FY22 OMA DB Install Restroom Facility, P6950, 6957 (ZH-300000262986), USAG Humphreys Kickoff Meeting 2 March 2022 BLDG: P12600 U405 Conference Room The blue texts are confirmed or discussed during the kick-off meeting by users/DPW on 2MAR-2022 1.5.6 KICK-OFF MEETING MINUTE PRE-DESIGN QUESTIONNAIRE • Separate Excel Spreadsheet FY22 OMA DB Install Restroom Facility, P6950, 6957 (ZH-300000262986), USAG Humphreys Questionnaire FY22 OMA DB Install Restroom Facility, P6950, 6957 (ZH-300000262986) Camp Humphreys 2-Mar-22 Questionnaire Reponse By Response General 1 Verify the Utility Sinks Quantity on WORK DESCRIPTION. Place prefabricated buildings next to Bldg P6950 and Bldg P6957. Provide enough prefabricated buildings to Add 24 toilets, 8 urinals, 16 sinks wash sinks, 2 3 Utility Sinks in support of the employee and customer base of the SPT060 Warehouse Complex of P6950, P6953, and P6957...... Timothy O'Brien 2 Utility Sinks 2 Site 1 Can I get the as built drawing(.dgn format) for civil work? Pak, Chong Myon, DPW DPW provided FED a CD with design drawings for Civil Work Timothy O'Brien Confirmed by end-user 3.4.1 12 commode stalls in female, 12 coomode stalls in male 3.4.4 two per each restroom 3.4.5 12 total 3.4.6 4 total 3.4.8 two in each restroom 2 Architectural: 1 Verify the Quantity on para 3.4 on SOO 3.4 Restroom Partitions and Accessories 3.4.1 Stainless Steel Partitions;.....stalls with 12 16 commode stalls in female restrooms, 12 8 commode stalls and 8 urinal stalls in male restrooms 3.4.4 Paper-towel dispensers, stainless steel, wall mount; two one per each restroom, ....; 8 total 3.4.5 Sanitary Napkin Receptacle, one in each female restroom stall; 12 16 total 3.4.6 Diaper Deck, one in each restroom; 4 8 total 3.4.7 Mirror, Glass w/stainless steel trim, one per each sink, in the four restroom; 16 total 3.4.8 Stainless steel trashcan, two one in each restroom; 8 total 2 Is it possible to amend the exterior finish & roof slope in section 3.8 for SOO? 3.8.1 Exterior siding shall be mortar joint ground-faced block 3.8.2 Truss Roof System; Slope at 5/12 pitch Timothy O'Brien Exterior finish & roof slope depend on structural system 3.8.1 - Concerete: EIFS - EB: metal siding 3.8.2 check snow load Timothy O'Brien End-user does not have preference of EB or cast-in-place concrete but prefers structural system with faster construction schedule. Timothy O'Brien Heavy use Structural: 1 The state of objective (SOO) describes that the restrooms will be prefabricated structures with masonry block. IH team suggests cast-inplace concrete structures. Please verify with user. Mechanical: 1 Is this latrine with higher rate where periods of heavy use are expected to occur like near theatres, schools and sports facilities? 2 Does this latrine need cooling system shown on para. 3.3.3 in SOO? Need more clarification. The FED mechanical engineer will sent out questions via email shortly Electrical: 1 Identify the location of the primary power connection point manhole or load interrupter switchgear where connections for this project will be made. FED will get the information via site survey. Site survey is scheduled on 4-MAR-2022 2 Is there a utility (power & communication) as built drawing for the project site? FED will get the information via site survey. Site survey is scheduled on 4-MAR-2022 3 Need a communication system? 4 Fire Protection: 1 NONE Timothy O'Brien End-user requested intercom system: where do you want to install intercom? Next to main entrance or inside ADA stall? comments 10229336 Kim, Sang Sok/PM sangsok.kim2.ln@army.mil Yi, Yong Sop/Deputy Design Br. yongsop.yi.ln@army.mil Yi, Kwae Sang/Arch kwaesang.yi1.ln@army.mil Pak, Chong Myon/Civil chongmyon.pak.ln@army.mil Yi, KyongHun/Mech Kyonghun.yi4.ln@army.mil Timothy S O'Brien/ FOS/FAC MGR, 403d AFSB AFSBn-Korea / Ph: 010-4727-2857/ DSN: 315-755-2907 / timothy.s.obrien8.civ@army.mil Jason Henry /Acting Chief, Installation Supply Division, 403d AFSB AFSBn-Korea / Cell: 010-7290-0475/ VOIP: 755-1131/ jason.m.henry20.civ@army.mil MAJ Tatum, Jerome/ jerome.tatum.mil@army.mil 1.5.7 CORRESPONDENCE - Cooling system and Intercom system Hur, Myo Boon CIV USARMY CEPOF (USA) From: Sent: To: Cc: Subject: Signed By: Lara, Reese 1LT USARMY CEPOF (USA) Monday, March 7, 2022 12:56 PM Hur, Myo Boon CIV USARMY CEPOF (USA) Yi, Won Ho LN USARMY CEPOF (KOR); An, Kyunyang LN USARMY CEPOF (KOR); Choe, Chang Hyon LN USARMY CEPOF (KOR); Choe, Hyon Ku LN USARMY CEPOF (KOR); Kim, Yong Chun LN USARMY CEPOF (KOR); Pak, Un Yong LN USARMY CEPOF (KOR); Sin, MiA LN USARMY CEPOF (KOR); Yi, Kyong Pop LN USARMY CEPOF (KOR); Yun, Kwang Chan LN USARMY CEPOF (KOR) RE: FY22 OMA DB Install Restroom Facility - Kick Off Meeting Minutes Reese.Lara@usace.army.mil Myo, Please see below response from End-User We would like the units to be equipped with cooling. A small spilt system should be adequate; one sized a bit larger for the unit near P6950. The intercom/dedicated one-way phone should be on the wall in the middle of the restroom. v/r comments 10229336 1LT Reese Lara Project Manager Installation Support Branch, PPMD Far East District, USACE U.S. Army Corps of Engineers reese.lara@usace.army.mil 315-755-6426 010-7631-7363 From: Lara, Reese 1LT USARMY CEPOF (USA) Sent: Friday, March 4, 2022 3:48 PM To: Hur, Myo Boon CIV USARMY CEPOF (USA) <Myoboon.Hur@usace.army.mil> Cc: Yi, Won Ho LN USARMY CEPOF (KOR) <WonHo.Yi@usace.army.mil>; An, Kyunyang LN USARMY CEPOF (KOR) <Kyunyang.An@usace.army.mil>; Choe, Chang Hyon LN USARMY CEPOF (KOR) <ChangHyon.Choe@usace.army.mil>; Choe, Hyon Ku LN USARMY CEPOF (KOR) <HyonKu.Choe@usace.army.mil>; Kim, Yong Chun LN USARMY CEPOF (KOR) <YongChun.Kim@usace.army.mil>; Pak, Un Yong LN USARMY CEPOF (KOR) <UnYong.Pak@usace.army.mil>; Sin, Mi-A LN USARMY CEPOF (KOR) <Mi-A.Sin@usace.army.mil>; Yi, Kyong Pop LN USARMY CEPOF (KOR) <KyongPop.Yi@usace.army.mil>; Yun, Kwang Chan LN USARMY CEPOF (KOR) <KwangChan.Yun@usace.army.mil> Subject: RE: FY22 OMA DB Install Restroom Facility - Kick Off Meeting Minutes Myo, Thank you, I’ll distribute to end-user and DPW. I’ll also provide your questions to end-user for their response v/r 1