DRAWINGS OVERALL DRAWING. ROAD KEY PAVING PLAN RA-614091 RA-641030 DETAILS & DWG. LIST RA-614201 LANDSCAPING RA-614268 (SHT. 007) 327909.8200 TON 50 TON TON 50 50 TON TON 50 50 TON TON 50 11. FOR LANDSCAPING AREA DETAILS WITHIN THE LANDSCAPING ZONES SPECIFIED IN PAVEMENT DRAWINGS (LIKE KERBS, PAVEMENT STRIP, GRAVEL AND OTHER MATERIALS), REFER RA-614062 , RA-614063, RA-614070 TO RA-614076 & RA-614139 LANDSCAPING DRAWINGS.. REF. UPV Test IN METRES UNLESS NOTED ALL LEVELS ARE RELATIVE TO CHART DATUM DETERMINED AT THE TIDAL GAUGE RAK-1 IN THE EXISTING RAS AL KHAIR PORT. ±0.000 CD (m)= LAT. 4. THE CONCRETE POURING SEQUENCE SHALL BE REFERRED AS PER THE DETAILS GIVEN IN DESIGN DRAWING RA-614030. IN CASE OF ANY CHANGE IN SEQUENCE, SAME SHALL BE GET APPROVED FROM ENGINEER IN CHARGED/COMPANY. 5. THE ROAD AND PAVING MATERIAL SPECIFICATION RE-614007 SHALL BE REFERRED FOR ALL THE MATERIALS. ANY DEVIATION SHALL BE APPROVED ENGINEER IN CHARGE/COMPANY BY EASTING OUT POINT 328651.3200 3046226.5110 P202 328659.3200 3046226.5087 P203 328650.8200 3046380.5110 P204 328659.3200 3046380.5110 FOR PAVING LEVELS, LAYOUT DRAWING. RELEVANT GRADING 7. FOR GRADING LAYOUT AND COMPOSITE UTILITY NETWORK, REFER RESPECTIVE DRAWING PACKAGES. FOR DRAWING NUMBERS, REFER RA-614091 (SHT 001 & 002). 8. FOR ROAD LAYOUT, SETTING OUT, MARKINGS AND TRAFFIC SIGNS, KERBS AND BARRIER LAYOUT, REFER RESPECTIVE ROAD PACKAGE DRAWINGS. FOR DRAWING NUMBERS, REFER RA-614201 (SHT 001 & 002). EXTRA HEAVY DUTY STONE 35 t/m² TYPE 1A CRUSHED STONE SURFACE-10,000 SA TYPE 1B EXTRA HEAVY DUTY CONCRETE 35 t/m² TYPE 2 0A1 DUTY CONCRETE 20 WITH SKID OVER DUTY CONCRETE 10 MEDIUM DUTY CONCRETE 5 ASPHALT; 10 STONE t/m² - 4 t/m² - TYPE 5 MSA TYPE 6 CYCLE WAY - ASPHALT - TYPE 9 CYCLE WAY - ASPHALT - TYPE 10A - AREA TYPE MAIN ROAD 3A BEAMS (SHT. 001 & SHT. 003) MEDIUM TYPE DWG NO. RA-614263 0A1 t/m² - - GENERAL ROADS - ASPHALT; 5 MSA TYPE 7A GENERAL ROADS - CONCRETE; 5 MSA TYPE 7B ABNORMAL ACCESS ROADS - ASPHALT; 5 MSA - TYPE 7C LIGHT ROADS & CAR PARKS - ASPHALT; 0.5 MSA - TYPE 8 FOOTPATH MEDIAN - SHARED REFER - TYPE TYPE PATH 10B 11A - TYPE 11B MEDIUM DUTY CONCRETE 20kPA - TYPE 12 MEDIUM DUTY CONCRETE 80kPA - TYPE 13 LANDSCAPING QUAY WALL STRUCTURE P201 PAVING / BUILDINGS SETTING OUT / PILED POINT FOR B306 B102 REFER LEGEND: NORTHING P201 6. CONTINUATION B102 ZONE LIMIT N 3046380.5110 1775 B302-2 ARE HEAVY DUTY CONCRETE 20 t/m² - TYPE 3B HEAVY DUTY CONCRETE 20 t/m² - TYPE 3C A305 1627 ZONE LIMIT N 3046226.5110 (SHT. 007 & SHT. 009) REFER DWG NO. RA-614265 A122-1 ALL COORDINATES ARE BASED ON THE AIN AL ABD 1970 ON THE INTERNATIONAL (HAYFORD 1924) SPHEROID. GRID COORDINATES ARE LISTED ON THE UTM PROJECTION, ZONE 39 N AND CENTRAL MERIDIAN 51°E. HEAVY 1744 A+B FOR CONTINUATION (TYP) BEAM CRANE Core Test PAVING SETTING CRANE BEAM (TYP) FOR CONTINUATION B302-1 NO. RA-614263 REFER DWG N LIMIT B505-1 ZONE A302-9 FOR CONTINUATION REFER DWG NO. RA-614263 (SHT. 001 & SHT. 003) ZONE LIMIT N 3046380.5110 FOR CONTINUATION REFER DWG NO. RA-614263 (SHT. 001) 2. 10. UTILITY LAYOUTS SHALL BE REFERRED FOR UTILITIES PENETRATION, EMBED CONDUITS ETC AND 3. NECESSARY PROVISION SHALL BE MADE BEFORE POURING OF CONCRETE TO AVOID ANY ABORTIVE WORK. (SHT. 001) 3046480.6300 3046226.5110 N LIMIT BUS STOP BUS STOP LAYOUT 1:1000 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 NOT 05 58x871x604 BU 58x871x604 BU 58x871x604 BU 58x871x604 BU 58x871x604 BU 58x871x604 BU NOT NOT NOT 05 05 05 05 05 05 NOT NOT 05 05 NOT NOT NOT 05 05 05 05 NOT NOT NOT NOT MODULAR SUBSTATION (TYP) THIS DRAWING B505-2 0 10 20 30 40 50 100 B302-3 ZONE (SHT. 007 & SHT. 009) TON DWG NO. RA-614265 TON REFER 50 CONTINUATION 50 TON TON FOR 50 TON TON 50 50 TON TON 50 50 50 328101.8200 ALL DIMENSIONS OTHERWISE. 406x178x85 406x178x85 406x178x85 406x178x85 TON TON E 1. UB UB UB UB 50 50 406x178x85 SCALE TON UB 406x178x85 SH 001 ZONE B PAVING TON UB - 50 TON TON ZONE LIMIT MATCH LINE A-A E 328172.6019 50 30 30 BUS SHELTER 406x178x85 406x178x85 B406 B205-1 FOR SETTING OUT POINT (SOP) OF BUILDINGS & OTHER FACILITIES, REFER ZONAL MASTER PLAN / SITE PLANS OF RESPECTIVE BUILDINGS. IF ANY DISCREPANCY IS NOTED , SAME SHALL BE GET VERIFIED BY DESIGN OFFICE OR ENGINEER IN CHARGE. 12. IN CASE OF ANY DISCREPANCY IN THE DETAILS INCLUDING LEVELS, SAME SHALL BE GET VERIFIED BY DESIGN OFFICE OR ENGINEER IN CHARGE. E 328172.6019 UB UB B405 B205-2 TO MATCH LINE A-A 50 ZONE LIMIT E RA-614062 RA-641063 9. TON STANDARD DRAWING LIST TON RA-615178 ABBREVIATION NOTES: 50 GENERAL NOTES AND ROAD AND PAVING 0A1 50 RA-614261 TON OVERALL LAYOUT PAVING AND SURFACING PLAN TON RA-614084 LAYOUT THE PAVEMENT CONSTRUCTION SHALL BE STARTED ONLY AFTER THE CONSTRUCTION OF FOLLOWINGS: A. COMPLETE INSTALLATION i.e. LAYING OF THE UTILITIES/MEP PITS INCLUDING FOUNDATION AND ANY CONNECTIONS. B. CONSTRUCTION OF THE BUILDINGS FOUNDATIONS. C. CONSTRUCTION OF THE TOWER CRANE AND CRANE BEAMS FOUNDATIONS INCLUDING TURNOVER PITS AND SLOTS. D. CONSTRUCTION OF ALL THE MAJOR/MINOR FOUNDATIONS WORKS LIKE MODULAR SUB-STATION, CAPACITOR BANK, DIESEL GENERATOR, SIGN POSTS, SIGNAL FOUNDATIONS, TURNSTILES, BOLLARDS, KERBS, GATE EQUIPMENTS, FENCE, GATES ETC. THE RELEVANT INTERFACE DRAWINGS FOR ABOVE FOUNDATION WORKS SHALL BE REFERRED. 50 MASTER PLAN ZONE B SEQUENCE: 50 RA-614081 TON MASTER PLAN LAYOUT ZONE & PACKAGE BOUNDARIES OVERALL KEY PLAN AND CIVIL WORKS LAYOUT FOR CONTINUATION REFER DWG NO. RA-614265 (SHT. 004) & CONSTRUCTION 50 AH K K MA REFERENCE 1:1000 B505-3 0A1 25-00053-0005-305 P203 P201 TON TON NOT 05 50 50 UB 406x178x85 NOT 05 P202 P204 MATCH LINE E 328669.8200 SGU 04/12/20 0A1 UFA 04/12/20 04/12/20 ISSUED FOR CONSTRUCTION 25-00053-0005 SH 001 ZONE B SCALE PARTIAL PAVING LAYOUT PAVING 1:1000 B505-1, OFFSHORE RAS AL B000 962 LAYOUT GAP 505-2, SUPPORT 505-3 VESSELS KHAIR S RA-614264 001 0A1 CAD