys and tests performed by the firm (manufacturer); the Type Approval Certificate (СТО) number, date of issue and period of validity; firm statement on item conformity to the approved type specified in the Type Approval Certificate (СТО) or in the approved technical documentation; signature of the firm (manufacturer) authorized person. 4.5.1 The Agreement on Survey (CO) comes into force from the date of signing and remains valid for at most 5 years subject to: . 1 for the items delivered with the Certificate (СЗ) - satisfactory results of survey of the item of technical supervision and the firm (manufacturer) in accordance with the requirements of Section 16, to be carried out not less than once a year (in well-grounded cases to be carried out not less than once every 2, 5 years, unless otherwise specified); .2 for the items delivered with the Type Approval Certificate (СТО) copy - satisfactory results of survey of the item of technical supervision and the firm (manufacturer) in accordance with the requirements of Section 10, to be carried out not less than once a year (in well-grounded cases to be carried out not less than once every 2,5 year, unless otherwise specified); .3 the validity of the approval of the type item of technical supervision as certified by the RS type approval certificate, or validity of the Recognition Certificate for Manufacturer (СПИ).”. New Section 16 shall be introduced: “16 ALTERNATIVE CERTIFICATION SCHEME (ACS) 16.1 DEFINITIONS 16.1.1 Alternative Certification Scheme (ACS) is a certification scheme involving a manufacturer (and associated sub-suppliers, if needed) in the inspection, testing and certification of the manufacturer’s products. 16.1.1 An ACS shall clarify: the extent of the required inspection and testing; to which extent and under which conditions the manufacturer may perform all or parts of the required inspection and testing without the presence of the RS surveyor when RS Certificate (СЗ) is required. 16.1.2 The extent to which the manufacturer is given permission to carry out inspections and testing without the presence of the RS Surveyor shall be agreed on a case by case basis, e.g. for a specific product production line or for specific parts. 16.2 SCOPE 16.2.1 An ACS may be arranged with product manufacturers and/or sub-suppliers. 16.2.2 An ACS with a manufacturer shall define the handling of subcontracted parts (those that require the RS or work Certificates or in any other way are addressed in the RS rules). The sub-supplier may be included in the ACS of the manufacturer or have his own ACS or deliver parts that are inspected and certified by the Register. 16.2.3 An ACS that permits the manufacturer to carry out all or parts of required inspection and testing without the presence of a Surveyor may be arranged in two versions with regard to traceability): the ACS describes inspection, testing and certification additional to the manufacturer’s standard quality control in order to meet the RS rules. The components shall be stamped with a special stamp supplied by the Register or identified as required by the Register; the manufacturer has a standard quality control that covers all required inspection, testing and certification in compliance with the RS rules. Traceability and the required type of product document for components or products shall be defined in the ACS. 16.3 CONDITIONS 16.3.1 The conditions for the manufacturer to be granted the permission to carry out inspection and testing without the presence of a Surveyor are that: .1 the manufacturer has an implemented Quality Management System according to a national or international standard approved by an accredited certification body or recognised by the Register. The availability of the Quality Management System certified for compliance with the current version of the ISO 9001 is sufficient to meet this condition; .2 the manufacturer has a quality control system, current drawings, and rules and standards that cover the materials and product to be certified; .3 the inspection and testing required by the RS rules are either standard procedures in the Quality System or those that are specified in detail in the ACS; .4 the RS shall initially ascertain the manufacturer’s compliance with the ACS- requirements by verifying the required product and process approvals and performing an initial survey. Followup and renewal audits are conducted by the Register on a regular basis to verify that conditions of the ACS are continuously maintained by the manufacturer; .5 if work certificates (W) or test reports (TR) are found not to fulfil the standards agreed with the Register, the component may not be accepted; .6 the Register may carry out unscheduled inspections at the manufacturer and/or subcontractor at its own discretion; .7 the manufacturers commit themselves to involve the Register when changes to the design, manufacturing process or testing are made as well as when any major production problems or any major product delivery problems have occurred; .8 the Agreement on Survey (CO) issued in compliance with ACS may be renewed subject to the survey. The scope of the renewal survey shall: verify the conditions of the ACS are still met; verify that the current products and processes are appropriately controlled. 16.4 INFORMATION TO BE SUBMITTED 16.4.1 For admission to an alternative certification scheme (ACS) for a product, the manufacturer shall submit an application enclosing the following documentation: .1 product details; .2 existing RS approvals of the manufacturer’s products as far as required; .3 the procedures relevant to the manufacturing process; .4 a list of material suppliers with an indication of their approval by the Register (as far as required by the RS rules) and the type of technical supervision in each case; .5 Quality control plans relevant to the products and relevant components to be certified through the alternative certification scheme (ACS). Said plans shall detail the inspections and tests required by the RS rules with an indication of which inspections and tests are delegated to the manufacturer and which shall be done in the presence of the RS surveyor; .6 the procedures relevant to the quality control and inspections, their methods, frequency and certification; .7 the quality system details; .8 list of nominated personnel for: marking/stamping of products; tests and inspection (responsible persons); provision of data and information (e.g. declaration of conformity, test reports etc.); .9 any other additional documents that the Register may require in order to evaluate the manufacturing processes and product quality control. 16.5 PROCEDURE FOR THE MANUFACTURER SURVEY 16.5.1 Upon satisfactory examination of the complete documentation for application an initial audit shall be carried out at the manufacturer’s works. This audit shall verify that the manufacture of the product and the relevant controls are performed in accordance with the documents submitted and are in compliance with the requirements laid down in the ACS documentation and the RS rules. 16.5.2 Upon satisfactory outcome of the audits, the extent, duration and conditions of the ACS are documented.”. Российский морской регистр судоходства Правила технического наблюдения за постройкой судов и изготовлением материалов и изделий для судов Том 1 Часть I Общие положения по техническому наблюдению Часть П Техническая документация Russian Maritime Register o f Shipping Rules for Technical Supervision During Construction of Ships a n d Manufacture of Materials a n d Products for Ships Volume 1 Parti General Regulations for Technical Supervision Partn Technical Documentation T h e edition i s prepared by Russian Maritime Register o f Shipping 8, D v o r t s o v a y a N a b e r e z h n a y a , 191186, S t . P e t e r s b u r g , Russian Federation www.rs-class.org/ru/