Uploaded by irfannnurhidayat

Laporan Ujian Pentauliahan & Latihan PAC

advertisement
BERITA ACARA
TEST COMMISSIONING DAN TRAINING
PERTITION AIR CONDITIONER / PAC
MMR 1 & 3
PEMBANGUNAN DATA CENTER
MMR DAN POI
PT. Tiga Kreasi , Elektrikal , Elektronika , Plumbing dan Mekanikal
2023
CM KONSULTAN
PROJECT
TEST COMMISSIONING MMR 1 & 3
3 UNIT PAC
KONTRAKTOR
Siswo B.Rahmat
Project Manager
Hormat kami,
Kontraktor Pelaksana
Tes simulasi alarm
Setting PAC dg LAN system ( 2 running1 stand by bergantian)
Tes PAC alarm water system
Tes konfigurasi dg FM
9
10
11
12
PAC Posisi Tes Running
PAC Posisi Tes Running
PAC Posisi Tes Running
PAC Posisi Tes Running
PAC Posisi Tes Running
Service Manifold,Tang Amphere,
Termometer Digital, Form Tescom.
Catat hasil ukur tekanan freon,amphere electrical,temperatur in-out
8
Kabel LAN
Sensor water alarm
Dry contact relay FM
PAC Posisi Tes Running
PAC Posisi Stand by Power.
Pac Posisi Off
Pac Posisi Off
Pac Posisi Off
Pac Posisi Off
Pac Posisi Off
KETERANGAN
Service Manifold, Tang Amphere,
Termometer Digital
Tang Amphere
Phasa Meter
Service Manifold
Service Manifold
Service Manifold
Service Manifold
ALAT KERJA
Lakukan posisi semua MCB status on,dan tekan tombol power PAC
ON, paralel pengisian freon lewat pentil pengisian area indoor sampai tekanan pipa gas 70-80 psi.
Lakukan pembuangan gas N2 di pipa instalasi sampai habis lewat pentil pipa
area outdoor.
Lakukan vakum pada pipa instalasi sampai tekanan
mines 29 atau mines 30 psi (durasi waktu sekitar 3 jam )
Isi pipa instalasi dg freon R 407 c lewat pentil pipa area outdoorsampai tekanan 90 psi.
Pengecekan phasa R,S,T power PAC dg benar.
Naikan MCB display pada indoor PAC untuk energized compresor
selama 9 jam .
Pastikan Instalasi pipa PAC dari Indoor to outdoor selesai
lulus tess press minnimum 24 jam.
URAIAN KERJA
7
6
5
4
3
2
1
No.
Pekerjaan : Start Up PAC Stulz
Tanggal : 14 Juni 2023
Lokasi
: Data Center MMR 1&3
METODE TEST COMMISIONING PAC
PT. KARUNIA INTI MANDIRI
General Contractor & Suppliyer
Jl. Sumur Batu Raya Blok A3 No. 13 Sumur Batu Kemayoran Jakarta Pusat 10640
Telp. 021 – 4241661 Fax. 021 – 4252671 Email : karuniaintimandiri2000@gmail.com
Deltamas
User Training
CRAC
6/14/2023
ditetapkan.
dengan parameter yang telah
ruangan secara presisi sesuai
suhu udara dan kelembapan
Untuk mengatur dan menjaga
FUNGSI PRESISI AC
2
1
CRAC TYPE : ASD 251 A (Cyber Air 3)
Unit Overview
Air Cooled Condensor
Page 4
1
A/AS-Sytem : Air Cooled / Direct Expansion (DX) System
Unit Overview
Page 5
1
Nominal Cooling Capacity (kW)
D = Downflow
U = Upflow
Fan Unit position:
S = Standard
L = Low energy
Unit version:
Cyber Air
1 = 1 Circuit
2 = 2 Circuits
Page 6
Number of refrigerant circuits:
A = Air-Cooled
G = Water-Cooled
GE = Indirect Free Cooling
ACW = Dual Fluid Air-Cooled
GCW = Dual Fluid Water-Cooled
Cooling System:
ASD 251 A
NOMENCLATURE DX
Unit Overview
A = Aluminium, hammer finish
S= Steel, powdercoated
Condenser frame:
38°C ambient, Max. 45°C condensation
Nominal Capacity (kW)
V = Vertical
Airflow direction:
S = Standard
L = Low noise
Noise level:
Condenser
1
Fan quantity
1 = R407C, R134a, (R22)
2 = R410A
Refrigerant:
KSV 037 A 2 1
Unit Overview
Page 7
Display View - C7000 Advance Terminal
Overview Unit
Page 8
C7000 Advance Terminal
Overview Unit
Page 9
not attainable
bus member
selected bus
member
running unit IOC
standby unit IOC
„myself“ AT
„foreign“ AT
Bus Overview AT
Page 10
C7000
Info
Operate
Config
Menu Structure AT
Page 11
Info → info
Menu Structure AT
Page 12
Control → operate
Menu Structure AT
Page 13
Service → config
Menu Structure AT
Page 14
BMS message
Zone: 2+1 with an average of temperature
and humidity
Alarm Sequencing
Page 15
In case of a failure
 Our Zone 1
BMS message
Zone: 2+1 with an average of temperature
and humidity
 Our Zone 1
Page 16
In case temperature
increases overload
function is activated
Overload Sequencing
BMS message
Zone 2+1 with an average of temperature
and humidity
Time Sequencing
Rotation after
adjusted time
 Our Zone 1
Page 17
3. Jasa penggantian part.
3. Pemeriksaan panel elektrikal.
6/14/2023
13. Emergency Call & onsite support
12. Pencatatan laporan hasil pemeliharaan.
11. Simulasi fungsi alarm (Jika diperlukan)
10. Pengecekan koneksi kabel power & kontrol
9. Pemeriksaan titik-titik bocor disambungan
8. Pemeriksaan setting parameter pada controller.
7. Pembersihan saluran piping drainase
6. Pemeriksaan fungsi komponen.
5. Pemeriksaan pressure refrigerant
18
2. Penggantian part & material
2. Pemeriksaan fisik dan jalur drainase.
4. Pemeriksaan voltage & arus komponen
1. Scope of Work Preventive Maintenance Point 1-13
Comprehensive Maintenance
1. Pembersihan air filter dan unit outdoor.
Preventive Maintenance
Pemeliharaan PAC STULZ
Tanda ada alarm
Compressor 2 non aktif
Compressor 1 non aktif
Compressor 2 non aktif
Semua komponen non aktif
Semua komponen non aktif
Semua komponen non aktif
LOW PRESSURE 2
COMP 1 FAILURE/HP
COMP 2 FAILURE/HP
AIRFLOW FAILURE
WATER ALARM
FIRE ALARM
6/14/2023
Compressor 1 non aktif
LOW PRESSURE 1
Alarm
Efek
Tanda bahwa unit dalam kondisi non aktif
Kelembapan ruangan aktual
Suhu ruangan aktual
Penanganan Alarm
19
6/14/2023
4. Lakukan tindakan penanganan sesuai penyebab.
3. Konsultasi Alarm CRAC ke Engineer Stulz
2. Lakukan Dokumentasi Alarm CRAC
1. Periksa informasi pada layar controller unit.
Tindakan Awal
20
6/14/2023
Kondensor
Kotor
• Bersihkan kondensor dengan menggunakan air bertekanan
Tindakan Penanganan – High Pressure Alarm
21
6/14/2023
Tindakan Penanganan – Low Pressure Alarm
22
6/14/2023
Sensor
Error/Rusak
Air
23
• Periksa koneksi kabel pada relay sampai dengan sensor, pastikan tidak
ada kabel yang putus atau korsleting
• Ganti kabel bila terdapat kerusakan pada kabel
• Lakukan penggantian suku cadang
Bersihkan air di area pemasangan sensor hingga bersih dan kering
Water Alarm : Deteksi adanya air yang menggenang dibawah unit PAC.
Tindakan Penanganan – Water Alarm
6/14/2023
AirFlow Failure/Filter Failure Alarm : Deteksi penurunan kecepatan aliran
udara yang masuk kembali ke evaporator.
24
6/14/2023
Loss Air Flow/Fan Failure Alarm : Deteksi fungsi kerja dari Blower Fan
Indoor, bila alarm ini timbul akan membuat unit PAC Shutdown
Tindakan Penanganan – Loss Air Flow / Fan Failure Alarm
25
6/14/2023
Asap atau Api
• Pastikan bahwa fire alarm bukan alarm palsu (false alarm).
• Hubungi pihak penanggung jawab fire suppression system.
Fire Alarm : Deteksi adanya asap atau kebakaran dari sistem pemadam
kebakaran (fire suppression) di area data center yang otomatis menonaktifkan unit PAC.
Tindakan Penanganan – Fire Alarm
26
6/14/2023
5. Lakukan tindakan penanganan sesuai penyebab.
refrigerant dengan manifold gauge
27
4. Untuk alarm yang berhubungan dengan Kompressor, periksa tekanan
keseluruhan untuk sementara.
3. Non-aktifkan komponen yang bermasalah atau unit PAC STULZ secara
2. Tekan tombol “RESET” dua kali.
1. Setelah Konsultasi Engineer Stulz
Tindakan Akhir
6/14/2023
: 081295000890
: 081398933958
: 089527517642
Hotline Service Stulz
Engineer Stulz Dedi Sobari
Engineer Stulz M. Sarip
Help Desk Stulz
28
Thanks you for your Attention !
Finish
Page 29
Download