Work Permit OPCW-CMT-14/F6 (10-Oct-11) Work Details Type of Permit: Project: Permit Applicant: Work Permit Permit No. 04 Date: May,08-May 15, 2021 Position: Architect Date / Time Commence: 7:00AM – 5:00PM/ May,08-May 15, 2021 Date / Time Complete: 7:00AM – 5:00PM/ May,08-May 15, 2021 Painting Works, Electrical Works, Plumbing Works, Masonry Works, Roofing Installation Landscaping Works Validity of Permit: Nature of Work: Trade of Work: Location: Block 49 Lot 10, Highway Improvement, Block 46 Lot 39, Block 47 Lot 50, Block 64 Lot 55, Block 67 Lot 62, Block 70 Lot 49 No. of Workers;55 Tools & Equipment Details: *indicate all tools & equipment to be used Hose One Bagger Cement Water Cut-off Backhoe Drill Cutting wheel Mini Dump truck Grinder Painting Materials Existing / Potential Hazards & Recommended Control Measures Actions: *indicate all hazards identified and mitigating measures to be performed. Hazard Mitigating Measures Flask from The Welding Area Provide Welding Mask and glasses and keep away from the working activity Wear a PPE uniform and keep away from the Structural Activities Falling Object from the Structural Activities. Concrete Pouring of Raised Table. Scaffold Scraft Materials and chemical dust from the near housing, Put a Mask or improvised clothes and keep the mask wet Use a proper Safe Full body Harness Proper Housekeeping and provide a mask of alternative clothes to protect their sense of smell Personal Protective Equipment & Safety Equipment / Devices Details: *indicate all PPE & safety equipment / devices required: Hardhat Safety Shoes Safety Vest Safety Boots Gloves Safety Welding Mask Long sleeves Full Body Harness Gas Testing Details: *for entry to confined space or hot works on tanks, pipes, etc. which previously contained flammable materials Oxygen Level: Gas Test Readings: Time Tested: Flammability: H2S: Area Tested: CO: Inspection & Approval: *all signatories shall be aware of the responsibilities laid down in this permit. Permit Applicant: I confirm that the safety precautions specified will be observed Supervising Engineer: I am aware of the job to be done and the precautions to be taken Engineer/Architect: I have checked and certified that all precautions established are adequate to protect all workers Name & Signature Name & Signature Name & Signature Work Permit OPCW-CMT-14/F6 (10-Oct-11) Work Details Type of Permit: Project: Permit Applicant: Work Permit Permit No. 04 Seafront Residences Date: May,08-May 15, 2021 JSL Enterprises Position: Architect Date / Time Commence: 7:00AM – 5:00PM/ May,08-May 15, 2021 Date / Time Complete: 7:00AM – 5:00PM/ May,08-May 15, 2021 Painting Works, Electrical Works, Plumbing Works, Masonry Works, Roofing Installation Landscaping Works Validity of Permit: Nature of Work: Trade of Work: Location: Block 49 Lot 10, Highway Improvement, Block 46 Lot 39, Block 47 Lot 50, Block 64 Lot 55, Block 67 Lot 62, Block 70 Lot 49 No. of Workers;55 Tools & Equipment Details: *indicate all tools & equipment to be used Hose One Bagger Cement Water Cut-off Backhoe Drill Cutting wheel Mini Dump truck Grinder Painting Materials Existing / Potential Hazards & Recommended Control Measures Actions: *indicate all hazards identified and mitigating measures to be performed. Hazard Mitigating Measures Flask from The Welding Area Provide Welding Mask and glasses and keep away from the working activity Wear a PPE uniform and keep away from the Structural Activities Falling Object from the Structural Activities. Concrete Pouring of Raised Table. Scaffold Scraft Materials and chemical dust from the near housing, Put a Mask or improvised clothes and keep the mask wet Use a proper Safe Full body Harness Proper Housekeeping and provide a mask of alternative clothes to protect their sense of smell Personal Protective Equipment & Safety Equipment / Devices Details: *indicate all PPE & safety equipment / devices required: Hardhat Safety Shoes Safety Vest Safety Boots Gloves Safety Welding Mask Long sleeves Full Body Harness Gas Testing Details: *for entry to confined space or hot works on tanks, pipes, etc. which previously contained flammable materials Oxygen Level: Gas Test Readings: Time Tested: Flammability: H2S: Area Tested: CO: Inspection & Approval: *all signatories shall be aware of the responsibilities laid down in this permit. Permit Applicant: I confirm that the safety precautions specified will be observed Supervising Engineer: I am aware of the job to be done and the precautions to be taken Engineer/Architect: I have checked and certified that all precautions established are adequate to protect all workers Ar. Bryan Amiel Lao Name & Signature Name & Signature Name & Signature