Uploaded by Gerry FLORES

LIGHT POST DETAIL SINGLE-Model

advertisement
³
³
³
³
DETAIL OF LIGHTING CONCRETE FOUNDATION (SINGLE ARM)
CONSULTANT
CONTRACTOR :
SUBMITTED BY:
CEBU BRT - PIU
NOTED BY:
CHECKED & REVIEWED BY:
REPUBLIC OF THE PHILIPPINES
CEBRT PROJECT MANAGEMENT OFFICE
UNIT 25, 3rd Floor, Legaspi Tower Building
Vito Cruz corner Roxas Boulevard, Malate, Metro Manila
HUANG QUNHONG
JANG SEUCK JUN
PROJECT MANAGER
CONTRACTOR
PROJECT MANAGER
CONSULTANT
DEPARTMENT OF TRANSPORTATION
BRT - NATIONAL PROGRAM MANAGEMENT OFFICE
PINATUBO STREET, CORNER OSMEÑA STREET
BRGY. CLARO M. RECTO, CLARK FREEPORT ZONE
2009 PAMPANGA, PHILIPPINES
NORVIN V. IMBONG
PROJECT MANAGER
CEBRT-PIU
PROJECT AND LOCATION
PROCUREMENT OF PACKAGE 1: WORKS
CEBU SOUTH BUS TERMINAL (CSBT) TO
CAPITOL URBAN REALM ENHANCEMENT
(LINK TO THE PORT)
CEBU CITY, REGION VII
SHEET CONTENTS
SHT. NO.
SHOP DRAWING
FOR
PRECAST LAMP POST PEDESTAL
(SINGLE ARM)
02
2 2
Download