advertisement
3
NS
N
M
This Bracing Length
max 20 to 25 m
both side
L
K
C
J
C
B
I
This highlighted green color
6- location required
lateral
H
Bracing
B
A
A
F
E
D
C
B
A
X9
Drg No
:
63022070-ECPL-NLAG-ARENA-SS-TS-016
EVERSENDAI CONSTRUCTION PVT LTD.
Plot No. 1 & 2, THE LORDS, Block 1, 5th Floor, Jawaharlal Nehru Road,
DATE
:
03-11-2022
REVISION
:
REV:00
Tel: +91 44 4070 1200-49 Fax: +91 44 4070 1230
PROJECT : NLAG
PRINTED : 19.12.2022
Ekkatuthangal, Guindy, Chennai-600032, TamilNadu, India
CHENNAI, INDIA
Email : eversendai.india@eversendai.com
TITLE : ERECTION SEQUENCE - 016
Required lateral tie
from RCC Column at
25 m lvl
HSLpress.:
SWL:
Test
5000
5000
kN
430@bar
350 bar
Required lateral tie
from RCC Column at
25 m lvl
HSLpress.:
SWL:
Test
5000
5000
kN
430@bar
350 bar
LIFTING
Required lateral tie
from RCC Column at
25 m lvl
HSLpress.:
SWL:
Test
5000
5000
kN
430@bar
350 bar
Required lateral tie
from RCC Column at
25 m lvl
HSLpress.:
SWL:
Test
5000
5000
kN
430@bar
350 bar
LIFTING
Required lateral tie
from RCC Column at
25 m lvl
Required lateral tie
from RCC Column at
25 m lvl
HSL5000
SWL:
5000
kN @ 350 bar
HSL5000
SWL:
5000
kN @ 350 bar
Test press.: 430 bar
Test press.: 430 bar
LIFTING
184
Drg No
:
63022070-ECPL-NLAG-ARENA-SS-TS-017
EVERSENDAI CONSTRUCTION PVT LTD.
Plot No. 1 & 2, THE LORDS, Block 1, 5th Floor, Jawaharlal Nehru Road,
DATE
:
03-11-2022
REVISION
:
REV:00
Tel: +91 44 4070 1200-49 Fax: +91 44 4070 1230
PROJECT : NLAG
PRINTED : 19.12.2022
Ekkatuthangal, Guindy, Chennai-600032, TamilNadu, India
CHENNAI, INDIA
Email : eversendai.india@eversendai.com
TITLE : ERECTION SEQUENCE - 017
Download