ANALYSIS OF SLOPE STABILITY IN URBIZTONDO RIDGE -TMC OPEN PIT MINE BY GIS APPLICATION A Thesis Presented to The College of Engineering St. Paul University Surigao In Partial Fulfillment of the Requirements for the Degree BACHELOR OF SCIENCE IN MINING ENGINEERING By: CUARTERO, BRYAN C. NOTORIO, JECILYNN P. PADILLA, ERNESTO JR. May 2022 1 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application APPROVAL SHEET This thesis entitled Analysis of Slope Stability in Urbiztondo Ridge -TMC Open Pit Mine by GIS Application prepared and submitted by Bryan Cuartero, Jecilyn Notorio, and Ernesto Padilla Jr and has been examined and is recommended for approval and acceptance for ORAL EXAMINATION. ENGR. NATHANIEL D. TIU Adviser ---------------------------------------------------------------------------PANEL OF EXAMINERS APPROVED by the Committee of Oral Examination with a grade of _____ on __________________. SR. MARIE ROSANNE MALLILLIN, SPC Chair DR. MELVIN NIŇAL Member MR. ARJUNE A. LUMAYNO, LPT, MAST Member ACCEPTED in partial fulfillment of the requirements for the degree of BACHELOR OF SCIENCE IN MINING ENGINEERING ENGR. ANGELUS VINCENT P. GUILALAS Dean, College of Engineering 2 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Certificate of Originality This is to certify that this research paper is our work and does not contain any material previously published or written by another person nor material which to a substantial extent has been accepted for the award of any degree or diploma in Saint Paul University Surigao, and other educational institutions, except where due acknowledgment is made in the thesis. Any contribution made to the research by others, with whom we have worked at Saint Paul University Surigao or elsewhere, is explicitly acknowledged in the thesis. BRYAN CUARTERO Candidate JECILYNN NOTORIO Candidate ERNESTO PADILLA JR Candidate Date: _________________ Attested by: ENGR. NATHANIEL D. TIU Adviser Date: _____________ 3 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application ACKNOWLEDGMENT First and foremost, praises and thanks to God, the Almighty, for the wisdom and strength He endowed us throughout this research work. We would like to express our deep and sincere gratitude to the geologists of MProject UAE who impart their thoughts and share their expertise in our study. We would also like to show deep appreciation to the staff of Taganito Mining Corporation (TMC); Engr. Duane Paloma and Engr Harvy Jason Contreras for providing us with the technical data, information, and maps needed for this project. We also acknowledge our instructor and adviser, Engr. Nathaniel D. Tiu for the invaluable guidance and encouragement throughout this research. We are extremely grateful to our families and loved ones for the prayers, care, and sacrifices to make our dream come true. 4 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application ABSTRACT Analysis of Slope Stability in Urbiztondo Ridge -TMC Open Pit Mine by GIS Application (Bryan Cuartero, Jecilyn Notorio, Ernesto Padilla Jr) The study aims to determine and test the slope stability of the mined-out open pit within the area of coverage by spatial analysis through Geographic Information System (GIS) Software. The researchers used spatial analysis and remote sensing to generate the value of the perimeter factors through this mapping system. The stability of the slope in open pit mines is an issue of great concern because of the significant detrimental consequences and instabilities can have during the operation. It is necessary to systematically assess and manage slope stability risk to ensure safety whenever the area will be used to construct any structures in the future. A proposal would be presented to the barangay officials and company if there is a need to stabilize the slope by profiling the slope stability and within the area of responsible mining. 5 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application TABLE OF CONTENTS Page TITLE i APPROVAL SHEET ii CERTIFICATE OF ORIGINALITY iii ACKNOWLEDGEMENT iv ABSTRACT v TABLE OF CONTENTS viii LIST OF TABLES AND FIGURES x CHAPTER 1 THE PROBLEM AND ITS BACKGROUND Introduction Conceptual Framework of the Study Statement of the Problem Assumptions Significance of the Study Scope and Limitation Definition of Terms 2 REVIEW OF RELATED LITERATURE Synthesis of the Review 6 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application 3 METHOD Research Design Participants Instrument Data Gathering Procedure 4 RESULTS AND DISCUSSION 5 SUMMARY, FINDINGS, CONCLUSIONS & RECOMMENDATIONS Summary Findings Conclusions Recommendations REFERENCES APPENDICES A Letter of Consent B Questionnaire CURRICULUM VITAE 7 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application LIST OF FIGURES AND TABLES FIGURES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TABLES 1 2 3 4 IPO Diagram of the Desired Project Methods of Data Acquisition Map Working on GIS from Reality GPS Position Determination Project Design Procedure Data Gathering Procedure Flow Chart of Development Procedure Climate map of the Philippines Geologic map of Caraga region Geologic map of Caraga region legend Seismic map of Caraga region from PHIVOLCS Flooding and Landslide Ground settlement potential Liquefaction Chart 20 meters Contour Interval Interpolation Method and Triangulation Digital Elevation Model (DEM) Create an Elevation Slope Grid Model Elevation Slope map standard parameters with assigned values Slope map analysis results by color level in landslide susceptibility map Profile of the Participants Location of Project Site Summary of subsoil index properties Casagrande plasticity chart 8 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application CHAPTER I PROBLEM AND ITS BACKGROUND Mining is one of the country's most progressive and productive industries today. Because of the advancement of technology, mining continues to improve its processes and tap into the modernization of equipment for an efficient and responsible mining operation. This field also plays an essential economic role, contributing significantly to overall growth. Responsible mining takes care of the environment and does not focus on profit but on improving the environment. In the open-pit mining method, the vertical height of the open-pit mine slope continues to increase; the slope deformation and failure mode have a close relationship with soil and geological features. The slope stability is influenced largely by rock mass, joints and fissures, and fault lines. Weathering and soil creeping with heavy rainfall can affect the steep slope area, particularly in open pit mines. Unstable slopes, soil movement, and heavy rains are dangerous direct damage on high and steep slopes. The soil and rock instabilities occur when several factors come together for one reason or another. The slope stability monitoring and mapping by GIS can be performed in two distinct circumstances: before or after the outbreak of the movement. In the first case, if the slope is stable, then it should have conducted monitoring. The purpose of slope and ground monitoring is to define sliding/collapsing surfaces with the best chance of environmental damage. This kind of monitoring is critical because it allows for choosing the parameters for the study to ensure the stability of the open pit mine. People are considerably living in danger without knowing the geologic identity of their area. The rock identity and soil characteristics are essential, specifically in constructing a building 9 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application or house, to secure safety and protection from rock falls and landslides for those who chose to reside in the area. Soil is the mixture of organic matter, minerals, gases, liquids, and organisms that support life on Earth, while a rock is a solid mass of geological material. The Urbiztondo Ridge -TMC Open pit mine is near a river and creeks. This area is prone to landslides and soil erosion, especially during bad weather conditions. The researchers conduct data gathering MGB, NEDA, and PHIVOLCS for the effectiveness or accuracy of information aside from GIS-developed data through satellite imaging. Using a geohazard map helps identify the safe areas for future infrastructures and constructions; satisfaction with this slope analysis study applied in mining for the best partner in safety purposes. The researchers conducted this study to help the community and mining industry enhance information and educational campaigns to aim for zero casualties and minimize expenses for repeating damage during weather calamities. The researchers conducted a method to develop the fastest innovative technology, like time-saving, the accuracy of locations, calculating the total area, and effectiveness of safety purposes using Arc GIS software application to generate an output of this study. A proposed study using GIS applications will solve the issues mentioned above. This study aimed to determine the geologic hazard monitoring of a specific area. The GIS Application is designed with essential tools for map viewing, printing, and querying spatial data. The GIS Application can create maps that people can see through the GIS output, which is the Geologic Monitoring and Safety Methods means hazard identification and hazard analysis. 10 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Conceptual Framework of the Study The Analysis of Slope Stability in an Open Pit Mine Through GIS Application can promote awareness and monitoring of the geologic and slope stability to the living people within the Taganito, Claver, Surigao del Norte, and in a specific area. Determine geologic and soil monitoring of the mining and quarry with the updated elevation of 20 meters intervals or it depends on what elevation for detailed mapping we used GPS location, Tape measure, and other methods. The operation and accuracy of the ground are based on its composition. The topographic map is very useful for determining the contour elevation in an actual survey and it indicates the physical features of the land. The symbols used to represent features can be of three types: points, lines, and polygons. Points are used to depict features like bridges and buildings. Lines are used to illustrate features that are linear graphically. Some common linear features include roads, railways, and rivers. However, we also need to include representations of area, in the case of forested land or cleared land; this is done through the use of color in map legends. Figure 1. will show the Input Process Output (IPO) Diagram of the flow of our study. It shows the process and the materials which are used to determine the movement of the soil, how we gather and input data, how the materials are being applied, and tested on how it would come to its desired output. 11 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Input Gathering Data GIS Specialist/Operator - GPS Data Location - Input Data Collected - MGB - Geo-hazard Map Geologic Map Topographic Map - PHIVOLCS - - Process / Generate Database GIS - Lay-Outing Maps - Printing Maps 1:10,000 scale map Fault Line - NEDA - NAMRIA Maps Hardware - GPS (Global Positioning System) - Computer/laptop - Printer Software - Arc GIS version 10.3 - MapInfo Professional - Global Mapper - Google Earth - Map Source Output Process - - Survey Documentation GPS Data Locations Collecting Sample Specimen - Numerical Modeling Figure 1. IPO Diagram of the Desired Project 12 Printed 1:40,000 Scale Map Geohazard Map Geologic Map Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application The First Box shows the input of how we gathered the data and the materials we used. The gathered data will be used for generating output using GIS Application software. All the recorded data survey in actual is put into one map. The conduct of the actual survey and the GPS location should collect and segregated. The collected data from the different agencies is very reliable on such data gathered in terms of accuracy and effectiveness. In addition, the researchers applied the software to indicate all hazardous materials coming from the ground verification. The Analysis follows a stepby-step process to generate output in ArcGIS Software and the hardware and software for this application to give an output of this study. The process box shows the GIS Operator/s the data gathered during the survey are input into a GIS software application and lay out the map to make it very simple and easy to understand the output Location collected data. surveys must be put into one layout of a map layout. GPS data location, collecting auger sampling, and others are important to complete these requirements. The GIS specialist interpolates of elevation model and generates a slope map and layout plan with a 1:10,000 scale map. The output of this study is a generated map from the ArcGIS software application that was evaluated in terms of accuracy; efficiency was determined based on the reliability of data collected from said agencies and partnership of research study applied particularly in mining and quarry area, the accuracy was evaluated through the ability 13 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application technical adviser of in terms of preciseness and correctness. The output printed on a map would be benefited communities, establishment owners, future researchers, engineering students, and mining and quarry companies. This study also determines the risk potential in the areas and it helps to develop all resources from the owner of the mining and quarry operators. VECTOR DATA ACQUISITION Computer- Assisted Digitizing Field Surveying GPS Surveying ATTRIBUTE DATA ACQUISITION RASTER DATA ACQUISITION Scanning Maps Keyboard Entry Figure 2. Methods of Data Acquisition Figure 2. Methods of Data Acquisition show the GIS user works and create a manual digitizing involves an operator using a digitizing table (or tablet) (known as heads-down digitizing), or with the operator using a computer screen (heads-up digitizing). The digitizing table has a fine grid of wires embedded in it that acts as a Cartesian coordinate system. The coordinate may be in a plane or geographic coordinates. The procedure involves tracing map features in the form of points, lines, or polygons with a mouse (puck) which relays the coordinate of each sample point to be stored in the 14 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application computer. The tablet and puck acting together with the computer can locate the puck’s position relative to reference information provided by the operator (McGowan, 1998). Figure 3. Map working on Geographic Information System (GIS) from reality Geographic Referencing is important when the data is gathered for accurately locating point coordinates. Projection is one of the requirements in a map, particularly when putting coordinates in a corner with four points 15 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Figure 3. Shows the layers of separated data composed of shape files in one geodatabase. A layer can be anything that contains similar features such as customers, buildings, streets, lakes, forests, and mountains. Data is the most important part of GIS. The map has a two-dimensional plane from the three-dimensional earth’s surface, using a software application first to do is Geographic Referencing, which is useful when the data is gathered for accurately locating points with coordinates. Second, Projection is one of the requirements in a map particularly when putting coordinates in a corner with four points, and it is called geo-referencing. Statement of the Problem This study aimed to design a geographic information system map for geologic monitoring and safety methods and identifying the hazard in the research area. Specifically, the researchers sought to answer the following questions to achieve the abovementioned purpose. 1. What are the characteristics of the research area in terms of: a. Location and Accessibility b. Climate c. General Geologic Setting d. Tectonic Setting e. Subsoil geology 2. What is the landslide susceptibility in the research area in terms of: a. Flooding and landslide b. Seismic ground shaking 16 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application c. Settlement d. Liquefaction 3. What is the level of slope stability in the research using the GIS? Assumption This researched assumed that by the end of the study, they would be able to create a GIS map with geologic monitoring. The following are the assumptions of the researchers upon completion of this project: 1. The GIS application could be smoothly operated without technical malfunction. 2. The researchers would generate an accurate map using a GIS application; and 3. The generated map would be easy to understand by the community, which raises awareness of potential risks in the research area. 4. The level of slope stability of the research area is safe for future development. Significance of the Study Using a GIS application, this research establishes slope maps and possible slope failure locations, including geological conditions around a chosen open pit mine. This study would add knowledge about software applications using Arc GIS in engineering methods; for the interpolation and generating of map data from DENR-MGB and TMC where the affected areas are identified through this application. Furthermore, this study would be beneficial for the following: 17 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Mining Company. The mining company can analyze the stability of the slope within an active pit. This tool will give awareness of possible erosion from Translational, Rotational Failure, Wedge Failure, and Compound Failure. This study would serve as a guide for implementing slope stability risk management. Researchers. This project will enhance the researcher’s knowledge, information, and understanding of the mine software application and the structure of the soil. Engineering Student. This system application will help future researchers with ideas regarding a software system and save time surveying a specific area. Community. This study will help the community identify and avoid risks of landslides and other hazards. Understanding the slope stability using the GIS tool will ensure safety for people near and within the mining area. Scope and Limitations of the Study This study covers and is limited to the following parameters: gather useful information and concepts for the geographic information system map for geologic monitoring and safety methods. The study area is within the company's availability and covers barangay. The study shows that GIS is a comprehensive technology designed to compile, process, analyze, display, and archive extensive volumes of data. A welldesigned, implemented, and supported GIS management structure is critical to the success of any mining and quarry operations. GIS will replace the old map analysis process: traditional drawing tools and drafting. 18 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application This study was conducted during the second semester of the Academic Year 2021-2022 at Saint Paul University Surigao, Surigao City, Surigao del Norte, Philippines, 8400. Definition of Terms Geographic Information System (GIS). A computer-based tool application is used to store, capture, analyze, and manage spatial reference data. Global Positioning System (GPS). An accurate worldwide navigational and surveying facility based on the reception of signals from an array of orbiting satellites. Digital Elevation Model (DEM). Representation of the bare ground (bare earth) topographic surface of the Earth excluding trees, buildings, and any other surface objects. Digital Surface Model (DSM). is one of the geospatial features generated with a UAV mapping system that captures both the natural and built/artificial features of the environment. Digital Terrain Model (DTM. A topographic model of the bare Earth that can be manipulated by computer programs. 19 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Interferometric Synthetic Aperture Radar (IFSAR). An imaging radar technique, in which additional information is calculated by comparing the phases of two images resulting from the different aspect angles. Shuttle Radar Topographic Mission (SRTM). An international project spearheaded by the National Geospatial-Intelligence Agency and NASA whose objective is to obtain the most complete high-resolution digital topographic database of the Earth. Department of Environment and Natural Resources (DENR). A Philippine government agency that is responsible for the formulation and implementation of policies, guidelines, and rules related to the environment, as well as the management and conservation of the country’s natural resources. Mines and Geosciences Bureau (MGB). A Philippine government agency is responsible for the conservation, management, development, and use of the country’s mineral resources, including those in reservations and public lands. National Economic and Development Authority (NEDA). An independent cabinet-level agency of the Philippine government responsible for economic development and planning. Department of Sciences and Technology (DOST). The primary science and technology body in the Philippines supports local efforts in science, technology, and research and development. 20 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Philippine Institute of Volcanology and Seismology (PHIVOLCS). A Philippine national institution dedicated to providing information on the activities of volcanoes, earthquakes, and tsunamis, as well as other specialized information and services primarily for the protection of life and property and in support of economic, productivity, and sustainable development. CHAPTER II Review of Related Literature This Section of the study reviews books, electronic sources, and other literature which have a direct bearing on the present study. They are classified as foreign, Asian, and local source-related studies and literature regarding the Geologic Monitoring and Analysis of Slope maps in Open pit mining. Socio-Economic and Environmental Impacts of Mining The extraction of mineral resources activity is likely to have a destructive, widespread, and long-term impact on ecosystems and communities. Environmental issues are related to human impact on the living environment, habitats, land use, and natural resources. However, exploitation can have many negative impacts on the immediate environment of the exploitation sites. Mining has a long history in the Philippines. Small- 21 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application scale mining has been practiced by the Philippine people for at least ten centuries, and large-scale mining by foreign as well as Filipino firms for about a century. 22 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Geographic information systems (GIS) Application A computer-based tool application is used to store, capture, analyze, and manage spatial reference data. This integrates common database operations such as query and statistical analysis with the unique visualization and geographic analysis benefits offered through maps. The researchers collect the soil samples and get the coordinate longitude/latitude through GPS etrex 30 with projected datum so that the location will interpret into GIS software. Topographic maps can also use in this study that can generate the contour elevation as a basis when the researchers conduct drilling and the technology of Interferometric Synthetic Aperture Radar (IFSAR) technology is very effective in the creation of accurate large-area elevation datasets. This is evidenced by the Shuttle Radar Topographic Mission (SRTM) and the mapping of the United Kingdom, the (DEM) Data Elevation Model created from an IFSAR system is essentially a first-surface DEM, also known as a digital surface model (DSM). The digital terrain model (DTM), representative of the earth’s terrain, is obtained by editing the DSM using a semi-automated process during which all man-made and vegetation features are removed. This process is extremely challenging and labor-intensive and requires the classification of terrain based on land cover, a set of editing rules to handle hydrological, and road features, and a quality control process to ensure that the output DTM is accurate and consistent across borders and boundaries. Border surveillance is a major concern for security agencies around the world. IFSAR helps make data collection across border areas feasible. Finally, this is most important with a new technology to deal with the potential to revolutionize many aspects of society through an increased ability to make decisions and solve problems. This GIS application can generate and interpolate from the data 23 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application gathering to locate longitude/latitude coordinates until it is complete and produce the desired output of this study. From the manual survey, The GIS application will integrate technology data and analyze it. Defining a Geographic Information system composed of hardware, software, data, people, methods, and organization to make a desired output of a map. Arc GIS 10.3 Using ArcGIS software, the data of researchers gathered data during the conduct of fieldwork and collected data from the different agencies from MGB, NEDA, PHIVOLCS, MINDA, and NAMRIA maps to produce output and it always recorded the drill depth, coordinated location and number of samples. Using these base maps, the proposed drill location can anticipate weather calamities and it will be accurate output when data is input into GIS and generate slope elevation after putting database. Spatial data, also known as geospatial data, is information about a physical object that can be represented by numerical values in a geographic coordinate system. Geodatabase GIS is the primary data storage model for ArcGIS. It is a container of spatial and attribute data and enables the user to store many different types of GIS data within its structure. With its comprehensive GIS data model, geospatial modeling capabilities, and architecture. the geodatabase is the foundation that enables the assembling of intelligent geographic information systems that can be adapted for many different GIS businesses and other GIS applications. Arc GIS is a tool that provides some basic tools for map viewing, printing, and querying spatial data. ArcGIS can run this computer specs: Windows 10 OS, and 24 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Enterprise (32-bit and 64 bits [EM64T]) with a minimum Operating System version of SP1 (Service Pack 1). Global Positioning System Global Positioning System is a tool that we used during the survey for collecting data location with longitude and latitude. The national government in the Philippines has required a Luzon Philippines 1911 projection in DENR-MGB regions. The researchers used GPS to get the coordinates of longitude/latitude with projected datum Luzon Philippine 1911. The located coordinates and other data that were conducted of the study needed waypoints and tracks will have recorded into GPS and transferred into map source software application and convert into shape file GIS file extension (shp, .shx, and .dbf) to read on ArcGIS software application. Application of GPS Technology: Satellite Setting and Timing – bringing precise timing and accuracy. Mapping – Creating maps of the world Tracking – Monitoring the movement and elevation of the human operator. Navigation – Getting Orientation of Cartesian Coordinates Location – Determining the basic positions 25 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Figure 4. GPS Position Determination Geohazard Map/ Geologic Map Using this Geo-hazard map and geologic map applied to geologic monitoring for the effectiveness of this study. It is very helpful to the community for determining the risk susceptibility in a particular area. A geohazard map will be one of the based references from MGB that the researchers conduct in this study to make an accurate based map for a long-term strategy for safety purposes during putting infrastructures with the combination of this study it will provide safety to the community against weather calamities. Synthesis of the review. The literature mentioned above is important information regarding our proposed project in using GIS Application for Analysis of Stability in Open 26 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application pit mining. The topics mentioned above help the researchers come up with the idea of determining the differences in soil creeping in a specific location based on its geological conditions. It made the researchers develop the idea of the study which is made as a basis for this conduct of study. 27 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application CHAPTER III METHOD This chapter contains the methodology applied for the development of our proposed study and deals with how the research study would be done by the researchers. It presents the research design being used in the study, the participants of the study, the instruments used in conducting the study, the procedure employed by the researchers in gathering the data of the study, and the data analysis used. Research Design The study used the descriptive research method. A descriptive study design was used to obtain information regarding the current status of the phenomena. It provided the answers to what, when, where, who, and how associated with its research problem. The descriptive research design was likewise used to determine the soil sample taken from the conducted survey in the area. The step to effective descriptive research is to ensure the accuracy of the results. The study also utilized the experimental design, where experimental research allows the researchers to identify cause-and-effect relationships between variables. The study also employed a quantitative research approach. Quantitative research focuses on gathering numerical data and generalizing it across groups of people or explaining a particular phenomenon. Quantitative research describes the procedures for processing and analyzing the data. These methods are appropriate since the study aims to gather data and generate a conclusion to the problem. 28 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Project Design This part presents the project design for obtaining the characteristics of the geologic or rock materials in an actual survey. A diagram is created to present the systematic phases of the project design. Figure 5 shows the general arrangement of processes in conducting the study. The chart was made in connected cubes that show the systematic phases of the project design. The researchers surveyed the area in order to assess the situation in the said area and consulted the experts whether the proposed area is feasible or not. The researchers prepared the equipment used in the actual survey. GPS and other materials were used for the output. 29 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application START Sending letters to the Dean of the College of Engineering and Company Survey the Area Consult Geologists, GIS Operator, Mining and Civil Engineers Conduct Rock Identification and Soil Collecting Data, GPS and Other needs for GIS Generate Slope map and Layout maps END Figure 5. Project Design Procedure 30 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Participants The participants of the study served as validators and evaluators who will assess the data for GIS output. The materials from the survey would be the basis to get our requirements for the output of detailed and accurate maps. They were chosen to analyze the results and consult them for good and suggested results. The following are the selected experts who are adept in the field of the study conducted. Participants F(n=10) (consultants/practitioners) Mining Engineers 2 Geologists 4 GIS Operator 2 Civil Engineers 2 TOTAL 10 Table 1. Profile of the Participants 31 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Instruments The researchers will use the result as a basis for our data gathering from fieldwork and use statistical analysis with the help of experts, consultants, and practitioners in order to achieve the desired output. In conducting the actual survey, the researchers will provide a form for evaluation that will be validated by the experts where the form consists of sample number, sample identification, and the coordinates of the samples where they were taken. Data Gathering Procedure START Soil Monitoring Checklist and GPS for Location Data Analysis The researcher will conduct a survey in said area of existing mining and quarry END Figure 6. Data Gathering Procedure 32 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application The Samples and Documentation were conducted in the field area where the researchers monitored the stability of soil creeping, get the GPS location coordinates and other survey materials that we used to be to be noted in the field book. Through GPS we gathered the data coordinate locations of soil samples found in the area. And during the obtaining of samples, the soil samples have been separated and labeled along with their unique numbers and coordinate locations. the materials we used in the fieldwork we have sampling bags, & plastic buckets. The identification from monitoring would determine the characteristics of geologic material taken from the site. After collecting the samples, the researchers always contact the geologist and GIS Specialist to evaluate the result of collecting in the actual survey and input data in the map with its slope analysis. the result of the survey and collected data would be interpreted by experts who are proficient in the field of study for the current condition of the field area. The practitioners would be analyzed the data and result whether it is correct and if there are no portions to be revised. Data Analysis Quantitative and qualitative information will then be treated, analyzed, and interpreted with the help of Project Developmental tools. The following tools are used to help in the analysis. ArcGIS Pro ArcGIS ver.10.3. A system designed to capture, store, manipulate, analyze, manage, and present all types of geographical data. GIS applications are tools that allow users to perform spatial queries, analysis, edit spatial data and create hard copy maps. MapInfo Professional version 10.5. A desktop geographic information system (GIS) software product produced by Pitney Bowes that allows one to create, manage and 33 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application visualize geospatial data. MapInfo connects geography with data but with a smaller price tag. Vertical Mapper is a valuable add-on to MapInfo Professional that enables you to perform advanced 3D and grid-based analytical functions. Working seamlessly within MapInfo Professional, Vertical Mapper displays, manages, and interprets spatial information. Map Source. A software that lets one create, view and edit waypoints, routes, and tracks on the computer and transfer them to their navigation device for their next trip. This is where data from GPS are stored. Global Positioning System. The Global Positioning System (GPS) is a satellitebased navigation system made up of at least 24 satellites. GPS works in any weather conditions, anywhere in the world, 24 hours a day, with no subscription fees or setup charges. Global Mapper. It is an affordable and easy-to-use GIS application that offers access to an unparalleled variety of spatial datasets and provides just the right level of functionality to satisfy both experienced GIS professionals and beginning users. It is a GIS application that handles both vector, raster, and elevation data, and provides conversion and other GIS features. Google Earth Pro. Google Earth is a geospatial software application that displays a virtual globe, which offers the ability to analyze and capture geographical data. It can be used to view locations as well as obtain directions between locations. It served as the researchers starting point in determining the location of their study and pinpointing strategic points where they will conduct actual fieldwork. 34 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application AutoCAD. Is a computer-aided design software that lets one design 2-D and 3-D drawings and models, replacing traditional pencil-and-paper drafting to create blueprints of the proposed design with easily altered electronic files. Remote sensing is the acquisition of information about an object or phenomenon without making physical contact with the object and thus is in contrast to on-site observation. The term is applied specially to acquiring information about the Earth. Flowchart. A flowchart is a visual representation of the sequence of steps and decisions needed to perform a process. Each step in the sequence is noted within a diagram shape. Steps are linked by connecting lines and directional arrows. This allows anyone to view the flowchart and logically follow the process from beginning to end. A flowchart is a powerful tool with proper design and construction as it communicates the steps in a process very effectively and efficiently. 35 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application START Consultation College of Engineering Dean Barangay and Company Covered Area Research Adviser Technical Adviser Review of Related Literature GIS Data Gathering Consult Geologist and Mining Engineer Conduct Ground Survey Conduct Topographic Survey Use GPS to Locate Strategic Points Gather Survey Data Generate/Create GIS MAP STOP 36 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Figure 7. Flow Chart of Development Procedure CHAPTER IV RESULT AND DISCUSSION This chapter contains the methodology for developing our proposed study and deals with how the researchers would do the research study. It presents the research design used in the study, the study's participants, the instruments used in conducting the study, the procedure the researchers employed to gather the study's data, and the data analysis used. Location and Accessibility Urbiztondo is a countryside village located in the Municipality of Claver, Surigao del Norte, with a population of 3, 158 or 8.76% of the total population of Claver ("PhilAtlas: Urbiztondo”, 2020). Urbiztondo is situated at approximately 9.5537, 125.7863, in the island of Mindanao at an estimated elevation of 16.7 meters or 54.8 feet above mean sea level. Urbiztondo is accessible via public and private land transport vehicles. There are daily bus trips from Bislig, Surigao del Sur bound Taganito Claver to Placer, Surigao del Norte. It is likewise also accessible to Surigao City and Butuan City through Maharlika National Highway. Urbiztondo adjacent barangays are Cabugo and Wangke, Claver, Surigao del Norte 37 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Table 2. Location of the Project Site (Google Maps) Climate Urbiztondo, as is Caraga Region, falls under the Type II category of the Modified Coronas Classification of Philippine Climate (Figure 2). PAGASA characterizes this climate type as the wet season with pronounced rainfall from November to January. The rainy months concur during the northeast monsoon period, where the eastern part where the archipelago is exposed to this airstream, while dry months coincide with the southwest monsoon months. The average temperature in San Francisco is 26.5 °C. The annual precipitation here averages 3724 mm. The driest month is July, with a mean rainfall of 210 mm. With an average of 27.3 °C, May is the warmest month. The year's 38 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application lowest average temperatures of around 25.2 °C recording the greatest average amount of precipitation of 577mm occur in January. THIS SITE Figure 8. Climate map of the Philippines based on Modified Coronas 39 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application General Geologic Setting Based on the available geologic map, the project site underlies undifferentiated ultramafic and mafic plutonic rocks with adjacent alluvium deposits and marine deposits. These recent alluvial deposits are loose aggregates of silt, sand, and gravel along floodplains. There are two types of magnetite deposits found in the region. Felsic intrusives are intruding the primary magnetite in the skarn deposit reported in Jubgan, San Francisco, Surigao del Norte hosted in ultramafic rocks. The secondary titaniferous magnetite sands are found in the coastal beaches of the Bacuag-Gigaquit-Claver area, Surigao del Norte mainland. Of still unresolved genesis are the recently discovered magnetite bodies overlying ultramafic rocks in Urbiztondo, Claver, Surigao del Norte adjacent to ultramafic terrain – arc basalt/limestone lithology. 40 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application 41 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Figure 9. Geologic map of Caraga region 42 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application Figure 10. Geologic map of Caraga region XIII (LEGEND) Tectonic Setting The nearest earthquake generators with relevant bearing on the seismicity threatening the project site are the Philippine Fault-Anao-and Surigao del Norte Fault segment to the west. These fault systems are about 60.0 kilometers from the site, respectively. Further to the east is the Philippine Trench, a locus of high-magnitude earthquake approximately 120 kilometers from the site. Aside from ground shaking, other seismic-related geohazards could affect the site as energy is released from these earthquake generators. Seismic Ground Shaking The seismic bearing of an earthquake usually differs from the distance of the epicenter of an earthquake to the site, the magnitude produced, and the subsurface conditions of the site. Based on the attenuation equation of Fukushima and Tanaka (1990), using a deterministic approach applied to soft soils, the project site could experience shaking of 0.388 g and 0.558 g, assuming a magnitude 6.9 earthquake will occur from the nearest trace of the Philippines Fault. Considering its distance from the site, the Philippine Trench could bring the minimal effect of ground shaking. 43 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application THIS SITE 44 Analysis of Slope Stability In Urbiztondo Ridge -TMC Open Pit Mine By GIS Application 45