LEGO KOM CAMPUS
LEED-GENERAL CONTRACTOR INPUT
Projekt navn
LEGO KOM Campus
Projekt nr.
1100047581
Dokument type Technical Note
Dato
10.05.2022
Udfærdiget af
Martin Maribo
Kontrolleret af
Helle Lundsgaard Hansen
Godkendt af
Martin Maribo
1
CONTENT
1.
2.
3.
4.
5.
6.
Intro
Monthly Reports and update of documentation
Introduction to LEED
input by General Contractor
Documentation that must be supplied to the LEEDcertification
How and what is the General Contractor expected to deliver
for the various prerefquisites and credits
3
3
5
5
8
10
2
1.
INTRO
This document describes the LEED-requirements in addition to the LEED-requirements in the
contract between KG Hansen and LEGO. The document outlines regular monthly deliveries in
addition to the overall requirements for the LEED-Platinum-Certification of LEGO KOM Campus.
2.
MONTHLY REPORTS AND UPDATE OF DOCUMENTATION
Documentation format
All monthly documentation must be uploaded to LEGO’s online Project Management Platform.
SSp - Construction Activity Pollution Prevention
Template for Documentation as narrative and photo must be submitted to LEGO before start of
demolition or construction.
ESC plan (Erosion and Sedimentation Control Plan) must be developed, approved by LEGO, and
uploaded before start of demolition or construction.
MRp-c - Construction and Demolition Waste Management Plan
Template for Documentation as narrative and photo must be submitted to LEGO before start of
demolition or construction.
Construction and Demolition Waste Management Plan must be developed, approved by LEGO, and
uploaded before start of demolition or construction.
Construction and Demolition Waste Management Calculator must be uploaded at least monthly,
from start of demolition and construction on site.
MRc-Building Product Disclosure and Optimization—Environmental Product Declarations
Building products and EPD’s must be approved by LEGO prior to procurement.
BPDO Calculator (Building Product Disclosure and Optimization Calculator) must always be up to
date and must be uploaded at least monthly, from start of demolition and construction on site.
MRc-Building Product Disclosure and Optimization—Sourcing of Raw Materials
Compliant manufacturer documentation or third-party claim must be approved by LEGO prior to
procurement.
BPDO Calculator (Building Product Disclosure and Optimization Calculator) must always be up to
date and must be uploaded at least monthly.
MRc-Building Product Disclosure and Optimization—Material Ingredients
Documentation of chemical inventory (Sikkerhedsdatablade) for all products contributing toward
credit compliance. CE Mark documentation for alle products covered by EU harmonised standards.
BPDO Calculator (Building Product Disclosure and Optimization Calculator) must always be up to
date and must be uploaded at least monthly.
EQc-Construction Indoor Air Quality Management Plan
Template for Documentation as narrative and photo must be submitted to LEGO before start of
demolition or construction.
IAQ management plan (Indoor Air Quality Management Plan) must be developed, approved by
LEGO, and uploaded before start of demolition or construction.
3
Schedule of GC-deliveries
The General Contractor must update the schedule on a monthly basis
4
3.
INTRODUCTION TO LEED
LEED stands for Leadership Energy and Environmental Design, and is a certification system for the
design, construction and operation of sustainable buildings. Originally, LEED was developed for
the US market, but over time it has been developed and expanded to target the international
market as well. Since its origins, LEED has pushed construction in a more sustainable direction
with over 80,000 LEED-certified buildings.
LEED is managed by the U.S. Green Building Cuncil, U.S.-G. B.C, but you can find LEED-certified
buildings in more than 135 countries around the world. There is no version adapted to Danish
standards, but the LEED certification incorporates the European standards. Ongoing updates of
the LEED-certification aim to improve standard, encourage leadership, improve usability,
accessibility and collaboration on the platform and certification system. LEED, like BREEAM, has
its primary focus on indoor climate and environment, here by a focus on materials and energy
consumption.
LEED is a tool that can help construction focus on efficiency and leadership, thereby raising the
standard of construction for the 8 focus areas:
In connection with new construction, the certification process is divided into two parts; the design
phase and the construction phase. In the first phase, initial design concepts and the location of
the building must be submitted to GBCI (Green Business Certification inc.), which evaluates the
documents. The result of this assessment is a list that either approves or rejects the sustainability
initiatives used in the project. This initial evaluation allows the building owner to improve or
correct the relevant topics to an increased level of certification if desired. The next step concerns
the materials used in the construction as well as the construction process itself. At the end of the
construction phase, documents are submitted for review by GBCI. If documentation is incomplete
or lacks information, the project has a period of 25 days to obtain and modify the documentation.
More information about LEED can be found at https://www.usgbc.org/leed
4.
INPUT BY GENERAL CONTRACTOR
The schedule shows prerequisites and credits. Prerequisites must be met to achieve LEEDcertification. Credits can achieve points. The sum of total points decides the level of the LEEDcertification. Certification: 40 to 49 Points; Silver: 50 to 59 Points; Gold: 60 to 79 points;
Platinum: 80 to 110 Points.
5
Possible
points
Target
Integrative Process
1
Credit
1
1
Integrative Process
Location and Transportation
Credit
Credit
Credit
Credit
Credit
Credit
Credit
Sensitive Land Protection
High Priority Site and Equitable Development
Surrounding Density and Diverse Uses
Access to Quality Transit
Bicycle Facilities
Reduced Parking Footprint
Electric Vehicles
Sustainable Sites
Prereq
Credit
Credit
Credit
Credit
Credit
Credit
Construction Activity Pollution Prevention
Site Assessment
Protect or Restore Habitat
Open Space
Rainwater Management
Heat Island Reduction
Light Pollution Reduction
Water Efficiency
Prereq
Prereq
Prereq
Credit
Credit
Credit
Credit
Outdoor Water Use Reduction
Indoor Water Use Reduction
Building-Level Water Metering
Outdoor Water Use Reduction
Indoor Water Use Reduction
Optimize Process Water Use
Water Metering
Energy and Atmosphere
Prereq
Prereq
Prereq
Fundamental Commissioning and Verification
Minimum Energy Performance
Building-Level Energy Metering
Prereq
Fundamental Refrigerant Management
Credit
Enhanced Commissioning
Credit
Optimize Energy Performance
Credit
Advanced Energy Metering
Credit
Grid Harmonization
Credit
Renewable Energy
Credit
Enhanced Refrigerant Management
1
16
4
1
1
0
0
0
0
1
1
1
10
0
0
1
1
1
7
Required
Required
1
1
1
1
1
2
1
11
1
1
2
1
9
Required
Required
Required
2
6
0
1
33
Required
2
6
0
1
31
Required
Required
Required
Required
Required
Required
6
Required
6
18
0
0
5
5
1
(X)
Required
18
1
X
1
Required
Required
Input by
GC
(X)
1
1
6
Materials and Resources
Prereq
Credit
Credit
Storage and Collection of Recyclables
Building Life-Cycle Impact Reduction
Environmental Product Declarations
Credit
Sourcing of Raw Materials
Credit
Material Ingredients
Construction and Demolition Waste Management
Credit
Indoor Environmental Quality
Prereq
Prereq
Credit
Credit
Credit
Credit
Credit
Credit
Credit
Credit
Credit
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke Control
Enhanced Indoor Air Quality Strategies
Low-Emitting Materials
Construction Indoor Air Quality Management
Plan
Indoor Air Quality Assessment
Thermal Comfort
Interior Lighting
Daylight
Quality Views
Acoustic Performance
Innovation
Credit
Credit
Credit
Credit
Credit
Credit
Credit
Innovation
Purchasing Lamps
Green Building Education
WELL Features
Occupant Comfort Survey
Exemplary Performance: Environment Product
Declarations
Exemplary Performance: Material Ingredients
LEED Accredited Professional
Regional Priority
Credit
Regional Priority: Thermal Comfort
Credit
Regional Priority: Protect or Restore Habitat
Credit
Regional Priority: Light Pollution Reduction
Credit
Regional Priority: Optimize Energy Performance
Credit
Regional Priority: Sensitive Land Protection
Credit
Regional Priority: Rainwater Management
TOTALS
Possible Points:
13
9
Required
Required
1
1
X
1
X
4
1
1
2
16
4
1
X
2
X
13
Required
Required
2
2
Required
2
Required
2
1
1
1
1
2
2
2
1
0
2
1
0
1
1
1
1
1
1
1
1
4
4
1
1
1
1
0
0
110
X
1
1
1
X
2
6
1
X
2
6
1
X
X
X
1
1
1
0
0
84
7
5.
DOCUMENTATION THAT MUST BE SUPPLIED TO THE
LEED-CERTIFICATION
Certification matrix
The Certification-Matrix is shared online on Sharepoint. The various team-members of the project
are marked with “X”, where they are expected to give input. The Matrix gives some information
about the prerequisites and credits, and it also links to explanation on the USGBC-webpage.
Figure 1, Screenshot of matrix
LEED manuals
v4-manual:”LEED_BDC_FINAL.pdf”
v4.1-manual: “LEED_v4.1_BD_C_Guide_102521.pdf”
Here you can read more in detail about requirements for prerequisites and credits, and what
reference standards are used.
Our project is certified after the v4.1-manual. The v4.1-manual refers to sections of the v4manual, where the prerequisites and credits have not been changed.
Figure 2, Screenshot of LEED v4.1 manual
8
Figure 3, Screenshot of LEED v4 manual
Sample Forms
Each prerequisite and credit has a sample form, that need to be filled in online together with the
required documentation.
A randomly filled in sampla form is downloaded as pdf, to be used as guidance to see
requirements for documentation.
Figure 4, Screenshot of sample form
9
Documentation language
All documentation must be compiled in English for GBCI (Green Business Certification Inc.).
This applies to LEED-documents to be filled in (sample forms and calculators) and own or project
documents as drawings and descriptions. Product documentation must also be submitted in
English or translated.
Relevant sample forms and calculators for the various team members of the project
Is filed in the supplementary folders for the project. For team members outside Ramboll, will have
their file sent as a Zip-file.
6.
HOW AND WHAT IS THE GENERAL CONTRACTOR
EXPECTED TO DELIVER FOR THE VARIOUS
PREREFQUISITES AND CREDITS
SSp - Construction Activity Pollution Prevention
Develop ESC-Plan (Erosion and Sedimentation Control Plan). Construction drawings can also be
used to describe erosion and sedimentation control measures implemented on site
Describe how the local erosion and sedimentation control standards and codes are equal to or
more stringent than the requirements of the 2017 EPA CGP.
Describe how the project complies with the requirements of local erosion and sedimentation
control standards and codes.
EAp - Fundamental Commissioning and Verification
The General Contractor must liaise with the Cx-Agent. Construction checklists must be followed.
EAc – Enhanced Commissioning
The General Contractor must liaise with the Cx-Agent with regards to Monitoring-Based
Commissioning. General Contractor shall follow the Cx plan and provide all required information to
the Cx-Agent, perform prefunctional and functional tests.
MRc - Environmental Product Declarations
Fill products into the MR Building Products Calculator. The GC is responsible for reaching at least
40 EPD’s, from at least 10 different manufacturers.
MRc - Sourcing of Raw Materials
Fill products into the MR Building Products Calculator. The GC is responsible for reaching 15% of
total material cost, that meet sustainable extraction criteria.
MRc - Material Ingredients
Fill products into the MR Building Products Calculator. The GC is responsible for reaching at least
40 products from at least 10 different manufacturers, that contribute toward credit compliance.
Documentation of chemical inventory for all relevant products must be uploaded.
MRc - Construction and Demolition Waste Management
Develop Construction and Demolition Waste Management Plan.
Compile documentation verifying the diversion rate of commingled waste.
Compile documentation demonstrating at least 50% diversion from landfill.
Compile documentation demonstrating less than 75 kg/m² waste generation. (<50kg/m² for
exemplary performance point).
Fill in the “v4_Construction and Demolition Waste Management Calculator_v02.xlsm”
10
EQc – Low Emitting Materials
Make sure that all materials used for paints and coatings, adhesives and sealants, flooring, wall
panels, and ceilings meet the VOC emissions evaluation.
Complete the Low-Emitting Materials Calculator, with all of the products contributing toward credit
compliance.
EQc – Construction Indoor Air Quality Management Plan
Develop IAQ Management Plan (Indoor Air Quality Management Plan).
Plan must prohibit smoking in and around the buildings within 7,5 meters from the building.
Compile photos and narrative documenting each of the IAQ measures implemented.
EQc – Indoor Air Quality assessment
Compile test report according to the sample form.
INc – Purchasing Lamps
Make sure to choose light fixtures that do not contain mercury.
INc - Exemplary Performance: Environment Product Declarations
Achieve 40 different products from 10 different manufacturers (MRc-Environmental Product
Declarations)
INc - Exemplary Performance: Material Ingredients
Achieve 40 different products from 10 different manufacturers (MRc-Material Ingredients)