Uploaded by Ahmed Wsf

1CV UP DATE AHMED (1)(1)

advertisement
AHMED MOHAMED HUSSIN
TOOL PUSHER
As a supervisor, a tool pusher primarily renders adequate guidance and direction
to the rig crew on specific tasks to ensure smooth and efficient drilling operations.
He has full authority to oversee all drilling activities and enforce productivity
standards to meet. As a specialist, he should perform the following Tool Pusher
responsibilities.
EXPERIENCE
CONTACT
TECHN. TRAINER CREW
AHMED MOHAMED HUSSIN
+20 1009113325
ahmed_wsf@yahoo.com
EGYPT
Date of Birth
3/4/1975
EDUCATION
 Suez Higher Institute For
Management Information
Systems(1997)
SKILLS





Well Control, H2S, BOP.
Safety Procedures.
Rig Moves.
Leadership, Top Drive
Work under Pressure
 Arabic
 English
COURSES
TOOL PUSHER
ADES OFFSHORE
8-2019
8-2021
jack up Rig NOW Varco 1320 UE Gardner Denver PZ-11 Triplex NOW V, TDS-11varco ,
TOOLPUSHER
SINOPEC KSA .
Duties and Responsibilities
9- 2014
7-2018
Cyber rig BUILT20M07AINFECTOER..2000HP .JC-70 DB8- CAP-1600KW
ensuring that health and safety regulations are met, including the wearing
ofprotective clothing and the correct use of safety equipment
comanaging the day-to-day drilling operations, monitoring the work in progress
and dealing with any problems that arise
ensuring that all the necessary equipment, materials and resources are available
selecting, hiring and managing workers on board the rig nd ensuring they are
properly trained pping with any emergencies liaising with representatives from
thea oil companies who visit and inspect the site conducting or ensuring that
regular rig inspections are carried outassisting other team members, such as the
driller and rig manager, with the effective running of the rig.
DRILLER.
SIPEM , KSA ZOON
8-2013
9-2014
1-2013
7-2013
2000HP –TDS.9. Varco
DALMA GULF,KSA
Cyber rig Built 20 M07Ainfectoer.2000HP DB8- CAP-1600KW 4 ENG. BOP
DRILLER.
GREY WOLF, KSA
5-2012
7-2013
9-2009
4-2012
CANRIG, 3000HPBOP CAMERON 13 5/8
DRILLER & ASSIST.
SAKSON GROUP
EDDY Current Electric Brake, TDS 11 SA VARCO
DERRICK , F H, TRANSOCEAN
has completed all training
courses for more than 20 years
8-2022 1-2023
Arrange for and conduct on-site training when needed
Keep and report on completed courses, absences, issues etc.
Observe and evaluate results of training programs
DRILLER.
LANGUAE
RST GLOBAL.
4- 1998 2- 2008
Roustabout. On rig MERCRY Jack up from 98. To. 2000 and on rig Actinia Semisubmersible Drilling Unit. In Spain. From 2000. To. 2001.
Worked as. Floor man. On rig Comet Jack up from.2001. To. 2005.
Worked as Derrick man on rig. Comet Jack From. 2005 To. 2007.
Worked as PUMP man on rig Deep water Drill ship in Egypt. From. 2007.2008.
Download