PROPOSED BALCONY CLADDING JOINT POSITION 1 Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. Elevation - Type A1 Scale: 1:100 @ A1 CK CJ CH CG CF CE CD CC CB 22 21 2305 2305 CA PARAPET + 61.920 CP-90 CP-90 ROOF FFL +61.520 CP-90 + 61.170 ROOF SSL W033 THESE PANELS ARE COMPLETELY HIDDEN BY BALCONY THERFORE WE HAVE NO FURTHER COMMENTS W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 INDICATES BALCONY STUB 14. FLOOR FFL + 58.100 + 58.020 14. FLOOR SSL W033 1,402mm 2,000mm 2,000mm 23 13. FLOOR FFL + 54.950 + 54.870 13. FLOOR SSL CLADDING JOINT 2305 W033 INDICATES CLADDING JOINT 12. FLOOR FFL + 51.800 + 51.720 12. FLOOR SSL W033 WE NOTE THAT THIS IS A SKETCH STRATEGY TO AGREE PRINCIPLES. PRECISE COMMENTS/STATUS WILL BE PROVIDED ON FORMAL CONSTRUCTION DRAWINGS W005 W005 W005 W005 W005 W005 W005 W005 W004(p) W004(p) W004 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 CP-01 CP-01 CP-01 W005 W005 W005 W005 W005 W005 W005 W005 W004(p) W004(p) W004 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 CP-01 CP-01 CP-01 W005 W005 W005 W005 W005 W005 W005 W005 W004(p) W004(p) W004 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 CP-01 CP-01 CP-01 W005 W005 W005 W005 W005 W005 W005 W005 W004(p) W004(p) W004 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 BP-01 CP-01 CP-01 CP-01 W048 W048(H) FOR STRATEGY ONLY FA ED025(H) W155 W155 11. FLOOR FFL + 48.650 + 48.570 11. FLOOR SSL 10. FLOOR FFL + 45.500 + 45.420 10. FLOOR SSL 09. FLOOR FFL + 42.350 + 42.270 09. FLOOR SSL 08. FLOOR FFL + 39.200 + 39.120 08. FLOOR SSL 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL W068 W155 W155 W154(p) W155 W154(p) 06. FLOOR FFL + 32.900 + 32.820 06. FLOOR SSL 23 22 21 2305 2305 2305 SAPPHIRE BRACKETS LAYOUT AS PER DRG 9615-SBL-C-01-DRW-X-1002-C01 AND 9615-SBL-C-13-DRW-X-1014-C01 05. FLOOR FFL + 29.750 + 29.670 05. FLOOR SSL 04. FLOOR FFL + 26.600 CCS 06/07/23 + 26.520 04. FLOOR SSL 03. FLOOR FFL + 23.450 + 23.370 03. FLOOR SSL 02. FLOOR FFL + 20.300 P2 P1 +20.220 02. FLOOR SSL Rev: SECTIONS ADDED ISSUED FOR COMMENT/APPROVAL Amendment: GH GH 18/05/2023 03/05/2023 By: Date: Drawing Title ELEVATION A2 BLOCK C 01. FLOOR FFL + 17.150 FOR APPROVAL Project / Site : + 17.070 01. FLOOR SSL CAPITAL INTERCHANGE WAY UGF. FLOOR FFL + 14.055 Client: TELFORD HOMES + 13.755 UGF. FLOOR SSL Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2113 Rev. P2 Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. 1 Elevation - Type A2 C09 19 20 2305 2305 C08 C07 C06 C05 C04 Scale: 1:100 @ A1 ROOF FFL +61.520 PARAPET + 61.920 The section lines are confusing the joint lines. + 61.170 ROOF SSL W031 14. FLOOR FFL + 58.100 + 58.020 14. FLOOR SSL W032 W004(p)(H) W004 CP-01 CP-01 W031 13. FLOOR FFL + 54.950 + 54.870 13. FLOOR SSL W032 W004(p)(H) W004 CP-01 CP-01 W035 12. FLOOR FFL + 51.800 + 51.720 12. FLOOR SSL W032 W004(p)(H) W004 CP-01 CP-01 FE W032 11. FLOOR FFL + 48.650 + 48.570 11. FLOOR SSL 10. FLOOR FFL + 45.500 + 45.420 10. FLOOR SSL 09. FLOOR FFL + 42.350 + 42.270 09. FLOOR SSL 08. FLOOR FFL + 39.200 + 39.120 08. FLOOR SSL 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL 06. FLOOR FFL + 32.900 19 2305 W004(p)(H) W004 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W004(H) W004 W004(p) CP-01 CP-01 CP-01 W154(H) W154 W154(p) NO MARK-UPS/BALCONIES SO NO COMMENTS TO ADD + 32.820 06. FLOOR SSL 20 2305 05. FLOOR FFL + 29.750 + 29.670 05. FLOOR SSL 04. FLOOR FFL + 26.600 + 26.520 04. FLOOR SSL 03. FLOOR FFL + 23.450 + 23.370 03. FLOOR SSL 02. FLOOR FFL + 20.300 +20.220 02. FLOOR SSL P3 P2 P1 Rev: SECTIONS ADDED UPDATED TO COMMENTS ISSUED FOR COMMENT/APPROVAL Amendment: GH GH GH 18/05/2023 10/05/2023 03/05/2023 By: Date: Drawing Title ELEVATION A2 BLOCK C 01. FLOOR FFL + 17.150 FOR APPROVAL Project / Site : + 17.070 01. FLOOR SSL CAPITAL INTERCHANGE WAY UGF. FLOOR FFL + 14.055 Client: TELFORD HOMES + 13.755 UGF. FLOOR SSL Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2114 Rev. P3 Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. 1 Elevation - Type A3 Scale: 1:100 @ A1 2 C05 C06 C07 C08 C09 Elevation - Type A4 Scale: 1:100 @ A1 18 16 17 2304 2304 2304 PARAPET PARAPET + 55.770 ROOF FFL + 55.220 ROOF FFL + 55.220 + 54.870 ROOF SSL + 54.870 ROOF SSL W005A(p) 12. FLOOR FFL + 51.800 + 51.720 12. FLOOR SSL W005 BP-01 W035 12. FLOOR FFL + 51.800 W005 BP-01 BP-01 + 51.720 12. FLOOR SSL W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W005B W005D(p) W005C(H) BP-01 BP-01 BP-01 W067 W066(p) W065(H) FE W005A(p) 11. FLOOR FFL + 48.650 + 48.570 11. FLOOR SSL W005 BP-01 11. FLOOR FFL + 48.650 W005 BP-01 BP-01 + 48.570 11. FLOOR SSL 16 2304 W005A(p) 10. FLOOR FFL + 45.500 + 45.420 10. FLOOR SSL W005 BP-01 W005 BP-01 BP-01 10. FLOOR FFL + 45.500 + 45.420 10. FLOOR SSL W005A(p) 09. FLOOR FFL + 42.350 + 42.270 09. FLOOR SSL W005 BP-01 W005 BP-01 BP-01 09. FLOOR FFL + 42.350 + 42.270 09. FLOOR SSL W005A(p) 08. FLOOR FFL + 39.200 + 39.120 08. FLOOR SSL W005 BP-01 W005 BP-01 BP-01 08. FLOOR FFL + 39.200 + 39.120 08. FLOOR SSL W005A(p) 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL 06. FLOOR FFL + 32.900 + 32.820 06. FLOOR SSL W005 W005 BP-01 BP-01 BP-01 W155 W155A(p) W155 17 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL 06. FLOOR FFL + 32.900 + 32.820 06. FLOOR SSL 2304 18 2304 05. FLOOR FFL + 29.750 05. FLOOR FFL + 29.750 + 29.670 05. FLOOR SSL + 29.670 05. FLOOR SSL 04. FLOOR FFL + 26.600 04. FLOOR FFL + 26.600 + 26.520 04. FLOOR SSL + 26.520 04. FLOOR SSL 03. FLOOR FFL + 23.450 03. FLOOR FFL + 23.450 + 23.370 03. FLOOR SSL + 23.370 03. FLOOR SSL 02. FLOOR FFL + 20.300 02. FLOOR FFL + 20.300 +20.220 02. FLOOR SSL +20.220 02. FLOOR SSL 01. FLOOR FFL + 17.150 01. FLOOR FFL + 17.150 + 17.070 01. FLOOR SSL + 17.070 01. FLOOR SSL NO MARK-UPS/BALCONIES SO NO COMMENTS TO ADD P3 P2 P1 Rev: SECTIONS ADDED UPDATED WITH NEW TYPES / LOWER TRANSOM ISSUED FOR COMMENT/APPROVAL Amendment: GH GH GH 18/05/2023 10/05/2023 03/05/2023 By: Date: Drawing Title ELEVATION A3 & A4 BLOCK C UGF. FLOOR FFL + 14.055 UGF. FLOOR FFL + 14.055 + 13.755 UGF. FLOOR SSL + 13.755 UGF. FLOOR SSL FOR APPROVAL Project / Site : CAPITAL INTERCHANGE WAY Client: TELFORD HOMES Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2115 Rev. P3 Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. 1 Elevation - Type B Scale: 1:100 @ A1 13 15 14 12 2303 2303 2303 2303 C09 C08 C07 C06 C05 C04 PARAPET + 55.770 ROOF FFL + 55.220 CP-95 + 54.870 ROOF SSL W008 W012 12. FLOOR FFL + 51.800 CP-32 + 51.720 12. FLOOR SSL W005(H) W005 BP-01 BP-01 CP-25 11. FLOOR FFL + 48.650 CP-32 W005(H) W005 BP-01 BP-01 CP-32 W005(H) W005 BP-01 BP-01 BP-01 W005(H) W005(H) BP-01 BP-01 W005(H) W005(H) BP-01 BP-01 W008 09. FLOOR FFL + 42.350 CP-32 W005(H) W005 BP-01 BP-01 W005(H) W005(H) BP-01 BP-01 W008 08. FLOOR FFL + 39.200 CP-32 W005(H) W005 BP-01 BP-01 CP-25 W047 W003(p) CP-25 CP-25 W005(H) BP-01 BP-01 CP-02 CP-37 W047 W003(p) CP-25 CP-02 CP-37 W047 W003(p) CP-25 CP-02 CP-37 W008 W005(H) CP-02 CP-37 W008 CP-25 W012 W003(p) W008 CP-25 W012 + 39.120 08. FLOOR SSL BP-01 W008 10. FLOOR FFL + 45.500 + 42.270 09. FLOOR SSL W005(H) W047 W008 CP-25 W012 + 45.420 10. FLOOR SSL W005(H) W008 W012 + 48.570 11. FLOOR SSL W008 W047 WE NOTE THAT THIS IS A SKETCH STRATEGY TO AGREE PRINCIPLES. PRECISE COMMENTS/STATUS WILL BE PROVIDED ON FORMAL CONSTRUCTION DRAWINGS W003(p) CP-25 CP-02 CP-37 FOR STRATEGY ONLY W008 W012 07. FLOOR FFL + 36.050 CP-32 + 35.970 07. FLOOR SSL W005(H) W005 BP-01 BP-01 CP-25 06. FLOOR FFL + 32.900 CP-32 W005(H) W005 BP-01 BP-01 CP-32 W005(H) W005 BP-01 BP-01 CP-32 W005(H) W005 BP-01 BP-01 CP-32 W005(H) W005 BP-01 BP-01 CP-32 W005(H) W005 BP-01 BP-01 W005(H) W005 BP-01 BP-01 W005(H) W005 BP-01 BP-01 W005(H) W005 BP-01 BP-01 W005(H) W005 BP-01 BP-01 W008 2,361mm 2,000mm CP-32 W005(H) W005 BP-01 BP-01 W047 W003(p) CP-25 CP-37 3,260mm 1,600mm 1,600mm W003 CP-25 CP-37 CP-25 W005(H) W005 BP-01 BP-01 CP-02 W047 W003 CP-25 CP-37 CP-02 W047 W003 CP-25 CP-37 CP-02 W047 W003 CP-25 CP-37 W008 1,600mm 1,600mm 3,632mm CP-02 W047 W008 CP-25 W012 + 17.070 01. FLOOR SSL BP-01 W008 02. FLOOR FFL + 20.300 CAN JOINT BE HANDED? THIS WILL KEEP IT MORE SYMETRICAL TO OPPOSITE END BP-01 CP-02 CP-37 W008 CP-25 W012 2,000mm W005(H) W008 03. FLOOR FFL + 23.450 CP-25 W008 CP-25 W012 01. FLOOR FFL + 17.150 W005(H) W008 04. FLOOR FFL + 26.600 +20.220 02. FLOOR SSL BP-01 W003(p) W008 CP-25 W012 + 23.370 03. FLOOR SSL BP-01 W008 05. FLOOR FFL + 29.750 + 26.520 04. FLOOR SSL W005(H) W047 W008 CP-25 W012 + 29.670 05. FLOOR SSL W005(H) W008 W012 + 32.820 06. FLOOR SSL W008 CP-02 W047 1,600mm 1,600mm 1,083mm W003 CP-25 CP-37 CP-02 P2 P1 Rev: CLADDING JOINT CLADDING JOINT CLADDING JOINT SECTIONS ADDED ISSUED FOR COMMENT/APPROVAL Amendment: GH GH 18/05/2023 03/05/2023 By: Date: CLADDING JOINT Drawing Title W108 W112 W105(H) W105(H) W105 ELEVATION B BLOCK C W108 W105 W014 W103 FOR APPROVAL Project / Site : CAPITAL INTERCHANGE WAY +13.705 U.S.A RT018 RT017 RT016 RT016 ED011 RT015 FS 10.700 10.550 10.315 10.400 10.400 10.550 CAN JOINT BE HANDED? THIS WILL KEEP IT MORE SYMETRICAL TO OPPOSITE END CAN JOINT BE ADDED HERE TO MAINTAIN SYMMETRY WITH OTHER END? 10.550 Client: TELFORD HOMES 10.400 13 15 14 12 2303 2303 2303 2303 Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2116 Rev. P2 1 CA Elevation - Type C CB 11 2302 CC Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. 10 CD 2302 CE CF CG CH CJ CK Scale: 1:100 @ A1 ROOF FFL +61.520 PARAPET + 61.920 CP-90 CP-90 CP-96 + 61.170 ROOF SSL W006 9 2302 14. FLOOR FFL + 58.100 + 58.020 14. FLOOR SSL W004 W004(H) CP-01 CP-01 CP-38 W006 PARAPET + 55.770 13. FLOOR FFL + 54.950 + 54.870 13. FLOOR SSL W004 W004(H) CP-01 CP-01 ROOF FFL + 55.220 8 CP-91 2302 CP-38 CP-91 + 54.870 ROOF SSL W006 12. FLOOR FFL + 51.800 + 51.720 12. FLOOR SSL W004 W004(H) CP-01 CP-01 CP-38 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 12. FLOOR FFL + 51.800 + 51.720 12. FLOOR SSL W006 11. FLOOR FFL + 48.650 + 48.570 11. FLOOR SSL W004 W004(H) CP-97 CP-01 CP-01 CP-38 W055(H) W006 10. FLOOR FFL + 45.500 + 45.420 10. FLOOR SSL W004 W004(H) CP-01 CP-01 + 42.270 09. FLOOR SSL W004 W004(H) CP-01 CP-01 + 39.120 08. FLOOR SSL W004 W004(H) CP-01 CP-01 + 35.970 07. FLOOR SSL W004 W004(H) CP-01 CP-01 + 32.820 06. FLOOR SSL W004 W004(H) CP-01 CP-01 + 29.670 05. FLOOR SSL W004 W004(H) CP-01 CP-01 + 26.520 04. FLOOR SSL W004 W004(H) CP-01 CP-01 + 23.370 03. FLOOR SSL W004 W004(H) CP-01 CP-01 +20.220 02. FLOOR SSL W004 W004(H) CP-01 CP-01 + 17.070 01. FLOOR SSL CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 W004(H) W004(H) CP-01 CP-01 2,516mm CLADDING JOINT W150 W150(h) CP-35 + 39.120 08. FLOOR SSL WE NOTE THAT THIS IS A SKETCH STRATEGY TO AGREE PRINCIPLES. PRECISE COMMENTS/STATUS WILL BE PROVIDED ON FORMAL CONSTRUCTION DRAWINGS CP-35 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL FOR STRATEGY ONLY CP-35 06. FLOOR FFL + 32.900 + 32.820 06. FLOOR SSL CP-35 05. FLOOR FFL + 29.750 + 29.670 05. FLOOR SSL CP-35 04. FLOOR FFL + 26.600 + 26.520 04. FLOOR SSL CP-35 03. FLOOR FFL + 23.450 + 23.370 03. FLOOR SSL CP-35 02. FLOOR FFL + 20.300 +20.220 02. FLOOR SSL W055 1,600mm 1,600mm 1,600mm 1,600mm CP-35 W004(H) CP-01 CLADDING JOINT W106 UGF. FLOOR FFL + 14.055 CP-01 W055(H) 2,181mm CP-38 CP-01 08. FLOOR FFL + 39.200 W055 CP-35 1,592mm W004(H) 1,672mm W004(H) W055(H) CP-38 + 42.270 09. FLOOR SSL W055 CP-35 2,400mm W004 W004(H) W055(H) CP-38 CP-35 W055 CP-35 CP-38 W006 01. FLOOR FFL + 17.150 CP-01 W055(H) W006 02. FLOOR FFL + 20.300 CP-01 09. FLOOR FFL + 42.350 W055 CP-35 W006 03. FLOOR FFL + 23.450 W004(H) W055(H) CP-38 + 45.420 10. FLOOR SSL W055 CP-35 W006 04. FLOOR FFL + 26.600 W004(H) W055(H) CP-38 CP-35 W055 CP-35 CP-38 W006 05. FLOOR FFL + 29.750 CP-01 W055(H) W006 06. FLOOR FFL + 32.900 CP-01 10. FLOOR FFL + 45.500 W055 CP-35 W006 07. FLOOR FFL + 36.050 W004(H) W055(H) CP-38 + 48.570 11. FLOOR SSL W055 CP-35 W006 08. FLOOR FFL + 39.200 W004(H) W055(H) CP-38 11. FLOOR FFL + 48.650 W055 CP-35 CP-38 W006 09. FLOOR FFL + 42.350 CP-97 W004(H) CP-01 FA CP-35 2,945mm CLADDING JOINT 01. FLOOR FFL + 17.150 + 17.070 01. FLOOR SSL P2 P1 Rev: SECTIONS ADDED ISSUED FOR COMMENT/APPROVAL Amendment: GH GH 18/05/2023 03/05/2023 By: Date: Drawing Title W202 ED003(H) W150(h) W015 ELEVATION C BLOCK C W150(H) W150(H) UGF. FLOOR FFL + 14.055 FOR APPROVAL Project / Site : + 13.755 UGF. FLOOR SSL 11 2302 CAN JOINT BE ADDED HERE TO MAINTAIN SYMMETRY WITH OTHER END? 10 2302 CAN JOINT BE HANDED? THIS 8 WILL KEEP IT 2302 MORE SYMETRICAL TO OPPOSITE END + 13.755 UGF. FLOOR SSL CAPITAL INTERCHANGE WAY 9 2302 Client: TELFORD HOMES Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2117 Rev. P2 Notes to be read in conjuntion with this drawing: All dimensions to be signed off by the principle designer prior to fabrication. If additional information is requried, ask for clarification. This drawing is to be read in conjunction with all other CCS Facades drawings and schedules and any relevant Engineer and Architect drawings & specifications for this project. Do not scale from this drawing, use figured dimensions only. THIS DRAWING MUST BE READ IN COLOUR. C05 1 C06 Elevation - Type D 7 6 C07 2301 C08 2301 C09 Scale: 1:100 @ A1 PARAPET + 61.920 ROOF FFL +61.520 CP-90 + 61.170 ROOF SSL W008 W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 14. FLOOR FFL + 58.100 CP-28 + 58.020 14. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 13. FLOOR FFL + 54.950 CP-28 + 54.870 13. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 12. FLOOR FFL + 51.800 CP-28 + 51.720 12. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 11. FLOOR FFL + 48.650 CP-28 + 48.570 11. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 10. FLOOR FFL + 45.500 CP-28 + 45.420 10. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 09. FLOOR FFL + 42.350 CP-28 + 42.270 09. FLOOR SSL W010(H) W010 W004 CP-01 CP-25 W005(H) W005 BP-01 BP-01 W008 CP-28 W005(H) W005 BP-01 BP-01 08. FLOOR FFL + 39.200 CP-28 + 39.120 08. FLOOR SSL W010(H) W010 W004 1,102mm 2,400mm CP-01 2,400mm CP-25 W005(H) W005 BP-01 BP-01 1,600mm 2,050mm BP-01 CP-28 CLADDING JOINT 1,543mm W005 BP-01 2,000mm 1,600mm CP-28 CLADDING JOINT W008 CAN JOINT BE ADDED HERE TO MAINTAIN SYMMETRY WITH OTHER END? W005(H) 4,577mm 07. FLOOR FFL + 36.050 + 35.970 07. FLOOR SSL CLADDING JOINT W010(H) W010 W004 W005(H) W005 BP-01 BP-01 CP-28 W005(H) W005 BP-01 BP-01 06. FLOOR FFL + 32.900 CP-28 TYPE - D TYPE - E TYPE - G W005 BP-01 BP-01 CP-28 W005(H) W005 BP-01 BP-01 TYPE - D TYPE - D TYPE - E TYPE - E TYPE - G TYPE - G W005 BP-01 BP-01 CP-28 W005 BP-01 BP-01 CP-28 W005(H) W005 BP-01 BP-01 04. FLOOR FFL + 26.600 CP-28 W005 BP-01 BP-01 CP-28 W005(H) W005 BP-01 BP-01 03. FLOOR FFL + 23.450 CP-28 TYPE - H TYPE - H TYPE - F W005 BP-01 BP-01 + 23.370 03. FLOOR SSL W010(H) CP-28 W005(H) W005 BP-01 BP-01 02. FLOOR FFL + 20.300 CP-28 +20.220 02. FLOOR SSL W010(H) W010 W005(H) + 26.520 04. FLOOR SSL W010(H) W010 W005(H) + 29.670 05. FLOOR SSL W010(H) W010 W005(H) FOR STRATEGY ONLY 05. FLOOR FFL + 29.750 W010 W005(H) + 32.820 06. FLOOR SSL W010(H) W010 W005(H) WE NOTE THAT THIS IS A SKETCH STRATEGY TO AGREE PRINCIPLES. PRECISE COMMENTS/STATUS WILL BE PROVIDED ON FORMAL CONSTRUCTION DRAWINGS CP-28 W005(H) W005 BP-01 BP-01 01. FLOOR FFL + 17.150 CP-28 + 17.070 01. FLOOR SSL P2 P1 Rev: SECTIONS ADDED ISSUED FOR COMMENT/APPROVAL Amendment: GH GH 18/05/2023 03/05/2023 By: Date: Drawing Title W151 W151(H) W151(H) W110 W151 ELEVATION D BLOCK C W110(H) UGF. FLOOR FFL + 14.055 FOR APPROVAL Project / Site : + 13.755 UGF. FLOOR SSL CAPITAL INTERCHANGE WAY Client: TELFORD HOMES 7 6 2301 2301 Drawn by: Checked by: CFD NM Job Number Drawing No; P2375 Scale (U.N.O.): SEE NOTE Date: 03-04-2023 9615-CCS-C-XX-DRG-X-2118 Rev. P2