Solid MEP Department Project : GolF Central Main Mechanical , Electrical Equipments Date: Item Description Sunday, October 23, 2022 QTY Unit TOTAL PRICE NOTES Main Electrical Systems 1 2 3 4 5 6 7 8 9 10 R.M.U FOR TR. 1500 &1600 KVA R.M.U FOR 2000 KVA MDB & EMDB A.T.S Automatic Transfer Switch TRANSFORMER 1600 KVA TRANSFORMER 2000 KVA SMSB & ESMSB CCTV SYSTEM Elevators Escalator Nr Nr Nr Nr Nr Nr Nr Nr Nr Nr 5 1 9 3 1 1 49 1 12 4 Total Electrical Work 1,036,575.00 V.O 5,849,803.00 1,689,225.00 715,325.00 V.O 2,698,882.00 7,000,000.00 V.O V.O 18,989,810.00 Main Mechanical Systems C C.1 C.1.1 C.1.1.1 C.1.1.2 C.1.1.3 C.1.1.4 C.2 C.3 C.3.1 C.3.2 C.3.3 C.3.4 Eng. 15410 PLUMBING PIPING Drainage and Vent Pipes Supply and install uPVC pipes and fittings for above & underground installation complete with fittings, supports, hangers, cleanout, floor clean out, roof vent cowls at each riser including, excavation, back filling and all necessary accessories 142,755.32 50 M 896 226,238.94 80 M 689 265,218.84 110 M 569 745,874.83 160 M 985 Forced Drainage Pump Room Piping Supply and install Polypropylene pipes for above ground installation complete with all fittings, hangers, supports, gate valves, automatic air vent at each riser, water hammer arrestor and all necessary accessories (All Pipe Diameters Are Outer Diameter ) 20 125 9,750.68 M 25 100 10,310.12 M 32 110 14,241.72 M 40 184 34,014.36 M 1 OF 3 Solid MEP Department Project : GolF Central Main Mechanical , Electrical Equipments Date: Item C.3.5 C.3.6 C.3.7 C.3.8 C.3.9 V V.1 V.2 V.3 V.4 V.5 V.6 V.7 V.8 A A.1 A.1.1 A.1.2 A.1.3 A.1.4 A.1.5 A.1.6 A.1.7 Eng. Description Sunday, October 23, 2022 QTY Unit TOTAL PRICE NOTES 50 25 5,683.59 M 65 765 229,248.20 M 75 869 342,598.74 M 90 985 460,449.28 M 110 869 465,669.89 M HVAC 15997 MOTOR CONTROL CENTER Supply, install, connect, test and put into operation the motor control center panel, complete with all protective devices, measuring instruments, breakers, contactors, motor starters, terminal blocks, busbars, under/over voltages relays, over load elements, push buttons, devices for connection to fire alarm system, connection to building mangement system, termination of incoming and outgoing cables including cable glands, labels, tags, components, accessories and all related ancillary works as specified and shown on drawings. M 3 202,051.11 EMCC ‐ B ‐ 02 M 3 205,336.50 EMCC ‐ B ‐ 05 M 5 361,392.24 EMCC ‐ JT2 ‐ B M 7 367,619.65 EMCC ‐ JT5 ‐ B M 6 359,953.76 EMCC ‐ T ‐ 02 M 6 358,515.27 EMCC ‐ R ‐ 02 M 3 223,406.11 MCC ‐ T ‐ 02 M 4 317,587.12 MCC ‐ R ‐ 03 FIRE FIGHTING SYSTEM 15060 PIPES AND PIPES FITTINGS Supply and install Black seamless steel pipes schedule40 for above ground installations complete with all UL listed and FM approved grooved connection fittings,hangers, supports, automatic air vent above each risand all necessary accessories 25 mm dn. 32 mm dn. 40 mm dn. 50 mm dn. 65 mm dn. 80 mm dn. 100 mm dn. M M M M M M M 123 325 623 856 245 356 648 31,601.07 103,449.81 230,175.82 374,647.45 162,933.45 461,363.40 839,785.07 2 OF 3 Solid MEP Department Project : GolF Central Main Mechanical , Electrical Equipments Date: Item A.1.8 A.1.9 A.2 A.2.1 A.2.2 Description Sunday, October 23, 2022 QTY Unit TOTAL PRICE NOTES M 945 1,542,401.27 150 mm dn. M 500 1,591,535.49 200 mm dn. Supply and install Galvanized steel pipes for test and drain network complete with all connection fittings, hangers, automatic air vent above each riser , supports, and all any necessary accessories 25 mm dn. 50 mm dn. M M 236 569 104,333.99 395,294.47 11,185,437.55 Total Mechanical Work Summary OF MEP ( Mechanical , Electrical ) Equipment , Systems A Total Mechanical Equipment 11,185,437.55 B Total Electrical Equipment 18,989,810.00 Total 30,175,247.55 Eng. 3 OF 3