Republic of the Philippines Department of Education Region IX, Zamboanga Peninsula Division of Zamboanga Del Sur TUKURAN TECHNICAL-VOCATIONAL HIGH SCHOOL Tukuran, Zamboanga del Sur IMMERSION TRAINING PLAN Name of Student: School: Track: Duration of Work Immersion School Partnerships Focal Person Work Immersion Teacher JHON CELSO L. YBAÑEZ Tukuran Technical-Vocational High School TVL Model A 80 hrs Immersion (320 hrs. Specialization) Grade and Section Immersion Site: Strand/Specialization: EIM 12 LGU-TUKURAN Electrical Installation and Maintenance GLENCIL B. JOROLAN Contact Number: 09506037155 RENE G. MOSQUEDA Contact Number: 09606657691 Competencies 1. PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING AND AUXILIARY SYSTEMS LIST OF TASKS/ACTIVITIES Tasks/Activities Time Allotment Actual Schedule Install electrical metallic /nonmetallic (PVC conduit) 8 hrs. February 27, 2023 Install wire ways and cable tray 8 hrs. February 28, 2023 8 hrs. March 1, 2023 8 hrs. March 2, 2023 8 hrs. March 3, 2023 Install auxiliary terminal cabinet and distribution panel Prepare for cable pulling and installation Perform wiring and cabling lay out Remarks 2. INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION AND GROUNDING SYSTEMS Plan and prepare work 8 hrs. March 6, 2023 Install electrical protective devices 8 hrs. March 7, 2023 Install lighting fixture and auxiliary outlet. 8 hrs. March 8, 2023 8 hrs. March 9, 2023 8 hrs. March 10, 2023 Install wiring devices 3. INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES AND AUXILLIARY OUTLETS ___________________________________ Student’s Signature over Printed name RENE G. MOSQUEDA Work Immersion Teacher’s Signature over Printed Name Install lighting fixture/ switches __________________________________ Parent’s Signature over Printed Name NESTOR A. GONZALES Industry Supervisor’s Signature over Printed Name