MEP ( Mechanical , Electrical ) Equipment

advertisement
Solid MEP Department
Project : GolF Central
Main Mechanical , Electrical Equipments
Date:
Item
Description
Sunday, October 23, 2022
QTY
Unit
TOTAL PRICE
NOTES
Main Electrical Systems
1
2
3
4
5
6
7
8
9
10
R.M.U FOR TR. 1500 &1600 KVA
R.M.U FOR 2000 KVA
MDB & EMDB
A.T.S Automatic Transfer Switch
TRANSFORMER 1600 KVA
TRANSFORMER 2000 KVA
SMSB & ESMSB
CCTV SYSTEM
Elevators
Escalator
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
5
1
9
3
1
1
49
1
12
4
Total Electrical Work
1,036,575.00
V.O
5,849,803.00
1,689,225.00
715,325.00
V.O
2,698,882.00
7,000,000.00
V.O
V.O
18,989,810.00
Main Mechanical Systems
C
C.1
C.1.1
C.1.1.1
C.1.1.2
C.1.1.3
C.1.1.4
C.2
C.3
C.3.1
C.3.2
C.3.3
C.3.4
Eng.
15410 PLUMBING PIPING
Drainage and Vent Pipes
Supply and install uPVC pipes and fittings for above & underground installation complete with fittings, supports, hangers, cleanout, floor clean out, roof vent cowls at
each riser including, excavation, back filling and all necessary accessories
142,755.32
50
M
896
226,238.94
80
M
689
265,218.84
110
M
569
745,874.83
160
M
985
Forced Drainage
Pump Room Piping
Supply and install Polypropylene pipes for above ground installation complete with all fittings, hangers, supports, gate valves, automatic air vent
at each riser, water hammer arrestor and all necessary accessories (All Pipe Diameters Are Outer Diameter )
20
125
9,750.68
M
25
100
10,310.12
M
32
110
14,241.72
M
40
184
34,014.36
M
1 OF 3
Solid MEP Department
Project : GolF Central
Main Mechanical , Electrical Equipments
Date:
Item
C.3.5
C.3.6
C.3.7
C.3.8
C.3.9
V
V.1
V.2
V.3
V.4
V.5
V.6
V.7
V.8
A
A.1
A.1.1
A.1.2
A.1.3
A.1.4
A.1.5
A.1.6
A.1.7
Eng.
Description
Sunday, October 23, 2022
QTY
Unit
TOTAL PRICE
NOTES
50
25
5,683.59
M
65
765
229,248.20
M
75
869
342,598.74
M
90
985
460,449.28
M
110
869
465,669.89
M
HVAC
15997 MOTOR CONTROL CENTER
Supply, install, connect, test and put into operation the motor control center panel, complete with all protective devices, measuring instruments, breakers, contactors,
motor starters, terminal blocks, busbars, under/over voltages relays, over load elements, push buttons, devices for connection to fire alarm system, connection to
building mangement system, termination of incoming and outgoing cables including cable glands, labels, tags, components, accessories and all related ancillary works
as specified and shown on drawings.
M
3
202,051.11
EMCC ‐ B ‐ 02
M
3
205,336.50
EMCC ‐ B ‐ 05
M
5
361,392.24
EMCC ‐ JT2 ‐ B
M
7
367,619.65
EMCC ‐ JT5 ‐ B
M
6
359,953.76
EMCC ‐ T ‐ 02
M
6
358,515.27
EMCC ‐ R ‐ 02
M
3
223,406.11
MCC ‐ T ‐ 02
M
4
317,587.12
MCC ‐ R ‐ 03
FIRE FIGHTING SYSTEM
15060 PIPES AND PIPES FITTINGS
Supply and install Black seamless steel pipes schedule40 for above ground installations complete with all UL listed and FM approved grooved connection fittings,hangers,
supports, automatic air vent above each risand all necessary accessories
25 mm dn.
32 mm dn.
40 mm dn.
50 mm dn.
65 mm dn.
80 mm dn.
100 mm dn.
M
M
M
M
M
M
M
123
325
623
856
245
356
648
31,601.07
103,449.81
230,175.82
374,647.45
162,933.45
461,363.40
839,785.07
2 OF 3
Solid MEP Department
Project : GolF Central
Main Mechanical , Electrical Equipments
Date:
Item
A.1.8
A.1.9
A.2
A.2.1
A.2.2
Description
Sunday, October 23, 2022
QTY
Unit
TOTAL PRICE
NOTES
M
945
1,542,401.27
150 mm dn.
M
500
1,591,535.49
200 mm dn.
Supply and install Galvanized steel pipes for test and drain network complete with all connection fittings, hangers, automatic air vent above each riser , supports, and
all any necessary accessories
25 mm dn.
50 mm dn.
M
M
236
569
104,333.99
395,294.47
11,185,437.55
Total Mechanical Work
Summary OF MEP ( Mechanical , Electrical ) Equipment , Systems
A
Total Mechanical Equipment
11,185,437.55
B
Total Electrical Equipment
18,989,810.00
Total
30,175,247.55
Eng.
3 OF 3