Uploaded by Sandeep Patiyal

Resume Sandeep Patiyal Inst Engg

advertisement
CURRICULUM VITAE
SANDEEP PATIYAL
E-mail: sandeep.patiyal91@gmail.comMobile: +91 9410079069
CAREER OBJECTIVE
To place in a reputed company where I can explore my technical skills and knowledge and give 100% for my company & also enhance
my carrier.
SUMMARY
a) Instrumentation and control engineer with good knowledge of the instrumentation measurements and measuring instruments for
power plant process control applications.
b) Well versed with panel wiring diagrams and able to read & interpret P&ID diagrams, cable schedules and other
instrumentation logic diagrams.
c) Establishing communication between PLC, SCADA using RS-232, Ethernet, and Modbus protocol for real time monitoring of
plant process.
d) Commissioning, testing & maintenance of various field instruments.
e) Exposure of DCS of HONEYWELL C300 (Experion PKS).
h) Exposure of PLC of Honeywell ML 200.
g) Well versed with SCADA of HMI WEB DISPLAY BUILDER.
h) Experience and knowledge of all field instrument and there calibration procedure such as pressure, Temperature, flow, level
transmitter ,all type of gauges and switches, level sensors, solenoid valve ,analyzers and different type of temperature sensing devices,
motorized valve, pneumatic actuator, control valve etc….
i) Familiar with the calibration of pneumatic control valves (MIL, SIEMENS, and ABB) dampers,Motorized valve etc…
j) Smart pressure, flow and level transmitter (ROSEMOUNT, HONEYWELL, ABB, YOKOGAWA), solenoid valves (single and
double acting), THERMOCOUPLES, RTD, SWITCHES (temperature, pressure, level, flow, limit, vibration) speed and vibration
measurement devices for gauges (temperature, pressure, level, flow), PH and ORP sensors, O2 Analyzer, SPM and SOX NOX
Analyzers.
k) Experience and Knowledge of Siemens PCS 7.0 and wincc v7.0.
l) Experience and Knowledge of Emerson Ovation DCS.
m) Experience and Knowledge of Yokogawa Centum VP.
WORKING EXPERIENCE






Presently working in Auro Textiles(A Unit of Vardhman Textiles Ltd.) as an Executive from July 2022 to till date.
Worked in ISGEC as Sr. Instrument Engineer at Vedanta Alumina site from November 2021 to June 2022.
Worked in VIZEN SOLUTION as Sr. Technical Engineer from March 2020 to November 2021.
Worked as an Instrument Engineer in C&I department Lakshmi Energy and Foods Ltd during December 2017 to March 2020.
Worked as Instrument Engineer in GREEN PLANET ENERGY PVT LTD, BIRPIND during April 2016 to December 2017.
Worked as an Instrument Engineer in Dev Priya Industries Ltd during October 2013 to March 2016.
PLANT DETAILS
Auro Textiles(Unit Of Vardhman) including boilers(12TPH*2, 20TPH, 40TPH*2 and Thermic Heaters
(25LKcal*4).
Vedanta Alumina is powerplant including PULVERISED BOILER(275TPH*3) and Turbine(30MW*3). 
Lakshmi Energy and Foods Limited is power plant including AFBC BOILER (67 TPH*2) and Shin Nippon
turbine(15.75*2 MW).
Lakshmi Energy and Foods Limited is power plant including AFBC BOILER (67 TPH*2) and Shin Nippon
turbine(15.75*2 MW).
Green Planet Energy private limited is power plant including TRAVELLING GRATE BOILER (30 TPH) and
Triveni turbine(7 MW).
ACADEMIC QUALIFICATION
YEAR
2013
2009
QUALIFICATION
B.Tech in Electronics and
Telecommunication Engg
XII Standard
INSTITUTE/BOARD
PADMANAVA COLLEGE
OF ENGINEERING, BPUT
Dalmia College, Rajgangpur
MARKS
(%)
65%
63%
2007
X Standard
Dalmia Vidya Mandir, Rajgangpur
63%
TECHNICAL SKILLS





Ladder logic & functional block programming of the PLC&DCS.
Creating new SCADA projects, database of tags, creating alarms &events.
Creating & editing graphics for DCS.
Knowledge of Microsoft office applications (MS word, Excel, PowerPoint).
Communication establishment between PLC, DCS, PC and SCADA.
PROJECTS UNDERTAKEN
1. HONEYWELL ML-200




END USER – SILVERTOAN PAPERS
LOCATION: MUZZAFARNAGAR(U.P)
DURATION – 19-OCT-2021 TO 29- OCT-2021.
OFSITE-SCADA&LOGICDEVELOPMENT,IOLIST, PANELTESTING.
2. Honeywell DCS C300.




END USER : M/s DHAMPUR SUGAR MILLS LTD
LOCATION: DHAMPUR(U.P)
DURATION – 1-OCT-2021 To 12-OCT-2021.
ONSITE – POWERPLANT(80TPH) SCADA AND LOGIC DEVLOPMENT, FIRMWARE UPDATE
3. Honeywell DCS C300.




END USER : M/s BHOLARAM PAPERS AND POWER
LOCATION: MUZZAFARNAGAR(U.P)
DURATION – 21-JULY-2021 To -21-AUGUST-2021.
ONSITE – POWERPLANT(80TPH) SCADA AND LOGIC DEVLOPMENT, FIRMWARE UPDATE
4. Honeywell DCS C300.




END USER : M/s BHOLARAM PAPERS AND POWER
LOCATION: MUZZAFARNAGAR(U.P)
DURATION – AUGUST-2021 To SEPTEMBER-2021.
ONSITE – PULPMILL(180TPD) SCADA AND LOGIC DEVLOPMENT, FIRMWARE UPDATE
5. Honeywell DCS C300.




END USER : M/s SILVERTOAN PAPERS
LOCATION: MUZZAFARNAGAR(U.P)
DURATION – 21-MAY-2021 To -24-JUNE-2021.
ONSITE – POWERPLANT(27TPH) SCADA AND LOGIC DEVLOPMENT, FIRMWARE UPDATE
6. HONEYWELL ML-200




END USER – PPBOILER
LOCATION: BEHROR(RAJASTHAN)
DURATION – 25-FEB-2020 TO 11- MARCH-2021.
OFSITE-SCADA&LOGICDEVELOPMENT,IOLIST, PANELTESTING.
7. Honeywell DCS C300.




END USER : M/s NIKITA PAPERS
LOCATION: SHAMLI(U.P)
DURATION – 21-JAN-2021 To -24-FEB-2021.
ONSITE – PULP MILL SCADA AND LOGIC DEVLOPMENT, FIRMWARE UPDATE
8. HONEYWELL ML-200




END USER – PPBOILER
LOCATION: LAKHIMPUR(UP)
DURATION – 25-DEC-2020 TO 11- JAN-2021.
OFSITE-SCADA&LOGICDEVELOPMENT,IOLIST, PANELTESTING.
9. FATEK PLC




END USER : M/s PATANJLI AYURVEDA LTD
LOCATION: PADARTHA (U.K)
DURATION – 03-SEPTEMBER-2020 To -05-SEPTEMBER-2020
ONSITE –6TPH BOILER LOGIC AND HMI WORKDONE.
10. Honeywell DCS C300.




END USER : M/s GARG DUPLEX)
LOCATION: MUZZAFARNAGAR(U.P)
DURATION – 19-AUGUST-2020 To -26-AUGUST-2020
ONSITE – ASH HANDLING LOGIC AND SCADA WORK DONE
FIRMWARE UPDATE.
11. Honeywell DCS C300




CLIENT: KR Papers Limited
LOCATION: SHAHJAHANPUR
DURATION – 10-JULY-2020 TO 04-AUGUST-2020.
ON SITE - PANEL CHARGE, Fibre optical Communication SCADA &
LOGICDEVELOPMENT,IOLIST, PANELTESTING, FIRMWARE UPDATE, FATDONE.
12. Honeywell DCS C300.





END USER : M/s SVP INDUSTRIES LIMITED(140KLPD MOLASSES BASED DISTELLERY PLANT)
Client: Ditap-V
LOCATION: Mansurpur
DURATION – 29-May-2020 To 30-JUNE-2020
ON SITE - PANEL CHARGE, MODBUS Communication SCADA &
LOGICDEVELOPMENT,IOLIST, PANELTESTING, FIRMWARE UPDATE,
FATDONE.
13. Honeywell PLC ML-200.




END USER – MARUTI PAPERS
LOCATION: SHAMLI(UP)
DURATION – 03-MAY-2020 TO 25- MAY-2020.
OFSITE-SCADA & LOGIC DEVELOPMENT, IOLIST, PANEL TESTING,
FIRMWARE UPDATE, FATDONE
ACTIVITIES AND ACHIEVEMENTS
 Successfully commissioned paper industry and distillery industry.
 Worked on autonomous tags to reduce the break downtime.
 Planning of the plant shut down jobs for doing the preventive maintenance of DCS.
PERSONAL PROFILE






Date of Birth
Sex
Marital status
Nationality
Language proficiency
Strengths
:
:
:
:
:
:
 Correspondence address
 Hobbies
:
:
15 May,1991
Male
Married
Indian
English, Hindi
Quick Learner, confident, dedicated to my work
and able to work under pressure.
Amravati Apartment, Baddi
Playing cricket and listening songs.
Date :Place:-
SANDEEP PATIYAL
Download