UNIVERSITI OF KUALA LUMPUR MALAYSIA FRANCE INSTITUTE FVB21602 - ENGINEERING ETHICS ACCIDENT IN LPT2 (LEBUHRAYA PANTAI TIMUR 2) Group 1 Name Muhammad Aisar Bin Saipun Azzaman Amal Syakir Bin Amaludin Muhammad Nazirul Aiman Bin Abdul Rasid Nur Irdina Athirah Binti Khairulnizam Student Id 50221223162 50221223199 50221223057 50221223154 No. Content Identification 1. 1.1 Background of LPT 2 ( LebuhRaya Pantai Timur 2) 1.2 Moral of the accident LPT 2 ( LebuhRaya Pantai Timur 2 ) Discussion 2. 2.1 Incident Cases 2.2 Investigation Point Of View In Engineering Ethics 3. 3.1 Ethical Issues 3.2 Point Of Views In Engineering Ethics 3.3 Recommendations & Improvement Figure 1 : Rolling Barrier Figure 2 : Solar Reflector Lamp Figure 3 : Runway Ramp ( Sand ) Figure 4 : Runway Ramp ( Water Barrel ) 4. Conclusion Page 1.0 IDENTIFICATION 1.1 Background of LPT 2 ( Lebuhraya Pantai Timur 2 ) Lebuhraya Pantai Timur 2, also known as LPT2, is a major highway in Malaysia. It is part of the East Coast Expressway network linking the states on the east coast of Peninsular Malaysia. LPT2 serves as an important transport route, improving connectivity and boosting the region's economic development. The location of LPT2 stretches from Jabor in Terengganu state to Kuala Lumpur, the capital of Malaysia. It straddles several states on the east coast, including Pahang and Kelantan and the total length of the highway is about 185 kilometers (KM). The purpose of the construction of LPT 2 is to improve transportation infrastructure, promote regional development, and provide a more efficient route for passenger and cargo transportation along the eastern coast. The features of the LPT 2 is the expressway has modern facilities such as multiple lanes, interchanges, toll stations, rest areas, and service areas. These facilities provide amenities such as gas stations, restaurants, restrooms, and parking lots for the convenience of travellers.Benefits of the contruction LPT 2 is to reduce travel time between East Coast countries and Kuala Lumpur, improve accessibility to tourist destinations and industrial areas, facilitate flow of goods and services. LPT2 uses a toll system where users have to pay tolls at certain toll booths along the highway. Fees vary based on distance traveled and vehicle type. Overall, LPT2 plays a vital role in connecting the states on the east coast of Malaysia with the capital and other regions, contributing to the country's economic development and improved connectivity. 1.2 Moral of the accident LPT 2 There are many accidents happen in LPT2 and due to the occurrence of the accident there is a moral that we can take advice as below : Safety And Responsibility Accidents remind us of the importance of responsible and safe driving. It is our moral duty to put the safety of ourselves and others first by obeying traffic laws, avoiding distractions and driving carefully. Responsibilities And Assistance After an accident, it is important to take responsibility for your actions, accept responsibility if at fault, and cooperate with the authorities and insurance companies. Furthermore, providing help and support to those injured in an accident embodies a sense of moral responsibility. Learning And Prevention. The accident is a reminder of ongoing efforts to improve road infrastructure, safety regulations and driver education. Identifying the causes of accidents and implementing preventive measures helps reduce the likelihood of similar events occurring in the future and promotes the moral obligation to protect human life and well-being. Compassion And Empathy. Accidents often cause physical harm, emotional trauma and financial hardship to those involved. Respond with compassion, empathy, and support for victims and their families, demonstrate a sense of moral integrity, and care for others when needed. It is important to note that each accident is unique and that the specific circumstances and details play an important role in determining the moral implications. It is wise to approach such incidents with empathy anunderstanding, taking into account the well-being and rights of everyone involved. 2.0 DISCUSSION 2.1 Incident Cases DUNGUN: Another passenger in the tour bus crash at KM375.4 of East Coast Highway 2 (LPT 2), Bukit Besi-Ajil, near here succumbed to his injuries at 8.53 am today. This brings the total death toll to two. Dungun district police chief Supt Baharuddin Abdullah said the victim, identified as Choo Chia Tan, 44, sustained severe injuries to his chest and died while receiving treatment at the Dungun Hospital Emergency Unit. He said the first victim who died at the scene has been identified as Tan Poh Hwa, 42, a manager at a Honda factory. Her body was taken to Dungun Hospital for a post-mortem. “Preliminary investigations found that the bus carrying 30 passengers was heading from Tampin, Negeri Sembilan to Jeti Taman Tamadun Islam, Kuala Terengganu to go to Pulau Redang. “The accident is believed to have occurred after the bus lost control and skidded to the right and hit the guard rail before entering the opposite lane,” he said when contacted today. Baharudin said the other injured victims had been taken to Hulu Terengganu Hospital and Dungun Hospital for treatment. In addition, urine and blood samples of the 26-year-old bus driver will be taken for screening, he said.“At the time of the incident, the weather was good, the road was dry, but it was still dark,” he added. – Bernama 2.2 Investigation These is the result of investigations incident on LPT 2 ( Lebuhraya Pantai Timur 2) : Driving Over The Speed Limit Head of the State Traffic Investigation and Enforcement Department, Supt Shahrum Hashim has been contacted as a result of frequent accidents occurring on LPT 2 above not following the speed set by the Malaysian Highways Authority (LLM) to find the best mechanism to boost safety for roadusers throughout the highway. Uneven Road Surface Base on the investigation on LPT 2 ( Lebuhraya Pantai Timur 2 ) along the way 185 kilometers (KM) there is an uneven road surface which contributes to the occurrence of accident due to loss control when driver drive over the speed limit. Safety Barrier & Reflector Some part of the road do not have a safety barrier and reflector to assist driver when driving the road is dark. Failure Of Drainage System Failure of drainage system is the one of the causes of the incident. This is because when it rains, the road will easily become waterlogged due to an imperfect drainage system and can contribute to the cause of accidents. 3.0 POINT OF VIEW IN ENGINEERING ETHICS 3.1 Ethical Issues Lebuhraya Pantai Timur 2 (LPT2) is a highway project in Malaysia that aims to improve transportation infrastructure along the East Coast of Peninsular Malaysia. Here is the ethical issues that commonly arise in LPT 2 : Land Acquisition and Displacement An ethical issue in road construction projects is land expropriation, which may displace local communities or destroy their livelihoods. It is important to ensure that affected individuals or communities receive fair compensation and relocation opportunities. Environmental Impact Infrastructure projects can have significant environmental impacts, including habitat destruction, deforestation, and increased pollution. Mitigating and minimizing these impacts through proper planning, environmental impact assessments and compliance with environmental regulations is critical. Rights of Indigenous Peoples Where there are indigenous peoples, infrastructure projects must respect the rights and cultural heritage of these communities. Appropriate consultation, consent and participation of Indigenous groups should be ensured throughout the project life cycle. Occupational Safety and Labor Rights Construction projects involve a large workforce, and ensuring the safety and well-being of workers is critical. Ethical concerns may arise in the event of violations of labor laws, inadequate safety measures or poor working conditions. Transparency and Corruption Large infrastructure projects are prone to corruption, favoritism and a lack of transparency in the procurement process. Implementing robust governance mechanisms such as open tenders and independent oversight can help mitigate these moral hazards. Socioeconomic Equity Infrastructure projects should consider equitable distribution of benefits to local communities. This includes creating local jobs, supporting local businesses and ensuring that the benefits of the project also reach marginalized groups. Community Engagement and Public Consultation Meaningful engagement with local communities and stakeholders is critical to addressing their concerns and incorporating their input into project design and implementation. Ethical issues arise when the voice of the community is ignored or there is a lack of transparency in decisionmaking. 3.2 Point Of View In Engineering Ethics In engineering ethics, when considering a project like Lebuhraya Pantai Timur 2 (LPT2), there may be different views and perspectives. Here are some possible perspectives that engineers and stakeholders might consider: Safety and Reliability Engineers have a responsibility to prioritize the safety and reliability of the infrastructure they design and build. From this perspective, the focus will be on ensuring that LPT2 meets or exceeds safety standards, minimizing risks to users and ensuring the long-term integrity of the highway. Environmental Responsibility Environmental considerations are of paramount importance in engineering ethics. Engineers may emphasize minimizing environmental impact during the construction and operation of LPT2. This includes implementing sustainable practices, curbing pollution and habitat destruction, and considering environmental considerations in the design process. Social Impact and Community Well-being Engineers can consider the social implications of LPT2, aiming to enhance the well-being of local communities. This viewpoint may focus on minimizing disruptions to communities, improving connectivity and accessibility, and promoting equitable access to transportation infrastructure. Cost-effectiveness and Efficiency Engineers often have to work within budgetary constraints and optimize the use of resources. From this perspective, the focus may be on ensuring that LPT2 is cost-effective, efficient in terms of construction and maintenance, and provides value for the investment made. Ethical Governance and Transparency Stakeholders may emphasize the need for ethical governance, transparency, and accountability throughout the project. This viewpoint would involve ensuring fair procurement processes, preventing corruption, and maintaining open communication with stakeholders. Cultural and Heritage Preservation LPT2 may pass through areas with cultural or heritage significance. Engineers may consider preserving and respecting cultural sites or artifacts during the design and construction phases, working closely with local communities to minimize any adverse impacts. 3.3 Recommendations & Improvements Based on the investigation on LPT 2 ( Lebuhraya Pantai Timur 2) there are several factors that need to be improved or upgraded to reduce the occurrence of accidents. These is the factors need to be upgrade : Barrier & Reflector Lembaga LebuhRaya Malaysia ( LLM ) need to upgrade or improve safety barrier and reflector such as using a roller barrier that can reduce the impact of the incident. For reflector , need to upgrade to reflector that has a lamp that use solar system for charging batteries.This reflector can assist the driver when driving in night. Runway Ramp Lembaga LebuhRaya Malaysia ( LLM ) must consider to build or install runway ramp that use sand or barrel that fill with water to reduce the impact or reduce the worst incident when car or truck have a braking system failure of loss of handling. SpeedTrap Base on the investigation, on LPT 2 ( Lebuhraya Pantai Timur 2 ) along the way they don’t have a speedtrap camera that can snap or take picture of the car driving over the speed limit.Lembaga LebuhRaya Malaysia (LLM) must take action on this thing or many driver will drive over the speed limit that can endanger other road users. Drainage System Lembaga LebuhRaya Malaysia ( LLM ) must have schedule for maintenance to prevent waterclogged when raining to avoid or to reduce the risk of incident when raining.Waterclogged can make the car or truck lost handling when driving. Figure 1 : Rolling Barrier Figure 2 : Solar Reflector Lamp Figure 3 : Runway Ramp (Sand) Figure 4: Runway Ramp (Water Barrel ) 4.0 CONCLUSION