Uploaded by Syed Sohrab Shah

QD0400-KEO-DRW-DTL-ELE-02-2B1-04501

advertisement
2
1
3
4
6
5
7
Client:
‫اﻟﺸﺮآﺔ ﺎ ﻜﻌﻮدﻳﺔﺎء ﻜﻬﺮﺑﺎء‬
Saudi Electricity Company
31-SDMS-02, Rev. 01
DATE: 6-04-2004G
SEC DISTRIBUTION MATERIALS SPECIFICATION
F
‫اﻟﺸﺮآﺔ ﺎ ﻜﻌﻮدﻳﺔﺎء ﻜﻬﺮﺑﺎء‬
Saudi Electricity Company
31-SDMS-02, Rev. 01
DATE: 6-04-2004G
SEC DISTRIBUTION MATERIALS SPECIFICATION
‫اﻟﺸﺮآﺔ ﺎ ﻜﻌﻮدﻳﺔﺎء ﻜﻬﺮﺑﺎء‬
Saudi Electricity Company
SEC DISTRIBUTION MATERIALS SPECIFICATION
‫اﻟﺸﺮآﺔ ﺎ ﻜﻌﻮدﻳﺔﺎء ﻜﻬﺮﺑﺎء‬
Saudi Electricity Company
31-SDMS-02, Rev. 01
DATE: 6-04-2004G
31-SDMS-02, Rev. 01
DATE: 6-04-2004G
SEC DISTRIBUTION MATERIALS SPECIFICATION
‫اﻟﺸﺮآﺔ ﺎ ﻜﻌﻮدﻳﺔﺎء ﻜﻬﺮﺑﺎء‬
Saudi Electricity Company
SEC DISTRIBUTION MATERIALS SPECIFICATION
31-SDMS-02, Rev. 01
DATE: 6-04-2004G
F
Project Name / Logo:
Qiddiya Public Golf Development
Public Golf Course
E
E
±30 ±30
±30
±30
±30
±30
Notes:
±30 ±30
1. ALL ELECTRICAL SUBSTATIONS, PANELS, FEEDER PILLARS, CABLE LAYING,
UNDERGROUND PROTECTION AND DUCT PROVISIONS SHALL BE AS PER LATEST
SEC STANDARDS.
±30 ±30 ±30
±30
±30
LOW VOLTAGE DISTRIBUTION PILLAR (INTERNAL DETAILS)
LOW VOLTAGE DISTRIBUTION PILLAR
±30
LOW VOLTAGE DISTRIBUTION PILLAR
LOW VOLTAGE DISTRIBUTION PILLAR
±30
±30 ±30 ±30
±30 ±30
LOW VOLTAGE DISTRIBUTION PILLAR BASE
DRAWING NO. SEC/DP-02
DRAWING NO. SEC/DP-01
DRAWING NO. SEC/DP-04
DRAWING NO. SEC/DP-03
DRAWING NO. SEC/DP-05
D
D
TYPICAL DISTRIBUTION PILLAR DETAILS
PROPOSED 3nos. x Ø150mm uPVC
LV CONDUITS UNDER BRIDGE DECK
WITH CABLE HANGER/SUPPORT
BRACKET AT EVERY 1m INTERVAL
(TYPICAL)
WADI/ROAD TOP SURFACE VARIES
AS PER SITE CONDITION
WADI/ROAD TOP SURFACE VARIES
AS PER SITE CONDITION
ROAD LEVEL
ROAD LEVEL
LV CABLES
IN CONDUIT
(TYPICAL)
500
150 200 150
C
PE SHEET OR TANKING
Ø200mm PVC PIPE
(TYPICAL)
CONCRETE ENCASE
LEAN CONCRETE
COMPACTED SOIL
150 200 100 200 100 200 100 200 150
1400
950 (MIN.)
BACKFILL MATERIAL
BACKFILL MATERIAL
800
150 200 100 200 150
950 (MIN.)
PROPOSED LV CABLE CONDUIT AT BRIDGE SECTIONAL DETAIL
C
PE SHEET OR TANKING
00
Ø200mm PVC PIPE
(TYPICAL)
LV CABLES
DIRECT BURIED
(TYPICAL)
CONCRETE ENCASE
PROPOSED 8-WAYS Ø200mm PVC DUCT
(4nos. X 2-LAYERS)
Drawn
PROPOSED LV CABLE CONDUIT AT BRIDGE ELEVATION DETAIL
NS
30.06.2022
Chk'd
Date
CONSTRUCTION DRAWINGS
Consultant / Lead Designer:
PROPOSED 3nos. x Ø150mm uPVC
LV CONDUITS UNDER BRIDGE DECK
WITH CABLE HANGER/SUPPORT
BRACKET AT EVERY 1m INTERVAL
(TYPICAL)
150 200 100 200 100 200 100 200 150
1400
RG
Description
Rev. No.
LEAN CONCRETE
COMPACTED SOIL
PROPOSED 4-WAYS Ø200mm PVC DUCT
(4nos. X 1-LAYER)
ISSUED FOR CONSTRUCTION
Riyadh,
11595
P.O. Box 62621,
Saudi Arabia
Tel: +966 11 201 2042, Fax: +966 11 201 1023
web:
http://www.keoic.com
email:
info@keoic.com
TYPICAL BRIDGELV CABLE CONDUIT DETAILS
TYPICAL ROAD/WADI CROSSING DUCT SECTIONS
Contractor
FINISH GROUND LEVEL
FINISH GROUND LEVEL
CARTPATH/ACCESS ROAD
(TYPICAL)
B
B
LV CABLE
DIRECT BURIED
(TYPICAL)
WADI FINISH GRADING/EMBANKMENT
MV/LV CABLES
DIRECT BURIED
(TYPICAL)
WADI
PROPOSED LV DUCT
(VARIES AS PER REQUIREMENTS)
(TYPICAL)
Sub-Consultant/Sub-Contractor:
MV CABLE
DIRECT BURIED
(TYPICAL)
Drawing Title:
1000 to 1500
1m TO 1.5m MINIMUM
CLEARANCE FROM BOTTOM OF
WADI TO TOP OF CONCRETE
ENCASE DUCT
PROPOSED MV DUCT 4/8-WAYS
(4 x 2-LAYERS x Ø200mm uPVC)
(TYPICAL)
FOC CABLE IN
Ø100mm DUCT
(INDICATIVE ONLY)
ELECTRICAL STANDARD DETAILS
PROPOSED MV/LV DUCT 4/8-WAYS
CONCRETE ENCASE - INSITU
(TYPICAL)
Reference File:
ALL CONDUITS USED SHALL BE
SEALED WITH APPROVED MATERIAL
AND SPARES CONDUITS SHALL BE
PROVIDED WITH END CAP
A
QD0400-KEO-DRW-DTL-ELE-02-2B1-04501
ALL CONDUITS USED SHALL BE
SEALED WITH APPROVED MATERIAL
AND SPARES CONDUITS SHALL BE
PROVIDED WITH END CAP
Checked By:
A
N. SILVA
TYPICAL WADI CROSSING DUCT ELEVATION DETAIL
TYPICAL CARTPATH/ACCESS ROAD CROSSING DUCT PLAN
Approved By:
A. HASSAN
Scale:
Drawing Number:
1
2
3
4
5
6
7
NTS @ A0
Project ID
Orig.
Doc.
Type.
Dwg.
Type
Disc
Area
Venue
QD0400
KEO DRW DTL
ELE
02
2B1 04501
Seq.
Download