Radiography Discrepancy ABENER Root Cause Analysis. Revision: Date: Page: 00 2018/06/20 1 of 1 SINSINA CORNER COMPANY FOR CONTRACTING RADIOGRAPHY DISCREPANCY Project: Waad Al-Shamal ISCCPP , Turaif, Saudi Area / Unit: HTF Piping Name of organizer: Sinsina Period of Analysis: April’ 2018 to June’2018 DATE: -June 20th.2018 Report No : Sinsina/01 Contract Reference: Department: Qc Type of the process :Heat transfer fluid systems Details of Observations: 1- RT Films not matching ROOT CAUSE: 1- Two times marking of zero were observed and repairs were attended two times according to two times zero marking of RT and up to R2 . Corrective actions: 1- After finding root cause of issue, we took whole joint,o-o, to observe defect free joint. 2- RT marking shall be on pipe with proper numbering and segment wise as defect can be traced easily. 3- Defect shall be traced with tracing paper and related QA/QC inspector shall be responsible for repair marking. 4- NDT agency shall be responsible for proper Location marking on joint. Person responsible for corrective & Preventive actions: Irshad Rasool Verification of corrective action: 1- Corrective Action implemented: YES / NO,…. Yes 2- Date:30/6/2018 Prepared By ------------------(Sinsina QC) Verified By -------------------(Sinsina QA/QC Manager) Approved By --------------------(ABE Level-III)