Mudlogging QC Report
Well Name:
B9-NC151
Date:
29-Dec-2022
General Information & Crew Operators
Mud logging
Contractor Name:
Unit Number:
Rig Name:
Rig Type:
Rig Manager:
Tool Pusher:
Company Man:
Aljowfe Oil Technology
Unit Manager:
Mraga Alfakry
076
NWD (FB) #50
750 HP Land Rig
Maher AL atman
Maher AL atman
Data Engineer:
Mud Logger:
Mud Logger:
Sample Catcher:
Sample Catcher:
Walid Alhaddad
Wellsite Geologist:
Mraga Alfakry
Ayman Alabedi
Salah Azzawi
/
/
Mohsen Rahoumah
Nasruldeen Souysi
Rig Condition
Rig Status
Accommodation
/food
Generally, appears in a good condition
- Waiting for fixing some things
- No TV
- Food: acceptable
Personnel
Good




Fair good
Unit presentation and organisation
Mud loggers’ presentation
Data engineers’ presentation
Crew homogeneity, teamwork
Technical level
Fair




Bad




n/a




Safety
1
CONFIDENTIAL
Mudlogging QC Report
Good
Is the unit installed safely (zone, etc)
Is the Unit Book up-to-date
Air lock status / unit outer door
Emergency exit clear inside / outside the unit
Attendance at rig safety meetings
Mudlogging safety manuals
Extinguishers condition & certification status
First aid kit availability & condition
Accident / Hazard report forms (Availability)
Safety Policy displayed
Safety Glasses / Gloves
Unit Safety File maintained for safety doc.
Gas & smoke (Test of system)
Pressurisation (Test of shut down system)
Shut down timings - alarm - number of seconds….
Purge cycle time - minutes
Fair
Bad
n/a






















Present Reports in Case of Accidents
















2-3 min

Unit Condition
External general condition of unit
Mudlogging & Clint Logo
Internal general condition of unit
Air conditioner
Gas, panels and Computer rack status
Printer status
System interconnection
Geological area
Good
Fair




Fair to good







There is not internet


Bad








n/a








Bad







n/a







Electrical Equipment
Power control drawer & transformer condition
Unit Emergency Power down (test & label)
Cable extension cords condition
Switches and power sockets condition
Circuits on the switchboard clearly labelled
Procedure for working on Degasser on unit wall
UPS use & condition
Good







Fair







Acquisition & Gas System
Acquisition:
Main Gas system:
Backup Gas System:
Gas system calibration is done (OK)
Geological Equipment
2
CONFIDENTIAL
Mudlogging QC Report
Microscope and Light
Fluoroscope
Autocalcimeter / Manocalcimeter
Oven
Sieves
Sample trays
Tweezers and pins
Magnet
Thin section
Grind saw
Core saw
Geological Hammer
Unwashed sample bag & box
Washed sample bag & box
Wax bath
Good















Fair















Bad















n/a















Fair









Bad









n/a









Good
Fair
Bad









YES / NO
YES / NO
EX Log – Log blot
YES / NO
version
n/a



Sensors Installation & Operation
Sensors installation & maintenance
Cables status, shielding (earthing) & certification
Status of UZB / UTB
Cable connection status at UZB / UTB
Cable layout from unit to sensors
Sensor calibration status and history
Record of calibration sheets
Junction boxes availability & status
Drill floor monitor
Good









Acquisition Panels & Computers
Acquisition panels status (DAP, SCP, DLP)
DAP rack fan filter clean
Computers condition
Acrobat distiller installed
Microsoft office installed
Authorised software status
Virus scan status (availability and version)
Gas installation & Operation
3
CONFIDENTIAL
Mudlogging QC Report
Main gas equipment status
Backup gas equipment status
Degasser installation & maintenance
Main gas line / Lag time checks (records)
Backup gas line status
Gas panels calibration checks and records
Gas bottles availability & batch number
Silica gel & calcium chloride (condition)
Compressor maintenance
CO2 calibration check & records
H2S calibration checks & records
HOG / Whatman spares (pressure switch)
Calibration gas cylinders secured outside unit
Good
Fair
Bad


















3 Bottle (CO2, H2S,C1&C2…etc.)















inside
n/a











Stock / Spares
spare list availability & spare status
Stock control (spare parts and consumables)
Good


Fair


Bad


n/a


Fair




Bad




n/a




Fair


No




Bad


n/a


Reports & Logs
Morning reports status / Logs Status
Mudlogging QA
Log standard & status
Final well report standard and status (backup)
Good




Sampling Collection and Preparation
Condition of sample-catching PPE
Condition of Sieves
Correct PPE used
Correct volume of samples caught
Samples labelled correctly
Samples correctly dried in oven
Good


Yes




Chemical Management
4
CONFIDENTIAL
Mudlogging QC Report
Chemicals stored in a safe manner
Calcium carbide stored separately from liquids
Chemical containers adequately / clearly labelled
Chemical storage location clearly identified
Availability of chemical handling gloves
Stock of chemical handling gloves
Chemical inventory maintained
Good







Fair







Bad







n/a







Fair


Bad


n/a


Data Backup
Depth database & Time database
Other backups / ASCII files / final well report
Good


Client representative General remarks
-The unit is generally in a good condition, with good teamwork and homogeneity status.
Date: 29 Dec 2022
Signature:
Mohsen Rahoumah
Nasruldeen Souysi
5
CONFIDENTIAL