INSPECTION & TEST PLAN FOR SITE PREPARATION, EARTH WORKS & BACKFILL OF DUCT BANKS,CABLE TRENCHS,MANHOLES,OPEN TRENCHES, CATCH BASINS,CULVERTS,U/G CIVIL WORKS,TANK FOUNDATIONS,SLEEPERS,LOCAL PLATFORMS ,SUPPORT FOUNDATIONS, SHELTER & EQUIOMENT FOUNDATIONS, PITS & PONDS,EARTH DIKES,PAVING, PATROL ROADS &FENCING WORKS Page 1 of 17 ONTENTS 1.0 PURPOSE..................................................................................................4 2.0 SCOPE......................................................................................................4 3.0 REFERENCE DOCUMENTS..............................................................................4 4.0 LIST OF VERIFYING DOCUMENTS.....................................................................6 5.0 DEFINITIONS/ABBREVATIONS.........................................................................6 6.0 INSPECTION AND TEST PLAN..........................................................................8 Item 1.0 Control Activity Civil Material Testing Laboratory approval Action to be verified Reference Document Acceptance Criteria Calibration certificates and validity Testing procedures and formats Applicable international standards Client/company approval Laboratory test equipment list and maintenance register Calibration certificates Applicable specifications/ standards/ Procedures (Refer Clause 3.0 - Reference documents) Testing equipment shall be in good working condition with valid calibration certificates Testing equipment/ procedures shall be in accordance with relevant test standards Evidence of company/client approval of proposed testing Responsible Party QC Verifying Document Approved document from company Intervention Points SC PSJV C TP H H R/A H Page 2 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Intervention Points Verifying Document SC PSJV C TP Non Conforman ce Report H H R N/A Calibration Certificate/ Register H R/A S N/A Drawing Register H R/A S N/A H S/R/A S/R/A H agency 2.0 Control of NonConforming Products Non-conformance control Procedure(DRP001OUF-PRO-Q-000-503) Non-conformance report . 3.0 Control of Inspection Test & Measurin g Equipment 4.0 5.0 Drawings and Documents status Site excavated material approval Review & verify validity of calibration certificates, Identification Number/Sticker Verify condition of the test equipment Review of applicable drawings/documents and ensure that latest revision is available at site Review of work procedures, Method Statements, QC Procedures and other related documents etc. Verification of laboratory test reports for excavated material Excavated material in excess of that required for normal embankment construction shall be stockpiled within the construction limits or Manufacturer’s data sheet Material & Equipment Management Procedure (DRP001-OUF-PRO-L000-006) Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500). List of latest revision of applicable drawings IFC drawings and Specification for Site Preparation, Excavation & Backfill (DRP001-OUFSPE-C-000-500) Project specification for Site Preparation, Excavation & Backfill (DRP001-OUF-SPE-C000-500) IFC Drawings Agreed disposition action taken QC Good mechanical and electrical condition Valid calibration certificate Conforms to Material & Equipment Management Procedure (DRP001-OUFPRO-L-000-006) QC Complies with IFC document register Complies with IFC drawings, applicable standards and specifications Excavated material shall be stock piled and samples shall be tested at laboratory Classified in accordance with Site Preparation, Excavation & Backfill (DRP001-OUF-SPE-C-000500, Clause 6.1.3, 6.1.4 & 6.2) specification by testing agency, if found suitable, QC QC Laboratory Test Reports for excavated material Page 3 of 17 Item Control Activity Action to be verified shall be placed in a designated spoil area beyond the construction limits as specified by the Company. Standard sieve analysis in accordance with ASTM C136, ASTM D422, or ASTM D1140 Liquid and plastic limit determination in accordance with ASTM D4318 Modified Proctor Test in accordance with ASTM D1557 or one Standard Proctor Test in accordance with ASTM D698 Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV existing excavated material can be used. Testing shall be carried out for One standard sieve analysis, one liquid and plastic limit determination, and one Modified Proctor test in accordance with the standards listed in this ITP, every 1000m3 of fill or as directed by the Company. Depending on variation in analysis, additional tests shall be made as determined by the Engineer / Company. Fill and backfill material shall not contain material larger than 75mm and shall be free of organic matter or any kind of contamination or any other unsatisfactory material. Gypsum content for all fill materials shall be less than 10%. General fill material shall comply with the requirement of DRP001-OUF-SPE-C000-500, Clause 6.2.2. Structural fill materials shall comply with the requirement of DRP001-OUF-SPE-C000-500, Clause 6.2.3 Controlled low strength material(CLSM) shall comply with the requirement of DRP001-OUF-SPE-C-000500, Clause 6.2.4 The 28 days compressive strength for controlled low strength material shall be Page 4 of 17 C TP Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Intervention Points Verifying Document SC PSJV C TP H S/R/A S/R/A H between 0.7 and 1.4 Mpa. 6.0 Fill material approval (from supplier or borrow pit) Source approval and Verification of laboratory test reports for fill material Standard sieve analysis in accordance with ASTM C136, ASTM D422, or ASTM D1140 Liquid and plastic limit determination in accordance with ASTM D4318 Modified Proctor Test in accordance with ASTM D1557 or one Standard Proctor Test in accordance with ASTM D698 Bedding & Padding Material for UG services Project specification for Site Preparation, Excavation & Backfill (DRP001-OUF-SPE-C000-500) IFC Drawings Fill material shall be obtained either from approved supplier or borrow pit areas Fill material shall be tested and classified by testing agency Fill material shall comply with Project specification for Site Preparation, Excavation & Backfill (DRP001-OUFSPE-C-000-500, Clause 6.1.3 & 6.1.4 & 6.2) If the type, or source, of fill material changes, the control tests shall be performed again with the new material. Testing shall be carried out for One standard sieve analysis, one liquid and plastic limit determination, and one Modified Proctor test in accordance with the standards listed in this ITP, every 1000m3 of fill or as directed by the Company. Depending on variation in analysis, additional tests shall be made as determined by the Engineer / Company Fill and backfill material shall not contain material larger than 75mm and shall be free of organic matter or any kind of contamination or any other unsatisfactory material. QC Laboratory Test Reports for fill material Page 5 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV C TP H W S/R N/A Gypsum content for all fill materials shall be less than 10%. General fill material shall comply with the requirement of DRP001-OUF-SPE-C000-500, Clause 6.2.2. Structural fill materials shall comply with the requirement of DRP001-OUF-SPE-C000-500, Clause 6.2.3 Controlled low strength material(CLSM) shall comply with the requirement of DRP001-OUF-SPE-C-000500, Clause 6.2.4 The 28 days’ compressive strength for controlled low strength material shall be between 0.7 and 1.4 Mpa. Bedding and Padding materials for US services shall be as per IFC drawings 7.0 Inspection of materials used for filling like excavated soil, general fill material, 20/40mm, 2/6mm, 10/20mm gravel, clean sand & structural fill and geotextile, Check fill material. Storage and preservation (e.g. long term outdoor storage at site) Material approval request(MAR) Test certificates Material Management Procedure (DRP001-OUFPRO-W-000-001) Specification for Site Preparation, Excavation & Backfill (DRP001-OUFSPE-C-000-500) IFC Drawings Confirm to Specification for Site Preparation, Excavation & Backfill (DRP001-OUFSPE-C-000-500, Clause 6.1.3 & 6.1.4 & 6.2) Confirms to storage and preservation requirements Confirms to Material Management Procedure (DRP001-OUF-PRO-W-000001) Confirms to IFC Drawings QC Test Reports & Material Approved Document & Notification for material inspection( NFMI) & Material Page 6 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Setting out SC PSJV C TP H H W N/A inspection report(MIR) & Pictures of the material HDPE liner PVC sleeves & Asphalt fibre boards 8.0 Intervention Points Verifying Document Temporary monuments shall be provided as part of the site preparation works in accordance with the details provided on DRP001-FED-000000C-CVL-900-1 & IFC drawings. Alternative proposed locations, if requested, are to be indicated on copy of drawing DRP001-FED-000000C-CVL-900-1 by Contractor for Company review and approval. After installation the location and level of the temporary monuments shall be checked and confirmed by a third party surveying contractor. All reference points (e.g., property markers, benchmarks, etc.) shall DRP001-OUF-SPE-C000-500 IFC Drawings Tolerance for survey works shall be as per Table-1 of DRP001-OUF-SPE-C-000500 DRP001-FED-000000-CCVL-900-1 IFC Drawings QC ITR-C0102X Page 7 of 17 Item Control Activity Action to be verified 9.0 Site preparation and top soil removal (If applicable) be carefully maintained during excavation, backfilling, compaction, and earthwork. If a reference point is damaged during performance of the work, the reference point shall be repaired or replaced at the Contractor’s expense. Top soil stripping activity Grubbing Grading Reference Document Acceptance Criteria Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Clause 6.3) IFC Drawings Stripped material shall be disposed of to a designated area Stripped material shall not be used as Structural fill material, under any circumstances. Grubbing consists of removal of roots prior to excavation. Before any soil is removed, the area shall be cleared of all debris. Unless otherwise directed by the Company, topsoil shall be removed to full-depth or as specified in the Project specification/IFC drawings and stockpiled for re-use. Reusable materials shall be stockpiled as necessary for the Contractor’s operations in areas approved by the Company. Stripping, grubbing and grading shall comply with clause 6.3 of DRP001-OUF- Responsible Party Intervention Points Verifying Document QC SC PSJV C TP H W S N/A ITR-C0101X & Pictures of the activity Page 8 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Intervention Points Verifying Document SC PSJV C TP H W S N/A SPE-C-000-500 General area grading shall be completed to within a tolerance of ±25 mm of the elevations shown in the contract documents, but shall not be uniformly high or low. 10 UG Services (Cables/Pipi ng) Trench Excavation Pre-padding/Bedding Post-Padding Backfilling Specification for Site Preparation, Excavation & Backfill (DRP001FED-SPE-C-000-500) IFC Drawings ASTM D 5334 Trench excavation dimensions shall be as per IFC drawings Lift thickness of bedding/Padding material shall be as per IFC drawings. Compaction for Backfill of trenches (for utility lines or foundations) – one test for every 50 linear feet (15 m) of each lift where directed by Company. Electrical trenches shall be backfilled with clean sand having thermal resistivity value less than 2Km/Watt, till the top of cable tiles. Above the cable tiles, trench is to be backfilled with normal excavated soil or mixed with imported fill material in appropriate proportion to get thermal resistivity value of 2Km/watt. Thermal resistivity test shall be conducted as per ASTM D 5334, on soil samples compacted to 90% MDD (Standard proctor density) to QC ITR-C0101X & ITR-C0102X & Pictures of Excavation & Backfilling Page 9 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Intervention Points Verifying Document SC PSJV C TP H W W N/A reflect the actual compaction of trench backfill. 11.0 Excavation work Marking and setting out Excavation lines/elevation Vertical sides preparation/support/ shoring UG services identification Dewatering system Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500) IFC Drawings Excavation dimensions shall be in accordance with Contract documents and IFC drawings Excavated material shall be stock piled Shoring to be provided (If required) Prior to excavation, underground services shall be identified and a hazard assessment of work site prepared by competent person If required dewatering system to be provided Over excavation shall be backfilled with suitable fill material and compacted to required degree of compaction as stated under Item 14& 15 of this ITP or may be backfilled with lean concrete of a mix design proportioned to achieve a minimum 28-day compressive strength 7.0 MPa. Unless otherwise shown in the contract documents, excavation under foundations shall not be permitted. Known contaminated soils within the construction limits shall be managed in accordance with a QC ITR-C0101X & ITR-C0102X & Pictures of Excavation Page 10 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV C TP H W S N/A contaminated soil management plan provided by the Contractor before the start of excavation. Vertical tolerance for structural excavations and earthen structure shall be ±25mm If blasting is not permitted, rock shall be excavated with mechanical rippers, mechanical breakers, or mechanical drills with nonexplosive demolition agents. If blasting is permitted and required, blasting operations shall be managed in accordance with the rockblasting plan (DRP001-FEDSPE-C-000-500, Clause 6.1.8.2). Excavation safety shall be as per DRP001-FED-SPEC-000-500, Clause 6.3.2.4 and contract documents. 12.0 Preparation for filling areas Cleaning Sub grade preparation Finished grade level Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Clause 6.3.6) IFC Drawings ASTM D1557 ASTM D698 Prior to filling, area to receive fill shall be cleared of all vegetation and construction debris Area shall be free of standing water Area shall be proof rolled with 10 tonne roller. Before placing classified fill, the sub-grade top 150mm shall be scarified and recompacted in accordance with Item 14& 15 of this ITP QC ITR-C0101X & ITR-C0102X Page 11 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV C TP H W S N/A Area to receive fill shall be free of loose and soft soil If soft, compressible soil is encountered at footing grades, as shown in the contract documents, the Company shall be informed by Contractor with proposals removal and replacement of material with structural fill. Where ground improvement required, Contractor shall propose to Company for approval, prior to start of the activity. Geotextile materials shall be placed as per IFC drawings. Finished grade level and coordinates shall be as per IFC drawings. The density of the top 150 mm in areas for fill and loading shall not be less than 90% of the maximum Modified Proctor density in accordance with ASTM D1557, or 95% of the maximum Standard Proctor density in accordance with ASTM D698. 13.0 Placement of fill material Structural Fill material spreading beneath and around foundations, beneath slabs, roadways, railroads, area pavement, and parking areas General Fill material Layer thickness Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Clause 6.3.7) IFC drawings QC Structural fill shall be placed ITR-C0101X in lifts of 200 mm maximum in loose depth. General fill shall be placed in lifts of 300 mm maximum in loose depth. For hand-operated compaction equipment, Page 12 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria OMC control 14.0 Compaction Test Layer thickness Degree of compaction Test reports verification Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Responsible Party Verifying Document Intervention Points SC PSJV C TP H W W H general and structural fill materials shall be placed in lifts of 100 mm maximum in loose depth Side slopes of embankments and berms shall be cut true and straight, as shown on the IFC drawings, and shall be graded to the proper cross section. Soil that is spilled or washed onto paved areas, roads or highways or washed into drains, pipes, gutters, or ditches or onto adjacent property shall be removed daily from the surface. Unless otherwise permitted in writing by the Company, backfill around or over castin-place concrete shall not be permitted until the concrete has attained 75% of its specified strength. Compacted surface of fill and backfill shall be within a vertical tolerance of ±25mm for rough grading and ±15mm for structural backfill. Installation of base course for roads, parking area to be surfaced shall be as per DRP001-OUF-SPE-C-000500, clause 6.3.8. Fill shall be compacted to required degree of compaction in accordance with (DRP001-OUF-SPE-C- ITR-C0101X QC & Page 13 of 17 Item Control Activity Action to be verified Reference Document Acceptance Criteria Application of proctor value clause 6.3.7) IFC drawings Sand-cone method in accordance with ASTM D1556 Nuclear method in accordance with ASTM D2922 Drive-cylinder method in accordance with ASTM D2937 000-500) and IFC drawings. Structural fill shall be compacted to at least 90% of the maximum Modified Proctor density in accordance with ASTM D1557, or 95% of the maximum Standard Proctor density in accordance with ASTM D698. Granular soil used as structural fill that does not exhibit well-defined moisture-density relationship shall be compacted to at least 80% relative density in accordance with ASTM D4253 and ASTM D4254. General fill shall be compacted to at least 85% of the maximum Modified Proctor density in accordance with ASTM D1557, or 90% of the maximum Standard Proctor density in accordance with ASTM D698. Granular soil used as general fill that does not exhibit well-defined moisture-density relationship shall be compacted to 70% to 75% relative density in accordance with ASTM D4253 and ASTM D4254. Responsible Party Verifying Document Intervention Points SC PSJV Pictures of Compacted area Page 14 of 17 C TP Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV The moisture content of the material being compacted shall be within +3% of the optimum moisture content Where hand operated compacting equipment is used, fill shall be compacted to required degree of compaction in accordance with DRP001OUF-SPE-C-000-500/IFC drawings. If approved by the Company in writing, chemical stabilization may be used if modification of liquid limit and plasticity index are necessary to obtain satisfactory compaction. Compaction by water jetting or flooding shall not be permitted. Compaction of base course shall be to at least 95% of the maximum Modified Proctor density in accordance with ASTM D1557, or 100% of the maximum Standard Proctor density in accordance with ASTM D698. If base course materials are clean granular material and Relative Density is the standard, compact to 85% of relative density. All failed areas shall be recompacted and retested. Retest shall bear same test Page 15 of 17 C TP Item Control Activity Action to be verified Reference Document Acceptance Criteria Responsible Party Verifying Document Intervention Points SC PSJV C TP H W W H identification number as the original test number with suffix “R” 15.0 Frequency of compaction tests and other fill material tests Verification of compaction tests frequency Verification of fill material full analysis frequency Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Clause 6.1.4) IFC drawings Structural fill under foundations and building slabs – one test every 1000 square feet (90 square m) of each lift Tank Foundations – for tank foundations a minimum of 3 field density tests for every 5000 square feet (460 square m) of each compacted layer. Structural fill under roadways, railroads, area pavement and parking areas – one test every 2000 square feet (180 square m) of each lift Road base and sub-base – one test every 2000 square feet (180 square m) of each lift Backfill of trenches (for utility lines or foundations) – one test for every 50 linear feet (15 m) of each lift where directed by Company. General fill – one test minimum every 5000 square feet (460 square m) of each lift. As a minimum, one, in-place moisture content and one density test shall be performed on every individual layer of fill, per QC ITR-C0101X Page 16 of 17 Item 16 17.0 Control Activity Geo-textile Membrane, HDPE liner & Pipe sleeves for CP Site preparation and Earth work completion Action to be verified Reference Document Installation of Geotextile Membrane, HDPE liner & Pipe sleeves for CP Specification for Site Preparation, Excavation & Backfill (DRP001OUF-SPE-C-000-500, Clause 6.1.4) IFC drawings DRP-001-OUF-510030C-CON-004-001, R2 DRP-001-OUF-510030C-CON-004-002, R2 Compile all Inspection and test records and laboratory test records Survey reports for Finished grade level DRP001-OUF-SPE-C000-500 IFC drawings Acceptance Criteria work area. For embankments, in place density and moisture content tests, in accordance with structural fill requirements in DRP001-OUF-SPE-C-000500, clause 6.3.7 (Filling and Backfilling) shall be performed on every lift of compacted fill every 150m2, unless directed otherwise by the Company. Geo-textile Membrane, HDPE liner & Pipe sleeves for CP shall be installed as per IFC drawings. Geo-textile Membrane, HDPE liner & Pipe sleeves for CP shall be as per Referenced project specifications Materials shall be approved prior to use. All quality records shall be approved and signed by all parties Responsible Party QC QC Intervention Points Verifying Document SC PSJV C TP ITR-C0101X H W W N/A H H H N/A ITR-C0104A & Pictures of Earth work completion Page 17 of 17