The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Welcome to this presentation
It walks you through The Piping Engineering sequence.
It offers many reading of this synoptic:
Chronological,

By discipline,

Along workstreams,

Along the Critical Path.
© 2015– Hervé Baron

The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Welcome to this presentation
It walks you through The Piping Engineering sequence.
It offers many reading of this synoptic:
Chronological,

By discipline,

Along workstreams,

Along the Critical Path.
© 2015– Hervé Baron

The Piping Engineering sequence
Process
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Equipment/Mechanical
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Plant Layout
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Process/P&IDs
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Piping
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Piping materials
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Welcome to this presentation
It walks you through The Piping Engineering sequence.
It offers many reading of this synoptic:
Chronological,

By discipline,

Along workstreams,

Along the Critical Path.
© 2015– Hervé Baron

The Piping Engineering sequence / Equipment workstream
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence / P&IDs workstream
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence / Piping Materials
workstream
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence / Plant layout & Piping
design
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Welcome to this presentation
It walks you through The Piping Engineering sequence.
It offers many reading of this synoptic:
Chronological,

By discipline,

Along workstreams,

Along the Critical Path.
© 2015– Hervé Baron

The Piping Engineering sequence
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
Piping supply
P&ID 3rd issue (IFC)
HAZOP
What is the
critical path?
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
Critical Path
Process
Flow
Diagrams
Equipment
Mechanical
Data sheets
& requisition
Equipment
Process Data
sheets
Piping
routing
Piping studies & layout
3D model & Piping design
Piping MTO
up-date
Stress
analysis
Pocess
Equipment
List
1st Piping
MTO, for
Inquiry
2nd Piping
MTO, for
Order
P&ID
review
meeting
P&ID 3rd issue (IFC)
HAZOP
© 2015– Hervé Baron
P&ID 2nd issue (IFD)
P&ID 1st issue (IFR)
Piping supply
Piping
isometric
drawings
PIPING FABRICATION
Plot Plan
Vendor drawings
The Piping Engineering sequence
NOT
© 2015– Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
You Enjoy this presentation and want more?
Get the Guide
A unique synthesis for the
busy Project professional
 270 pages
 300 illustrations
© 2015– Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
Discipline presentation:
activities and deliverables
The overall process
© 2015– Hervé Baron
Methods & tools
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
The overall process
© 2015– Hervé Baron
Understand the new
3D-model centered
engineering process
© 2015– Hervé Baron
Know the interfaces
between disciplines...
and with Vendors
© 2015– Hervé Baron
Understand what drives
the Project schedule
© 2015– Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
© 2015– Hervé Baron
The Oil & Gas Engineering Guide
2nd edition
Order direct from the publisher:
http://www.editionstechnip.com/en/catalogu
e-detail/1111/oil-gas-engineering-guidethe.html
© 2015– Hervé Baron
Download