Refractory Application Procedure REFRACTORY APPLICATION PROCEDURE OLD CO BOILR HPCL VISAKH REFINERY Refractory Application Procedure, 06.09.2021 Page 1 of 4 Refractory Application Procedure 1. SCOPE Refractory application in Old CO Boiler wherever it is required. 2. PRE INSTALLATION ACTIVITIES 2.1 Obtain work permit 2.2 Existing castable lining to be removed in full thickness for that layer and complete Anchor should be exposed for the area to be repaired. 2.3 Obtain mechanical clearance from HPCL. All mechanical work such as welding of Anchor and any other mechanical, if any. should be completed prior to refractory lining. 2.4 Ensure all workmen and supervisors are briefed about safety requirements, instructions to be followed during emergencies. 2.5 Ensure/ arrange necessary safety gears for workmen and supervisors such as safety shoes, helmets, gloves, safety belts (if working at heights), googles (for welders), dust mask etc. 2.6 Check physical availability of the following materials: a. Refralite – 9 Li , Insulating Castable - 5MT b. Refratab-94, 94% alumina dense castable (Refratab 94) 2.7 Check following tools & machineries are available and in working condition: a. Mixer b. Masonary tools c. Gunning machine 2.8 Arrange electric power and connections to work points for mixer and Gunning machine. 3. MIXING RATIO FOR CASTABLE & MORTAR Following are recommended water % and mixing proportions for castables and mortars used for the refractory lining. Water demand may vary to a reasonable extent depending on site weather conditions. Refractory Application Procedure, 06.09.2021 Page 2 of 4 Refractory Application Procedure Brand Name Refratab -94 Recommended Water % by weight 10 to 12%* Refralite – 9 LI 40 to 46% *For gunning castables, the water % is controlled by gunman to achieve required consistency of castable on the surface and cannot be checked physically. 4. REFRACTORY APPLICATION IN OLD CO BOILER 4.1 Surface preparation/ coating a. After anchor welding, clean inside casing thoroughly and remove all debris. 4.2 Formwork a. Castable applications shall be made in panels, each panel shall be approx 1000mm by 1000mm. Panels to be cast in a staggered manner (first 1,3,5 positions and then 2, 4 etc.). b. Formwork for (Refratab-94) shall be prepared and fixed in a manner to obtain required castable thickness, length and slope as per drawing. c. Make wooden forms. d. The form shall be fixed into position with adequate supports to prevent it form displacing, while installing the castable. e. The formwork is fixed at a distance, slightly greater than the thickness of lining, from the shell plate, wooden or metal gauges can be used for this purpose. The tolerance limit of lining thickness is -0 to +6mm. f. No formwork is necessary for Insulating castable (Refralite – 9 LI) applications as it is patch-up work applied by hand pack. 4.3 Mixing & placement of Refratab -94 Castable by gunning. a) Clean the mixer and other material handling tools before mixing. b) Use potable water for mixing of Castables. c) Water at ambient temperature is required to expedite the setting time and avoid fall of castable during gunning. Mixing temperature may go above 300C. Refractory Application Procedure, 06.09.2021 Page 3 of 4 Refractory Application Procedure d) Pan mixer with adequate capacity shall be used for mixing of castable. Mixer shall be thoroughly cleaned before use. If required, scrappers may be adjusted to ensure uniform mixing and no accumulation of dry material at corners. e) Pre dampen the dry castable by mixing with small percentage of water in a pan mixer. Transfer the pre-dampened castable to the gunning machine. f) Check connection of hose pipes, water and compressed air lines are OK for the application. Ensure proper coordination between the nozzle-man at application point and gun-man at discharge point regarding controlling of pressure/ release of materials from machine etc. 5.1 Curing & formwork removal a. Castables generally start setting after 3-4 hours of application. Setting is indicated by warming of the formwork and/ or lining surface. Immediately after the installed lining exhibits start of setting, curing shall be started and continued for 24 hours. b. Curing shall be done by covering the open surface/ formwork with wet jute bags and sprinkling water time to time to keep the surface cool so as to minimize loss of water from castable during setting. Side stoppers can be removed after 2-4 hours depending on the setting behaviour of the castable. Immediately after formwork removal, the surface shall be covered and curing shall be done for 24 hours from application end point c. Check the lining for voids, if any. Small voids, if any (less than 1 inch dia) may be filled with castable mix. In case of larger void, castable lining may have to be locally repaired by breaking for full thickness and reapplying with shuttering. 5.2 Application records for castable installation Following records shall be maintained in suitable formats: a. b. c. d. e. Date of application Batch number of castable Manufacturing date/ expiry date whichever is available Area of application (mention reference drawing number) Quantity of materials used. Refractory Application Procedure, 06.09.2021 Page 4 of 4